Вы находитесь на странице: 1из 8

<PROCUREMENT>

Module Outline

<SPECIAL PROCUREMENT PROCESS>


Document Information:
This document has been designed and built by the following individual(s):

Name Role

Veena Kumar SME

Version history:

Rev. Date Issued By Summary of Revision

Approval tracking:

Rev. Date Approved Approval Notes/Signature

<Process> Page 1 of 8
12/3/2018
<PROCUREMENT>
Module Outline

Module Information:
Module Name: Special Procurement Process

Delivery Length: 360 mins

Module MODULE INTRODUCTION


Introduction:

Audience Profile: Material Management Department Executives,

Module Pre- You need to have prior knowledge of the following:


requisites
• Basic knowledge of procurement process

Module Objectives: After completing this module, you will be able to:
 Explain the process of CAFE

Development SME KT session, Functional spec docs


Inputs:

Simulations in SIMULATIONS TO BE ADDED


Module:

<Process> Page 2 of 8
12/3/2018
<PROCUREMENT>
Module Outline

Module Outline:
All modules timed in hours
Module Introduction

Topic 1: Purchase Requirement 4


Topic 2: Purchase Order 4
Topic 3: Release Procedure 2
Topic 4: Stock Transfer Order 2
Topic 5: Special Procurement Process 6
Topic 6: License Validation 1
Topic 7: Freebie 1
Topic 8: Purchasing Info Record 1
Topic 9: Pricing and Promotion 4
Module Summary

Course Content Length (Total) 25 Hrs

<Process> Page 3 of 8
12/3/2018
<PROCUREMENT>
Module Outline

Topic Outline:

Topic Name: SPECIAL PROCUREMENT PROCESS

Topic Introduction: MODULE INTRODUCTION

Topic Objectives:
After completing this topic, you will be able to:
 Explain the CAFÉ Process

<Process> Page 4 of 8
12/3/2018
<PROCUREMENT>
Module Outline

1.2: CAFE

CAFÉ

Café process in Walmart is a business verticle inside a specific store where they sell only
café related articles like coke, burger, sandwich to site an example.

Café is a storage location where specific inventory is stored of Café articles as per the
given example above. They procure ingredients required for burger or sandwich or any
other Café article.

Creation of Ingredient Articles

Article Master is a term used in the Retail Industry equivalent to the Material Master in
Standard. Article master is created for all ingredients that are used in the Café.

Following are the Transaction codes that are used for Article Maintenance:

MM41 – Create New Article


MM42 – Change Existing Article
MM43 - Display Article
MM44 – Display Change Documents

Important Views of the Article Master Data

- Basic Data
This is essentially the basic data view of the material master.

- Listing
Since retail customers have huge number of stores, logistics views are not created
store by store, instead with a mass process called ‘Listing’

<Process> Page 5 of 8
12/3/2018
<PROCUREMENT>
Module Outline

- Purchasing
Purchasing view would contain details that are required for purchasing. This view is
mandatory for all procurement activities. This applies even to those articles which are
being given as freebies.

- Accounting
Accounting view will have details on the valuation of the material. This view is also
mandatory for procurement. If this view is not created in the article master, goods receipt
posting will be difficult, as the system will give an error message.

Create PR and PO
A Purchase Requisition is created for all the ingredient articles for which procurement is
to be done.
A purchase order can be either created manually or an Auto PO is generated cause of the
replenishment program in the background.

<Process> Page 6 of 8
12/3/2018
<PROCUREMENT>
Module Outline

Sub-topic Process Flow

PROCESS FLOW – CAFE

Ingredien Purchase
Purchase Goods
t Article Requisitio
Order Receipt
Master n

Physical
Inventory Vendor
of Invoice
Ingredient

SUB-TOPIC PROCESS STEPS


1. Create ingredient article master for all Café articles.
2. PR can be created for the required articles.
3. Create PO with reference to the PR manually. Auto PO is also possible through the
replenishment program in the background.
4. An STO can also be created with reference to a PR or directly without any reference.
5. Goods receipt will be posted for the ingredient articles.
6. Vendor Invoice posted upon receipt of the invoice.
7. Physical inventory is done for all the ingredient articles.

<Process> Page 7 of 8
12/3/2018
<PROCUREMENT>
Module Outline

1.3: Topic Summary:


You have completed this topic. You should now be able to:
 Explain the Café process

Module Summary

You have completed this module. You should now be able to:
 Explain the process of STO – DC to Site
 Explain the process of STO – Site to Site

<Process> Page 8 of 8
12/3/2018

Вам также может понравиться