Asiakirjan nimi - Name of Document Tunniste - Identification Rev.

10.8 PI-DIAGRAMS CFBM-582-1 0

Osasto - Department Kohde - Subject Sivu - Page

Power Generation RAPP PB3 PROJECT 1 (2)


Systems CFB MULTIFUEL BOILER

10.8 PI-DIAGRAMS

Feedwater tank T582-00007 rev. 9 25.08.2005


Feedwater pumps T582-00008 rev. 8 22.06.2005
Economizers T582-00009 rev. 6 11.02.2005
Drum and furnace walls T582-00010 rev. 8 22.06.2005
Second pass walls, primary and secondary
T582-00011 rev. 7 11.03.2005
superheaters
Tertiary superheater and main steam pipe T582-00012 rev. 7 11.03.2005
Sootblowing system T582-00013 rev. 7 22.06.2005
Blowdown system T582-00014 rev. 10 25.08.2005
Chemical station T582-00015 rev. 8 22.06.2005
Sample station T582-00016 rev. 6 11.03.2005
Combustion air T582-00017 rev. 7 22.06.2005
Cyclones T582-00018 rev. 7 22.06.2005
Flue gas T582-00019 rev. 7 22.06.2005
Steam coil airpreheater T582-00020 rev. 7 11.03.2005
Fluo seals T582-00021 rev. 7 22.06.2005
Fuel silos, front wall T582-00022 rev. 8 11.04.2005
Fuel feeding, front wall T582-00023 rev. 7 11.03.2005
Sand feeding equipment T582-00024 rev. 4 22.06.2004
Fuel feeding, rear wall T582-00025 rev. 7 11.03.2005
Heavy oil and diesel oil units T582-00026 rev. 9 22.06.2005
Heavy oil and diesel oil to burners T582-00027 rev. 7 11.04.2005
Start-up burners 1-3 T582-00028 rev. 6 11.02.2005
Start-up burners 4-6 T582-00029 rev. 6 11.02.2005
Limestone drying T582-00030 rev. 9 25.08.2005
Limestone feeding T582-00031 rev. 8 11.04.2005
Bottom ash handling T582-00032 rev. 9 22.06.2005

0 2005 - 08 - 30 T. Anttonen
Muut. Pvm Laatinut Pvm Tarkastanut Pvm Hyväksynyt
Rev. Date Prepared by Date Reviewed by Date Approved by
KLY-1 1997-05 P:\582-RAPP-PB3\int\Kayttoonotto\käyttöohje\Operation and Maintenance Manuals\Folder
2\10.8 PI-diagrams list.doc
This document is the exclusive intellectual property of Kvaerner Power Oy and is furnished for the sole purpose of operating and maintaining of the specific project, and re-use of the document for any other project or
purpose is prohibited. The document or the information shall not be reproduced or copied, or disclosed to a third party without prior written consent of Kvaerner Power Oy.

© Kvaerner Power Oy, Tampere, Finland 2005


Asiakirjan nimi - Name of Document Tunniste - Identification Rev.

10.8 PI-DIAGRAMS CFBM-582-1 0

Osasto - Department Kohde – Subject Sivu - Page

Power Generation RAPP PB3 PROJECT 2 (2)


Systems CFB MULTIFUEL BOILER

Fly ash handling I, ESP ash conveying equipment T582-00033 rev. 4 11.02.2005
Fly ash handling II, 2nd and 3rd pass ash and silo T582-00034 rev. 6 11.03.2005
Cooling water and auxiliary system T582-00035 rev. 9 22.06.2005
Fire water T582-00036 rev. 4 11.02.2005
Instrument and pressure air distribution T582-00037 rev. 8 11.04.2005
Legend sheet T582-00038 rev. 3 11.02.2005
Oil lubrication units of the ID fans T582-00039 rev. 4 11.04.2005
Oil lubrication unit of the recirculation fan T582-00040 rev. 3 11.04.2005
Oil lubrication units of the primary air fans T582-00041 rev. 3 11.04.2005
Oil and cooling water of the feedwater pump 1 T582-00042 rev. 1 22.06.2005
Oil and cooling water of the feedwater pump 2 T582-00043 rev. 1 22.06.2005
Oil and cooling water of the feedwater pump 3 T582-00044 rev. 1 22.06.2005
Oil and cooling water of the feedwater pump 4 T582-00045 rev. 1 22.06.2005

This document is the exclusive intellectual property of Kvaerner Power Oy and is furnished for the sole purpose of operating and maintaining of the specific project, and re-use of the document for any other project or
purpose is prohibited. The document or the information shall not be reproduced or copied, or disclosed to a third party without prior written consent of Kvaerner Power Oy.

© Kvaerner Power Oy, Tampere, Finland 2005