SAES: Saudi Aramco Engineering Standards

SAEP: Saudi Aramco Engineering Procedures

SASD: Saudi Aramco Standard Drawings

SATIP: Saudi Aramco Typical Inspection Plan

SAIC: Saudi Aramco Inspection Checklist

SATR: Saudi Aramco Test Report

WPS: Welding Procedure Specification

PQR: Procedure Qualification Record

WQT: Welder Qualification Test

WRR: Weld Rejection Rate

PWS: Project Weld Status

PQP: Project Quality Plan

PQI: Project Quality Index

MQMR: Monthly Quality Management Report

FW: field Weld (It will come before the weld No. example: FW – 01, FW - 02)

SW: Shop Weld (It will come before the weld No. example: SW – 01, SW - 02)

R1: First Repair (It will come after the weld No. example: FW – 01R1, SW – 01R1)

R2: Second Repair (It will come after the weld No. example: FW – 01R2, SW – 01R2)

CRW: Cut and Re-weld, Repair is only allowed two time after that joint has to be cut out, CRW will come
after the weld No. example: FW – 01CRW, SW – 01CRW

RS: Reshoot for the first time

RS2: Reshoot for the Second time

RS3: Reshoot for the Third time

CRS: Clean and Reshoot

GRS: Grind and Reshoot

RSC: Reshoot for confirmation


ASME: American Society of Mechanical Engineers

ASTM: American Society for Testing of Materials

API: American Petroleum Institute

ISO: International Organization for Standardization

NCR: Non Conformance Report

ACD: Agreed Completion Date

QMIS: Quality Management Information System

RFI: Request for Inspection

IIR: Internal Inspection Request

CAR: Corrective Action Report

CSD: Consulting Services Department

SIS: Safety Instruction Sheet

IFB: Issued for Bid

IFC: Issued for Construction

P & ID: Piping and Instrument Diagram

UG / AG: Under Ground / Above Ground

CA: Corrective Action

PA: Preventive Action

PID: Project Inspection Division

VID: Vendor Inspection Division

SAPMT: Saudi Aramco Project Management Team