NOTES

GROUND REBAR CAGE TO STEEL 1. COMPRESSIVE STRENGTH OF CONCRETE TO BE AT MINIMUM


POLE GROUND WIRE. SEE NOTE 15. 4000 PSI AT 28 DAYS.
2. ALL REINFORCING STEEL BAR SHALL MEET THE REQUIREMENTS

1"
"D
ANCHOR BOLT CAGE TOP TEMPLATE TO LAP SPLICES ON TIES OF ASTM A615, GRADE 60.

ER
BE REMOVED PRIOR TO SETTING POLE
3. FORMED CONCRETE SURFACES WHICH WILL BE EXPOSED

T
6" CLR.
APART ALTERNATELY

ME
1" CHAMFER ABOVE GRADE SHALL BE CLEANED AND RUBBED TO PRODUCE A

A
DI
ALL AROUND SMOOTH, UNIFORM SURFACE FREE OF MARKS, VOIDS, SURFACE

E
GLAZE, AND DISCOLORATIONS.

CL
BOLT PROJECTION (SEE SCHEDULE)

1"

CAISSON DIAMETER "D"

R
4. ALL CONCRETE SHALL BE PLACED IN A SINGLE CONTINUOUS

CI
T.O.C. ELEVATION

LT
OPERATION TO PRODUCE A MONOLITHIC FOUNDATION.
1 1

BO
FOUNDATION REVEAL

SPACED 6" O.C.


5. ALL REINFORCING CLEAR DISTANCES SHALL BE THE DISTANCE
QTY. 6 MK T1
(SEE SCHEDULE)
FROM THE FACE OF EACH BAR.
FINISHED GRADE 6. PRE-ASSEMBLED ANCHOR BOLT CAGES SHALL BE FURNISHED
ALL FOUNDATIONS 6" CLEAR BY THE STRUCTURE FABRICATOR. CONTRACTOR SHALL VERIFY
MIN. MK TX TO EARTH
THE NUMBER, LENGTHS, ETC. BEFORE CONSTRUCTION.
7. SEE THE PROJECT PLAN AND PROFILE DRAWINGS FOR
3" CLEAR MIN. FROM ANCHOR STRUCTURE FOUNDATION LOCATION.
MK V1 MK T1 BOLTS TO MK V1 8. NO WELDING TO CAISSON REINFORCING (VERTICAL REBAR OR
TIES), OR TO ANCHOR BOLT CAGES SHALL BE PERMITTED. ALL
ANCHOR BOLT CAGE LAP SPLICES USED FOR REINFORCING SHALL BE CLASS-B
ANCHOR BOLTS
BOTTOM TEMPLATE SPLICES IN ACCORDANCE WITH THE LATEST EDITION OF ACI 318.
9. NEAT-LINE CONCRETE VOLUMES DO NOT INCLUDE EXTRA
ANCHOR BOLT CAGE PLAN VIEW CONCRETE THAT MAY BE REQUIRED TO FILL VOIDS OR MAKE
BOTTOM TEMPLATE SECTION A-A FIELD ADJUSTMENTS.
SCALE: N.T.S. 10. CASINGS USED TO FORM FOUNDATIONS SHALL BE REMOVED
UNLESS OTHERWISE SPECIFIED BY THE ENGINEER.
11. FOUNDATIONS ARE DESIGNED IN ACCORDANCE WITH THE
RESPECTIVE SOIL PROPERTIES AND BORING LOGS FOR 'NYSEG
ATP' PERFORMED BY SJB DATED JUNE 2015 AND AUGUST 2015
A A 12. IF ROCK IS ENCOUNTERED AT A DIFFERENT DEPTH THAN SHOWN

N
LIN ISSIO
ON THE BORING LOGS, NOTIFY TRC FOR POSSIBLE REDESIGN OF
MK T2 SPACED 18" O.C.

THAT SPECIFIC FOUNDATION.

E
AN L
SM
LENGTH "L2"

ANGLE ( L .A .
LENGTH "L1"

13. ANCHOR BOLT CAGE ASSEMBLY WILL BE DONE IN MARSHALLING


L INE )

TR
1/2 L.A YARDS AND HAULED IN AS AN ASSEMBLY TO REQUIRED
.
FOUNDATION LOCATION. NO REBAR WELDING OR ASSEMBLY
WORK IS TO BE DONE IN THE RIGHT OF WAY.
QUANTITY OF ANCHOR BOLTS 14. REFER TO DEWATERING BAIL BASIN DETAIL ON DWG.
VARIES (SEE SCHED.) NAUBU-1-8746-D-16009 SH. 5.
CAISSON 15. SEE DRAWING NAUBU-1-87-46-D-16609 SHT. 07. FOUNDATION
MK T2 REBAR CAGE IS TO BE BONDED TO THE STEEL POLE GROUND
WIRE. 25 OHMS IS REQUIRED RESISTANCE. IF 25 OHMS IS NOT
CL OBTAINED WITH ONE GROUND ROD, THEN UP TO 3 ADDITIONAL
ANGLE BISECTOR GROUND RODS SHALL BE INSTALLED AT LEAST 10 FEET APART.
IF NEW MEASURED RESISTANCE IS ABOVE 35 OHMS THEN
ORIENT TEMPLATE
V-NOTCH ALONG CONTACT ELECTRICAL SYSTEM ENGINEERING - TRANSMISSION
TRANSMISSION LINE FOR ASSISTANCE. IN AGRICULTURAL FIELDS, THE TOP OF
ANGLE BISECTOR GROUND RODS ARE TO BE INSTALLED A MINIMUM OF 48 INCHES
BELOW THE GROUND SURFACE.
ANCHOR BOLT CAGE
TOP TEMPLATE

TR
AN INE
CL
SM
L
ISS
ION
MK T2 TO MK T3
SPACING VARIES
SEE SCHEDULE ANCHOR BOLT
MK T3 SPACED 6" O.C. ASSEMBLY ORIENTATION LAP=K

QUANTITY VARIES SCALE: N.T.S.


SEE SCHEDULE

HORIZONTAL TIES
MK. TX DIMENSIONS
CLASS B SPLICE
2"
6" CLR.

FOUNDATION ELEVATION
SECTION 1-1
CADD Drawing, DO NOT REVISE MANUALLY.

SCALE: N.T.S.

REV. DATE BY CK APP OWNER ENGINEER: APPROVAL STAMP: PE Stamp


DESCRIPTION IUSA ENGINEERING
CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION
AUBURN 115 KV TRANSMISSION PROJECT
Property of Iberdrola, USA NYSEG FOUNDATION DETAILS
SHEET 02 OF 02
DRAWING PREPARED BY: ACCEPTED BY OE:
STATE STREET TO ELBRIDGE CAYUGA/ONONDAGA
DR. TRC SCALE: AS SHOWN FILE:
CK. NO. REV.
ANSI D

1 06/16/16 TRC ADDED REBAR CAGE GROUNDING NOTES; NOTE 14 AND 15 ADDED
REV. DATE BY DESCRIPTION APP.
APP.
DATE: 06/16/16