Date: 17-Sep-18
38
BSBG
Response
Response responded & AFC
Sl No: NCR No. Description of NCR Issue Date Required On or Closed On Status Remarks
Received on returned to AFC resubmitted on
Before
on
2 QAQC-NCR-002 Pile cap cast without obtaining relevant approvals from MEP Consultant 12-Jul-18 19-Jul-18 1-Sep-18 Open under review with BSBG
corrective action is acceptable by
3 QAQC-NCR-003 Onsite Water addition to ready mix concrete for pile cap 12-Jul-18 19-Jul-18 15-Jul-18 10-Sep-18 Open
BSBG
corrective action is acceptable by
6 QAQC-NCR-006 Core wall Concrete Honeycomb & Unacceptable Repair Method 30-Jul-18 6-Aug-18 02-Aug-18 10-Sep-18 Open
BSBG
7 QAQC-NCR-007 Lift Pit without drainage provision 19-Aug-18 26-Aug-18 Open
Zone 1 – Grid A/1-6-Pile cap and tie beam-Soil erosion noticed under the casted corrective action is acceptable by
8 QAQC-NCR-008 23-Aug-18 30-Aug-18 28-Aug-18 10-Sep-18 Open
footing BSBG
Casted core wall, 2nd lift Nos. 5, 6 & 7 at Zone 1 without approved IRF & Shear Wall corrective action is acceptable by
9 QAQC-NCR-009 27-Aug-18 3-Sep-18 09-Sep-18 10-Sep-18 Open
(GL-12/C-D) BSBG
Erected precast column with multiple in-situ drilling and not according to submitted
10 QAQC-NCR-010 30-Aug-18 6-Sep-18 Open
design calc
Back Blinding against shoring piles proceeded without approved Design
11 QAQC-NCR-011 30-Aug-18 6-Sep-18 Open
Calculations & method statements
Protection Screed Cast Noticed Without Approval of Final Water proofing Inspection-
12 QAQC-NCR-012 2-Sep-18 9-Sep-18 16-Sep-18 Open under review with BSBG
Zone 06Area
Protection Screed Cast Noticed Without Approval of Final Water proofing Inspection-
13 QAQC-NCR-013 2-Sep-18 9-Sep-18 16-Sep-18 Open under review with BSBG
Zone 05Area
Delivered and installed precast columns not according to design calculation and
14 QAQC-NCR-014 4-Sep-18 11-Sep-18 Open
drawing
15 QAQC-NCR-015 Installation of pre-stressed beam on rejected & recently grouted precast columns 4-Sep-18 11-Sep-18 Open
Date: 17-Sep-18
38
BSBG
Response
Response responded & AFC
Sl No: NCR No. Description of NCR Issue Date Required On or Closed On Status Remarks
Received on returned to AFC resubmitted on
Before
on
corrective action is acceptable by
30 QAQC-NCR-030 Quality of Work at Zone-1 9-Sep-18 16-Sep-18 16-Sep-18 16-Sep-18 Open
BSBG
31 QAQC-NCR-031 Casted column at Zone-01, Basement; GL A-E/1 without inspection 10-Sep-18 17-Sep-18 Open
32 QAQC-NCR-033 Quality of backfilling (Zone 5) 11-Sep-18 18-Sep-18 12-Sep-18 Open under review with BSBG
33 QAQC-NCR-034 Quality of backfilling (Zone 3) 11-Sep-18 18-Sep-18 12-Sep-18 Open under review with BSBG
34 QAQC-NCR-035 Quality of backfilling (Zone 2) 11-Sep-18 18-Sep-18 12-Sep-18 Open under review with BSBG
35 QAQC-NCR-036 Quality of backfilling (Zone 1) 11-Sep-18 18-Sep-18 12-Sep-18 Open under review with BSBG
38 QAQC-NCR-039 Quality of backfilling (Zone 6) 11-Sep-18 18-Sep-18 12-Sep-18 Open under review with BSBG
39 QAQC-NCR-040 Chipped-off top of pile cap for installation of precast column exposing the rebar 11-Sep-18 18-Sep-18 Open