OCC-513 127 400 403 Main Bay of 400 kV Bus Reactor at BDTCL Bhopal
OCC-513 131 400 400kV MAPUSA Ckt-II MAIN BAY (403) AT KOLHAPUR
OCC-513 132 765 765kV Kotra # 2 & AT#1 Tie Bay (702) at Tamnar PS
OCC-513 138 400 MAIN BAY (420) OF WARDHA (PG) CKT @ WARORA
OCC-513 140 400 Main bay (409) of Tirora - Warora ckt-2 @ TIRORA
Additional
approved 800 Champa-Kurukshetra Pole 1
outage
OCC-513 29 400 Padgha - Kalwa ckt - 2
OCC-513 124 400 500MVA ICT-2 at Itarsi SS (Dia shall be kept open)
Approved
Continuou
30-Nov-18 9:30 7-Dec-18 18:00 s
Continuou
1-Dec-18 9:00 5-Dec-18 17:00 s
Continuou
3-Dec-18 9:00 4-Dec-18 18:00 s
Continuou
3-Dec-18 10:00 7-Dec-18 17:00 s
Continuou
4-Dec-18 8:00 6-Dec-18 18:00 s
CONTINUO
3-Dec-18 6:00 8-Dec-18 18:00 US
deferred
Continuou
28-Nov-18 9:00 15-Dec-18 18:00 s
Continuou
1-Dec-18 8:00 10-Dec-18 17:00 s
Continuou
3-Dec-18 7:30 4-Dec-18 17:30 s
Continuou
3-Dec-18 9:00 4-Dec-18 17:00 s
Continuou
3-Dec-18 7:30 7-Dec-18 17:30 s
Continuou
4-Dec-18 9:00 6-Dec-18 18:00 s
Approved
For Hardware tightening & replacement of faulty disc
insulators and for Annual Outage maintencne Approved
work/Diagnostic work of Sub Station Equipment etc
Quarterly Maintenance work & Reapir scissors of 400KV
P.G Isolator and Servicing and allignment of isolators Approved
work
For OPGW stringing works, Auto to Non Auto request Approved
Under
For online SEM meter calibration at Korba NTPC end review
Under
For online SEM meter calibration at Korba NTPC end review
Installation and Testing of Impedance Relay and AMP Approved
Works
REFIXING OF LINE SPACERS AND JUMPER SPACERS OF Approved
LINE-2
Hotline maintenance of Bus B, inside the DBPL Approved
switchyard
deferred
For Pole-3 Stand alone Commissioning works. During
Pole -3 power flow testing Pole 1 cannot be run, so Pole Deferred
1 shutdown
1) is required
Dismentling on continuous
of conductor at loc. No.basis.
1103 to 1106 2)
Tower erection at loc. No. 1104 to 1105 3) Dismentling Deferred
of Tower exsting Loc.No.1104 4) Stringing of conductor
at Loc.No. 1103 to 1106
Line Reactor overhauling works Deferred
Off line washing job for Bus B Gantry insulators, 4B2 Deferred
isolator and EMVT of Bus.
PID work from location no.33 (LILO Point) to PGCIL End Approved
OK POWERGRID SRTS-I
System
All other lines at SSP /Dhule (depend on voltage conditions) to SSP/getco/M ownership to be
be inservice with Ar enabled. SLDC Maharashtra / SSP to be GSECL
H mentioned
informed clearly.
Line to be in service with tie bay TRNEPL TRNEPL
ved
OK MSETCL MSETCL
OK POWERGRID NR-1
OK POWERGRID WR-II
OK POWERGRID WR-II
OK MSETCL MSETCL
OK MSETCL MSETCL
OK MSETCL MSETCL
OK MSETCL MSETCL
Sent Date WRLDC
Utility
NLDC Remark Readiness Approval
Readiness Timing Number
140696
C
Load managed READY 11/30/2018 12:50 140723
on 400KV
Talandge-2 & READY 11/30/2018 15:40 140724
load shifted on
LoadTBC on
managed
03.12.2018
on Dabhol- Ready 11/30/2018 15:44 140725
Nagothane-II
R READY 11/30/2018 15:31 140726
Ready 140766
400 KV Asoj-
Chorania line DEFER DUE TO
KASOR GPEC 12/1/2018 14:17
no. 01 A/R will LINE OUTAGE
remain out
Ready 43435.741979
Ready 43435.742153
Ready 43435.370058
Ready 43435.370116
Ready 43435.742326
Ready 43435.742593
Ready 43435.742743
Ready 43435.74294