PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description: TAIL FRAME 4/2/2017
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2000 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 02/04/2017 02/04/2017 02/04/2017 03/04/2017 ACC


11.00 AM 12.00 PM 03.30 PM 10.35 AM ***

SA 2 1/2 *** Refer attached annexure for DFT


TAIL FRAME readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2000 TAIL FRAME


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
TAIL FRAME 58 56 60 62 62 59.6 180 185 175 164 160 172.8 50 45 54 52 55 51.2

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 28-12-2016 &
Item Description: STANDARD STRINGER DETAILS(STD-1) Date : 29/12/2016

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2005 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 28/12/2016 28/12/2016 28/12/2016 29/12/2016 ACC


11.30 AM 1.30 PM 3.30 PM 09.30 AM ***

STANDARD STRINGER SA 2 1/2 *** Refer attached annexure for DFT


DETAILS(STD-1) readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2005 STANDARD STRINGER DETAILS(STD-1)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

STANDARD
STRINGER
DETAILS(STD-1) 63 65 60 60 58 61.2 174 172 165 175 168 170.8 50 55 66 55 59 57

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 28-12-2016 &
Item Description: STANDARD STRINGER DETAILS NSTD-1 Date : 29/12/2016

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2006 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 28/12/2016 28/12/2016 28/12/2016 29/12/2016 ACC


10.30 AM 12.30 PM 4.30 PM 11.30 AM ***

STANDARD STRINGER SA 2 1/2 *** Refer attached annexure for DFT readings
DETAILS NSTD-1 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2006 STANDARD STRINGER DETAILS NSTD-1


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

STANDARD
STRINGER
DETAILS NSTD-1 60 62 63 58 54 59.4 175 172 176 172 170 173 50 50 50 58 56 52

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 28-12-2016 &
Item Description: STANDARD STRINGER DETAILS (NSTD-2) Date : 29/12/2016

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2007 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 28/12/2016 28/12/2016 28/12/2016 29/12/2016 ACC


10.10 AM 12.50 PM 4.00 PM 11.00 AM ***

STANDARD STRINGER SA 2 1/2 *** Refer attached annexure for DFT


DETAILS (NSTD-2) readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2007 STANDARD STRINGER DETAILS (NSTD-2)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

STANDARD
STRINGER
DETAILS (NSTD-
2) 65 62 60 59 58 60.8 170 180 180 165 170 173 52 52 58 56 60 55.6

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 21-03-2017 &
Item Description: STANDARD STRINGER DETAILS (NSTD-3) Date : 22/03/2017

Paint Spec 19260008-PRC-ME-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2008 No: GNR-0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 21/03/2017 21/03/2017 21/03/2017 22/03/2017 ACC


11.40 AM 01.00 PM 03.00 PM 11.35 AM ***
STANDARD STRINGER SA 2 1/2 *** Refer attached annexure for DFT readings
DETAILS (NSTD-3) ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2008 STANDARD STRINGER DETAILS (NSTD-3)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

STANDARD
STRINGER
DETAILS (NSTD-
3) 62 61 65 58 57 60.6 170 174 172 165 172 170.6 50 50 45 55 55 51

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 21-03-2017 &
Item Description: STANDARD STRINGER DETAILS (NSTD-4) Date : 22/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2009 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 21/03/2017 21/03/2017 21/03/2017 22/03/2017 ACC
11.00 AM 01.20 PM 03.50 PM 11.55 AM ***

STANDARD STRINGER SA 2 1/2 *** Refer attached annexure for DFT


DETAILS (NSTD-4) readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2009 STANDARD STRINGER DETAILS (NSTD-4)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

STANDARD
STRINGER
DETAILS (NSTD-
4) 60 62 62 59 60 60.6 170 172 175 175 168 172 55 50 52 58 59 54.8

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 24-03-2017&
Item Description: STANDARD STRINGER DETAILS (NSTD-5) Date : 25/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2010 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 24/03/2017 24/03/2017 24/03/2017 25/03/2017 ACC


10.20 AM 12.00 PM 03.00 PM 10.55 AM ***

STANDARD STRINGER SA 2 1/2 *** Refer attached annexure for DFT readings
DETAILS (NSTD-5) ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2010 STANDARD STRINGER DETAILS (NSTD-5)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

STANDARD
STRINGER
DETAILS (NSTD-
5) 60 60 62 59 60 60.2 175 175 180 165 168 172.6 50 50 52 56 58 53.2

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 24-03-2017&
Item Description: STANDARD STRINGER DETAILS (NSTD-6) Date : 25/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2011 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 24/03/2017 24/03/2017 24/03/2017 25/03/2017 ACC
10.20 AM 12.00 PM 03.30 PM 11.55 AM ***
STANDARD
STRINGER DETAILS SA 2 1/2 *** Refer attached annexure for DFT
(NSTD-6) readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2011 STANDARD STRINGER DETAILS (NSTD-6)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

STANDARD
STRINGER
DETAILS (NSTD-
6) 60 60 58 65 62 61 170 177 168 170 170 171 51 55 58 50 50 52.8

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description: STANDARD STRINGER DETAILS (NSTD-7) 24-03-2017& 25/03/2017
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2012 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 24/03/2017 24/03/2017 24/03/2017 25/03/2017 ACC


10.20 AM 11.20 AM 04.30 PM 10.55 AM ***

STANDARD STRINGER SA 2 1/2 *** Refer attached annexure for DFT


DETAILS (NSTD-7) readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2012 STANDARD STRINGER DETAILS (NSTD-7)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

STANDARD
STRINGER
DETAILS (NSTD-
7) 60 60 55 55 65 59 175 172 175 175 172 173.8 62 64 65 47 47 57

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 21/03/2017 &
Item Description: STANDARD STRINGER DETAILS (NSTD-8) Date : 22/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2013 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 21/03/2017 21/03/2017 21/03/2017 22/03/2017 ACC


09.40 AM 01.20 PM 03.30 PM 1.55 PM ***

STANDARD STRINGER SA 2 1/2 *** Refer attached annexure for DFT


DETAILS (NSTD-8) readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2013 STANDARD STRINGER DETAILS (NSTD-8)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

STANDARD
STRINGER
DETAILS (NSTD-
8) 60 60 65 56 6 49.4 165 170 175 178 165 170.6 45 50 60 55 60 54

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 22/03/2017 &
Item Description: STANDARD STRINGER DETAILS (NSTD-9) Date : 23/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2014 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 22/03/2017 22/03/2017 23/03/2017 23/03/2017 ACC
11.00 AM 02.20 PM 11.00 AM 3.00 PM ***

STANDARD STRINGER SA 2 1/2 *** Refer attached annexure for DFT


DETAILS (NSTD-9) readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2014 STANDARD STRINGER DETAILS (NSTD-9)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

STANDARD
STRINGER
DETAILS (NSTD-
9) 56 62 69 59 62 61.6 169 165 175 174 171 170.8 60 52 53 50 55 54

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 02/04/2017 &
Item Description: HEAD FRAME Date : 03/04/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2015 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 02/04/2017 02/04/2017 02/04/2017 03/03/2017 ACC


10.00 AM 12.00 PM 03.00 PM 12.35 AM ***

SA 2 1/2 *** Refer attached annexure for DFT


HEAD FRAME readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2015 HEAD FRAME


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
HEAD FRAME 62 58 59 60 66 61 174 174 165 165 173 170.2 55 55 50 50 54 52.8

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 02/04/2017 &
Item Description: HGTU BEND PULLEY FRAME DETAILS Date : 03/04/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2022 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 02/04/2017 02/04/2017 02/04/2017 03/03/2017 ACC


10.00 AM 12.00 PM 03.00 PM 12.35 AM ***
HGTU BEND PULLEY SA 2 1/2 *** Refer attached annexure for DFT
FRAME DETAILS readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2022 HGTU BEND PULLEY FRAME DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

HGTU BEND
PULLEY FRAME
DETAILS 58 62 58 50 56 56.8 174 172 170 165 170 170.2 60 58 56 55 54 56.6

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 18-12-2016 & 19-12-2016
Item Description: DETAILS OF HGTU WEIGHT BOX GUIDE COLUMN Dates :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2024 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 37 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 18-12-2016 18-12-2016 18-12-2016 19-12-2016 ACC


10.30 AM 12.30 AM 04.30 P00M 10.30 AM ***

DETAILS OF HGTU SA 2 1/2


WEIGHT BOX GUIDE *** Refer attached annexure for DFT
COLUMN readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2024 DETAILS OF HGTU WEIGHT BOX GUIDE COLUMN


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

DETAILS OF
HGTU WEIGHT
BOX GUIDE
COLUMN 66 62 61 60 56 61 163 169 170 171 170 168.6 50 48 54 55 60 53.4

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 23/01/2017 &
Item Description: HGTU TROLLEY TRACK FRAME Date : 24/01/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2025 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 23/01/2017 23/01/2017 23/01/2017 24/01/2017 ACC


09.40 AM 10.30 AM 01.20 PM 09.15 AM ***

HGTU TROLLEY TRACK SA 2 1/2


FRAME *** Refer attached annexure for DFT
readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2025 HGTU TROLLEY TRACK FRAME


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
HGTU TROLLEY
TRACK FRAME 55 58 65 60 64 60.4 170 170 165 170 175 170 51 54 55 50 52 52.4

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 02/04/2017 &
Item Description: SHEAVE BRACKETS DETAILS Date : 03/04/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2026 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 23/01/2017 23/01/2017 23/01/2017 24/01/2017 ACC
09.40 AM 10.30 AM 01.20 PM 09.15 AM ***
SHEAVE BRACKETS
DETAILS
SA 2 1/2
*** Refer attached annexure for DFT
readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2026 SHEAVE BRACKETS DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

SHEAVE
BRACKETS
DETAILS 65 62 60 59 58 60.8 174 175 180 165 170 172.8 55 54 50 52 58 53.8

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 09/03/2017 &
Item Description: GRID DETAILS FOR HGTU TOWER Date : 10/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2031 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 09-03-2017 09-03-2017 09-03-2017 10-03-2017 ACC
9.30 AM 10.20 AM 2.30 PM 10.30 AM ***
SHEAVE BRACKETS
DETAILS
SA 2 1/2
*** Refer attached annexure for DFT
readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2031 GRID DETAILS FOR HGTU TOWER


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

GRID DETAILS
FOR HGTU
TOWER 65 62 60 59 58 60.8 174 175 180 165 170 172.8 50 51 52 54 56 52.6

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description: COLUMN DETAILS FOR HGTU TOWER 12/23/2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2032 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 23-12-2016 23-12-2016 23-12-2016 23-12-2016 ACC


9.30 AM 10.30 AM 2.30 PM 5.30 PM ***
COLUMN DETAILS FOR
HGTU TOWER
SA 2 1/2
*** Refer attached annexure for DFT
readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2032 COLUMN DETAILS FOR HGTU TOWER


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

COLUMN
DETAILS FOR
HGTU TOWER 65 62 60 59 58 60.8 174 175 180 165 170 172.8 50 48 59 54 50 52.2

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description: FLOOR PLAN ASSE.&DETAILS@14.2M FOR HGTU 4/2/2017
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2033 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
02-04-2017 02-04-2017 02-04-2017 02-04-2017
Date / Time ACC
9.30 AM 10.40 AM 1.20 PM 4.30 PM ***
FLOOR PLAN
ASSE.&DETAILS@14.2M
FOR HGTU SA 2 1/2
*** Refer attached annexure for DFT
readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2033 FLOOR PLAN ASSE.&DETAILS@14.2M FOR HGTU


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
FLOOR PLAN
ASSE.&DETAILS
@14.2M FOR
HGTU
65 62 60 59 58 60.8 174 175 180 165 170 172.8 50 52 52 55 54 52.6

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Item Description: FLOOR PLAN ASSE.&DETAILS@14.2M FOR Inspection 4/2/2017
HGTU (16-20) Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2033 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 36 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

02-04-2017 02-04-2017 02-04-2017 02-04-2017


Date / Time ACC
9.30 AM 10.40 AM 1.20 PM 4.30 PM
***
FLOOR PLAN
ASSE.&DETAILS@14.2M
FOR HGTU (16-20) SA 2 1/2
*** Refer attached annexure for DFT
readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2033 FLOOR PLAN ASSE.&DETAILS@14.2M FOR HGTU


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
FLOOR PLAN
ASSE.&DETAILS
@14.2M FOR
HGTU (16-20)
65 62 60 59 58 60.8 174 175 180 165 170 172.8 52 54 50 58 55 53.8

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 22/03/2017 &
Item Description: STANDARD STRINGER DETAILS STD -2 Date : 23/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2035 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 22/03/2017 22/03/2017 23/03/2017 23/03/2017 ACC


10.20 AM 02.10 PM 12.10 PM 4.10 PM ***
STANDARD STRINGER
DETAILS STD -2
SA 2 1/2
*** Refer attached annexure for DFT
readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2035 STANDARD STRINGER DETAILS STD -2


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

STANDARD
STRINGER
DETAILS STD -2 65 62 60 59 58 60.8 174 175 180 165 170 172.8 55 48 50 52 50 51

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 22/03/2017 &
Item Description: STANDARD STRINGER DETAILS STD -3 Date : 23/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2036 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 22/03/2017 22/03/2017 23/03/2017 23/03/2017 ACC


10.20 AM 02.10 PM 12.10 PM 4.10 PM ***
STANDARD STRINGER
DETAILS STD -3
SA 2 1/2
*** Refer attached annexure for DFT
readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2036 STANDARD STRINGER DETAILS STD -3


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

STANDARD
STRINGER
DETAILS STD -3 65 62 60 59 58 60.8 174 175 180 165 170 172.8 48 55 46 58 59 53.2

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 22/03/2017 &
Item Description: STANDARD STRINGER DETAILS STD -4 Date : 23/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2037 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 22/03/2017 22/03/2017 23/03/2017 23/03/2017 ACC


10.20 AM 02.10 PM 12.10 PM 4.10 PM ***
STANDARD STRINGER
DETAILS STD -4
SA 2 1/2
*** Refer attached annexure for DFT
readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2037 STANDARD STRINGER DETAILS STD -4


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

STANDARD
STRINGER
DETAILS STD -4 65 62 60 59 58 60.8 174 175 180 165 170 172.8 55 48 54 52 56 53

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Item Description: STRINGER WITH SHORT SUPPORT Inspection 26/03/2017 &
ASSY&DETAIL@HEAD END Date : 27/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2038 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 26/03/2017 26/03/2017 26/03/2017 27/03/2017 ACC


10.00 AM 12.10 PM 03.00 PM 11.20 aM ***
STRINGER WITH SHORT
SUPPORT
ASSY&DETAIL@HEAD SA 2 1/2
END
*** Refer attached annexure for DFT
readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2038 STRINGER WITH SHORT SUPPORT ASSY&DETAIL@HEAD END


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
STRINGER WITH
SHORT SUPPORT
ASSY&DETAIL@
HEAD END

65 62 60 59 58 60.8 174 175 180 165 170 172.8 55 49 46 51 50 50.2

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 30-12-2016 & 01.01.2017
Item Description: SHORT SUPPORT STRINGER SUPPORTING FRAME Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2039 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 30-12-2016 30-12-2016 30-12-2016 01-1-2017 ACC
09.45 AM 12.25 AM 03.05 PM 10.45 AM ***
SHORT SUPPORT
STRINGER SUPPORTING
FRAME SA 2 1/2
*** Refer attached annexure for DFT
readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2039 SHORT SUPPORT STRINGER SUPPORTING FRAME


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
SHORT SUPPORT
STRINGER
SUPPORTING
FRAME

65 62 60 59 58 60.8 174 175 180 165 170 172.8 50 45 53 51 52 50.2

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 06/04/2017 &
Item Description: 20 M GANTRY DETAILS Date : 07/04/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2101 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 06/04/2017 06/04/2017 06/04/2017 07/04/2017 ACC
10.00 AM 1.00***
PMRefer attached
04.00 AMannexure
10.00 AM
for DFT ***
20 M GANTRY DETAILS SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2101 20 M GANTRY DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
20 M GANTRY
DETAILS
65 62 60 59 58 60.8 174 175 180 165 170 172.8 53 52 54 50 50 51.8

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description: WALKWAY DETAILS FOR 20M GANTRY Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2102 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

Surface DFT Toatal DFT


Item / part No. preparati Avg(in Result
on Primer Coat Intermediate final Coat microns)
Coat

Date / Time ACC


*** Refer attached annexure for DFT readings ***
20 M GANTRY DETAILS SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2102 WALKWAY DETAILS FOR 20M GANTRY


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
WALKWAY
DETAILS FOR
20M
GANTRY(1-25)
65 62 60 59 58 60.8 174 175 180 165 170 172.8 54 50 54 51 50 51.8

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description: DETAILS OF 24.365 MTS HEAD END GALLERY 1/2/2017
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2104 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 37 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 02/01/2017 02/01/2017 02/01/2017 02/01/2017 ACC


10.00 AM 12.10 PM 02.30 PM 06.15M ***
DETAILS OF 24.365 MTS
HEAD END GALLERY SA 2 1/2 *** Refer attached annexure for DFT
readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2104 DETAILS OF 24.365 MTS HEAD END GALLERY


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
DETAILS OF
24.365 MTS
HEAD END
GALLERY
65 62 60 59 58 60.8 174 175 180 165 170 172.8 49 55 45 50 50 49.8
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 11-02-2017 &
Item Description: WALKWAY DETAILS OF 24.365 MTS GALLERY Date : 12/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2105 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 11/02/2017 11/02/2017 11/02/2017 12/02/2017 ACC
10.00 AM 11.10 PM 04.00 PM 11.20 AM ***
WALKWAY DETAILS OF
24.365 MTS GALLERY SA 2 1/2 *** Refer attached annexure for DFT
readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2105 WALKWAY DETAILS OF 24.365 MTS GALLERY


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
WALKWAY
DETAILS OF
24.365 MTS
GALLERY
65 62 60 59 58 60.8 174 175 180 165 170 172.8 45 55 51 52 50 50.6
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description: TWO LEGGED TRESTLE (3.038MTS) 23.01.2017
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2106 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 23/01/2017 23/01/2017 23/01/2017 24/01/2017 ACC


11.40 AM 01.00 PM 03.00 PM 11.35 AM ***
TWO LEGGED TRESTLE SA 2 1/2 *** Refer attached annexure for DFT
(3.038MTS) readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2106 TWO LEGGED TRESTLE (3.038MTS)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
TWO LEGGED
TRESTLE
(3.038MTS)
65 62 60 59 58 60.8 174 175 180 165 170 172.8 48 45 54 55 50 50.4
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description: TWO LEGGED TRESTLE TR-1(5.475M HT) 1/3/2017
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2107 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 35 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 03/01/2017 03/01/2017 03/01/2017 03/01/2017 ACC


10.20 AM 11.50 PM 02.20 PM 05.15PM ***
TWO LEGGED TRESTLE
TR-1(5.475M HT) SA 2 1/2 *** Refer attached annexure for DFT
readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/0

DRAWING Nos 192-60-001-DRW-ME-CD1-2107 TWO LEGGED TRESTLE TR-1(5.475M HT)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
TWO LEGGED
TRESTLE TR-
1(5.475M HT)
65 62 60 59 58 60.8 174 175 180 165 170 172.8 48 50 52 53 55 51.6
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description: DRIVE BASE FRAME DETAILS 9/1/2017
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD1-2107 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:077014122 BASE :077024315 BASE :77091962
Batch No
BINDER :077024523 HARD :07702411 HARD :77081656
OBSERVATIONS
Temperature 35 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 01/09/2017 01/09/2017 01/09/2017 03/01/2017 ACC


09.20 AM 11.50
***AM 05.20 PMannexure
Refer attached 05.15PM
for DFT ***
DRIVE BASE FRAME SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD1-2016 DRIVE BASE FRAME DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
TWO LEGGED
TRESTLE TR-
1(5.475M HT)
66 68 64 65 67 66 179 178 175 177 175 176.8 54 55 56 54 55 54.8