ROLL UP DOOR

SINGLE RIB ROOF 4" STEEL PIPE


1 21"
4" THCK. CHB. WALLING W/ PLASTER FIN.
1
2"

APEX / RIDGE LINE

2200
2500

300
7450

3750

3750
FINISH FLOOR LINE

1200
1200

NAT. GROUND LINE

FRONT ELEVATION

1 21" JALOUSY WINDOW


4" STEEL PIPE CONCRETE COLUMN
1
2" SINGLE RIB ROOF PANEL DOOR SINGLE RIB ROOF
RAILINGS (METAL)
APEX / RIDGE LINE APEX / RIDGE LINE

2200
2500

2500
7450

3750

3750

3750
FINISH FLOOR LINE FINISH FLOOR LINE

1200
1200

1200
NAT. GROUND LINE NAT. GROUND LINE

RIGHT-SIDE ELEVATION LEFT-SIDE ELEVATION

1 21" SINGLE RIB ROOF


1
2"
PANEL DOOR

APEX / RIDGE LINE

2200
2500

300
7450

3750

3750
FINISH FLOOR LINE

1200
1200

NAT. GROUND LINE

REAR ELEVATION

S E A L APPROVED: TITLE OF PROJECT : APPROVED AS TO PLAN & LOCATION : R.A. 9266, ARTICLE IV, SECTION 33: SHEET CONTENTS SHEET NUMBER
DRAWINGS AND SPECIFICATIONS AND OTHER
Ar. GIDO CATADA CABELLO, uap CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR

ARCHITECT
SEALED, AS INSTRUMENTS OF SERVICE, ARE
THE INTELLECTUAL PROPERTY AND DOCUMENTS OF THE
FRONT ELEVATION
PRC REG. NO. 6835 PROPOSED BILAR WATER BOTTLING PLANT MS. JADE ACAPULCO BAUTISTA ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY
ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL RIGHT-SIDE ELEVATION A-2
FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF
PTR NO. A0198123
OWNER
SAID DOCUMENTS FOR USE IN THE REPETITION OF AN LEFT-SIDE ELEVATION 3
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
ISSUED ON : JANUARY 15, 2016 EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN
CONSENT OF ARCHITECT OR AUTHOR OF SAID
REAR ELEVATION
PLACE ISSUED : TABILARAN CITY LOCATION: BUGANG NORTE, BILAR, BOHOL ADDRESS: LAYA, BACLAYON, BOHOL D O C U M E N T S .

Вам также может понравиться