Вы находитесь на странице: 1из 4

© 2015 IJSRSET | Volume 1 | Issue 6 | Print ISSN : 2395-1990 | Online ISSN : 2394-4099

Themed Section: Engineering and Technology

Ecofriendly Vehicle Charging Using Hybrid System


Pavan Sharma, Sapan Patel, Nitish Jadhav, Bhavik Patel
1
Student, Electrical Engineering, Sigma Institute of Engineering, Bakrol, Vadodara, Gujarat, India.
pavan_9sharma@yahoo.com
2
Student, Electrical Engineering, Sigma Institute of Engineering, Bakrol, Vadodara, Gujarat, India.
sapanpatel151997@gmail.com
3
Student, Electrical Engineering, Sigma Institute of Engineering, Bakrol, Vadodara, Gujarat, India.
jadhavnitish1@gmail.com
4
Assistant Professor, Electrical Engineering Department /Sigma Institute of Engineering, Bakrol, Vadodara, Gujarat, India.
bhavikb_patel@yahoo.com

ABSTRACT
Our project is about the Ecofriendly Vehicle Charging Using Hybrid System. If this technology is apply to any battery
operated vehicle than there are many advantages of this technology. In this technology wire connected charging system
is not used. In this project the charging system work on IR sensor (transmit & receive data) so due to this their no issue
of electrical shock & accident. For the hybrid system we are using the solar panel which is connected to the battery, so in
summer season it can be used for the charging of battery.
Keywords: Isolated transformer, Transmitter, battery, capacitor bank, motor

IJSRSETXXX | Received: XX June 2015 | Accepted: XX June 2015 | May-June 2015 [(1)2: XX-XX] 1
I. INTRODUCTION Receiver is connected at connected to the vehicle and battery which can be charged
secondary site of isolated the floor. In this system we and discharged into a load,
Now a day the battery transformer. When the use the transmitter as the and recharged many times, as
vehicles are used for vehicle come at these floor, sensing device. The output of they opposed to a disposable
transportation, so main sensors of both primary and the transfomer is given to the or primary battery, which is
problem of this vehicle is of secondary match and vehicle Ac to Dc converter. The fully charged and discarded
battery charging and speed of start charging through rectifier convert the power as after use.
charging. Normally the electrical supply. per requirement of the
From the secondary the battery. The capacitor bank is In our project the battery is
charging time is 6 to 7 hour.
supply is given to A.C to D.C use for the fast charging of charge through the isolation
So the owner keeps the
converter (rectifier) which the battery. The vicle come transformer, the Ac supply is
vehicle for charging during
converts the A.C supply into over the floor at which the convert into the Dc supply
night time, if due to lose of
D.C as appropriate to battery primary winding is connect which is useable for the
socket the vehicle is not able
charging. The A.C supply is the sensor are come in action battery charging. The battery
to charge and owner has to
converted into D.C using and battery is strat charging. is fast charge by the
suffer from this problem. So
Rectifier. The rating of Capacitor Bank.
we are mainly focus on the
charging of battery without rectifier is 12V-24V, 1A. The III. METHODS AND C. IR Sensor (Infrared
any interruption and charging rectifier output is supply to
MATERIAL sensors)
of battery fast as much as the battery. By using this
In our project the transmitter
possible. So we develop the technology there is no issue
 Material & receiver IR sensor are use.
project which solve the above of wire charging, charging of
Transmitter of IR sensor is
problem easily and vehicle is done by wireless in
A. Primary & Secondary connected to the primary side
economically. Our Project is which primary and secondary
Transformer coil of transformer and receiver
to develop a wireless vehicle is isolated from each other
Isolation Transformers have of IR sensor is connected to
charging system using hybrid and vehicle is charge through
primary and secondary the secondary side of
technology. The battery of magnetic field. So due to this
windings, which are transformer. Infrared
the vehicle is charge by their no issue of electrical
physically separated from technology mainly use in the
hybrid system in which shock & accident.
each other. Sometimes these wireless applications. The
battery is supported solar
transformers are referred as range of the IR sensor is up
charging and electrical
"insulated". This is because to 12 meter and voltage is up
charging. In our project, an II. BLOCK to 12V.
electrical charging system the primary and secondary
consists of primary &
DIAGRAM windings are insulated from
secondary winding of each other. In our project the
primary winding is kept D. Rectifier 24V/1A
transformer, IR sensor and The device which convert
Rectifier (AC-DC converter). under the floor area whose
the alternating current (AC)
Primary winding of rating is 230V A.C, 50Hz.
into the Direct current (DC),
transformer is kept under the which flows in only one
The secondary winding is
floor and secondary winding direction is knows as rectifier
kept under the vehicle chassis
is connected under the and the process is called
whose rating is 12V A.C. An
vehicle chassis. So the rectification. In our project
isolation transformer allows
problem of lose contacts and the 24V rectifier is used for
an A.C supply to be taken
socket is no more. the charging of battery.
Figure 1: Block diagram from one device and fed into
The rating of the transformer Rectifiers are available in
another without electrically
is 230V/12V & stepdown different voltage range and
In this paper we connecting the two circuits.
Transformer. In this use as per the battery
experimentally studied the Isolation transformers block
technology wire connected available.
hybrid electrical charging of transmission of D.C supply
charging system is not used.
the battery operated vehicle. from one circuit to the other,
In this project the charging E. DC Series Motor
In this we studied about the but allow AC signals to pass.
system work on IR sensor Construction of this motor is
fast charging of battery. In similar to any other types of
(transmits & receives data). B. 12 volt Rechargeable
our this phase we charge the DC motors in almost all
The rating of the transformer Battery
battery wirelessly throght the factors. DC series motor has
is 12V and 2M range. A storage battery, secondary
primery and secondry of the very high starting torque.
Transmitter of IR sensor is cell, rechargeable battery,
transformer which is Series motor draws less
connected at primary site and or accumulator is a type of

International Journal of Scientific Research in Science, Engineering and Technology (ijsrset.com)


4
current and power from the chassis of the vehicle are Figure 2: Hardware of The rubber wheels and
source compared to a shunt fabricated in the proper vehicle bearings are fitted and
or compound motor. Series alignment for better welding to the chassis of the
motor use the lowest starting performance of the vehicle. vehicle body. Nuts and bolts
current at a given torque. The floor at which the are tightening as per required
primary winding is connected and fitted to the major parts
F. Charging Indicator should be robust to handle of body structure.
The charging indicator the weight of the vehicle. The
is use to indicate the different test may be conduct B. Assembly Phase
charging level of the for better performance of the
battery. The charging vehicle. The electrical wiring After the body structure is
indicator must be and component are connected completed the main part is
accurate so the owner as per the diagram of the assembly of the electrical and
had got the proper vehicle. The rectifier, mechanical component of the
indication of the capacitor bank, primary & vehicle. The fitting of the
battery. secondary coil, sensors are primary and secondary
Figure 3: Hardware diagram
connect to the vehicle and the winding is completed. The
of vehicle
Component floor with the help to nuts primary winding is fitted
and proper wiring. under the floor and secondary
Requirement is fitted under the chassis of
TABLE I The system was tested by the vehicle body. The sensors
List of components means of human power for are fitted as per required
three times and it was distance and wiring id done.
SR COMPONENTrecognized that the charging
The rectifier and capacitor
NO NAME time and the reliability of the
bank is fitted to the body and
1. Transformer system must be require, it can
wiring is completed. The
easily operate by using single
winding charging indicator and analog
hand. Before staring the
2. IR Sensor & digital meter are connected
system the connection of
to the body. The wheel is
3. Rectifier vehicle and floor must be
connecting to the motor.
check. When the vehicle
4. Switch
come over the floor the C. Testing Phase:
5. RECHARGEABLE transmitter of the vehicle Figure 4: Circuit Daigram
send the signal to the receiver of System This phase is last phase of
BATTERY
6. CHARGING of the floor sensor and our project. In this phase
vehicle start the charging by In this system the fabrication, testing of electrical circuit
CIRCUIT means of indicating in the assembly and testing are the and Motor and maintenance
7. Capacitor Bank charging indicator. The important part of body of gear box. We check daily
vehicle is charge without any structure, they are discuss as arena which is must be clean.
9. BALL BEARINGS
wire connection. follow: The primary and secondary
10. Changeover
winding are checked and
A) Fabrication Phase
Switch coils are checked properly.
Fabrication of the body
11 Charging Indicator The sensors are clean and
structure is done carefully
12. D.C series Motor check the accuracy.
with the help of fabricator.
The body is fabricating
according to the design of the The DC series motor is run at
project. One of the major top speed and check the
parts of the fabrication is condition of the winding,
 Method
chassis alignment and joint heating, vibration etc. Testing
fabrication. The chassis are of the rectifier is done
Fabrication of the body
welded with the help of properly with the help of
structure is done carefully
welder is proper jointing are testing equipment. The
with the help of fabricator,
done. wiring of all equipment is
because of the vehicle body
which is made of metal. The

International Journal of Scientific Research in Science, Engineering and Technology (ijsrset.com)


4
check with the help of multi so there is no  The capacity of the [3] Fuller R. J., Aye LU,
meter. problem of loos battery can be 2012. “Human and
contact as well as animal power – The
increase of the more
sparking. forgotten renewables”
travelling capacity. Renewable Energy48
III. RESULTS AND  It is economical The chassis can be (2012) 326-332.
DISCUSSION system. made more robust [4] Maximo Gomez-Nacer,
 It provides
for the high load 2005. “Animal powered
This system depend on the maintenance free electricity generator”,
capacity.
fast charging system and the operation. Patent no - US
charging time require for the E. Features: 2005/0161289 A1.
battery. The reading of B. Applications:
charging time of the battery This system has many
is taken for three to four time  Government Travel characteristics few of them
so we can able to get time and transportation are mention as follows:
require for charging and if vehicle, two wheeler
any component require to battery motor bike,  For fast charging.
change that may be change. light and heavy  For wireless
battery vehicle. charging.
The accuracy of the sensors  Such area where  Easy operation.
are taking as the important fuel is not supplied  Highly sensitive.
part of the system so when easily. Further, it is  Reliable.
the vehicle come the floor the also applicable to  More flexible.
sensor come in the action and use against high fuel
battery start charging. The price. IV.
battery is full charge during  Running cost is less
the testing and reading of CONCLUSION
so the poor people
different charging methods can affords.
This project solves the
are taken.
The rectifier and the dc series problem of loos contact of
C. Limitation:
motor must be work properly wires and sockets used for
so the vehicle charging and the charging. Moreover, it is
 Battery is running
run without any interruption. also solves other problems
on the single source
such as slow rate of charging
of charging so in
There are some advantage, so that the owner may not
case of electricity
applications and limitation of have to kept his vehicle for
cut-off battery not
this system as follow and hours for the charging. For
able to charge.
also discuss about the future this we are use the capacitor
 They sensors must
planning and expansion of bank at cheaper rate and less
be clean sometimes
the system for the better maintenance requirement.
due to dirtiness
performance so we eliminate The running cost of the
charging is not start.
the error of the system. There  The changeover project is less. In this project,
are some feature of our switch is not using capacitor bank and
project which are main automatic. isolated transformer charging
highlight.  The chassis not able rate is boomed with wireless
to handle high charging economically.
A. Advantages:
capacity of load.
 It is an eco-friendly
V. REFERENCES
D. Future Enhancement:
to environment.
 Charging speed of [1] Bhandari, V. B., “Design
battery is high.  In future we use the
of Machine Elements”,
 Save the time of solar energy for the Tata McGraw-Hill,
charging of battery auxiliary charging in 1994.
vehicle. case of electrical [2] Battery charging
 Wiring charging supply is cut off or system. Available from
system is removes failure. http://www.wikkipedia.
com.