RENEWABLE ENERGY
Sludge Oil,
Secondary Oil Empty Fruit Bunch Palm Kernel Shell,
converting to Mesocarp Fibre, Oil Palm Trunk
biodiesel
APPROXIMATE CONTENT OF
PALM BIOMASS
20%
17% 11%
EFB
CPO PKS
FFB
4% 50%
Mesocarp
Fibre POME
Presented By: JAFAR DESIGNS 7
Sources: http://www.gelamai.org/en/namas/pome & AggarangsiEnergy Research and Development Institute-NakornpingChiang Mai University, Thailand
CASE STUDY #2
BIO CNG FROM POME, MALAYSIA
1st Bio-Compressed Natural Gas (Bio-CNG) commercial plant: Converting Biogas
from POME into Biogas for industry use
by Sime Darby Industrial
Generation of Distribution
POME, waste, Collection and Anaerobic Biogas Upgrade (Trailers, Consumption
sewage sludge, transport Digester & Compressed Presented
Natural GasBy: JAFAR DESIGNS 12
(Industry)
manure, crops grid)
CASE STUDY #3
PALM OIL EFB PELLET, MALAYSIA
Palm Oil Empty Fruit Bunch (EFB) is processed into pellets for use in Biomass
Power Plants or co-firing Power Plants, as alternative to wood pellets. Project
carried out by Treehouz Asia and Japanese and Korean partners.
EFB PKS
Biomass
Hub Sea Port
OPT
• Company/Operator: Colben Energy (Maju Intan) Joint Venture partner with Maju Intan Biomass Power
Plant
• Capable of generating 12.5MW electrical power
• Located in the vicinity of over 20 palm oil mill processors. Close reach to raw material.
• 4 Main Processes carried out at facility: Fuel Preparation, Wastewater treatment, Steam generation and
Electric power generation
Presented By: JAFAR DESIGNS 15
Source: https://www.asiatic.com.sg/our-businesses/energy/maju-intan-biomass-power-plant.html
CASE STUDY #6
JAPAN FIRES UP BIOMASS ENERGY
• More than 800 projects have already won government approval and government subsidies.
• Supported by Japan’s Feed-in-Tarriff subsidy scheme
• 12.4 gigawatts (GW) of capacity — equal to 12 nuclear power stations
• Projects would need the equivalent of up to 60 million tonnes of wood pellets, compared with global
output of 24 million tonnes in 2014
• Japan Renewable Energy (JRE) is building its first biomass power station north of Tokyo, adding to
Presented By: JAFAR DESIGNS 16
solar and wind power plants.
Source: Reuters
CASE STUDY #7
BIOMASS MIXED COMBUSTION POWER GENERATION FACILITY, JAPAN
Source: https://www.nipponpapergroup.com/news/year/2017/news170901003911.html
www.biomass.org.my
Mobile : 006012-2128700
Email : eh.tan@treehouz.asia