Академический Документы
Профессиональный Документы
Культура Документы
D Double A (DAA)
Excavator &
Wheel Loader Camera
Video Recorder
Project Monitorin
Dumptruck Camera
Video Recorder
Bulldozer Camera
Video Recorder
CBR analysis
OFR Analysis
OFR DCP test
Camera
OFR DCP test
Video Recorder
Seismic analysis
Optimum Fleet
Recomendation
OFR Analysis
OFR Seismic Test
Camera
Video Recorder
OFR Analysis
OFR Survey Test Camera
Video Recorder
OFR Analysis
Camera
Site/Project
Project Evaluatio
Evaluation
Video Recorder
Database
1. Product information and competitor comparation
data
2. Cycle Time Standard of Excavator & Wheel Loader
3. Primary & Secondary Time Standard of Excavator &
Wheel Loader based on working type
1.Material Characteristics Information (based on
mineralogy characteristics, hardness, fragmentation,
etc.)
2. Bench Height Standard for Excavator & Wheel
Loader
3. Stockpile Dimension (Heigth & angle) standard of
wheel loader
4. Bucket Contaminent test information of Excavator &
Wheel
1. Loader
Product information and competitor comparation
5. Working Application standard of Excavator & Wheel
data
Loader
2. Cycle Time Standard of Dumptruck
3. Primary & Secondary Time Standard of Dumptruck
based on working type
1.Material Characteristics Information (based on
mineralogy characteristics, hardness, fragmentation,
etc.)
2. Front width standard of dumptruck
3. Grade standard of dumptruck
4. Hauling Distance information of Dumptruck
5. Vessel Contaminent Test information of Dumptruck
6. Working Application standard of Dumptruck
1. Product information and competitor comparation
data
2. Cycle Time Standard of Bulldozer
3. Primary & Secondary Time Standard of Bulldozer r
based on working type
1.Material Characteristics Information (based on
mineralogy characteristics, hardness, fragmentation,
etc.)
2. Dozing area of bulldozer
3. Dozing distance of bulldozer
4. Working Application standard of Excavator & Wheel
Loader
1. Dumptruck ground pressure standard & analysis
2. Excavator ground pressure standard & analysis
3. DCP form & graphic generator
1. Price list of Unit & tyre
2. Unit Production data
3. Fleet matching, productivity, and cost analysis
1.Material Characteristics Information (based on
mineralogy characteristics, hardness, fragmentation,
etc.)
2.Product information and competitor comparation data
3. Working Condition List data & standard
1.Material Characteristics Information (based on
mineralogy characteristics, hardness, fragmentation,
etc.)
2.Product information and competitor comparation data
3. Working Condition List data & standard
1. Seismic speed form
2. Rippability & ripping productivity standard of
Bulldozer
3. Diggability standard of excavator
62 6 93 325 48 54 315
Preview Hasil
Primary Time :
Secondary Time :
Total Time :
Ritase :
Average
Activity
(minutes)
Loading 1.08
Hauling LP - DP 5.65
Spot at Dumping 0.66
Dumping 0.81
Returning DP - LP 5.04
Spot at Load 0.80
Queuing 1.52
Delay 0.38
37 20 Total Ritase
52 22 Total Time
4042 67.4
545 9.1
4587 76.5
4.8
5.69
35.90%
Spot at Dumping
35.90% Queuing
40.25% Dumping
Delay
Returning DP - LP
5.79% 4.70%
Spot at Load
Secondary Time HD785-7
Code: 096
19.82%
Queuing
Delay
80.18%
Contoh Kasus (Cycle Time in Seconds)
Digging Dumptruck Fill Factor Swing Angle Swing Loaded Dumping
Bucket Capacity
Preview Hasil :
Primary Time :
Secondary Time :
Total Time :
Dumptruck :
Activity
Digging
Swing Loaded
Dumping
Swing Empty
Dig to Prepare
Wait to Dump
Travelling
Clearing
Idle
Excavator Code:
Jumlah Pass
Swing Empty Dig to Prepare Wait to Dump Travelling Clearing Idle
5 0 0 0 0 0
4 0 8 10 0 0
5 0 0 0 3 0
5 18 0 0 0 0
6 0 0 0 0 15
5 21 0 0 7 0
6 0 0 0 0 0
6 0 9 0 0 0
5 0 8 0 0 0
5 14 9 0 0 0
6 0 0 0 0 0
6.3 m3
370 6.2
122 2.0
492 8.2
3
HE5010
4
=(Bucket Capacity*Fill
Total Production Jumlah payload yang dihasilkan oleh Factor*Total count dumping)
dumpturck
rata-rata pass yang dilakukan ={count(dumping)/total
Avg pass per Truck
dibandiingka jumlah ritase truck)}
Digging Dig to
16.46% Prepare
Swing Loaded
46.33% Wait to
16.46% Dump
Dumping
Travelling
20.76%
Swing Empty Clearing
Idle
Travelling
20.76%
Swing Empty Clearing
Idle
Hasil
53.55
3.3
08:26
04:36
03:35
Wait to
Dump 8.20%
43.44%
Travelling
Clearing
Idle 27.87%
Travelling
Clearing
Idle 27.87%
Contoh Kasus (Cycle Time in Seconds)
Backward
Digging Dumptruck Fill Factor Swing Angle Forward Loaded
Loaded
Bucket Capacity
Preview Hasil :
Primary Time :
Secondary Time :
Total Time :
Dumptruck :
Activity
Digging
Backward Loaded
Forward Loaded
Dumping
Backward Loaded
Forward Loaded
Wait to Dump
Clearing
Idle
7 2 2
6 1 2 16 31
8 2 2
9 2 2
8 2 1 23
8 1 2
7 2 2 16
8 1 1
8 2 1
6.1 m3
279 4.7
86 1.4
365 6.1
3
Average (minutes)
76.44%
WA545
3
=(Bucket Capacity*Fill
Total Production Jumlah payload yang dihasilkan oleh Factor*Total count dumping)
dumpturck
rata-rata pass yang dilakukan ={count(dumping)/total
Avg pass per Truck
dibandiingka jumlah ritase truck)}
=sum(Clearing: Wait to
Total Secondary Time Jumlah waktu perhitungan secondary Dump: Idle)
cycle time (dalam menit:detik)
6 Code: WA454
Primary Time WA480-6 Code: WA454
Digging
5.38%
Backward Loaded Wait
5.38%
Dump
24.73% Forward Loaded
47.31%
Dumping
Clear
8.60% Backward Loaded
me : 8.60%
24.73% Forward Loaded
47.31%
Dumping
Clear
8.60% Backward Loaded
me : 8.60%
Hasil
46.97
3.0
08:05
04:57
03:18
Wait to
Dump
36.05% 37.21%
Clearing
26.74%
Idle
36.05% 37.21%
Clearing
26.74%
Idle
Contoh Kasus (Dynamic Cone Penetrometer [DCP] in Mining Hauling Road)
Blow Penetration (cm) Blow Penetration (cm) Blow Penetration (cm) Blow
0 2.0 10 11.9 20 19.0 30
1 3.5 11 12.5 21 20.0 31
2 4.0 12 13.0 22 22.0 32
3 5.0 13 13.5 23 24.0 33
4 6.2 14 14.5 24 26.0 34
5 7.5 15 15.0 25 28.0 35
6 8.7 16 15.6 26 29.0 36
7 9.7 17 16.5 27 31.0 37
8 10.3 18 17.3 28 33.0 38
9 11.2 19 18.0 29 35.0 39
0 0.00
1 1.50
2 2.00
3 3.00
4 4.20
5 5.50
6 6.70
7 7.70
8 8.30
9 9.20
10 9.90
11 10.50
12 11.00
13 11.50
14 12.50
15 13.00
16 13.60
17 14.50
18 15.30
Table Conversion 19 16.00
mm/blow %CBR 20 17.00
110 1 21 18.00
109 1.02 22 20.00
108 1.04 23 22.00
107 1.08 24 24.00
106 1.1 25 26.00
105 1.14 26 27.00
104 1.18 27 29.00
103 1.2 28 31.00
102 1.24 29 33.00
101 1.26 30 38.00
100 1.3 31 41.00
99 1.34 32 44.00
98 1.36 33 49.00
97 1.4 34 53.00
96 1.42 35 56.00
95 1.46 36 61.00
94 1.5 37 64.00
93 1.52 38 66.00
92 1.56 39 67.00
91 1.58 40 77.50
90 1.62 41 78.50
89 1.66 42 79.50
88 1.68 43 80.50
87 1.72 44 81.50
86 1.74 45 82.50
85 1.78 46 83.50
84 1.82 47 84.50
83 1.84 48 85.50
82 1.88 49 86.50
81 1.9 50 87.00
80 1.94 51 88.00
79 1.98 52 89.00
78 2 53 90.00
77 2.04 54 91.00
76 2.06 55 92.00
75 2.1 56 93.00
74 2.14 57 94.00
73 2.16 58 96.00
72 2.2 59 98.00
71 2.22
70 2.26
69 2.3
68 2.32
67 2.36
66 2.4
65 2.42
64 2.46
63 2.48
62 2.52
61 2.56
60 2.58
59 2.62
58 2.64
57 2.68
56 2.72
55 2.74
54 2.78
53 2.8
52 2.84
51 2.88
50 2.9
49 2.94
48 2.96
47 3
46 3.14
45 3.32
44 3.48
43 3.66
42 3.84
41 4.02
40 4.2
39 4.38
38 4.54
37 4.72
36 4.9
35 5.08
34 5.26
33 5.44
32 5.62
31 5.78
30 5.96
29 6.14
28 6.32
27 6.5
26 6.68
25 6.86
24 7.06
23 7.56
22 8.08
21 8.58
20 9.1
19 9.6
18 10.22
17 11.22
16 12.22
15 13.22
14 14.22
13 15.38
12 17.24
11 19.08
10 21.48
9 24.42
8 29.72
7 35.6
6 41.48
5 50.02
4 64.46
3 91.26
2 138
1 278
Penetration (cm) Blow
Penetration (cm)Blow Penetration (cm) Blow Penetration (cm)
40.0 30 70.0 40 79.5 50 89.0
43.0 31 71.0 41 80.5 51 90.0
46.0 32 72.0 42 81.5 52 91.0
51.0 33 73.0 43 82.5 53 92.0
55.0 34 74.0 44 83.5 54 93.0
58.0 35 75.0 45 84.5 55 94.0
63.0 36 76.0 46 85.5 56 95.0
66.0 37 77.0 47 86.5 57 96.0
68.0 38 78.0 48 87.5 58 98.0
69.0 39 79.0 49 88.5 59 100.0
Penetrasi
Round Up CBR (%) HD785-7
Kumulatif (cm) Per Blow (mm/blow)
2.0 18.2
3.5
1.50 15.00 15 13.22 18.2
4.0 0.50 5.00 5 50.02 18.2
5.0
1.00 10.00 10 21.48 18.2
6.2
1.20 12.00 12 17.24 18.2
7.5
1.30 13.00 13 15.38 18.2
8.7 1.20 12.00 12 17.24 18.2
9.7 1.00 10.00 10.00 21.48 18.2
10.3 0.60 6.00 7 35.6 18.2
11.2 0.90 9.00 9 24.42 18.2
11.9
0.70 7.00 8 29.72 18.2
12.5 0.60 6.00 6 41.48 18.2
13.0
0.50 5.00 5 50.02 18.2
13.5
0.50 5.00 5 50.02 18.2
14.5 1.00 10.00 10 21.48 18.2
15.0
0.50 5.00 5 50.02 18.2
15.6 0.60 6.00 6 41.48 18.2
16.5 0.90 9.00 9 24.42 18.2
17.3 0.80 8.00 9 24.42 18.2
18.0 0.70 7.00 7 35.6 18.2
19.00 1.00 10.00 10 21.48 18.2
20.00 1.00 10.00 10 21.48 18.2
22.00 2.00 20.00 20 9.1 18.2
24.00 2.00 20.00 20 9.1 18.2
26.00 2.00 20.00 20 9.1 18.2
28.00 2.00 20.00 20 9.1 18.2
29.00 1.00 10.00 10 21.48 18.2
31.00 2.00 20.00 20 9.1 18.2
33.00 2.00 20.00 20 9.1 18.2
35.00 2.00 20.00 20 9.1 18.2
40.00 5.00 50.00 50 2.9 18.2
43.00 3.00 30.00 30 5.96 18.2
46.00 3.00 30.00 30 5.96 18.2
51.00 5.00 50.00 50 2.9 18.2
55.00 4.00 40.00 40 4.2 18.2
58.00 3.00 30.00 30 5.96 18.2
63.00 5.00 50.00 50 2.9 18.2
66.00 3.00 30.00 30 5.96 18.2
68.00 2.00 20.00 20 9.1 18.2
69.00 1.00 10.00 10 21.48 18.2
79.50 10.50 105.00 105 1.14 18.2
80.50 1.00 10.00 10 21.48 18.2
81.50 1.00 10.00 10 21.48 18.2
82.50 1.00 10.00 10 21.48 18.2
83.50 1.00 10.00 10 21.48 18.2
84.50 1.00 10.00 10 21.48 18.2
85.50 1.00 10.00 10 21.48 18.2
86.50 1.00 10.00 10 21.48 18.2
87.50 1.00 10.00 10 21.48 18.2
88.50 1.00 10.00 10 21.48 18.2
89.00 0.50 5.00 5 50.02 18.2
90.00 1.00 10.00 10 21.48 18.2
91.00 1.00 10.00 10 21.48 18.2
92.00 1.00 10.00 10 21.48 18.2
93.00 1.00 10.00 10 21.48 18.2
94.00 1.00 10.00 10 21.48 18.2
95.00 1.00 10.00 10 21.48 18.2
96.00 1.00 10.00 10 21.48 18.2
98.00 2.00 20.00 20 9.1 18.2
100.00 2.00 20.00 20 9.1 18.2
Information Of Tools:
HD465-7R HM400-3R
Parameter
9.2 3.3 Total Blow
Depth
9.2 3.3
9.2 3.3 Depth Start
Depth (cm)
9.2 3.3
9.2 3.3 Kumulatif (cm)
Per Blow
9.2 3.3
(mm/blow)
9.2 3.3
9.2 3.3 Round Up
% CBR
9.2 3.3
9.2 3.3
9.2 3.3 Result Of Calculation
9.2 3.3
9.2 3.3
9.2 3.3
Depth of Hauling Road vs %CBR
100
9.2 3.3 95
90
85
80
% CBR
75
70
65
60
Depth of Hauling Road vs %CBR
100
95
9.2 3.3 90
85
9.2 3.3 80
% CBR
75
9.2 3.3 70
9.2 3.3 65
60
9.2 3.3 55
50
9.2 3.3 45
9.2 3.3 40
35
9.2 3.3 30
9.2 3.3 25
20
9.2 3.3 15
10
9.2 3.3 5
9.2 3.3 0
0 5 10 15 20 25 30 35 40 45
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
9.2 3.3
Penjelasan
Jumlah Dentuman (blow) yang dilakukan oleh alat DCP
Kedalaman yang dimasukan oleh ujung alat DCP berdasarkan dari hasil
penetrasi dikurangi penetrasi awal alat DCP
Kedalaman DCP saat belum terjadi penetrasi sama sekali
Nilai %CBR yang dihasilkan dari pengujian pada penetrasi blow tersebut
Nilai %CBR yang dihasilkan dari pengujian pada penetrasi blow tersebut
10 15 20 25 30 35 40 45 50 55 60
Depth (cm)
Rumus Hasil
Choose 1 of Sorted list from "0" until "100++" 7
Rumus Hasil
Choose 1 of Sorted list from "0" until "100++" 7
=Roundup(mm/blow;0) 10.00