ANALISA STRUKTUR BAJA TEMPORARY OFFICE 16.

5 M

3.5 Load Combination


The following is loading combination which will be generated in STAAD.Pro analysis
program :
Factored Load Combination
Erection Condition
Load Comb. 1001 1.40 D
Load Comb. 1002 0.90 D + 1.00 W (x+)
Load Comb. 1003 0.90 D + 1.00 W (x-)
Load Comb. 1004 0.90 D + 1.00 W (z+)
Load Comb. 1005 0.90 D + 1.00 W (z-)
Load Comb. 1006 0.90 D + 0.30 Eqx + 1.00 Eqz
Load Comb. 1007 0.90 D + 0.30 Eqx - 1.00 Eqz
Load Comb. 1008 0.90 D - 0.30 Eqx + 1.00 Eqz
Load Comb. 1009 0.90 D - 0.30 Eqx - 1.00 Eqz
Load Comb. 1010 0.90 D + 1.00 Eqx + 0.30 Eqz
Load Comb. 1011 0.90 D + 1.00 Eqx - 0.30 Eqz
Load Comb. 1012 0.90 D - 1.00 Eqx + 0.30 Eqz
Load Comb. 1013 0.90 D - 1.00 Eqx - 0.30 Eqz
Operating Condition
Load Comb. 1014 1.20 D + 1.60 L
Load Comb. 1015 1.20 D + 1.60 L + 0.50 W (x+)
Load Comb. 1016 1.20 D + 1.60 L + 0.50 W (x-)
Load Comb. 1017 1.20 D + 1.60 L + 0.50 W (z+)
Load Comb. 1018 1.20 D + 1.60 L + 0.50 W (z-)
Load Comb. 1019 1.20 D + 1.00 L + 0.30 Eqx + 1.00 Eqz
Load Comb. 1020 1.20 D + 1.00 L + 0.30 Eqx - 1.00 Eqz
Load Comb. 1021 1.20 D + 1.00 L - 0.30 Eqx + 1.00 Eqz
Load Comb. 1022 1.20 D + 1.00 L - 0.30 Eqx - 1.00 Eqz
Load Comb. 1023 1.20 D + 1.00 L + 1.00 Eqx + 0.30 Eqz
Load Comb. 1024 1.20 D + 1.00 L + 1.00 Eqx - 0.30 Eqz
Load Comb. 1025 1.20 D + 1.00 L - 1.00 Eqx + 0.30 Eqz
Load Comb. 1026 1.20 D + 1.00 L - 1.00 Eqx - 0.30 Eqz
Test Condition
Load Comb. 1027 1.20 D + 1.00 L + 1.00 W (x+)
Load Comb. 1028 1.20 D + 1.00 L + 1.00 W (x-)
Load Comb. 1029 1.20 D + 1.00 L + 1.00 W (z+)
Load Comb. 1030 1.20 D + 1.00 L + 1.00 W (z-)

------------------------------------------------------------------------------------------------------------------------------------------------------------
Page 14 of 22 Rev.0
ANALISA STRUKTUR BAJA TEMPORARY OFFICE 16.5 M

Maintenance Condition
Load Comb. 1031 1.40 D
Load Comb. 1032 0.90 D + 1.00 W (x+)
Load Comb. 1033 0.90 D + 1.00 W (x-)
Load Comb. 1034 0.90 D + 1.00 W (z+)
Load Comb. 1035 0.90 D + 1.00 W (z-)
Load Comb. 1036 0.90 D + 0.30 Eqx + 1.00 Eqz
Load Comb. 1037 0.90 D + 0.30 Eqx - 1.00 Eqz
Load Comb. 1038 0.90 D - 0.30 Eqx + 1.00 Eqz
Load Comb. 1039 0.90 D - 0.30 Eqx - 1.00 Eqz
Load Comb. 1040 0.90 D + 1.00 Eqx + 0.30 Eqz
Load Comb. 1041 0.90 D + 1.00 Eqx - 0.30 Eqz
Load Comb. 1042 0.90 D - 1.00 Eqx + 0.30 Eqz
Load Comb. 1043 0.90 D - 1.00 Eqx - 0.30 Eqz

Unfactored Load Combination


Erection Condition
Load Comb. 2001 1.00 D
Load Comb. 2002 1.00 D + 1.0 W (x+)
Load Comb. 2003 1.00 D + 1.0 W (x-)
Load Comb. 2004 1.00 D + 1.0 W (z+)
Load Comb. 2005 1.00 D + 1.0 W (z-)
Load Comb. 2006 1.00 D + 0.3 Eqx + 1.0 Eqz
Load Comb. 2007 1.00 D + 0.3 Eqx - 1.0 Eqz
Load Comb. 2008 1.00 D - 0.3 Eqx + 1.0 Eqz
Load Comb. 2009 1.00 D - 0.3 Eqx - 1.0 Eqz
Load Comb. 2010 1.00 D + 1.00 Eqx + 0.30 Eqz
Load Comb. 2011 1.00 D + 1.00 Eqx - 0.30 Eqz
Load Comb. 2012 1.00 D - 1.00 Eqx + 0.30 Eqz
Load Comb. 2013 1.00 D - 1.00 Eqx - 0.30 Eqz
Operating Condition
Load Comb. 2014 1.00 D + 1.00 L
Load Comb. 2015 1.00 D + 1.00 L + 1.0 W (x+)
Load Comb. 2016 1.00 D + 1.00 L + 1.0 W (x-)
Load Comb. 2017 1.00 D + 1.00 L + 1.0 W (z+)
Load Comb. 2018 1.00 D + 1.00 L + 1.0 W (z-)
Load Comb. 2019 1.00 D + 1.00 L + 0.3 Eqx + 1.0 Eqz
Load Comb. 2020 1.00 D + 1.00 L + 0.3 Eqx - 1.0 Eqz

------------------------------------------------------------------------------------------------------------------------------------------------------------
Page 15 of 22 Rev.0
ANALISA STRUKTUR BAJA TEMPORARY OFFICE 16.5 M

Load Comb. 2021 1.00 D + 1.00 L - 0.3 Eqx + 1.0 Eqz


Load Comb. 2022 1.00 D + 1.00 L - 0.3 Eqx - 1.0 Eqz
Load Comb. 2023 1.00 D + 1.00 L + 1.00 Eqx + 0.30 Eqz
Load Comb. 2024 1.00 D + 1.00 L + 1.00 Eqx - 0.30 Eqz
Load Comb. 2025 1.00 D + 1.00 L - 1.00 Eqx + 0.30 Eqz
Load Comb. 2026 1.00 D + 1.00 L - 1.00 Eqx - 0.30 Eqz
Test Condition
Load Comb. 2027 1.00 D + 0.50 L
Load Comb. 2028 1.00 D + 0.50 L + 0.25 W (x+)
Load Comb. 2029 1.00 D + 0.50 L + 0.25 W (x-)
Load Comb. 2030 1.00 D + 0.50 L + 0.25 W (z+)
Load Comb. 2031 1.00 D + 0.50 L + 0.25 W (z-)
Maintenance Condition
Load Comb. 2032 1.00 D
Load Comb. 2033 1.00 D + 1.0 W (x+)
Load Comb. 2034 1.00 D + 1.0 W (x-)
Load Comb. 2035 1.00 D + 1.0 W (z+)
Load Comb. 2036 1.00 D + 1.0 W (z-)
Load Comb. 2037 1.00 D + 0.3 Eqx + 1.0 Eqz
Load Comb. 2038 1.00 D + 0.3 Eqx - 1.0 Eqz
Load Comb. 2039 1.00 D - 0.3 Eqx + 1.0 Eqz
Load Comb. 2040 1.00 D - 0.3 Eqx - 1.0 Eqz
Load Comb. 2041 1.00 D + 1.00 Eqx + 0.30 Eqz
Load Comb. 2042 1.00 D + 1.00 Eqx - 0.30 Eqz
Load Comb. 2043 1.00 D - 1.00 Eqx + 0.30 Eqz
Load Comb. 2044 1.00 D - 1.00 Eqx - 0.30 Eqz

Where:
D : Dead Load
L : Live Load
W : Wind Load
E : Earthquake Load

------------------------------------------------------------------------------------------------------------------------------------------------------------
Page 16 of 22 Rev.0