INITIAL REPORT OF TRANSMISSION SYSTEMS

( OFC SYSTEM )
( TO BE SUBMITTED BY THE INSTALLER )

1 Name of the Route : Alkapuri-IPCL-GR Plot


2 Name of the Terminal & Repeater stations : Alkapuri-IPCL-GR Plot
Indicating inter repeater distance : 8km +4.5km + 9 km=21.5km
3(a) Make & Capacity of the system : (I) Make : HUWAEI STM-16
(II) 8/34/140/565/Mbps PDH /
8 E1 STM-1/STM-4/STM-16/WDM
3(b) Number of systems equipped : (a) Planned (b) Equipped
(i.e. 1+0 or 1+1 etc ) : 1+0 1+0
3(c ) Operating Wavelength of system : 1310 nm / 1550 nm
3(d) System Configuration : RING
3(e) In case of ring configuration indicate the :
Number of Station where NMS is installed : :
4 Designation of Installation Authority : D.E.Tx-Urban, BSNL, VADODARA
5 Designation of Maintenance Authority : PGMTD, VADODARA
6 Full details of Optical Fiber Cables : Existing
(a) Type of cable : (I) Mono mode /Multi mode
(II) Loose tube/slotted core/
Flate Ribbon type.
(III) Make Existing
(b) Refractive index of fiber :
(c ) Year of manufacture of cable :
(d) Number of Fiber in the OFCable : 48F & 96 F
(e) Fiber No. over which the main system :
& protection system are Proposed to work :
(f) Whether cable is already A/Ted by T & D Circle YES
(g) In case cable is already A/Ted by T&D circle
give following particulars
(i) Are the fibers already tested at system wave Length YES
(ii) T & D Circle A/T clearance memo for system
(iii) Wavelength for which cable was tested 1310 nm / 1550 nm /
(h) Total No. of splices in each section
Section name No. of splices
EXISTING CABLE

7 The following particulars to be enclosed


(A) Eqpt.Purchased order No. & Date
(B) Eqpt.Details as per sanction project for TML Station
Terminal A Terminal B Terminal C
Station Name Alkapuri IPCL GR Plot
(i) OLTE Provided
(Give total No. of units )
(a) Normal 1 1
(b) Protection 1 1
(ii) Supervisory equipment : Provided / Provided /
Not Provided Not Provided
(iii) Swich Over equipment : Provided / Provided /
Not Provided Not Provided
(iv) Order wire equipment : Provided / Provided /
Not Provided Not Provided
(v) MUX Eqpt.(Give mark & total no. of eqpt.)
Sr TML A TML B TML C
No. Particular Planned Equipped Planned Equipped Planned
1 STM-1 OPT 16 16 16 16 16

2 STM-4 OPT 2 2 2 2 2

3 STM-16 OPT 2 2 2 2 2

( C) Is there any equipment which are not : ……… NO


QA approved (if any give detail )
8 Line digram of equipment enroute : ………. YES
( indicating allocation of various MUX provided )
9 Detail of three Phase AC power supply connection to indicate voltage &
KVA rating and remark about adequacy of AC power supply at
Terminal and repeater stations. Give following details.
Station KVA rating Adequency of rating AC Power Supply

Alkapuri 3 Phase Adequate


IPCL 3 Phase Adequate
GR Plot 3 Phase Adequate

10 Power Plant :
(a) In case of existing power plant please comment whether it will
sufficient for both old & new equipment including future expansion.
Also give following details.
(i) Load :
Station Load of Existing Load due to additional equipment
equipment
Alkapuri 5 Amp
IPCL 5 Amp
GR Plot 5 Amp

(ii) Capacity of Existing Power Plant :( For terminals & repeater 0


Station Battery Capacity FCBC Capacity
Alkapuri 4000AH 800A X 3
IPCL 1000AH 600A X 3
GR Plot 1000AH 50A X 8

(b) In case of New Power Plant : Give the following details. N/A
(i) D.C. Load (ii) Float cum Charger
Station D.C.Load Type Make Capacity

(iii) Battery Sets


Station No.of Sets Type Make Capacity

11 Engine Alternater Existing / New


(a) Engine Alternater
Station Type Make Capacity Adequate /
Inadequate
Alkapuri CUMMINS 500 KVA Adequate

IPCL Crompton Greaves


110 KVA Adequate

GR Plot Kirloskar Electric


50 Co
KVA
Ltd Adequate
(b) Station name :
Present Load (X) Additional Load (Y)

1.Load due to Power Plant in KVA

2.Other A.C.Load like fan etc.which


are to be put on E/A in KVA

12 Land status of transformer deed for the ownership of the land for building :

Obtained / Not obtained


13 Building New / Existing
Floor plan indicating lay out of proposed equipment along with existing
equipment in these rooms may be enclosed (For each terminal & RR station)
14 Details of Earth
Station A Station B Station C
Type of Earth Alkapuri IPCL GR Plot
Value of earth resistance 0.43 0.4 0.4
Date of Measurement
15 Air-Conditioning at TML station and attended repeater stations.
Name of Station Type ( Window / Package ) Adequacy

Alkapuri Package Adequate

IPCL Split Adequate

GR Plot Split Adequate

16 Provision of approach road to RR / TML : Provided / Not provided


Give the name of station where approach :
Road is not provided
17 Probable date of commencement of A/T :
15 Availability of (a) Document YES
(b) Test instrument YES
( c) Spare NO

Signature of the Installation authority


Designation of the Installation authority

Alkapuri GR Plot

IPCL
TT0 OFC

Both
TML C
Equipped
16