TYPE OF MAIN LINE COATINGS
3
BASIS OF SELECTION OF MAIN LINE COATINGS (NEW)
PIPELINE DIAMETER
TYPE OF SOIL
AMBIENT TEMPERATURE
ROW CONDITIONS
CONSTRUCTION PERFORMANCE
4
BASIS OF SELECTION OF MAIN LINE COATING –
OPERATING TEMPERATURE
6
3LPE COATING PROCESS
7
THREE LAYER POLYETHYLENE COATING
DESIGNATION / COATING CLASSIFICATION
8
THREE LAYER POLYETHYLENE COATING
FUNCTIONAL PROPERTIES
DIN-30670 ISO-21809-1 CAS-Z245.21-06
Peel Strength(N/mm) N-n S-n A B C B1
@23°c 3.5 3.5 10 15 23 6
9
THREE LAYER POLYETHYLENE COATING
OPERATING TEMPERATURES
DIN-30670- N (LDPE)
up to 50° C Not Clearly Specified.
Class-B : (– )40° C to (+) 80 °C
However, the purchaser
has to specify the max
(MDPE/HDPE)
design temp.
Class-C ; (– )20°C to (+)110°C
DIN-30670- S
up to 70° C
(PP)
10
VIPUL KUMAR, PEng,
Deputy General Manager-
Engineering
M 1 Infield Pipeline Pressure Class Length Kms
Power Fluid Lines 1500# 10
Water Injection Lines 900# 10
Production Fluid Lines 600# 53
R1 Infield Pipeline 600# 7
MR Pipeline
Gas Line 12” API 5LX60 PSL2 300# 90
Condensate Line 4” API 5LX 65 600# 90
T Pipeline
Water Supply Line 20” API 5LX 65 PSL2 20
Innovative Efforts
Improvisation on Basic Design of Anchor Flanges &
Blocks
Added bends to reduce total applicable force
Anchor flanges on downstream of Water and gas lines
eliminated after review
Above resulted in to Reduction of RCC to 10000 Cum(i.e.
reduction of 58 %)
INNOVATIVE TECHNIQUE
On power black out/ shut down displace oil in flow-
lines with water to ensure oil will not stay in flow lines.
Installed diesel driven high capacity pump at MPT end itself.
Advantages
Saving on concrete cost
Saving on pipe cost
Innovative Technique
Geo text bags filled with gravel material used
Advantages
Saving on time
Saving in logistics Vipul
andKumar,
costPEng
OPTIONS CONSIDERED
All 14 Pipelines on Steel / Concrete structure Bridge
Horizontal Directional Drilling
Bury below soil erosion point
TECHNO-COMMERCIAL FEASIBLE OPTION
IMPLEMENTED
1200 X 25 X 6 meters open excavation
Pipe-layers, cranes, trailers, welding sets etc lowered in
excavated trench
All 14 pipelines laid & trench backfilled
ADAVANTAGES ACCRUED
Saving on time and cost
Vipul Kumar, PEng
Launcher and Receiver skids matching
Hot bends and Cold bends
Inclusion of Magnetic Pigging
TCP and PCP System
MIJs
GOC
OFC
Hydro-testing
Drying with Compressor
Magnetic pigging
Nitrogen Packing of Pipelines
Vipul Kumar, PEng
Launcher and Receiver skids matching
Hot bends and Cold bends
Inclusion of Magnetic Pigging
TCP and PCP System
MIJs
GOC
OFC
Hydro-testing
Drying with Compressor
Magnetic pigging
Nitrogen Packing of Pipelines
Vipul Kumar, PEng
Vipul Kumar, PEng
Vipul Kumar, PEng
Cairn India – 2010 Technical Forum
(October 20th & 21st)
Celebrating Our Technical
Achievements
Cairn India – 2010 Technical Forum
(October 20th & 21st)
Celebrating Our Technical
Achievements