In operation management, planning and control are usually treated together as one subject, as
difficult to differentiate between these two activities. Planning is concern with action taken prior
to an event, typically arranging for resources to be provided in order to achieve a desire outcome.
Control is concern with remedial action taken in response to things not occurring as planned in
order to avoid an undesirable outcome. So control is concern with understanding what is actually
happening in the operation, deciding whether there is a significant deviation from what should
happening, and if necessary making changes to the operation. The control loop and it comprise the
o Plan: this would include a statement of what the operation what expected to produce over
a given period of the time. An operation plan would also consider what resource are
required to achieve the required level of output. When operating plans are expressed in
financial terms, as they frequently are, they are usually termed budget.
o Measurement: the first step in exercising control over the system is to measure its output
over the relevant time period. Whilst a number of different measure might be taken, they
would certainly include the actual volume or quantity of output achieved, as well as the
mix of different product. It is likely that the quantities of resources used in carrying out the
o Comparison: the next stage would be to compare what actually took place with what was
planned to the happen. It is important to compare like with like when comparing the actual
to the plan or budget accountants have devised various technique which help to do this. A
thorough analysis of any differences should help provide an understanding of why the plan
and then taking it. This depends in the analysis of any differences between actual and plan.
If the differences are small, there may be no need for action to be taken. Significant
differences between planned and actual would usually prompt some action to try to remedy
the situation. Operation manager need to realize which factors are in the immediate control
over what timescales. These will set to the limit to their control action.
There are many reason why a plan is not achieved. Customer demand may change. In particular,
the total volume, the mix of goods and services supplied, and their taming may all change with
significant impact cost. Although many of these factors are outside the control of the managers
responsible for the operations involved, it is they who must undertake the planning and control of
the resources required for the transformation process. These resource differ in their nature. They
People in the transformation process are either staff or costumer. Planning and
controlling staff is a vast area of study in its own right, usually covered by the term “human
resource management” in practice, most operation manager find that planning and
controlling staff occupies most of their time, and is a central concern of their work. In many
service industry, costumers are themselves part of the transformation process. However,
materials do not complain, nor do they take their custom elsewhere if they are kept waiting
Materials in the transformation process can either be those that are being processed
or those that are being consumed in the process. There are few operations that do not
involve material resource inputs of one or other of these categories. Although materials do
not complain about being stored before or during processing, there are costs involved in
storing materials. Most organizations seek ways to minimize those costs, in ways that do
technology, particularly associated with the internet are having a dramatic impact in many
operations.
Equipment and the facilities in which it is housed are usually fixed assets, not being
used up immediately but rather over many years. Issues affecting the design and choice
of facilities and equipment are discussed in Chapter 5 and 6. Facilities and equipment
usually the capacity of the operations process and cannot be changed very easily or quickly.
Planning and controlling equipment is thus likely to involve much longer timescales than
The success of any operation depends on how these resources are managed, both in the short-
term and the long-term. Application of the principles of the control loop can deepen operation
managers’ understanding of this task. However, they must also consider the different
These are typically long-term investment decisions affecting the organization’s facilities,
equipment and supply network that will determine its operating capacity. Such decisions
usually involve large-scale capital expenditure, for example setting up completely new
facilities on new site. It can typically take many months or even years before such
This level planning starts to consider in detail how the organization’s operation will
meet the demand for its products and services over the medium-term. It typically involves
attempting to match the total operation capacity of the organization to the demand forecast
basis and on a facility-by-facility basis, but is unlike to go into product mix detail at this
stage. The other possibility is that there may be insufficient demand for existing capacity,
used as the generic term to describe the activity of building up a detail a plan to show how
planning doesn’t usually consider individual product, the MPS does. As such, it works
from the details of individual customer orders and sales forecast by product line. Armed
with the information and knowledge of the operation capacity, the scheduler attempts to
match available supply with demand, using resources as efficiently as possible to meet
customer demand. This is usually a trial and error process via so-called “rough cut”
capacity planning.
Activity schedule (1-4 weeks)
The role of activity scheduling is to develop the MPS into sufficient detail so that
work can be assigned on a daily basis to every work center. The schedule will typically
provide details of when individual jobs are required to be started and finished (sequencing),
their route through different stage of the operation process, and what task will be assigned
to each work center. Sequencing is concerned with decisions about how to prioritized the
exact order of work at each work center. ‘what should be done next?’ some alternative are:
Shortest processing time ~ always do the next job available which has
Minimum slack time ~ ‘slack time’ is the time remaining until the due date
less the remaining process time. Minimizing slack time is aimed at always
Minimum planned start time ~ using planned start times from existing
schedules, always process the job with the minimum planned start time first.
Minimum due date ~ always process the job with the earliest due date first.
There are other dispatch rules. Which one is usually used in organization depends on what
criteria are considered most important. Some rules are more likely to achieve higher
resource utilization, some lower costs, some greater in-the job completion rates, etc.
Expediting (real time)
This is the term usually used to refer to intervention in day-to-day operation in order
operations planning and activity scheduling are carried out, there will inevitably be reasons
why such interventions may be required. Such as a customer makes change to an order,
there is an unexpected material storage due a problem with supplier, a piece of equipment
break down and so on. Expediting is perhaps best considered to be a control, rather than a
One of the main objectives of planning and control is to meet customer demand. In essence,
there are really only two ways in which an operation can respond to costumer’s demand: product-
order from a customer. Product-to-stock approach has the advantage of reducing the risk of not
being able to meet customer demand as the arise. Product-to-order, the necessary resources in place
There are two basic philosophies to exercising control at shop-floor level in any operating
Supply Push
This is the approach that has traditionally dominated attitudes to operation control,
particularly in Western country. This approach is based on the assumption that the
performance of any system can be optimized by optimizing the performance of the sub-
system that makeup the overall system. It aims to do this by controlling the activities of
Demand Pull
in recent years. This is demand-pull, which is the basis, of the ‘kanban’ system of control
and of the just-in-time approach to planning and control. It aims to optimized the
performance of the whole system irrespective of the performance of any one sub-system.
The basis of this approach is that each work center should only produce what is required
by the next process in the next time period. Its instructions come directly from the work
INVENTORY MANAGEMENT
The planning and control of material is not just matter for organization engaged in
manufacturing. Many service organizations also use materials even if their operation are
organization not use materials in any its operations. One of the main decisions for all user of
material is what level of stock to hold. The objective of materials management is to balance the
advantages of maintaining a high enough stock level to ensure the smooth running of the operation
against the disadvantage of the high costs associated with high stock levels. There are 3 types of
stock; raw material, work in process, and finish goods. Most operation, whether service or
manufacturing, are also likely to require item which are used in the operation process but do not
themselves form part of the output process. These include spares and other maintenance item for
equipment, work clothing, consumable, tools, etc. these are often referred to as MRO
(maintenance, repair, and operating) item. The reason for holding stock are likely to vary according
To buy when prices are low or before a known or anticipated price rise
marketing activity.
There is generally some degree uncertainty about the demand for materials within most operation,
due to uncertainty in demand for the final product or service in the marketplace that the
Independent demand and dependent demand. Independent demand is where demand for an item
occurs separately from that for any other item. Finish goods typically exhibit independent demand
which is normally determined by market forces. Similarly, with many MRO item, demand for
which often appears to exhibit a random pattern due to vagaries their use by the people and
equipment in operation. Approaches to stock control for independent demand item centers on
forecasting likely demand and maintaining a suitable level of stock to ensure customer can be
supplied on demand. Dependent demand, on other hand, is the demand that is linked to demand
another item. So, for the example, motor car manufacture will know how many door, wheels, seats
etc. understanding whether demand is independent and dependent can help determine what
The main aim in managing independent demand item is to ensure that stock do not run out. The
main requirement of a stock control system in such circumstances is to determine when and how
much order form supplier. There are basically two kinds of these so-called order point system.
Reorder Level System in this system, stock levels are continuously monitored, which requires
that records ae constantly update in real-time. Cyclical Review System in this system, stock level
The optimum quantity of any item that should be ordered from a supplier is known
as the economic order quantity (EOQ). This is commonly used to calculate the re-order
EOQ= √(2AS/RV)
S= annual demand
R= stockholding cost
An analysis of the annual usage value of stock items allow inventory to be classified into
3 board categories:
Class A: the small proportion (typically 10%) of the item which account for the
Class B: the middle proportion (say the next 20%) of the item which account for
Class A: the large proportion (say 70%) of the item with little value (say 10% of
cost)