DISPATCH INSTRUCTION

Date: 17.09.2018

To,
M/s Lamco Industries Pvt. Ltd.,
B-38, 39, 40 Industrial Estate,
Sanathnagar, Hyderabad – 500018 (T.S).

Kind Attn.: Mr. Ankur Aggarwal

Dear Sir,

This refers to our Purchase Order Ref. No. NEPL/LIPL/PO/01/Hydro-06/2017-18 dated


13.11.2017, we are providing dispatch instruction for 12 sets 120KV, 10KA Surge Arrestors with
IBDC from your works to our hydro power project site in Nepal by our transporter. The
transporter details shall be sent to you shortly.

Exporter/Buyer (Bill to be raised in f/o): Neon Energy Pvt. Ltd.


D4-1204, Puri Pranayam,
Sector-82-85, Tigaon Road, Nehar Par,
Faridabad-121002, India.

Consignee Address / Shipped to / End User:


The Transformers will be delivered to the following address:
M/s Upper Dordi “A” Hydropower Project (2 x 12.5 MW), (PAN No. 304015739)
KIRTIPUR BESI, LAMJUNG, NEPAL.

Thanking you,

Yours faithfully,

For Neon Energy Pvt. Ltd.

(Authorized Signatory)

Registered Office: D4-1204, Puri Pranayam, Sector-82-85, Tigaon Road, Nehar Par, Faridabad-121002
Correspondence Address : OCUS Quantum, 2nd Floor, Office No. 205-206, Sector-51, Gurgaon-122018 (India) Tel : (0124-7177335),
CIN No : U40300HR2015PTC055594 TIN No. : 06621228604, IEC No. : 0515039845, PAN No. : AAECN9329G

Вам также может понравиться