Content: The training consists of the instructions of the CFB boiler technology and
auxiliary equipment as follows; lay-out, design data, construction,
operation, safety and typical maintenance.
Time: Training courses are carried out before commissioning period in October
2005.
This document is the exclusive intellectual property of Kvaerner Power Oy and is furnished for the sole purpose of operating and maintaining
of the specific project, and re-use of the document for any other project or purpose is prohibited. The document or the information shall not
be reproduced or copied, or disclosed to a third party without prior written consent of Kvaerner Power Oy.
Time: During commissioning period; from 16.01.2006 until start of the test run of
the boiler.
Participants: Several small training groups / Pre-trained operators, field operators, shift
leaders and maintenance personnel.
LUNCH BREAK
P.M.
2.5 CFB- boiler interlocks Mr. Eero Karru 13.00… 14:30
• Main interlocks Mr Timo Anttonen
• Interlocking diagrams and
check list
2.6 Sequences Mr. Eero Karru 15.00… 16:30
• Function of start and stop
sequences in DCS
2.7 Evaluation test Mr Timo Anttonen 17:00 .... 18:00
• Written questions from Mr. Eero Karru
lessons during training days
1 and 2
• Talking through the right
answers and discussions
about main items