Вы находитесь на странице: 1из 11

DIHITUNG : Adit DIPERIKSA : Amaldo Gultom

PROYEK : BI JAYAPURA

DISETUJUI : Dwi Aji W.


PONDASI TC TGL : Hal : /

DATA TC

Type TC = POTAIN MC 205B


Tinggi TC (free standing) = 41.7 m (Free standing TC = 50,5 m, agar fondasi TC mampu men-
Lebar section = 2m dukung gaya lateral maka free standing TC diturunkan).

BEBAN TC :

1. Data TC dari Brosur

In service
Moment Max (Mmax) = t.m
Gaya Tekan Max (Vmax) = 121.00 ton
Gaya Horisontal Max (Hmax) = ton

Out of service
Moment Max (Mmax) = t.m
Gaya Tekan Max (Vmax) = 170.00 ton
Gaya Horisontal Max (Hmax) = ton

2. Beban TC dari Perhitungan


Base Section = 1.00 buah
Panjang Base Section = 7.74 meter
Jumlah Section = 11.00 buah
Tinggi per section = 3.26 meter
Berat per section = 1.53 ton
Tinggi TC (free standing) = 41.70 meter
Lebar section = 2.00 meter

Cat head + Cabin = 4.78 ton


Counter Jib = 3.58 ton
Jib Section = 6.68 ton
Tower head section = 5.12 ton
Trolley and Hook = 0.74 ton
Counterweight = 18.60 ton
Telescopic cage = 5.55 ton
Base Section = 4.12 ton
Mass Section = 16.81 ton
Max Angkut = 10.00 ton
Total 75.97 ton

DATA PONDASI
Jarak Tiang
Jenis Pondasi = BORE PILE
Jumlah Tiang = 4 buah
Jarak Tiang (s) = 3.5 m
Diameter tiang = 0.8 m
DIHITUNG : Adit DIPERIKSA : Amaldo Gultom
PROYEK : BI JAYAPURA

DISETUJUI : Dwi Aji W.


PONDASI TC TGL : Hal : /

Berat Poer
Tebal selimut beton = 0.10 m
Panjang minimum = 3.70 m
Panjang = 5.00 m OK!
Lebar = 5.00 m
Tinggi = 1.80 m
Berat Poer = p x l x t x g beton = 108.00 ton
= 108.00 ton
fc' = 24.90 MPa = 2,490.00 T/m2
fy = 400.00 MPa = 40,000.00 T/m2
Es = 200,000.00 MPa = 20,000,000.00 T/m2

Data TC
Panjang Jib (LJ) = 60.00 m
Beban Jib (qJ) = 0.11 ton/m
Panjang Counter Jib (LCJ) = 14.50 m
Beban Counter Jib (qCJ) = 0.25 ton/m
Counter weight (wCW) = 18.60 ton
Beban Max (wMAX) = 10.00 ton
Jarak beban max (LMAX) = 16.60 m

Momen pada kondisi normal = 0,5 x qJ x LJ2 - 0.5 x qCJ x LCJ2 - 1,3 x wCW x LCJ
= -176.00875 t.m
= 177 t.m

Momen pada kondisi beban 10 ton = 0,5 x qJ x LJ2 + 1,3 wMAX x LMAX - 0.5 x qCJ x LCJ2 - 1,3 x wCW x LCJ
= 39.79125 t.m
= 40 t.m

Momen akibat beban angin


Beban angin = 100 kg/m2
Koefisien angin = 1.2
Koefisien rangka = 0.3
Lebar Section = 2 m
Lebar bidang angin = 2.828 m
Tinggi TC = 41.7 m
Beban merata pada section = 102 kg/m 0.102 t/m
M = 88.53 t.m
Hmax = 4.25 ton
Mmax = 265.53 t.m
DIHITUNG : Adit DIPERIKSA : Amaldo Gultom
PROYEK : BI JAYAPURA

DISETUJUI : Dwi Aji W.


PONDASI TC TGL : Hal : /

Kesimpulan :

Beban yang dipakai dalam perhitungan :

M 265.53 t.m
DM 7.64 t.m (akibat beban horisontal)
M total 273.17 t.m

Vmax 170.00 ton


V akibat berat poer 108.00
V total 278.00

H 4.25 ton
DIPERIKSA : Amaldo Gultom

DISETUJUI : Dwi Aji W.

DATA TC

(Free standing TC = 50,5 m, agar fondasi TC mampu men-


dukung gaya lateral maka free standing TC diturunkan).
DIPERIKSA : Amaldo Gultom

DISETUJUI : Dwi Aji W.


DIPERIKSA : Amaldo Gultom

DISETUJUI : Dwi Aji W.


DIHITUNG : Adit DIPERIKSA : Amaldo Gultom
PROYEK : BI JAYAPURA

DISETUJUI : Dwi Aji W.


PONDASI TC TGL : Hal : /

PERHITUNGAN PONDASI TC1


DESAIN PONDASI TOWER CRANE TC1
PROYEK PAJAK SUDIRMAN
JAKARTA

DATA

a Gaya Maksimum Pondasi


Gaya horisontal maksimum Hmax = 4.25 t
Gaya vertikal maksimum Vmax = 170.00 t
Momen maksimum Mmax = 265.53 tm
Momen total Mtotal = 273.17 tm

b Dimensi Pondasi TC
Panjang pile cap P1 = 5.00 m
Lebar pile cap L1 = 5.00 m
Tebal pile cap T = 1.80 m
Tebal selimut p = 10.00 cm
Panjang section TC P2 = 2.00 m
Lebar section TC L2 = 2.00 m
Mutu beton K300 f'c = 249.00 kg/cm2
Tulangan utama D25 fy = 4000 kg/cm2
Jumlah bore pile n = 4 bh
Tipe bore pile ● Round SquareS = 80 cm
Kedalaman bore pile L = 8.00 m
Berat jenis tanah γtanah = 1.54 t/m3
Sudut geser tanah Ø = 11.5 º

c Data Tanah
Conus qc = 100.00 kg/cm2
Total friction JHP = 112.50 kg/cm

PERHITUNGAN

a Daya Dukung Tekan Tiang Tunggal

qc∗Ac JHP∗Oc
Pall= +
SF 1 SF 2
Luas penampang bore pile Ac = 5024 cm2
Keliling tiang pancang Oc = 251.2 cm
Faktor keamanan 1 SF1 = 3
Faktor keamanan 2 SF2 = 5
Daya dukung tekan tiang tunggal Pall = 173.12 t

Efesiensi Tiang Group


y

[ ][
D
arctan ( s)
η=1−
90
( n−1 ) m + ( m−1 ) n
m*n ] x s

Jarak pusat ke pusat bore pile s = 3.5 m


Syarat : 2.5*D ≤ s ≤ 6*D
2 ≤ s ≤ 4.8
Banyaknya baris m = 2 bh
Banyaknya kolom n = 2 bh
Efesiensi tiang group η = 0.98

Daya dukung tekan ijin tiang tunggal Pult = η*Pall


= 170.24 t
DIHITUNG : Adit DIPERIKSA : Amaldo Gultom
PROYEK : BI JAYAPURA

DISETUJUI : Dwi Aji W.


PONDASI TC TGL : Hal : /

b Beban Maksimum yang Diterima Bore pile


y
0.75

1.80
x 3.50 5.00

0.75

0.75 3.50 0.75


5.00

Berat poer Ppoer = P*L1*T*γbeton


= 108.00 t
Gaya vertikal total Vtotal = Vmax + Ppoer
= 278.00 t
Jumlah baris arah y ny = 2
Jarak maksimum tiang pancang terhadap sb x Xmax = 1.75 m
ΣX2 = 6.125 m2
Vtot Mtot∗X max
P max= ±
n ny∗∑ X 2
Beban maksimum yang diterima tiang pancang Pmax = 108.52 t
Pmax < Pult …ok!

c Kontrol Terhadap Tegangan Geser Pons

Tinggi efektif pile cap d = T - p - 0.5*Øutama


= 1.69 m
Mencari bo bo = (P2+d)*4
= 14.75 m
Gaya geser yang bekerja di sekeliling kritis Vu = 2*Pmax - Ppoer
= 109.05 t
Kapasitas geser beton

φVc=0.6∗0.33∗√ f ' c∗bo∗d ØVc = 777.68 t

Vu < ØVc …ok, pondasi aman terhadap geser pons

d Kontrol Terhadap Tegangan Geser Lentur

Gaya vertikal total Vtotal = 278.00 t


Gaya geser nominal Vn = Vtotal
Ø
= 463.33 t
Kapasitas geser pile cap Vc = 226.34 t

Vc=0 .17∗√ f ' c∗bw∗d


Mencari m1 m1 = Vn - Vc
= 236.99 t
Mencari m2 m2 = 887.61 t
2
m 2= ∗ √ f ' c∗bw∗d
3
m1 < m2 …ok, dimensi pile cap cukup

Cek tulangan geser ØVc = 135.80 t

ØVc < Vtotal …pile cap perlu tulangan geser

Luas tulangan geser Av = 2,962.41 mm2


d
∗( Vn−Vc )
2
Av =
d∗fy
digunakan tulangan geser D22 - 150 …not ok Astp = 2,532.93 mm2
DIHITUNG : Adit DIPERIKSA : Amaldo Gultom
PROYEK : BI JAYAPURA

DISETUJUI : Dwi Aji W.


PONDASI TC TGL : Hal : /

e Penulangan Pile Cap


y
0.75

1.80
x
3.50 5.00
O

0.75
2*Pmax 2*Pmax

0.75 3.50 0.75


5.00

Beban untuk 1 m lebar pias q = T*2.4


4.32 t/m
Momen lentur di titik O Mo = 366.34 t.m
Momen nominal Mn = Ma-a
Ø
= 457.92 t.m

Mencari nilai K K = 0.01520


Mn
K=
b∗d 2∗0 . 85∗f ' c
Mencari nilai F F = 0.01531
F=1−√ 1−2K
Luas tulangan pile cap As = 6,836.35 mm2
F∗b∗d∗0 . 85∗f ' c
As=
fy
Tul arah -X dan -Y bawah D25 - 70 …ok Astp = 7,008.93 mm2
Tul arah -X dan -Y atas D25 - 125 …ok Astp = 3,925.00 mm3

f Kontrol Gaya Horisontal


Hmax
T

Ld
Pp
L
Lz
O
Lz
R

Kedalaman jepit tiang pancang Ld = 1/3*H


= 2.67 m
Koefisien tanah pasif Kp = 1.50
φ
Kp=tan 2 45+ ( 2 )
Tekanan tanah pasif Pp = Kp*γtanah*(Ld+T)
= 10.29 t
Jarak Tekanan tanah pasif dari titik O Lz = 1/3*(Ld+T)
= 1.49 m
Mencari gaya horisontal ijin Hijin = Pp*2*Lz
(T+Ld+Lz)
= 5.14 t
Hmax < Hijin …ok, aman terhadap gaya lateral
Safety Faktor SF = 1.21
DIHITUNG : Adit DIPERIKSA : Amaldo Gultom
PROYEK : BI JAYAPURA

DISETUJUI : Dwi Aji W.


PONDASI TC TGL : Hal : /

DETAIL PENULANGAN PILE CAP

PANJANG (m) BERAT


TIPE SKETSA
2 BERSIH Ld TOTAL (kg)

1 4.80 3.20 8.00 2232.61

1 2 4.80 1.00 5.80 916.273


x 5.00
3 4.80 3.20 8.00 2232.61

4 4.80 2.00 6.80 1074.25

5 4.45 0.64 5.09 128.532


4 3
6 3.30 0.64 3.94 99.4922

7 4.90 0.10 64.95 738.025


5.00
7421.80
RASIO BESI BETON

1.80

7
5 6
Interpolasi
γtanah 1.531 1.542 1.454 1.51
Ø

Panjang 9.75 10 8.75 10.25 9.69


Tiang 8.75 9 7.75 9.25 8.69