Вы находитесь на странице: 1из 1

REPUBLIC OF THE PHILIPPINES

TO POWER DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


SUPPLY CEBU CITY
SCHEDULE OF LOADS AND COMPUTATIONS
OFFICE OF THE
M KW - HRM BUILDING OFFICIAL

HEAD ELECTRICAL SECTION: DATE:

APPROVED BY:
150 AT 2P
BUILDING OFFICIAL DATE

C1 15 AT 2P 15 AT 2P C2

C3 15 AT 2P 15 AT 2P
C4

C5 15 AT 2P 20 AT 2P C6

C7 20 AT 2P 20 AT 2P C8

C9 20 AT 2P 20 AT 2P C10

C11 20 AT 2P 30 AT 2P C12

C13 30 AT 2P 30 AT 2P C14

C15 30 AT 2P 30 AT 2P C16

C17 30 AT 2P 30 AT 2P C18

C19 SPARE SPARE


C20

C21 C22

PANEL BOARD
GROUND WIRE

ELECTRICAL DIAGRAM
DRAWN NOT TO SCALE

ELECTRICAL NOTES:

PA
SE
ALL ELECTRICAL WORKS AND INSTALLATIONS HEREIN SHALL BE EXECUTED A
E LIN

O
IN ACCORDANCE WITH THE LATEST APPROVED EDITION OF THE NG

SIE
E OA
AS

GF
PHILIPPINE ELECTRICAL CODE AND REGULATIONS OF THE LOCAL P

RE
AND NATIONAL AUTHORITIES CONCERNED IN THE ENFORCEMENT

DO
OF ELECTRICAL LAW AND ORDINANCES
WORKMANSHIP SHALL BE EQUAL TO THE BEST STANDARD PRACTICED
PAS
EO
PAN
SITE PB
TAL
EON
ADOPTED AND RECOGNIZED IN THIS TRADE S#

ALL MATERIALS TO BE USED SHALL BE NEW AND APPROVED TYPE TO N


ANY PURPOSE INTENDED. ALL WIRES TYPE TW/THW SHALL BE

PA
INSULATED FOR 600VOLTS.

SE
NO BRANCH CIRCUIT SHALL BE HAVE A LOAD OF MORE THAN 80% OF W E

O
RO
ITS RATING

DU
ACU
ELECTRICAL SERVICE REQUIREMENTS SHALL BE 220 VOLTS,1-PHASE

LF
S CO
A

O
NZ

60HZ, SUPPLY
RA
PE

ADEQUATE AND EFFECTIVE GROUNDING SHALL BE DONE TO METALLIC


ES

CONDUITS, CABINETS AND EQUIPMENTS


S EO

ALL ELECTRICAL INSTALLATIONS HEREIN SHALL BE DONE UNDER THE


PA

SUPERVISION OF A DULY LICENSED ELECTRICAL ENGINEER

VICINITY MAP RISER DIAGRAM


NOT DRAWN TO SCALE
DRAWN NOT TO SCALE
ELECTRICAL ENGINEER PRC REG NO : 955 SEAL TIN : 121-763-364 PROJECT TITTLE: APPROVED AS PLANS AND SPECIFICATIONS : SHEET CONTENT SHEET NO:
DATE ISSUED: 01-06-75 DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE PROJECT NO: 001-16
ARE THE INTELLECTUAL PROPERTIES AND DOCUMENTS
OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH
RYAN BERNARD GO E-03
PTR NO : 6391074 THEY ARE MADE IS EXECUTED OR NOT, IT SHALL BE
UNLAWFUL FOR ANY PERSON, WITHOUT THE CONSENT
OF THE ARHITECT REGISTERED OR AUTHOR OF SAID
DATE : FEB 2016 PROPOSED 2-STOREY RESIDENCE
DATE : 01-20-16 DOCUMENTS, TO DUPLICATE OR TO MAKE COPIES OF PROJECT TYPE: RES OWNER'S SIGNATURE
ENGR. HESIQUIO M. SOLEDAD
SAID DOCUMENTS FOR USE IN THE REPETITION OF AND
FOR OTHER PROJECTS OR BUILDINGS, WHETHER 09 13
PLACE : MANDAUE CITY EXECUTED PARTLY OR IN WHOLE.
SEC. 20 PAR. 4 OF RA 9266-PD 49 DRAWN BY: RCM LOCATION: LOT 77, MA. LUISA ESTATE PARK, CEBU CITY ADDRESS: MANDAUE CITY, CEBU

Вам также может понравиться