3/4 " thkn.

preformed expansion
4"
joint filler. Stop 5/8 " clear 4"
4"
of face of concrete 2" x 12"
2 3/4 " 2 3/4 "
Conc. bridge rail, continuous shear key
Type "F" Traffic side

2’-1 1/2 "


1’-2 3/4 "

24"

2’-1 1/2 "

2’-1 1/2 "


Median barrier or
shldr. barrier

PLAN
Pay limit for
Pay limit for median or

*
shldr. barrier
conc. bridge rail
8" 8" 8"
4"

Var. 6.25’ to 18.75’ MODIFIED MODIFIED


(See general note 8) STIRRUP PAIR STIRRUP PAIR
31-DEC-2009

A B

4"
3 - 1" dia. x 24" 1’-8" nom.
10" 10" SECTION A-A SECTION B-B
dowels 4" #4 Rebar #4 Rebar
6"

*
2’-8"
9" Dimension variable through transition section.

9"
rd520.dgn

Finish grade A B
2"

Modified #4 2" x 12" 4 - 11’-10" #4 GENERAL NOTES FOR ALL DETAILS:


stirrup pairs continuous shear key bars each face
NOTE: 1. All reinf. shall be full length as shown and shall be 2" clear of nearest face of conc.,
End configuration and connection details unless otherwise shown.
shall be as detailed for the barrier specified.
(See general note 7) 2. See Std. Drgs. RD500 & RD505 for additional details.

3. See Std. Drgs. RD505 & RD516 for securing concrete barrier to roadway.

4. See Std. Drg. BR200 for Concrete Bridge Rail, Type "F".
e
sid
fic 12 5. All pins, bolts, dowels, loop bars, and connectors shall be hot-dip galvanized after
af "
Tr fabrication.

6. Not for use on bridge end panel.

7. Field verify end configurations of connecting barriers prior to


forming connections at transitions. Dowelled connection is an
Metal or plastic dowel caps acceptable alternative. See Std. Drg. RD505 for details not shown.

8. Normal length for cast-in-place transition is 12’-6".


Site conditions may require varying lengths between 6’-3" and 18"-9".
Field verify transition length and end configurations of connecting barriers.

CALC. BOOK NO. N/A BASELINE REPORT DATE 12-JAN-2010


5’
.7 NOTE: All material and workmanship shall be in accordance with
18
’ to n e 8) the current Oregon Standard Specifications
25 io t
. 6. n sit no
a r r a ra l
V T ne OREGON STANDARD DRAWINGS
ge
e e
(S CAST-IN-PLACE CONCRETE BARRIER
TRANSITION TO
CONCRETE BRIDGE RAIL TYPE "F"
RD520

3 - 1" dia. x 24" dowels (Greased). 2" x 12" 2008


Dowels shall be embedded 12" into continuous shear key DATE REVISION DESCRIPTION
conc. bridge rail 12-2009 REVISED STANDARD DRAWING TITLE, DETAILS AND NOTES

CAST IN PLACE TRANSITION


( Looking at side away from traffic )

Effective Date: June 1, 2010 - November 30, 2010 RD520