The Present Facts Alternatives Selected for Alternative Development

Purpose – What is achieved? Is it necessary? If YES, Why? What ELSE could be done? Short Term
-Concrete Pouring transports concrete from - Yes, concrete possesses significant - Greencrete: Concrete substitute of - Ferrock
site of mixing to formworks and footings to compressive strength and tensile aluminosilicate material Long Term
create the necessary shape in an efficient strength when combined with rebar and - Ferrock: Produced from industrial - Further research and development
manner has diverse applications in the waste and mainly steel dust. Sets required to develop alternate methods to
construction industry faster than concrete provide efficiency of elevated concrete
pouring
Place – Where is it done? Why there? Where else could it be done? Where?
- Concrete boom tower is situated at the - Setting a stationary pump provides - The stationary pump can be - Utilisation of a crane guided kibble to
centre of the site and directs concrete over flexibility when pouring across a large replaced with pumps mounted onto provide a faster concrete pour process
large areas which is fed by a pump placed area and across multiple levels trucks whilst removing the need to facilitate a
at lower levels into which delivered -The procurement of concrete on site is - Necessity of a central concrete pump onsite
concrete was fed through fast due to its close proximity to Boral boom tower can be replaced with a
- 3-4 Parramatta Square Cement on Parramatta Road crane guided kibble
Sequence – When is it done? Why then? When else could it be done? When?
- Concrete pouring is completed after the - Formworks must be constructed prior - No Alternatives; guiding - Without further research in construction,
erection of formworks, placement of rebar to concrete pouring to ensure concrete formworks must be set to allow the current sequencing of concrete pouring
foundation and accommodation of is moulded into the desired shape. concrete to achieve a desired shape after formworks crucial in producing a
protrusions within the site with delay strips Rebar is to be laid to improve stable structure
or vertical rebar. compressive strength of concrete whilst
protrusions must be accounted for
beforehand to prevent obstruction to
future work.
Person – Who does it? Why that person? Who else could do it? Who?
- A team of individuals work together to - This team is required to ensure the - Machinery dedicated to - Machinery allows for long term savings
simultaneously pour, vibrate and screed correct and efficient setting of concrete autonomous concrete pouring and whilst ensuring safety to workers by
freshly poured concrete - Possessing the appropriate knowledge screeding reducing the strenuous task of screeding
- The team must exhibit suitable is crucial as quality of concrete pour
experience and safety knowledge dictates the structural integrity of the
reinforced with consistently following safe building. Furthermore, safe work
work practices and wearing Personal knowledge is required to prevent
Protective Equipment (PPE) accidents
Means – How is it done? Why that way? How else could it be done? How?
- Materials – Cement, water, aggregate Materials – Cement, water, aggregate
- Equipment – Concrete boom, pump, Materials – Materials are abundant, and - Replacing the stationary tower Equipment – Crane, Kibble, Formboards,
formboards, vibrators, helicopter trowels, addition of water produces a hydration boom with a kibble attached to a vibrator
rebar reaction with cement. crane Method – The crane lifts the cement filled
- Method – Concrete was delivered using a Equipment – Vibrators allow trapped kibble above site of pour before releasing
concrete tower boom as workers vibrate air to escape from the concrete. contents
and screed away the excess concrete. Concrete boom move concrete through
pumps to an agitator
Method – Simultaneous work ensures
the most efficient procedure