Вы находитесь на странице: 1из 15

ELECTRICAL POWER AND MACHINES (EPE 491)

INTRODUCTION OF ENERGY
COMMISSION
(SURUHANJAYA TENAGA)

BY : PROF. MADYA HJ. ISHAK ISMAIL


2011
Energy Commission
The Energy Commission is a statutory body
responsible for regulating the energy sector
particularly the electricity supply and piped gas
supply industries in Peninsular Malaysia and
Sabah. The Energy Commission ensures that
the supply of electricity and piped gas to
consumers is secure, reliable, safe and at
reasonable prices.

Suruhanjaya Tenaga
No. 12, Jalan Tun Hussein
Precinct 2,
62100, Putrajaya
Toll Free Number : 1-800-2222-78
Telephone : 03-8870 8500
Fax : 03-8888 8637
Background
The energy sector in Malaysia has undergone significant changes
since the 1990s. This was driven by the Government's aim to
enhance supply security, improve efficiency and quality in utility
services and increase the private sector's participation in
infrastructure development.

In its efforts to further enhance the performance of the energy


supply industry in Malaysia, on 1st May 2001, the Government
established the Energy Commission under the Energy Commission
Act 2001. The Energy Commission became fully operational on
1stJanuary 2002 and assumed all the responsibilities of the
Department of Electricity and Gas Supply which was dissolved on
the same date.

In line with the objectives of its formation, the Energy Commission


aims to balance the needs of consumers and providers of energy to
ensure safe and reliable supply at reasonable prices, protect public
interest, and foster economic development and competitive markets
in an environmentally sustainable manner.
Roles and Responsibilities of Energy
Commission (EC)
Economic Regulation - to promote efficiency and economy in the
generation, transmission, distribution, supply and use of electricity and in the
reticulation and use of gas; promoting and safeguarding competition; enabling
fair and efficient market conduct or, in the absence of a competitive market, to
prevent the misuse of monopoly or market power in the electricity and piped
gas industries.

Technical Regulation - to ensure security, reliability and quality in electricity


and piped gas supplies.

Safety Regulation - to protect the public from dangers arising from the
generation, transmission, distribution and supply and use of electricity and the
supply and use of piped gas.

Consumer Protection - to protect consumers in areas such as dispute


resolution, affordability of services as well as quality supply and services from
electricity and piped gas utilities.
APPLICATIONS OF ELECTRICAL LAWS
LICENSED AND REGISTERED
INSTALLATION
COMPETENT CONTROL

NOTIFICATION OF
ACCIDENT OR FIRE

OFFENCES AND PENALTY


LICENSED AND REGISTERED INSTALLATION
a) FOR THOSE WHO USE, WORK, OPERATE ANY INSTALLATION BY
MEANS OF SELF GENERATED ELECTRICITY SUPPLY WITH THE
CAPACITY OF MORE THAN 5KW, REQUIRE LICENCE FROM ENERGY
COMMISSION. FOR EXAMPLE, WORKS ON CONSTRUCTION SITES
USING GENERATOR SET MUST ACQUIRE LICENCE FROM EC.

b) FOR INSTALLATION (e.g. BUILDINGS, FACTORIES ETC.) WHERE THE


ELECTRICITY SUPPLY FROM LICENSEE (e.g. TNB) AT 11,000 VOLTS
AND ABOVE, OR IF THE INSTALLATION HAS A STANDBY
GENERATOR SET, THE INSTALLATION MUST BE REGISTERED WITH
EC.

HOW ABOUT SOLAR ENERGY?


ELECTRICITY SUPPLY ACT 1990
EXEMPTION UNDER SECTION 54

IN exercise of the powers conferred by section 54 of the Electricity Supply Act 1990 [Act
447], the Minister exempts any person who uses, works or operates or permits to be used,
worked or operated any installation or, supplies to or for the use any other person
electricity from any installation, that uses photovoltaic system or solar panel for purposes
of generating electricity-

(a) for a three phase system, at a voltage not exceeding low voltage with a capacity of up
to 72kW; or

(b) for a single phase system, at a voltage not exceeding low voltage with a capacity of up
to 24kW,

from section 9 of the Act.

Commencement

2. This Notification comes into operation on 15 August 2008.

Dated 21 July 2008


[KTAK: BP(S)223/353/22/4 KIt. 5; PN(PU2)486/VI]
DATO' SHAZIMAN BIN ABU MANSOR
Minister of Energy, Water and Communications
COMPETENT CONTROL

a. ELECTRICAL SERVICES ENGINEER


b. COMPETENT ELECTRICAL ENGINEER
c. ELECTRICAL SUPERVISOR
d. CHARGEMAN
e. CABLE JOINTER
f. WIREMAN
VISITING OF INSTALLATION BY ELECTRICAL
SERVICES ENGINEER, COMPETENT ELECTRICAL
ENGINEER AND ELECTRICAL SUPERVISOR.
CATEGORIES OF CHARGEMAN
CATEGORIES OF WIREMAN

NO CATEGORY CLASSIFICATION

1 PW1 SINGLE PHASE WIREMAN


2 PW2 SINGLE PHASE RESTRICTION ENDORSE TO TEST
3 PW3 THREE PHASE WIREMAN
4 PW4 THREE PHASE RESTRICTION ENDORSE TO TEST
5 PW5 ELECTRIC SIGN WIREMAN
6 PW6 ELECTRIC SIGN RESTRICTION ENDORSE TO TEST
NOTIFICATION OF ACCIDENT OR FIRE

WHENEVER ANY ACCIDENT OR FIRE CAUSING OR RESULTING IN


LOSS OF LIFE OR HURT TO ANY PERSON OR SERIOUS DAMAGE TO
PROPERTY HAS OCCURRED IN CONNECTION WITH ANY
INSTALLATION OR ELECTRICAL PLANT OR EQUIPMENT, THE OWNER,
LICENSEE OR SUPPLY AUTHORITY AND THE MANAGEMENT THEREOF
SHALL REPORT THE ACCIDENT OR FIRE TO COMMISSION BY THE
QUICKEST MEANS AVAILABLE, AND SUBSEQUENTLY WITH THE
LEAST POSSIBLE DELAY SHALL REPORT IN WRITING TO THE
COMMISSION THE FACTS OF THE MATTER SO FAR AS THEY ARE
KNOWN TO THEM RESPECTIVELY.
OFFENCES AND PENALTY
SOME OF THE OFFENCES AND PENALTIES UNDER SECTION 37 OF THE ACT:

SUBSECTION OFFENCES PENALTIES


1 TEMPERS ANY INSTALLATION CAUSES RM100,000 OR 5 YEARS JAIL OR BOTH.
DANGER, ETC.
2 BY ANY RASH OR NEGLIGENCE ACT RM50,000 OR 3 YEARS JAIL OR BOTH.
CAUSES DAMAGE ETC.
3 STEALING ELECTRICITY RM100,000 OR 3 YEARS JAIL OR BOTH.

4 DOES NOT LICENCED INSTALLATION RM 50,000 + RM 1,000 PER DAY.

5 SELLING ELECTRICITY ILLEGALLY RM 100,000 + RM 1,000 PER DAY.

8 FAILS TO REGISTER INSTALLATION RM 25,000 + RM 1,000 PER DAY.

9 DAMAGE PUBLIC LAMP ETC. RM5,000 OR 1 YEAR JAIL OR BOTH.

10 AFFIX ADVETISEMENT ETC. FINE RM1,000.

11 DAMAGE SUPPLY LINES ETC. RM50,000 OR 3 YEARS JAIL OR BOTH.

12 ACTIVITY IN VACINITY OF ELECTRICAL RM5,000 OR 2 YEARS JAIL OR BOTH.


INSTALLATION
13 NEW OR ADDITIONAL WIRINGS WITHOUT RM10,000 OR 2 YEARS JAIL OR BOTH.
APPROVAL
14 DAMAGE ANY METERS RM5,000 OR 2 YEARS JAIL OR BOTH.
TASBIH KAFFARAH

Maha Suci engkau Ya Allah


dan aku naik saksi Tiada Tuhan Melainkan Engkau
dan aku memohon ampun serta taubat kepadaMu

Al-Asr

‫َوا ْلعَص ِْر‬


‫سر‬ْ ‫ان لَ ِفي ُخ‬ َ ‫س‬َ ‫اْلن‬ِ ْ ‫إِ َّن‬
‫ص ْب ِر‬
َّ ‫ص ْوا بِال‬َ ‫ق َوتَ َوا‬ِ ‫ص ْوا بِا ْل َح‬
َ ‫ت َوتَ َوا‬
ِ ‫صا ِل َحا‬ َ ‫إِ ََّّل الَّذ‬
َّ ‫ِين آ َمنُوا َوع َِملُوا ال‬

Demi masa sesungguh manusia itu dalam kerugian


kecuali mereka yang pesan memesan dengan kebenaran
dan pesan-memesan dengan kesabaran.

Вам также может понравиться