Вы находитесь на странице: 1из 2
Mannheim GmbH Schweiftechnische Lehr- und Versuchsanstalt Staatlich anerkannt als Ausbildungs: Tet CLR Sacco CGemeinschafsinstiu der Stat Mannheim, des Devlschen Verbandes fur Schweitenu, verwanate Verfahren Vu. de Indutre-u. Hanglekarmer Rhein Neckar in Man Postecn 1217 2 s8008 annem =” Housacrsse: Kah Xohwtz-Svatie 18 Nevertisdplam) “6850 Mannhem " Tlsfon(3") 20 Ge + Teles (0821) 9004-292 Ineret pin sherananeln de Eat! sisivranhein de of manufactures to weld steel structures according to 18800-7:2008-11 Itis hereby certified that the firm inthe plant Level ,,C“ Technocraft Industries (INDIA) Ltd. (Tube & Scaffolding Division) In-421401 Murbad, A-4/1, M.LD.C., Dist-Thane, Maharashtra is qualified to carry out welding works in the following fields of application: DIN-Standards/Regulations Welding Processes Base Materials, Restrictions/Extensions Welding Supervisor (Name, christian name, date of bith, profession) Deputy (Name, christian name, date of bith, profession} Remarks Verification Certificate No. Validity Issued on General requirements po. DIN 1800-7 ISO 4036:2011 - 135, metal-active gas welding (partly and fully mechanized metal-active gas welding tMAGC, vMAGC 180 4036:2011 - 21, spot welding $235, $275, $355 complying to EN 1025-2 according to the valid "Bauregelliste” This verification is valid to weld scaffolding, props ‘and equivalent items fabricated in series. Joshi, Shashidhar, 18.02.1977, Jadhav, Keshav, 25.11.1980, see reverse 23276 2012-08-12 till 2013-06-01, 2013-01-03 Krameride SAP, SAP. ‘Schweiftechnische Lehr- und Versuchsanstalt Mannheim GmbH Inspection department A Nhe ipl-Ing. (FH) G. Kramer, IWE Goneral requirements Before carry-out welding works this certificate — either as certified copy or photo copy ~ should be submitted to the competent authorities issuing the building permit. For advertising or other purposes this certificate may only be duplicated or published in full. The wording of the advertising material must not be in contradiction to this certificate, If the welding supervisor(s) mentioned in this certificate are no longer with the company, if there are changes in the welding process or in essential parts ofthe facities necessary for the welding works, the inspecting authority has to be informed. If considered necessary a new inspection of the company will take place, . In case of doubt regarding the verification of the company on inspection and checkups in the plant by the inspecting authority without prior announcement is being reserved. ‘This certificate may at any time and with Immediate effect be withdrawn — without compensation — supplemented ‘or modified ifthe conditions under which this certificate has been issued have changed or ifthe requirements laid down in this certificate have not been adhered to. . At least two months before expiry a new application has to be submitted to the inspecting authority if the qualifca- tion should be certified once more, Remarks: ‘This verification replaces the prior version issued on August 11", 201 Wa cc. 4. Applicant (Original) 2. Principal Building Inspection Authority of the Country 3. File

Вам также может понравиться