Main Output Output Tools

D Double A (DAA)

Excavator &
Wheel Loader Camera

Video Recorder

Time Motion Study (TM

Project Monitorin
Dumptruck Camera

Video Recorder

Time Motion Study (TM

Bulldozer Camera

Video Recorder

CBR analysis

OFR Analysis
OFR DCP test
Camera
OFR DCP test

Video Recorder

Seismic analysis
Optimum Fleet
Recomendation
OFR Analysis
OFR Seismic Test

Camera

Video Recorder

OFR Analysis
OFR Survey Test Camera
Video Recorder

OFR Analysis

Camera
Site/Project
Project Evaluatio
Evaluation

Video Recorder
Database
1. Product information and competitor comparation
data
2. Cycle Time Standard of Excavator & Wheel Loader
3. Primary & Secondary Time Standard of Excavator &
Wheel Loader based on working type
1.Material Characteristics Information (based on
mineralogy characteristics, hardness, fragmentation,
etc.)
2. Bench Height Standard for Excavator & Wheel
Loader
3. Stockpile Dimension (Heigth & angle) standard of
wheel loader
4. Bucket Contaminent test information of Excavator &
Wheel
1. Loader
Product information and competitor comparation
5. Working Application standard of Excavator & Wheel
data
Loader
2. Cycle Time Standard of Dumptruck
3. Primary & Secondary Time Standard of Dumptruck
based on working type
1.Material Characteristics Information (based on
mineralogy characteristics, hardness, fragmentation,
etc.)
2. Front width standard of dumptruck
3. Grade standard of dumptruck
4. Hauling Distance information of Dumptruck
5. Vessel Contaminent Test information of Dumptruck
6. Working Application standard of Dumptruck
1. Product information and competitor comparation
data
2. Cycle Time Standard of Bulldozer
3. Primary & Secondary Time Standard of Bulldozer r
based on working type
1.Material Characteristics Information (based on
mineralogy characteristics, hardness, fragmentation,
etc.)
2. Dozing area of bulldozer
3. Dozing distance of bulldozer
4. Working Application standard of Excavator & Wheel
Loader
1. Dumptruck ground pressure standard & analysis
2. Excavator ground pressure standard & analysis
3. DCP form & graphic generator
1. Price list of Unit & tyre
2. Unit Production data
3. Fleet matching, productivity, and cost analysis
1.Material Characteristics Information (based on
mineralogy characteristics, hardness, fragmentation,
etc.)
2.Product information and competitor comparation data
3. Working Condition List data & standard
1.Material Characteristics Information (based on
mineralogy characteristics, hardness, fragmentation,
etc.)
2.Product information and competitor comparation data
3. Working Condition List data & standard
1. Seismic speed form
2. Rippability & ripping productivity standard of
Bulldozer
3. Diggability standard of excavator

1. Price list of Unit & tyre


2. Unit Production data
3. Fleet matching, productivity, and cost analysis
1.Material Characteristics Information (based on
mineralogy characteristics, hardness, fragmentation,
etc.)
2.Product information and competitor comparation data
3. Working Condition List data & standard

1. Price list of Unit & tyre


2. Unit Production data
3. Fleet matching, productivity, and cost analysis
1.Material Characteristics Information (based on
mineralogy characteristics, hardness, fragmentation,
etc.)
2.Product information and competitor comparation data
3. Working Condition List data & standard
1. Price list of Unit & tyre
2. Unit Production data
3. Fleet matching, productivity, and cost analysis
1. Working Condition List data & standard
2. Grade Resistance standard
3. Rolling Resistance standard
4. Road width standard
5. Front width standard
6. Dumptruck Hauling Distance
7. Bench height standard
8. Dozing Distance
9. Material Characteristics Information (based on
mineralogy characteristics, hardness, fragmentation,
etc.)
No. Page Bagian Sub Bagian (if available) Drop Down Box Output
1. Project Monitoring
1 Project Type - 2. Optimum Fleet Recommendation
3. Project Evaluation
1. Komatsu Excavator PC45 - PC8000
2. Komatsu Wheel Loader WA150 - WA1200
3. Komatsu Dumptruck HD325 - 930E
4. Komatsu Bulldozer D31 - D375
5. Komatsu Motor Grader GD511 - GD825
2 Job registration Machine Type
6. UD Trucks CWB45ALDN - Quester
7. Scania P310 - P580
8. Tadano Crane
9. Bomag BW, BM, etc
10. Komatsu Forest
Day 1 ~ 31
3 Month January - December
Project Start & End Year 2000 - 2999
Day 1 ~ 31
4 Time Motion Study Test Date Month January - December
Dumptruck Year 2000 - 2999
5 Material Type Terlampir
Day 1 ~ 31
6 Time Motion Study Test Date Month January - December
Excavator Year 2000 - 2999
7 Material Type Terlampir
Day 1 ~ 31
8 Time Motion Wheel Test Date Month January - December
Loader Year 2000 - 2999
9 Material Type Terlampir
10 Dynamic Cone Penetro Day 1 ~ 31
Test Date Month January - December
Year 2000 - 2999
11 Dynamic Cone PenetroTest Position - 1. midle
2. Slightly Side
3. Side
12 Dynamic Cone PenetroMaterial Type Terlampir
13 Dynamic Cone PenetroRoad type Mining 1. Overburden Hauling Road
2. Coal Hauling Road
3. Etc.
Construction 1. Jalan Desa
Material Type Drop Down Box

Material Name Sub Name


eet Recommendation Basalt
Bauxite
Caliche
Carnotite, Uranium Ore
Cinders
Clay
Clay & Gravel
Coal Anthracite
Bituminous
Decomposed Rock 75% Rock, 25% Earth
50% Rock, 50% Earth
25% Rock, 75% Earth
Earth Dry
Wet
Loam
Granite
Gravel
Gypsum
Hematite, Iron ore
Limestone
Magnetite, Iron ore
Peat Dry
Wet
Pyrite, Iron Ore
Sand Dry
Dump
Wet
Sand & Clay Loose
Compacted
Sand & Gravel Dry
Wet
Sandstone
Slag
Snow Dry
Hauling Road Wet
Stone
Taconite
Top Soil
Trap rock
Specific Gravity (ton/m3) Swell Factor
Bank Loose (LCM/BCM)
2.95 1.7 0.58
1.9 1.42 0.75
2.26 1.25 0.55
2.2 1.63 0.74
0.86 0.56 0.65
1.8 1.45 0.81
2 1.45 0.73
1.3 1 0.77
0.74 0.59 0.80
2 1.75 0.88
2.1 1.75 0.83
2.2 1.65 0.75
1.8 1.4 0.78
2 1.6 0.80
1.54 1.25 0.81
2.8 1.6 0.57
2.17 1.93 0.89
3.17 1.81 0.57
3.5 2 0.57
2.8 1.6 0.57
5.05 2.9 0.57
0.65 0.45 0.69
1.9 1.15 0.61
3.03 2.85 0.94
1.6 1.42 0.89
1.9 1.69 0.89
2.08 1.84 0.88
2.02 1.6 0.79
- 2.4
1.93 1.72 0.89
2.23 2.02 0.91
2.7 1.55 0.57
2.94 1.75 0.60
- 0.13
- 0.52
2.67 1.6 0.60
2.53 1.76 0.70
1.37 0.95 0.69
2.4 1.7 0.71
Contoh Kasus (Cycle Time in Seconds)
Loading Pass Payload Hauling LP-DP Spot at Dump Dumping Returning DP-LP

60 5 93.2 320 35 42 287

58 4 92.7 333 32 40 278

63 4 92.3 317 42 39 269

67 5 93.5 332 33 59 302

62 6 93 325 48 54 315

Preview Hasil
Primary Time :
Secondary Time :
Total Time :
Ritase :
Average
Activity
(minutes)
Loading 1.08
Hauling LP - DP 5.65
Spot at Dumping 0.66
Dumping 0.81
Returning DP - LP 5.04
Spot at Load 0.80
Queuing 1.52
Delay 0.38

Dumptruck Code: 222


Information:
Spot at Load Queue Delay Parameter

37 20 Total Ritase

42 240 23 Total Payload

44 68 22 Avg pass per Truck

55 129 21 Current Pass

52 22 Total Time

Total Primary Time

Total Secondary Time

4042 67.4
545 9.1
4587 76.5
4.8

Cycle Time HD785-7 Code: 096 Primary Ti


11.88%

5.69

35.90%

88.12% 5.79% 4.7

Primary Time Secondary Time


Penjelasan Rumus Hasil
Banyaknya jumlah dumping yang =count(dumping) 5
dilakukan truck

Jumlah payload yang dihasilkan oleh =sum(payload) 464.7


dumpturck
rata-rata pass yang dilakukan ={sum(pass)/Count 4.8
dibandiingka jumlah ritase (Dumping)}

Jumlah pass yang dilakukan per 1 =last Pass 6


ritase
Jumlah waktu perhitungan cycle time =sum(Loading:delay) 76:27
(dalam menit:detik)
=sum(loading:hauling:spot at
Jumlah waktu perhitungan primary load:dumping:spot at dump: 67:25
cycle time (dalam menit:detik) returning)

Jumlah waktu perhitungan secondary =sum(queue:delay) 9:03


cycle time (dalam menit:detik)

Primary Time HD785-7 Code: 096 Sec


7.67%
Loading
5.69%
Hauling LP - DP

Spot at Dumping
35.90% Queuing
40.25% Dumping
Delay
Returning DP - LP
5.79% 4.70%
Spot at Load
Secondary Time HD785-7
Code: 096

19.82%

Queuing

Delay
80.18%
Contoh Kasus (Cycle Time in Seconds)
Digging Dumptruck Fill Factor Swing Angle Swing Loaded Dumping

16 DT-01 0.8 30o 7 6

15 DT-01 0.9 45o 7 7

15 DT-01 0.9 30o 8 6

17 DT-01 0.8 30o 7 5

18 DT-02 0.8 45o 8 6

18 DT-02 0.9 30o 7 5

16 DT-02 0.8 60o 7 6

16 DT-03 0.9 30o 9 7


17 DT-03 0.9 30 o
7 5
18 DT-03 0.8 30o 7 6
17 DT-03 0.8 45 o
8 6

Bucket Capacity

Preview Hasil :
Primary Time :
Secondary Time :
Total Time :
Dumptruck :

Activity

Digging
Swing Loaded
Dumping
Swing Empty
Dig to Prepare
Wait to Dump
Travelling
Clearing
Idle

Excavator Code:
Jumlah Pass
Swing Empty Dig to Prepare Wait to Dump Travelling Clearing Idle

5 0 0 0 0 0

4 0 8 10 0 0

5 0 0 0 3 0

5 18 0 0 0 0

6 0 0 0 0 15

5 21 0 0 7 0

6 0 0 0 0 0

6 0 9 0 0 0
5 0 8 0 0 0
5 14 9 0 0 0
6 0 0 0 0 0

6.3 m3

370 6.2
122 2.0
492 8.2
3

Average (Seconds) Cycle Time PC2000-8M0 Code: HE5010


15.25
6.83
5.42
5.42 24.80%
4.42
2.83
0.83
0.83
1.25 75.20%

HE5010
4

Primary Time : Secondary Time :


75.20%

Primary Time : Secondary Time :


Information:
Parameter Penjelasan Rumus
Banyaknya jumlah truck yang
Total Truck mengangkut material dari produksi ???
excavator

=(Bucket Capacity*Fill
Total Production Jumlah payload yang dihasilkan oleh Factor*Total count dumping)
dumpturck
rata-rata pass yang dilakukan ={count(dumping)/total
Avg pass per Truck
dibandiingka jumlah ritase truck)}

Current Pass Jumlah pass yang dilakukan per 1 =last Pass


ritase
Total Time Jumlah waktu perhitungan cycle time =sum(digging: idle)
(dalam menit:detik)

=sum(digging: swing loaded:


Total Primary Time Jumlah waktu perhitungan primary dumping: swing empty)
cycle time (dalam menit:detik)

=sum(dig to prepare: wait to


Total Secondary Time Jumlah waktu perhitungan secondary dump: clearing: travel; idle)
cycle time (dalam menit:detik)

de: HE5010 Primary Time PC2000-8M0 Code: HE5010 Sec

Digging Dig to
16.46% Prepare
Swing Loaded
46.33% Wait to
16.46% Dump
Dumping
Travelling
20.76%
Swing Empty Clearing

Idle
Travelling
20.76%
Swing Empty Clearing

Idle
Hasil

53.55

3.3

08:26

04:36

03:35

Secondary Time PC2000-8M0


Code: HE5010
12.30%
Dig to
Prepare 8.20%

Wait to
Dump 8.20%
43.44%

Travelling

Clearing

Idle 27.87%
Travelling

Clearing

Idle 27.87%
Contoh Kasus (Cycle Time in Seconds)
Backward
Digging Dumptruck Fill Factor Swing Angle Forward Loaded
Loaded

14 DT-01 0.8 30o 3 3

13 DT-01 0.9 45o 2 3

15 DT-01 0.9 30o 3 3

16 DT-02 0.8 45o 3 2

15 DT-02 0.9 30o 3 2

14 DT-02 0.8 60o 2 3

14 DT-03 0.9 30o 3 3

15 DT-03 0.9 30o 2 2


16 DT-03 0.8 30o 3 3

Bucket Capacity

Preview Hasil :
Primary Time :
Secondary Time :
Total Time :
Dumptruck :
Activity

Digging
Backward Loaded
Forward Loaded
Dumping
Backward Loaded
Forward Loaded
Wait to Dump
Clearing
Idle

Wheel Loader Code:


Jumlah Pass:
Dumping Backward Empty Forward Empty Clearing Wait to Dump Idle

7 2 2

6 1 2 16 31

8 2 2

9 2 2

8 2 1 23

8 1 2

7 2 2 16

8 1 1
8 2 1

6.1 m3

279 4.7
86 1.4
365 6.1
3
Average (minutes)

14.67 Cycle Time WA480-6 Code: WA454


2.67
2.67
7.67
1.67
1.67 23.56%
3.56
2.56
3.44

76.44%
WA545
3

Primary Time : Secondary Time :


76.44%

Primary Time : Secondary Time :


Information:
Parameter
Penjelasan Rumus
Banyaknya jumlah truck yang
Total Truck mengangkut material dari produksi ???
excavator

=(Bucket Capacity*Fill
Total Production Jumlah payload yang dihasilkan oleh Factor*Total count dumping)
dumpturck
rata-rata pass yang dilakukan ={count(dumping)/total
Avg pass per Truck
dibandiingka jumlah ritase truck)}

Current Pass Jumlah pass yang dilakukan per 1 =last Pass


ritase
Total Time Jumlah waktu perhitungan cycle time =sum(digging: idle)
(dalam menit:detik)
=sum(digging: Backward
Loaded: Forward Loaded:
Total Primary Time Dumping: Backward Empty:
Jumlah waktu perhitungan primary Forward Empty)
cycle time (dalam menit:detik)

=sum(Clearing: Wait to
Total Secondary Time Jumlah waktu perhitungan secondary Dump: Idle)
cycle time (dalam menit:detik)

6 Code: WA454
Primary Time WA480-6 Code: WA454

Digging
5.38%
Backward Loaded Wait
5.38%
Dump
24.73% Forward Loaded
47.31%
Dumping
Clear
8.60% Backward Loaded

Forward Loaded Idle

me : 8.60%
24.73% Forward Loaded
47.31%
Dumping
Clear
8.60% Backward Loaded

Forward Loaded Idle

me : 8.60%
Hasil

46.97

3.0

08:05

04:57

03:18

Secondary Time WA480-6


Code: WA454

Wait to
Dump
36.05% 37.21%

Clearing

26.74%
Idle
36.05% 37.21%

Clearing

26.74%
Idle
Contoh Kasus (Dynamic Cone Penetrometer [DCP] in Mining Hauling Road)

Blow Penetration (cm) Blow Penetration (cm) Blow Penetration (cm) Blow
0 2.0 10 11.9 20 19.0 30
1 3.5 11 12.5 21 20.0 31
2 4.0 12 13.0 22 22.0 32
3 5.0 13 13.5 23 24.0 33
4 6.2 14 14.5 24 26.0 34
5 7.5 15 15.0 25 28.0 35
6 8.7 16 15.6 26 29.0 36
7 9.7 17 16.5 27 31.0 37
8 10.3 18 17.3 28 33.0 38
9 11.2 19 18.0 29 35.0 39

Calculation Data Table

Blow Depth (cm)

0 0.00

1 1.50
2 2.00

3 3.00

4 4.20

5 5.50
6 6.70
7 7.70
8 8.30
9 9.20

10 9.90
11 10.50

12 11.00

13 11.50
14 12.50

15 13.00
16 13.60
17 14.50
18 15.30
Table Conversion 19 16.00
mm/blow %CBR 20 17.00
110 1 21 18.00
109 1.02 22 20.00
108 1.04 23 22.00
107 1.08 24 24.00
106 1.1 25 26.00
105 1.14 26 27.00
104 1.18 27 29.00
103 1.2 28 31.00
102 1.24 29 33.00
101 1.26 30 38.00
100 1.3 31 41.00
99 1.34 32 44.00
98 1.36 33 49.00
97 1.4 34 53.00
96 1.42 35 56.00
95 1.46 36 61.00
94 1.5 37 64.00
93 1.52 38 66.00
92 1.56 39 67.00
91 1.58 40 77.50
90 1.62 41 78.50
89 1.66 42 79.50
88 1.68 43 80.50
87 1.72 44 81.50
86 1.74 45 82.50
85 1.78 46 83.50
84 1.82 47 84.50
83 1.84 48 85.50
82 1.88 49 86.50
81 1.9 50 87.00
80 1.94 51 88.00
79 1.98 52 89.00
78 2 53 90.00
77 2.04 54 91.00
76 2.06 55 92.00
75 2.1 56 93.00
74 2.14 57 94.00
73 2.16 58 96.00
72 2.2 59 98.00
71 2.22
70 2.26
69 2.3
68 2.32
67 2.36
66 2.4
65 2.42
64 2.46
63 2.48
62 2.52
61 2.56
60 2.58
59 2.62
58 2.64
57 2.68
56 2.72
55 2.74
54 2.78
53 2.8
52 2.84
51 2.88
50 2.9
49 2.94
48 2.96
47 3
46 3.14
45 3.32
44 3.48
43 3.66
42 3.84
41 4.02
40 4.2
39 4.38
38 4.54
37 4.72
36 4.9
35 5.08
34 5.26
33 5.44
32 5.62
31 5.78
30 5.96
29 6.14
28 6.32
27 6.5
26 6.68
25 6.86
24 7.06
23 7.56
22 8.08
21 8.58
20 9.1
19 9.6
18 10.22
17 11.22
16 12.22
15 13.22
14 14.22
13 15.38
12 17.24
11 19.08
10 21.48
9 24.42
8 29.72
7 35.6
6 41.48
5 50.02
4 64.46
3 91.26
2 138
1 278
Penetration (cm) Blow
Penetration (cm)Blow Penetration (cm) Blow Penetration (cm)
40.0 30 70.0 40 79.5 50 89.0
43.0 31 71.0 41 80.5 51 90.0
46.0 32 72.0 42 81.5 52 91.0
51.0 33 73.0 43 82.5 53 92.0
55.0 34 74.0 44 83.5 54 93.0
58.0 35 75.0 45 84.5 55 94.0
63.0 36 76.0 46 85.5 56 95.0
66.0 37 77.0 47 86.5 57 96.0
68.0 38 78.0 48 87.5 58 98.0
69.0 39 79.0 49 88.5 59 100.0

Penetrasi
Round Up CBR (%) HD785-7
Kumulatif (cm) Per Blow (mm/blow)
2.0 18.2

3.5
1.50 15.00 15 13.22 18.2
4.0 0.50 5.00 5 50.02 18.2

5.0
1.00 10.00 10 21.48 18.2

6.2
1.20 12.00 12 17.24 18.2

7.5
1.30 13.00 13 15.38 18.2
8.7 1.20 12.00 12 17.24 18.2
9.7 1.00 10.00 10.00 21.48 18.2
10.3 0.60 6.00 7 35.6 18.2
11.2 0.90 9.00 9 24.42 18.2

11.9
0.70 7.00 8 29.72 18.2
12.5 0.60 6.00 6 41.48 18.2

13.0
0.50 5.00 5 50.02 18.2

13.5
0.50 5.00 5 50.02 18.2
14.5 1.00 10.00 10 21.48 18.2

15.0
0.50 5.00 5 50.02 18.2
15.6 0.60 6.00 6 41.48 18.2
16.5 0.90 9.00 9 24.42 18.2
17.3 0.80 8.00 9 24.42 18.2
18.0 0.70 7.00 7 35.6 18.2
19.00 1.00 10.00 10 21.48 18.2
20.00 1.00 10.00 10 21.48 18.2
22.00 2.00 20.00 20 9.1 18.2
24.00 2.00 20.00 20 9.1 18.2
26.00 2.00 20.00 20 9.1 18.2
28.00 2.00 20.00 20 9.1 18.2
29.00 1.00 10.00 10 21.48 18.2
31.00 2.00 20.00 20 9.1 18.2
33.00 2.00 20.00 20 9.1 18.2
35.00 2.00 20.00 20 9.1 18.2
40.00 5.00 50.00 50 2.9 18.2
43.00 3.00 30.00 30 5.96 18.2
46.00 3.00 30.00 30 5.96 18.2
51.00 5.00 50.00 50 2.9 18.2
55.00 4.00 40.00 40 4.2 18.2
58.00 3.00 30.00 30 5.96 18.2
63.00 5.00 50.00 50 2.9 18.2
66.00 3.00 30.00 30 5.96 18.2
68.00 2.00 20.00 20 9.1 18.2
69.00 1.00 10.00 10 21.48 18.2
79.50 10.50 105.00 105 1.14 18.2
80.50 1.00 10.00 10 21.48 18.2
81.50 1.00 10.00 10 21.48 18.2
82.50 1.00 10.00 10 21.48 18.2
83.50 1.00 10.00 10 21.48 18.2
84.50 1.00 10.00 10 21.48 18.2
85.50 1.00 10.00 10 21.48 18.2
86.50 1.00 10.00 10 21.48 18.2
87.50 1.00 10.00 10 21.48 18.2
88.50 1.00 10.00 10 21.48 18.2
89.00 0.50 5.00 5 50.02 18.2
90.00 1.00 10.00 10 21.48 18.2
91.00 1.00 10.00 10 21.48 18.2
92.00 1.00 10.00 10 21.48 18.2
93.00 1.00 10.00 10 21.48 18.2
94.00 1.00 10.00 10 21.48 18.2
95.00 1.00 10.00 10 21.48 18.2
96.00 1.00 10.00 10 21.48 18.2
98.00 2.00 20.00 20 9.1 18.2
100.00 2.00 20.00 20 9.1 18.2
Information Of Tools:
HD465-7R HM400-3R
Parameter
9.2 3.3 Total Blow

Depth
9.2 3.3
9.2 3.3 Depth Start

Depth Per Blow


9.2 3.3
(mm/blow)
9.2 3.3
% CBR
9.2 3.3
9.2 3.3
9.2 3.3 Information Of Calculation Data Table:
9.2 3.3 Parameter
9.2 3.3 Total Blow

Depth (cm)
9.2 3.3
9.2 3.3 Kumulatif (cm)

Per Blow
9.2 3.3
(mm/blow)
9.2 3.3
9.2 3.3 Round Up

% CBR
9.2 3.3
9.2 3.3
9.2 3.3 Result Of Calculation
9.2 3.3
9.2 3.3
9.2 3.3
Depth of Hauling Road vs %CBR
100
9.2 3.3 95
90
85
80
% CBR

75
70
65
60
Depth of Hauling Road vs %CBR
100
95
9.2 3.3 90
85
9.2 3.3 80

% CBR
75
9.2 3.3 70
9.2 3.3 65
60
9.2 3.3 55
50
9.2 3.3 45
9.2 3.3 40
35
9.2 3.3 30
9.2 3.3 25
20
9.2 3.3 15
10
9.2 3.3 5
9.2 3.3 0
0 5 10 15 20 25 30 35 40 45
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
Penjelasan
Jumlah Dentuman (blow) yang dilakukan oleh alat DCP
Kedalaman yang dimasukan oleh ujung alat DCP berdasarkan dari hasil
penetrasi dikurangi penetrasi awal alat DCP
Kedalaman DCP saat belum terjadi penetrasi sama sekali

Kedalaman penetrasi antara blow saat itu dibandingkan blow sebelumnya

Kedalaman Depth Per Blow apabila dihitung berdasarkan satuan (mm)

Nilai %CBR yang dihasilkan dari pengujian pada penetrasi blow tersebut

Of Calculation Data Table:


Penjelasan
Jumlah Dentuman (blow) yang dilakukan oleh alat DCP
Kedalaman yang dimasukan oleh ujung alat DCP berdasarkan dari hasil
penetrasi dikurangi penetrasi awal alat DCP
Kedalaman Penetrasi saat Blow dilakukan

Kedalaman penetrasi antara blow saat itu dibandingkan blow sebelumnya

Kedalaman Depth Per Blow apabila dihitung berdasarkan satuan (mm)


Pembulatan Keatas Hasil (mm/Bow)

Nilai %CBR yang dihasilkan dari pengujian pada penetrasi blow tersebut

Depth of Hauling Road vs %CBR


Depth of Hauling Road vs %CBR

10 15 20 25 30 35 40 45 50 55 60

Depth (cm)
Rumus Hasil
Choose 1 of Sorted list from "0" until "100++" 7

=(Penetration blow)-($Penetration Initial$) 7.70

=(Penetration initial) 2.0

=(Penetartion Blow) - (Last Penetration Blow) 1.0

=(Depth Per blow) x 10 10

=Vlookup(Round Up;Table Conversion;2;FALSE) --> Data 21.48


based on Calculation Data Table

Rumus Hasil
Choose 1 of Sorted list from "0" until "100++" 7

=(Penetration blow)-($Penetration Initial$) 7.7

=(penetration blow) 9.7

=(Penetartion Blow) - (Last Penetration Blow) 1.0

=(Depth Per blow) x 10 10

=Roundup(mm/blow;0) 10.00

=Vlookup(Round Up;Table Conversion;2;FALSE) 21.48

List of Dumptruck Groun Pressure %CBR


Komatsu 930E 638
Komatsu 830E 220
Komatsu 730E 94
Komatsu HD1500-7 40
Komatsu HD785-7 18.2
Komatsu HD465-7R 9.2
Komatsu HM400-3R 3.3
UD Trucks CWB6D Quester 2.8
Scania P410 4.4
Scania P380 6x4 6.8
Scania R500 Double 6.6
Scania R500 Single 11.6