Академический Документы
Профессиональный Документы
Культура Документы
PASS-2-LOAD INSPECTION
Expiry
PRIME MOVER INSPECTION CHECKLIST
AIL Name: AIL Location: AIL No:
Vehicle Owner:
Record as:
This checklist must be completed in conjunction with the SLP Initial Inspection = 1 N/A
Operating Guidelines for Pass-2-Load Inspections - OG7-3 Re-inspection =2 Satisfactory ü
Defective û
1. Vehicle Placards Ref: SLP OG7-V3 1 2
Is there a red class 3 diamond attached to the front of the vehicle? Section 3.5
Is the class 3 diamond clearly visible and in good condition? -
Is the class 3 diamond reversible? -
Is the battery cover electrically insulated to the side of and above the battery terminals? -
Is the battery cover substantial, secure and acid and fuel resistant? -
Does the battery isolation switch shut down the engine and isolate all power sources? -
Can the battery isolation switch be operated from outside the immediate rear of the driver side -
cabin by either the battery isolation switch itself or a remote switch?
If fitted with a remote battery isolation switch on the driver’s side, is it clearly labelled? -
SLP
Prime
Mover
Inspection
Checklist
Version
3
Issue
date:
Jun
2015
Page 1
P2L label #
Expiry
NOTES:
SLP Prime Mover Inspection Checklist Version 3 Issue date: Jun 2015 Page 2