PDMC
WAPCOS LTD,
UJJAIN
CONTRACTOR:
TATA PROJECTS LIMITED
SECUNDERBAD,TELANGANA
Designed By
ECO PROTECTION ENGINEERS PVT LTD,
CHENNAI,600101
TECHNOLOGY
PROVIDER FOR STP
SFC ENVIRONIMENTAL TECHNOLOGIES PVT LTD.,
NAVI MUMBAI
TITLE :
NAME SIGN DATE
SIZE REV.
DOC.No. TPL - 340062 - UJN - STP - CVL - SBR -STR DC - 2001 A
A4 1
TABLE OF CONTENTS
I DESIGN BASIS 3
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
CHAPTER I
DESIGN BASIS
CLIENT: CONTRACTOR:
UJJAIN MUNICIPAL CORPORATION. TATA PROJECTS LIMITED.
UJJAIN.
SECUNDERABAD.
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
a) Splitter box
b) Inlet Channel
c) Selector Compartment
d) C-Tech basin
f) Outlet channel
g) Staircase
The water retaining structure have been designed as limited cracked section for
0.2mm crack width and non-water retaining components are designed in limit state
method.
The Following primary loads are considered in the design of the structure
The ground water table is not considered for the design of C-Tech basin
1.2) Material Specifications:
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
1.3) References:
1) IS: 3370 (Part I – IV) – Code of practice for concrete structures for the storage of
liquids.
2) IS: 456 - 2000 – Code of practice for Plain and Reinforced concrete
3) Moody’s chart
The Co-efficient of friction between the concrete and soil below is considered
as 0.35 for checking of sliding for Retaining walls of Basin.
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
The minimum clear cover to reinforcement in all R.C.C structures shall be as per
IS456: 2000(Clause 26.4, Page no. 46) &IS 3370 (part 1 to 3).
The Top of Liquid level is considered at (EL+482.80m Level) from the Top of Raft level
(EL+476.5m Level) for the SBR basin.
The outer walls and central wall of the basin are designed as a cantilever wall for the
hydrostatic pressure. The selector compartment wall is designed as the wall plate analyzed
using Moody’s chart. Selector compartment walls are designed for +2.6m Liquid height.
CLIENT: CONTRACTOR:
UJJAIN MUNICIPAL CORPORATION. TATA PROJECTS LIMITED.
UJJAIN.
SECUNDERABAD.
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
SECTIONS
CLIENT: CONTRACTOR:
UJJAIN MUNICIPAL CORPORATION. TATA PROJECTS LIMITED.
UJJAIN.
SECUNDERABAD.
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
SECTIONS
CLIENT: CONTRACTOR:
UJJAIN MUNICIPAL CORPORATION. TATA PROJECTS LIMITED.
UJJAIN.
SECUNDERABAD.
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
The loading combinations are considered in the design of structures in accordance with the
stipulations in the relevant design codes. The load combinations are mentioned below.
1.5DL + 1.5LL
Where,
The loading combinations are considered in the design of structures in accordance with the
stipulations in the relevant design codes. The load combinations are mentioned below.
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
CHAPTER II
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
Weir wall and base slab supported by beam spanning between splitter box wall
Eh = (D-x)/(d-x)*es = 3.51E-04
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = -1.99E-04
Calculating crack width at critical positions
Effective Cover p = 53 mm
Bar dia /2 y = 8 mm
Spacing of bar = 94 mm
am=(p^2+(x/2))^2)^0.5-y] = 62.84 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = -0.036 mm
safe
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain STR DC - 2001 A 1
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
fy = 500 N/mm
2
Dimensions
Thickness of Wall D = 200 mm
Clear cover to rebar C = 45 mm
Dia of main rebar = 10 mm
Eff. Thickness of Wall d = 150 mm
(200-45-10/2)
Height of wall = 1650 mm
((481.75-480.1)x1000)
3
Unit weight of sewage = 10.1 kN/m
Vertical reinforcement (Water Face)
Water pressure = 16.67 kN/m
2
(1650x10.1/10^3)
Moment M = 7.56 kNm (16.67x1650^2x/(6x10^6))
Shear force = 13.75 kN (16.67x1650/(2x10^3)
Unfactored moment = 7.56 kNm
Load factor = 1.5
Mu 11.3 kNm (7.56 X 1.5)
Percentage of steel required = 0.118 %
(0.5x30/500x(1-SQRT(1-4.6x11.34x1000000/(30x1000x150x150)))x100
Area of steel reqd = 177 mm
2
(0.118x1000x150/100)
Depth of Surface Zone = 100.000 mm As per IS3370-Part 2
Min. percentage of steel for wall = 0.35 % As per IS3370-Part 2
Area of steel reqd = 350 mm
2
(0.35x1000x100/100)
Spacing of reinft. Reqd. = 224 mm (0.7854x10x10/350x1000)
Spacing of reinft. Provided = 200 mm
Area of steel provided = 393 mm
2
Safe
(1000/200x0.7854x10x10)
Check for Crack width
2
Compressive strength of concrete = 30 N/mm
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain STR DC - 2001 A 1
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
2
Ec -Modulus of Elasticity of concrete = 27.39 kN/mm
2
ES -Modulus of Elasticity of steel = 200 kN/mm
Allowable crackwidth of the section = 0.2 mm
Dia of bar provided = 10 mm
Spacing provided = 200 mm
2
Area of steel provided on each face = 393 mm
(3.14x((10^2)/4)/200x1000)
Service moment @ the point considered M = 7.56 kNm
fy = 500 N/mm
2
Dimensions
Overall Depth of Base Slab , D = 200 mm
Clear cover to rebar C = 45 mm
Dia of main rebar = 8 mm
Eff. Depth of Base Slab d = 151 mm
(200-45-8/2)
Height of wall = 1650 mm
Length of slab = 1900 mm
3
Unit weight of sewage = 10.1 kN/m
Liquid pressure = 16.67 kN/m
2
(1000/125x0.7854x8x8)
Check for Crack width
2
Compressive strength of concrete = 30 N/mm
2
Ec -Modulus of Elasticity of concrete = 27.39 kN/mm
2
ES -Modulus of Elasticity of steel = 200 kN/mm
Allowable crackwidth of the section = 0.2 mm
Dia of bar provided = 8 mm
Spacing provided = 125 mm
2
Area of steel provided on each face = 402 mm
(3.14x((8^2)/4)/125x1000)
Service moment @ the point considered M = 9.78 kNm
Breath of section b = 1000 mm
Overall depth D = 200 mm
Clear Cover to the main reinft. Cmin = 45 mm
Effective depth of the section d = 151 mm
Calculating properties of equivalent transformed section with Ee=Ec/2
2
Eeq = 13.7 kN/mm
Modular ratio m = 14.6
pt = 0.0027
m*pt = 0.039
em - Average strain at the level where the crack is considered
x - Depth to NA assuming as cracked section
D - Overall depth of section
Cmin - Minimum Cover
acr - Dist. from the point considered to the surface of the nearest longitudinal bar
wcr - Design Surface crack width
x/d= - m*pt+((m*pt )*(2+m*pt))^0.5
x/d = 0.24
x = 36.63 mm
z (lever arm) = d-x/3 = 138.79 mm
Calculating average surface strain at tension face
2
Stress due to Service Moment fs= Ms/Ast*z = 175.3 N/mm
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain STR DC - 2001 A 1
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
2
Stress due to Direct tension = 0 N/mm
2
Total Stress = 175.30 N/mm
Strain es = fs /Es = 8.77E-04
Eh = (D-x)/(d-x)*es = 1.25E-03
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 2.84E-04
Calculating crack width at critical positions
Effective Cover p = 49 mm
Bar dia /2 y = 4 mm
Spacing of bar = 125 mm
am=(p^2+(x/2))^2)^0.5-y] = 75.42 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.047 mm
safe
Bottom moment of base slab (Fixed end moment of weir wall):
Effective Cover p = 49 mm
Bar dia /2 y = 4 mm
Spacing of bar = 125 mm
am=(p^2+(x/2))^2)^0.5-y] = 75.42 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.040 mm
safe
Check for Shear:
Unfacored Shear = 20.59 kN
Factored Shear = 30.87975 kN (1.5x20.5865)
Nominal shear stress = 0.20 N/mm
2
fy = 500 N/mm
2
Dimensions
Overall Depth of Wall D = 250 mm
Clear cover to reinft. C = 45 mm
Dia of main reinft. = 12 mm
Eff. Depth of Wall d = 199 mm (250-45-12/2)
Height of wall, b = 4300 mm
Liquid level = 4300 mm (478.5-482.8)
Unit weight of liquid = 10.1 kN/m3
Length of wall,(2a) = 5000 mm
Coefficient, (a/b) = 0.581 (5000/(4300*2))
Liquid pressure = 43.43 kN/m
2
(4300*10.1/10^3)
(Conditions -plate fixed along three edges, free at top, refer Moody's chart fig. no 4.)
(0.5*30/500*(1-SQRT(1-4.6*36.135*1000000/(30*1000*199*199)))*100)
Dia of main reinft. = 12 mm
Area of steel reqd = 433.820 mm
2
(3.14x((12^2)/4)/200x1000)
Service moment @ the point considered (M) = 8.03 kNm
Tensile force = 0.000 kN
(0.25*43.43*4300/10^3)
Breath of section b = 1000 mm
Overall depth D = 250 mm
Clear Cover to the main reinft. Cmin = 45 mm
Effective depth of the section d = 199 mm
Calculating properties of equivalent transformed section with Ee=Ec/2
2
Eeq = 13.695 kN/mm
Modular ratio m = 14.6
pt = 0.0028
m*pt = 0.041
Effective Cover p = 51 mm
Bar dia /2 y = 6 mm
Spacing of bar = 200 mm
am=(p^2+(x/2))^2)^0.5-y] = 106.25 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = -0.053 mm
safe
fy = 500 N/mm
2
Dimensions
Thickness of Wall D = 200 mm
Clear cover to rebar C = 45 mm
Dia of main rebar = 12 mm
Eff. Thickness of Wall d = 149 mm
(200-45-12/2)
Height of water = 1700 mm
((480.2-478.5)x1000)
3
Unit weight of sewage = 10.1 kN/m
Vertical reinforcement (Water Face)
Water pressure = 17.17 kN/m
2
(1700x10.1/10^3)
Moment M = 8.27 kNm (17.17x1700^2x/(6x10^6))
Shear force = 14.59 kN (17.17x1700/(2x10^3)
Unfactored moment = 8.27 kNm
Load factor = 1.5
Mu 12.4 kNm (8.27 X 1.5)
Percentage of steel required = 0.131 %
(0.5x30/500x(1-SQRT(1-4.6x12.405x1000000/(30x1000x149x149)))x100
Area of steel reqd = 195 mm
2
(0.131x1000x149/100)
Depth of Surface Zone = 100.000 mm As per IS3370-Part 2
Min. percentage of steel for wall = 0.35 % As per IS3370-Part 2
Area of steel reqd = 350 mm
2
(0.35x1000x100/100)
Spacing of reinft. Reqd. = 323 mm (0.7854x12x12/350x1000)
Spacing of reinft. Provided = 175 mm
Area of steel provided = 646 mm
2
Safe
(1000/175x0.7854x12x12)
Check for Crack width
2
Compressive strength of concrete = 30 N/mm
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain STR DC - 2001 A 1
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
2
Ec -Modulus of Elasticity of concrete = 27.39 kN/mm
2
ES -Modulus of Elasticity of steel = 200 kN/mm
Allowable crackwidth of the section = 0.2 mm
Dia of bar provided = 12 mm
Spacing provided = 175 mm
2
Area of steel provided on each face = 646 mm
(3.14x((12^2)/4)/175x1000)
Service moment @ the point considered M = 8.27 kNm
Note:
The same detail is adopted for wall W20 & W21
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
Load calculation :
Dead load:
Self weight of splitter box wall (250mm Thick) = 26.88 kN/m
(25*0.25*(482.8-478.5))
Live load:
Weight of liquid @ end beam = 70.57 kN/m
((10.1*(482.8-478.5)*3.25)/2),
Design Results :
Top reinforcement (4nos of T20 Dia bars)+(4nos of T20 Dia bars)+(2nos of T20 Dia bars) - 3 layers
Bottom reinforcement (4nos of T20 Dia bars)+(4nos of T20 Dia bars)+(4nos of T16 Dia bars) - 3 layers
Shear reinforcement T10 At 100mm C/C
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain STR DC - 2001 A 1
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
Check for Crack width-Beam ID B5a
Compressive strength of concrete = 30 N/mm2
Ec -Modulus of Elasticity of concrete = 27.39 kN/mm2
ES -Modulus of Elasticity of steel = 200 kN/mm2
Allowable crackwidth of the section = 0.2 mm
Dia of bar provided = 20 mm
Clear spacing = 86.67 mm
Area of steel provided on each face = 3141.6 mm2
Service moment @ the point considered M = 283.12 kNm
Breath of section b = 450 mm
Overall depth D = 600 mm
Clear Cover to the main reinft. Cmin = 45 mm
Effective depth of the section d = 525 mm
Calculating properties of equivalent transformed section with Ee=Ec/2
2
Eeq = 13.695 kN/mm
Modular ratio m = 14.6
pt = 0.0133
m*pt = 0.194
Eh = (D-x)/(d-x)*es = 1.28E-03
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 1.17E-03
Calculating crack width at critical positions
Effective Cover p = 55 mm
Bar dia /2 y = 10 mm
Spacing of bar = 86.67 mm
am=(p^2+(x/2))^2)^0.5-y] = 60.02 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.195 mm
safe
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain STR DC - 2001 A 1
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
Analysis Results for Splitter box supporting beam - B6 (300x450)
Bending Moment Diagram :
Design Results :
Top reinforcement (3nos of T20 Dia bars)+(3nos of T20 Dia bars) - 2 layers
Bottom reinforcement (3nos of T20 Dia bars)
Shear reinforcement T10 At 100mm C/C
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
Networks & Sewage Treatment Plant at Ujjain for Ujjain TPL - 340062 - UJN - STP - CVL - SBR - 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
Check for Crack width-Beam ID-B6
Compressive strength of concrete = 30 N/mm2
Ec -Modulus of Elasticity of concrete = 27.39 kN/mm2
ES -Modulus of Elasticity of steel = 200 kN/mm2
Allowable crackwidth of the section = 0.2 mm
Dia of bar provided = 20 mm
Clear spacing = 65 mm
Area of steel provided on each face = 1884.96 mm2
Service moment @ the point considered M = 118.20 kNm
Breath of section b = 300 mm
Overall depth D = 450 mm
Clear Cover to the main reinft. Cmin = 45 mm
Effective depth of the section d = 375 mm
Calculating properties of equivalent transformed section with Ee=Ec/2
Eeq = 13.695 kN/mm2
Modular ratio m = 14.6
pt = 0.0168
m*pt = 0.245
Eh = (D-x)/(d-x)*es = 1.40E-03
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 1.30E-03
Calculating crack width at critical positions
Effective Cover p = 55 mm
Bar dia /2 y = 10 mm
Spacing of bar = 65 mm
am=(p^2+(x/2))^2)^0.5-y] = 53.88 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.197 mm
safe
Client Contractor
Negative = 0.218
Area of Reinforcement (Ast)
Positive = 324.1
Negative = 466.1
Design Results along long span
Detailing for Bar dia (mm) Spacing (mm)
Positive Steel 12 345 c/c
Negative Steel 12 240 c/c
Maximum allowable spacing = 642 mm
Distribution Reinforcement = T12 at 376 c/c (Minimum steel)
Check for Deflection
Ast provided = 12 @ 100 c/c
Ultimate Moment M = 49.30 KNm
Effective depth d = 214 mm
Mu/bd2 = 1.0766
Modification factor = 0.55+(477-fs)/(120*(0.9+M/bd2)) <=2
fs = (2*fy*As req)/(3* As prov)
= 2.04
Allowable Deflection = 2*26
= 52
Actual DeflectionL/d = 15.953
< 52 SAFE
SLAB RESULT:
Provided slab thickness 250 mm
Provide 12 mm dia reinforcement at 100 mm c/c along shorter direction as a Top main reinforcement
Provide 12 mm dia reinforcement at 150 mm c/c along longer direction as a Top main reinforcement
Provide 12 mm dia reinforcement at 150 mm c/c along shorter direction as a Bottom main reinforcement
Provide 12 mm dia reinforcement at 200 mm c/c along longer direction as a Bottom main reinforcement
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
fy = 500 N/mm
2
Dimensions
Overall Depth of Slab D = 250 mm
Clear cover to reinft. C = 45 mm
Dia of main reinft. = 12 mm
Eff. Depth of Slab d = 199 mm (250-45-12/2)
Max. M = 43.658
Tensile force = 49.68
Eh = (D-x)/(d-x)*es = 1.59E-03
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 1.21E-03
Calculating crack width at critical positions
Effective Cover p = 51 mm
Bar dia /2 y = 6 mm
Spacing of bar = 100 mm
am=(p^2+(x/2))^2)^0.5-y] = 65.42 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.195 mm
safe
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project:Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
Reinforcement provided:
Ties - T8 AT 175mm
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project:Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
Reinforcement provided:
Ties - T8 AT 175mm
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
2
Compressive Strength of concrete = 30 N/mm
2
Yield strength of steel = 500 N/mm
Cantilever slab =
Mu/bd2 = 0.438
For M30 and Fe500, percentage of reinforcement,
pt = 0.5*Fck/Fy*(1- (1-(Mu/bd2)*4.589/Fck)* 100
= 0.102 %
Ast = Pt/100*b*d
= 0.102/100*1000*125
2
= 127.5 mm
Assumed diameter of the slab reinft = 8 mm
Minimum % of reinforcement = 0.35 %
2
Minimum area of reinforcement = 350 mm
Spacing of 8mm dia bars = Af/Ast.*1000
= 143.62 mm
= 125 mm
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
x/d = 0.32
x = 24.58 mm
Eh = (D-x)/(d-x)*es = 1.63E-03
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 8.19E-04
Calculating crack width at critical positions
Effective Cover p = 49 mm
Bar dia /2 y = 4 mm
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
am=(p^2+(x/2))^2)^0.5-y] = 75.42 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.115 mm
safe
SLAB RESULT:
Design of footing
2.500 m
0.500 m
474.00m LVL
X 2.40m
3 3
Density of Concrete = 25 KN/m Density of Soil = 17 KN/m
Size of Footing (Lx * Ly) = 2.4m X 2.4m Depth of Footing = 3.000 m
Size of Column (Cx * Cy) = 0.30m X 0.30m
2
Net SBC = 100 KN/m
2
Gross SBC = 142.5 KN/m
Legends
FGL Finished Ground Level
1 101 DL+LL -0.413 465.649 1.005 1.00 72 241 1.087 1.00 142.50 135.18 0.95 OK
102 1.0DL+1.0LL+1.0SL +X -0.418 465.637 1.005 1.25 72 241 1.088 1.00 178.13 135.18 0.76 OK
103 1.0DL+1.0LL+1.0SL -X -0.408 465.66 1.005 1.25 72 241 1.085 1.00 178.13 135.18 0.76 OK
104 1.0DL+1.0LL+1.0SL +Z -0.397 451.42 -2.786 1.25 72 241 2.814 1.00 178.13 132.71 0.75 OK
105 1.0DL+1.0LL+1.0SL -Z -0.429 479.877 4.795 1.25 72 241 4.814 1.00 178.13 137.65 0.77 OK
106 1.0DL+1.0 SL +X -0.241 263.219 1.398 1.25 72 241 1.419 1.00 178.13 100.04 0.56 OK
107 1.0DL+1.0 SL -X -0.232 263.242 1.398 1.25 72 241 1.417 1.00 178.13 100.04 0.56 OK
108 1.0DL+1.0 SL +Z -0.22 249.002 -2.393 1.25 72 241 2.403 1.00 178.13 97.57 0.55 OK
109 1.0DL+1.0 SL -Z -0.253 277.459 5.188 1.25 72 241 5.194 1.00 178.13 102.51 0.58 OK
13 101 DL+LL -0.406 458.162 -0.982 1.00 72 241 1.063 1.00 142.50 133.88 0.94 OK
102 1.0DL+1.0LL+1.0SL +X -0.41 458.15 -0.982 1.25 72 241 1.064 1.00 178.13 133.88 0.75 OK
103 1.0DL+1.0LL+1.0SL -X -0.401 458.174 -0.982 1.25 72 241 1.061 1.00 178.13 133.88 0.75 OK
104 1.0DL+1.0LL+1.0SL +Z -0.422 472.39 -4.772 1.25 72 241 4.791 1.00 178.13 136.35 0.77 OK
105 1.0DL+1.0LL+1.0SL -Z -0.389 443.934 2.808 1.25 72 241 2.835 1.00 178.13 131.41 0.74 OK
106 1.0DL+1.0 SL +X -0.233 255.732 -1.375 1.25 72 241 1.395 1.00 178.13 98.74 0.55 OK
107 1.0DL+1.0 SL -X -0.225 255.756 -1.375 1.25 72 241 1.393 1.00 178.13 98.74 0.55 OK
108 1.0DL+1.0 SL +Z -0.245 269.972 -5.165 1.25 72 241 5.171 1.00 178.13 101.21 0.57 OK
109 1.0DL+1.0 SL -Z -0.213 241.516 2.415 1.25 72 241 2.424 1.00 178.13 96.27 0.54 OK
0.95
Client Contractor
Ujjain Municipal Corporation-
Tata Projects Ltd.,-Secunderabad.
Ujjain.
DOCUMENT NO REV
Project: Design and Construction of 92.5 MLD
TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at 1
STR DC - 2001 A
Ujjain for Ujjain Municipal Corporation.
DSN CHK APP SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
Wf = Weight of footing = 72 kN
Pa = Ultimate axial load from column = 698.473 kN (Load taken from ultimate
load condition)
P = Design vertical load on footing = 1011.5 kN
3
W soil dry = Unit weight of dry soil = 17 kN/m ( soil above w.t)
Size Of Base :
Z
Lx
Y
Lz
X
Cz
DF
C d D
X
PLAN SECTION
D = Overall depth of base,d = Effective depth of base, DFd = Depth of foundation from Ground Level.
Pmax = P Mz * 6 Mx * 6
+ Q + + 2
A Lx2 * Lz Lz * Lx
= 175.60 kN/m²
Pmin = P Mz * 6 Mx * 6
+ Q - -
A Lx2 * Lz Lz2 * Lx
= 175.60 kN/m²
Lx/6 = 0.40 m
Lz/6 = 0.40 m
Lx
b
Lz
Cz
a Pmin
PLAN P' Pmax
SECTION
= 1.05 m
= 176 kN/m²
= 176 kN/m²
= 97 kN-m
= 97 kN-m
Muz = 0.4888
B*(d2 )
Percentage of reinforcement
pt = 0.115%
= 600 mm²/m
% of steel = 0.141 %
Mux = 0.489
B*(d2 )
Percentage of reinforcement
pt = 0.1150%
= 600 mm²/m
% of steel = 0.141 %
L
Lz
Cz
2
Design pressure at the critical section = Pcr = 175.60 kN/m
C
Effective thickness of footing at the critical section = dx = 445 mm
( Pmax+P
Upward shear force on footing at the critical section = cr ) * shorter side of footing * [max cant. length - 1.0dx]
2
Vt = 254.98 kN
2
Area of footing at Critical Section = dx * Lz = Ax = 1068000 mm
2
v = Vt*1000 = 0.24 N/mm
Ax
Client Contractor
Ujjain Municipal Corporation-
Tata Projects Ltd.,-Secunderabad.
Ujjain.
DOCUMENT NO REV
Project: Design and Construction of 92.5 MLD
TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at 1
STR DC - 2001 A
Ujjain for Ujjain Municipal Corporation.
DSN CHK APP SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
2
Permissible shear stress at the critical section == 0.29 N/mm
Therefore, V<Vc, OK
Punching shear is consider along a vertical section on the perimeter at a distance 0.5d from the
face of column, where d is the average effective depth of the reinforcement spanning in the two
dir.
Lx
Lz
0.5
= 435 mm
= 559 kN
2
Shear stress = Vud = 0.44 N/mm
b*d
2
Permissible shear stress at the critical section == 1.37 N/mm
Therefore, V<Vc, OK
Client Contractor
Ujjain Municipal Corporation-
Tata Projects Ltd.,-Secunderabad.
Ujjain.
DOCUMENT NO REV
Project: Design and Construction of 92.5 MLD
TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at 1
STR DC - 2001 A
Ujjain for Ujjain Municipal Corporation.
DSN CHK APP SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
Concerning eccentrically loaded foundn, it shall always be ensured that the overall stabilizing
moment (Mstab.) calc. at the lower side of the base, is greater than the overturning moment
(Mover.)
Z
A Y
X
A
B B
A
X
A
PLAN SECTION
= [ ( P ) + Psoil ] * ( Lx /2 )
= 1213.8 kN-m
Mstab = =
F.O.S against overturning 1213.8 > 1.5 Safe
Mover
= [ ( N ) + Psoil ] * ( Lz /2 )
= 1213.8 kN-m
Design of footing
2.500 m
0.400 m
474.00m LVL
X 3.30m
3 3
Density of Concrete = 25 KN/m Density of Soil = 17 KN/m
Size of Footing (Lx * Ly) = 2.5m X 3.3m Depth of Footing = 2.900 m
Size of Column (Cx * Cy) = 0.45m X 0.60m
2
Net SBC = 100 KN/m
2
Gross SBC = 142.5 KN/m
Legends
FGL Finished Ground Level
4 101 DL+LL 55.217 733.474 -1.941 1.00 82.5 339 55.251 1.00 142.50 140 0.98 OK
102 1.0DL+1.0LL+1.0SL +X 55.078 733.356 -1.941 1.25 82.5 339 55.112 1.00 178.13 139.98 0.79 OK
103 1.0DL+1.0LL+1.0SL -X 55.356 733.591 -1.941 1.25 82.5 339 55.39 1.00 178.13 140.01 0.79 OK
104 1.0DL+1.0LL+1.0SL +Z 55.231 722.711 -19.284 1.25 82.5 339 58.501 1.00 178.13 138.69 0.78 OK
105 1.0DL+1.0LL+1.0SL -Z 55.203 744.236 15.402 1.25 82.5 339 57.311 1.00 178.13 141.3 0.79 OK
106 1.0DL+1.0 SL +X 7.499 314.563 -2.065 1.25 82.5 339 7.778 1.00 178.13 89.22 0.5 OK
107 1.0DL+1.0 SL -X 7.777 314.798 -2.064 1.25 82.5 339 8.046 1.00 178.13 89.25 0.5 OK
108 1.0DL+1.0 SL +Z 7.652 303.918 -19.407 1.25 82.5 339 20.861 1.00 178.13 87.93 0.49 OK
109 1.0DL+1.0 SL -Z 7.625 325.443 15.279 1.25 82.5 339 17.076 1.00 178.13 90.54 0.51 OK
7 101 DL+LL 56.845 709.193 0.088 1.00 82.5 339 56.845 1.00 142.50 137.05 0.96 OK
102 1.0DL+1.0LL+1.0SL +X 56.714 709.075 0.088 1.25 82.5 339 56.714 1.00 178.13 137.04 0.77 OK
103 1.0DL+1.0LL+1.0SL -X 56.976 709.311 0.088 1.25 82.5 339 56.976 1.00 178.13 137.07 0.77 OK
104 1.0DL+1.0LL+1.0SL +Z 56.845 709.193 -18.73 1.25 82.5 339 59.851 1.00 178.13 137.05 0.77 OK
105 1.0DL+1.0LL+1.0SL -Z 56.845 709.193 18.906 1.25 82.5 339 59.907 1.00 178.13 137.05 0.77 OK
106 1.0DL+1.0 SL +X 7.827 288.72 0.088 1.25 82.5 339 7.827 1.00 178.13 86.09 0.48 OK
107 1.0DL+1.0 SL -X 8.09 288.956 0.088 1.25 82.5 339 8.09 1.00 178.13 86.12 0.48 OK
108 1.0DL+1.0 SL +Z 7.958 288.839 -18.73 1.25 82.5 339 20.35 1.00 178.13 86.1 0.48 OK
109 1.0DL+1.0 SL -Z 7.958 288.838 18.906 1.25 82.5 339 20.513 1.00 178.13 86.1 0.48 OK
10 101 DL+LL 55.22 733.288 2.077 1.00 82.5 339 55.259 1.00 142.50 139.97 0.98 OK
102 1.0DL+1.0LL+1.0SL +X 55.081 733.171 2.077 1.25 82.5 339 55.12 1.00 178.13 139.96 0.79 OK
103 1.0DL+1.0LL+1.0SL -X 55.359 733.406 2.076 1.25 82.5 339 55.398 1.00 178.13 139.99 0.79 OK
104 1.0DL+1.0LL+1.0SL +Z 55.206 744.051 -15.266 1.25 82.5 339 57.278 1.00 178.13 141.28 0.79 OK
105 1.0DL+1.0LL+1.0SL -Z 55.233 722.526 19.419 1.25 82.5 339 58.547 1.00 178.13 138.67 0.78 OK
Client Contractor
Ujjain Municipal Corporation-Ujjain. Tata Projects Ltd.,-Secunderabad.
DOCUMENT NO: REV
Project: Design and Construction of 92.5 MLD Sewerage Networks & Sewage Treatment Plant at Ujjain for Ujjain
TPL - 340062 - UJN - STP - CVL - SBR -STR DC - 2001 A 1
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
0.98
Client Contractor
Ujjain Municipal Corporation-
Tata Projects Ltd.,-Secunderabad.
Ujjain.
DOCUMENT NO REV
Project: Design and Construction of 92.5 MLD
TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at 0
STR DC - 2001 A
Ujjain for Ujjain Municipal Corporation.
DSN CHK APP SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
Pa = Ultimate axial load from column = 1100.21 kN (Load taken from ultimate
load condition)
P = Design vertical load on footing = 1521.7 kN
3
W soil dry = Unit weight of dry soil = 17 kN/m ( soil above w.t)
Size Of Base :
Z
Lx
Y
Lz
X
Cz
DF
C d D
X
PLAN SECTION
D = Overall depth of base,d = Effective depth of base, DFd = Depth of foundation from Ground Level.
Pmax = P Mz * 6 Mx * 6
+ Q + + 2
A Lx2 * Lz Lz * Lx
= 184.45 kN/m²
Pmin = P Mz * 6 Mx * 6
+ Q - -
A Lx2 * Lz Lz2 * Lx
= 184.45 kN/m²
Lx/6 = 0.42 m
Lz/6 = 0.55 m
Lx
b
Lz
Cz
a Pmin
PLAN P' Pmax
SECTION
= 1.35 m
= 184 kN/m²
= 184 kN/m²
= 97 kN-m
= 168 kN-m
Muz = 0.8188
B*(d2 )
Percentage of reinforcement
pt = 0.195%
= 480 mm²/m
% of steel = 0.219 %
Mux = 1.420
B*(d2 )
Percentage of reinforcement
pt = 0.3470%
= 480 mm²/m
% of steel = 0.389 %
L
Lz
Cz
2
Design pressure at the critical section = Pcr = 184.45 kN/m
C
Effective thickness of footing at the critical section = dx = 344 mm
( Pmax+P
Upward shear force on footing at the critical section = cr ) * shorter side of footing * [max cant. length - 1.0dx]
2
Vt = 463.89 kN
2
Area of footing at Critical Section = dx * Lz = Ax = 1135200 mm
2
v = Vt*1000 = 0.41 N/mm
Ax
Client Contractor
Ujjain Municipal Corporation-
Tata Projects Ltd.,-Secunderabad.
Ujjain.
DOCUMENT NO REV
Project: Design and Construction of 92.5 MLD
TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at 0
STR DC - 2001 A
Ujjain for Ujjain Municipal Corporation.
DSN CHK APP SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
2
Permissible shear stress at the critical section == 0.44 N/mm
Therefore, V<Vc, OK
Punching shear is consider along a vertical section on the perimeter at a distance 0.5d from the
face of column, where d is the average effective depth of the reinforcement spanning in the two
dir.
Lx
Lz
0.5
= 332 mm
= 1096 kN
2
Shear stress = Vud = 0.96 N/mm
b*d
2
Permissible shear stress at the critical section == 1.37 N/mm
Therefore, V<Vc, OK
Client Contractor
Ujjain Municipal Corporation-
Tata Projects Ltd.,-Secunderabad.
Ujjain.
DOCUMENT NO REV
Project: Design and Construction of 92.5 MLD
TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at 0
STR DC - 2001 A
Ujjain for Ujjain Municipal Corporation.
DSN CHK APP SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
Concerning eccentrically loaded foundn, it shall always be ensured that the overall stabilizing
moment (Mstab.) calc. at the lower side of the base, is greater than the overturning moment
(Mover.)
Z
A Y
X
A
B B
A
X
A
PLAN SECTION
= [ ( P ) + Psoil ] * ( Lx /2 )
= 1902.1 kN-m
Mstab = =
F.O.S against overturning 1902.1 > 1.5 Safe
Mover
= [ ( N ) + Psoil ] * ( Lz /2 )
= 2510.8 kN-m
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
Inlet channel wall and base slab supported by beam spanning between selector compartment walls such as
U/F and O/F walls. Over the O/F walls stub column SC2 (200x300) is taken to support inlet channel in slector
compartment zone.
Loading detail:
Dead load :
Top reinforcement 2 Nos. T16 Dia bars + 2 Nos. T20 Dia bars
Bottom reinforcement 2 Nos. T16 Dia bars + 2 Nos. T20 Dia bars
Shear reinforcement T8 At 125mm C/C Vertical bars of inlet channel wall
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
Check for Crack width Beam - Wall W12
2
Compressive strength of concrete = 30 N/mm
2
Ec -Modulus of Elasticity of concrete = 27.39 kN/mm
2
ES -Modulus of Elasticity of steel = 200 kN/mm
Allowable crackwidth of the section = 0.2 mm
Dia of bar provided = 20 mm
Clear distance between bar = 62 mm
2
Area of steel provided on each face = 1030 mm
Service moment @ the point considered M = 204.50 kNm
Breath of section b = 200 mm
Overall depth D = 2700 mm
Clear Cover to the main reinft. Cmin = 45 mm
Effective depth of the section d = 2625 mm
Calculating properties of equivalent transformed section with Ee=Ec/2
2
Eeq = 13.695 kN/mm
Modular ratio m = 14.6
pt = 0.0020
m*pt = 0.029
Eh = (D-x)/(d-x)*es = 4.22E-04
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = -2.97E-04
Calculating crack width at critical positions
Effective Cover p = 55 mm
Bar dia /2 y = 10 mm
Spacing of bar = 62 mm
am=(p^2+(x/2))^2)^0.5-y] = 53.13 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = -0.047 mm
safe
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
fy = 500 N/mm
2
Dimensions
Thickness of Wall D = 200 mm
Clear cover to rebar C = 45 mm
Dia of main rebar = 8 mm
Eff. Thickness of Wall d = 151 mm
(200-45-8/2)
Height of Liquid = 1800 mm
((482.8-481.5+0.5)x1000)
3
Unit weight of sewage = 10.1 kN/m
Vertical reinforcement (Water Face)
Water pressure = 18.18 kN/m
2
(1800x10.1/10^3)
Moment @ base M = 9.82 kNm (18.18x1800^2x/(6x10^6))
Shear force = 16.36 kN (18.18x1800/(2x10^3)
Unfactored moment = 9.82 kNm
Load factor = 1.5
Mu 14.7 kNm (9.82 X 1.5)
Percentage of steel required = 0.152 %
(0.5x30/500x(1-SQRT(1-4.6x14.73x1000000/(30x1000x151x151)))x100
Area of steel reqd = 230 mm
2
(0.152x1000x151/100)
Depth of Surface Zone = 100.000 mm As per IS3370-Part 2
Min. percentage of steel for wall = 0.35 %
Area of steel reqd = 350 mm
2
(0.35x1000x100/100)
Spacing of reinft. Reqd. = 144 mm (0.7854x8x8/350x1000)
Spacing of reinft. Provided = 125 mm
Area of steel provided = 402 mm
2
Safe
(1000/125x0.7854x8x8)
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
fy = 500 N/mm
2
Dimensions
Overall Depth of Base Slab , D = 200 mm
Clear cover to rebar C = 45 mm
Dia of main rebar = 8 mm
Eff. Depth of Base Slab d = 151 mm
(200-45-8/2)
Height of Liquid /wall = 1800 mm
Span of slab = 1700 mm
3
Unit weight of sewage = 10.1 kN/m
Liquid pressure = 18.18 kN/m
2
Eh = (D-x)/(d-x)*es = 1.07E-03
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 1.05E-04
Calculating crack width at critical positions
Effective Cover p = 49 mm
Bar dia /2 y = 4 mm
Spacing of bar = 125 mm
am=(p^2+(x/2))^2)^0.5-y] = 75.42 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.017 mm
safe
Bottom moment of base slab (Fixed end moment of inlet channel wall):
Mu/bd2 = 0.579
For M30 and Fe500, percentage of reinforcement,
pt = 0.5*Fck/Fy*(1- (1-(Mu/bd2)*4.589/Fck)* 100 = 0.136 %
2
Ast = Pt/100*b*d 0.136/100*1000*91 = 123.8 mm
Eh = (D-x)/(d-x)*es = 7.44E-04
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 1.24E-04
Calculating crack width at critical positions
Effective Cover p = 34 mm
Bar dia /2 y = 4 mm
Spacing of bar = 125 mm
am=(p^2+(x/2))^2)^0.5-y] = 67.15 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.014 mm
safe
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
LOAD CALCULATION FOR STUB COLUMN ABOVE OVERFLOW WALL - To support inlet channel
DESIGN OF STUB COLUMN (ABOVE OVER FLOW WALL INLET CHANNEL SUPPORT) - SC2
Reinforcement provided:
Ties - T8 AT 175mm
CLIENT: CONTRACTOR:
UJJAIN MUNICIPAL CORPORATION. TATA PROJECTS LIMITED.
UJJAIN.
SECUNDERABAD.
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
Properties of material
fck = 30 N/mm
2
fy = 500 N/mm
2
Dimensions
Thickness of wall D = 200 mm
Clear cover to reinft. C = 45 mm
Dia of main reinft. = 10 mm
Eff. Thickness d = 150 mm (200-45-10/2)
Depth of Surface Zone = 100 mm As per IS3370-Part 2
Min. percentage of steel for wall = 0.35 %
Area of steel reqd = 350 mm
2
Note:
Since this is baffle wall minimum reinforcement is provided
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
DESIGN OF SELECTOR COMPARTMENT WALLS
DESIGN OF OVER FLOW WALL - Wall W7
Properties of material
fck = 30 N/mm
2
fy = 500 N/mm
2
Dimensions
Thickness of Wall D = 200 mm
Clear cover to rebar C = 45 mm
Dia of main rebar = 12 mm
Eff. Thickness of Wall d = 149 mm
(200-45-12/2)
Height of Liquid = 2400 mm
((476.5-478.9)x1000)
3
Unit weight of sewage = 10.1 kN/m
Vertical reinforcement (Water Face)
Water pressure = 24.24 kN/m
2
(2400x10.1/10^3)
Moment @ base M = 23.27 kNm (24.24x2400^2x/(6x10^6))
Shear force = 29.09 kN (24.24x2400/(2x10^3)
Unfactored moment = 23.27 kNm
Load factor = 1.5
Mu 34.9 kNm (23.27 X 1.5)
Percentage of steel required = 0.387 %
(0.5x30/500x(1-SQRT(1-4.6x34.905x1000000/(30x1000x149x149)))x100
Area of steel reqd = 577 mm
2
(0.387x1000x149/100)
Depth of Surface Zone = 100.000 mm As per IS3370-Part 2
Min. percentage of steel for wall = 0.35 %
Area of steel reqd = 350 mm
2
(0.35x1000x100/100)
Spacing of reinft. Reqd. = 196 mm (0.7854x12x12/576.63x1000)
Spacing of reinft. Provided = 125 mm
Area of steel provided = 905 mm
2
Safe
(1000/125x0.7854x12x12)
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
fy = 500 N/mm
2
Dimensions
Thickness of wall D = 200 mm
Clear cover to reinft. C = 45 mm
Dia of main reinft. = 12 mm
Eff. Thickness d = 149 mm (200-45-12/2)
Height of wall, b = 5300 mm (481.8m-476.5m lvl)
Liquid level = 2900 mm (478.9-476.5+0.5)
3
Unit weight of liquid = 10.1 kN/m
Length of wall,(2a) = 6500 mm
Coefficient, (a/b) = 0.613 (6500/(5300*2))
Liquid pressure at base = 29.29 kN/m
2
(2900*10.1/10^3)
(Support Conditions -plate fixed along three edges, free at top, refer Moody's chart fig. no 5.)
Max. M @ (+ve)
Max. Mhorizontal
@ (+ve)(selector
horizontal
zone)
inside = 16.460 kNm
Unfactored moment = 16.460 kNm
Load factor = 1.5
Mu = 24.690 kNm (1.5*16.46)
Percentage of steel required = 0.268 %
(0.5*30/500*(1-SQRT(1-4.6*24.69*1000000/(30*1000*149*149)))*100)
Dia of main reinft. = 10 mm
Area of steel reqd = 399.320 mm
2
0.20 m 2.70 m
2 Water Side
0.30 m
5
0.200 m 6.400 m
6.80 m
Structural Properties
Resisting Moment
Distance of resultant vertical force from heel = 3.6 m
(883.44/245.56)
Resisting Moment (MR(DL)) about toe = 785.792 kN-m
(245.56*(6.8-3.6)
Overturning Moment (Taken From Wall Panel Design)
Maximum pressure due to water = 26.26 kN/m
2
(10.1*(2.6))
Load due to water pressure = 34.14 kN
((0.5*26.26*(2.6))
Overturning Moment (MO) = 20.43 kN-m
= 34.62
((0.9*785.792)/20.43)
FOS is greater than 1.5. Hence Safe against overturning
(34.62 > 1.5)
Client Contractor
(34.14+0)
Resisting Force (FR) = 245.56 kN
0.9*μ* FR
Factor of Safety against sliding =
FS
= 2.27 (2.27<1.5)
FOS is greater than 1.5
MR(DL + LL) + MO
Distance of R from the heel =
R (DL + LL )
= 3.68 m
((20.43)+(883.44))/(245.56)
Eccentricity e = 0.28 m
(3.68-(6.8/2))
= 45.030 kN/m
2
= 27.19 kN/m
2
Eccentricity e = 0.280 m
b/6 = 1.13 m
Client Contractor
No tension occurs
(0.28<1.13)
R
(Toe) (Heel)
6.80 m
a h
d f
b
g
2.65 m
e
c
2
Pressure at "de" distance from stem(toe side) = 45.15 kN/m
2
Pressure at "de" distance from stem(heel side) = 43.34 kN/m
Client Contractor
2
Self weight of Toe Slab = 7.5 kN/m
Net upward pressure @ c = 37.53 kN/m
2
(45.03-7.5)
Net upward pressure @ e = 37.01 kN/m
2
(44.51-7.5)
Net Pressure at "de" distance from stem = 37.65 kN/m
2
(45.15-7.5)
Depth of toe slab = 300 mm
Clear cover = 50 mm
Diameter of bar = 16 mm
Main Bar :
Ast Required =
2
Ast Required = 10.35 mm
2
Ast Provided = 1608.499 mm
(1000/125*0.7854*16*16)
Hence Provided Ast is ok
Client Contractor
Distribution Bar:
Diameter of bar = 12 mm
2
Ast Provided = 565.488 mm
(1000/200*0.7854*12*12)
Hence Provided Ast is ok
(((0.75*10^6)/213.438)/1608.4992)
2
Concrete stress 'fc' = 0.08 N/mm
(2*0.75*10^6)/(1000*85.685*213.438)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00001090 mm
Strain at the level considered ε1 = (h-x)/(d-x)*Es
Strain at the level considered ε1 = 0.0000149 mm
Strain due to stiffening effect of concrete ε2
Diameter of bar = 12 mm 0
Bottom Steel
Moment @ the face of stem = 35.88 kN-m
(10.22*0.5*6.4^2)
Main Bar :
Ast Required =
2
Ast Required = 526 mm
2
Ast Provided = 646.272 mm
(1000/175*0.7854*12*12)+(1000/200*0.7854*0*0)
Hence Provided Ast is ok
Distribution Bar:
Diameter of bar = 12 mm
2
Ast Provided = 565.488 mm
(1000/200*0.7854*12*12)
Hence Provided Ast is ok
(0.56>0.15)
Check for Crack width in heel Slab:
2
Characteristic cube strength of concrete, fck = M30 N/mm
Client Contractor
(((35.88*10^6)/224.303)/646.272)
2
Concrete stress 'fc' = 5.41 N/mm
(2*35.88*10^6)/(1000*59.092*224.303)
Client Contractor
(0.17<0.2)
3) Design of Heel Slab(Top steel) :
2
Self weight of Heel Slab = 7.5 kN/m
2
Downward water pressure = 26.26 kN/m
(*0.244)
2
Total Downward Pressure = 33.76 kN/m
(26.26+7.5)
2
Net downward Pressure @ h = 6.57 kN/m
2
Net upward Pressure @ g = 10.22 kN/m
At a distance of 2.65m from the stem, downward pressure will be 0, after that downward
pressure will increase linearly.
2
Net downward Pressure @ 'de' distance = 9.58 kN/m
Depth of heel slab = 300 mm
Clear cover = 50 mm
Client Contractor
Diameter of bar = 16 mm 0
Top Steel
Moment @ the face of stem = 63.6 kN-m
(0.5*6.57*3.75*2.65+(0.67*3.75)
Main Bar :
Ast Required =
2
Ast Required = 971.27 mm
2
Ast Provided = 1608.499 mm
(1000/125*0.7854*16*16)+(1000/200*0.7854*0*0)
Hence Provided Ast is ok
Distribution Bar:
Diameter of bar = 12 mm
2
Ast Provided = 565.488 mm
(1000/200*0.7854*12*12)
Hence Provided Ast is ok
(0.92>0.24)
Check for Crack width in heel Slab:
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.61
(((63.6*10^6)/213.431)/1608.4992)
2
Concrete stress 'fc' = 6.95 N/mm
(2*63.6*10^6)/(1000*85.708*213.431)
Distance 'a' = 300 mm
Strain Es in steel for the stress
185.26ofN/mm2 = 0.00092630 mm
Strain at the level considered ε1 = (h-x)/(d-x)*Es
Strain at the level considered ε1 = 0.0012701 mm
Strain due to stiffening effect of concrete ε2
(0.178<0.2)
Client Contractor
1.20 m
0.50 m 0.50 m
1 0.125 m
0.20 m 1.80 m
5.30 m
1.20 m 3
0.285 m
2.30 m 3.50 m
4 6
0.45 m
5 0.125 m
Note:
Since Wall design W4 & W5 are similar, design of wall W5 is not repeated.
CLIENT: CONTRACTOR:
UJJAIN MUNICIPAL CORPORATION. TATA PROJECTS LIMITED.
UJJAIN.
SECUNDERABAD.
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
1.WEIGHT CALCULATION
(8538.3x1000/9.81)
b) Weight of Base Slab = 17052.53 kN
(1263.15x0.45x30)
Mass of base raft mb = 1738280.3 Kg
(17052.53x1000/9.81)
d) Weight of water = 67616.42 kN
(1263.15x5.3x10.1)
Mass of water = 6892601.4 Kg
(67616.42x1000/9.81)
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD
TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain 1
STR DC - 2001 A
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
mi/m = 0.15
((TANH(0.866x40.1/5.3))/(0.866x40.1/5.3)
mi = 1033890.2 kg
(0.15x6892601.43)
mc/m = 0.79
(0.264xTANH(3.16x5.3/40.1)/(5.3/40.1)
mc = 5445155.1 kg
(0.79x6892601.43)
hi/h (As per IIT EQ08-Table C1) = 0.375
hi = 1.99 m
(0.375x5.3)
hc/h = 0.51
(1-((COSH(3.16x5.3/40.1)-1)/(3.16x(5.3/40.1)xSINH(3.16x5.3/40.1)))
hc = 2.7 m
(0.51x5.3)
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD
TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain 1
STR DC - 2001 A
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
hi*/h = 3.15
((0.866x40.1/5.3)/(2xTANH(0.866x40.1/5.3))-0.125
hi* = 16.70 m
(3.15x5.3)
hc*/h = 6.13
(1-(COSH(3.16x5.3/40.1)-2.01)/((3.16x5.3/40.1)x(SINH(3.16x5.3/40.1)))
hc* = 32.49 m
(6.13x5.3)
3.TIME PERIOD
Mass of one tank wall is obtained by considering itys inner dimension only,
mw = 191456.42 kg
(5.3x0.45x31.5x25x1000/9.81)
= 2.17 m
(((1033890.21x1.99/2)+(191456.422018349x5.3/2))/((1033890.21/2)+191456.422018349)
2
= 41.63 kN/m
((((1033890.21/2)+191456.422018349)x9.81)/(31.5x5.3)/1000
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD
TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain 1
STR DC - 2001 A
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
As per section 4.3.1.2 , a strip of unit width of wall is considered as cantilever and subjected
to a concentrated force
P = q*h*1
= 220.639 kN
(41.63x5.3x 1)
Length of the cantilever is h' = 2.17 m
Hence d =
2
E = = 2.50E+07 kN/m
Iw = Moment of Inertia of cantilever =
4
= 7.59E-03 m
Hence d =
= 0.003959 m
((220.639x2.17^3)/(3x25000000x0.00759375)
Time Period of Impulsive mode, = 0.13 sec
(2*PI()*(SQRT(0.003959/9.81)))
Time Period of Convective mode, =
Multiplying factor of 1.75 is used to obtain sa/g values for 0.5% damping from that
for 5% damping
5.BASE SHEAR
Mi = 6151.03 kN.m
Mc = 2884.52 kN.m
7.OVERTURNING MOMENT
8.HYDRODYNAMIC PRESSURE
Circumferential angle φ = 0
Where Qib,
= 0.00209
At base wall, y =0 ;
Where Qcw,
= 0.383
Where Qcb,
= 0.38
Av = 0.06
Pv = 3.12 kN/m2
11.CONCLUSION
For Earthquake condition, we can increase the net SBC by 1.25. Hence
Increased SBR = 117 kN/m2 (80 x 1.25) +17
Hence Safe
Client Contractor
0.285 m 3
1.90 m 3.50 m
6 2.30 m
FGL
Soil H= Water H = 1.40 m
4
0.90 m
8
0.450 m
0.35 m 5
Structural Properties
(On Average, NGL is at level 476.5m as per contour. Since the founding depth should 1m from NGL,
filling with mass concrete(1:5:10) for a thickness of 450mm
Unit weight of soil = 3
17 kN/m (As per soil report)
Unit weight of liquid = 10.1 kN/m
3
Restoring Moment
Distance of resultant vertical force from heel = 1.75 m
(558.82/320.18)
Client Contractor
(320.18*(4.85-1.75)
Overturning Moment
Maximum pressure due to water = 53.53 kN/m
2
(10.1*5.3)
Load due to water pressure = 141.85 kN
(0.5*53.53*5.3)
Overturning Moment due to water = 315.06 kN-m
and cantilever projection(Mo) (141.85*((5.3/3+0.5))+0.63)
0.9* MR(DL)
Factor of Safety against overturning =
MO
= 2.84
((0.9*992.56)/315.06)
FOS is greater than 1.5. Hence Safe against overturning
(2.84 > 1.5)
0.9*μ* FR
Factor of Safety against sliding =
FS
= 0.99 (0.99<1.5)
((0.9*0.35*320.18)/)
= 2.68 m
((558.82)+(315.06+0.63))/(320.18+6)
Eccentricity e = 0.255 m
(2.68-(4.85/2))
= 86.840 kN/m
2
< 97
Minimum Pressure = / (1−6 / )
= 45.19 kN/m
2
< 97
Hence Safe
iv) Check for Tension
Eccentricity e = 0.255 m
b/6 = 0.81 m
No tension occurs
2) Design of Vertical wall( 450 thk)(Water face):
Ast Required =
= 2
Ast Required for Moment 2465.4 mm
= 2
Ast Provided 3459.687 mm
(1000/200*0.7854*25*25) +(1000/200*0.7854*16*16)
Hence Provided Ast is ok
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.6
(((251.23*10^6)/340.86)/3459.69)
2
Concrete stress 'fc' = 9.52 N/mm
(2*251.23*10^6)/(1000*154.922*340.86)
Distance 'a' = 450 mm
Strain Es in steel for the stress of = 0.00106520 mm
(213.04/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0013230 mm
(((450-154.922)/(392.5-154.922))*0.0010652)
Strain due to stiffening effect of concrete ε2
Client Contractor
Ast Required =
Client Contractor
= 2
Ast Required for Moment 40 mm
= 2
Ast Provided 1130.976 mm
(1000/200*0.7854*12*12) +(1000/200*0.7854*12*12)
Hence Provided Ast is ok
Check for Crack width
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.6
(((4.62*10^6)/365.85)/1130.98)
2
Concrete stress 'fc' = 0.25 N/mm
(2*4.62*10^6)/(1000*99.46*365.85)
Distance 'a' = 450 mm
Strain Es in steel for the stress of = 0.00005585 mm
(11.17/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0000654 mm
(((450-99.46)/(399-99.46))*0.00005585)
Strain due to stiffening effect of concrete ε2
(-0.095<0.2)
Client Contractor
Rebar diameter = 12 mm
Spacing = 100 mm
Cover = 45.00 mm
Minimum Reinforcement = 0.35 %
Depth of surface zone = 225 mm
Minimum Reinforcement = 787.500 mm
2
2
Ast Provided = 1130.976 mm
(1000/100*0.7854*12*12)
Hence Provided Ast is ok
((212.775*10^3)/(1000*392.5)
Percentage of Reinforcement = 0.88 %
(100*3459.687/1000/392.5)
Design shear strength = 0.62 N/mm
2
Ast Required =
2
Ast Required = 722.44 mm
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)
Hence Provided Ast is ok
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.6
(((46.08*10^6)/208.95)/1005.31)
2
Concrete stress 'fc' = 6.38 N/mm
(2*46.08*10^6)/(1000*69.14*208.95)
Distance 'a' = 285 mm
Strain Es in steel for the stress of = 0.00109680 mm
(219.36/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0014537 mm
Client Contractor
(((285-69.143)/(232-69.143))*0.0010968)
Strain due to stiffening effect of concrete ε2
(0.198<0.2)
Vertical Reinforcement (Earth Face)(For 285 thk):
Rebar diameter = 12 mm
Spacing = 200 mm
Cover = 45.00 mm
Minimum Reinforcement = 0.35 %
Depth of surface zone = 151.5 mm
Minimum Reinforcement = 530.250 mm
2
2
Ast Provided = 565.488 mm
(1000/200*0.7854*12*12)
Hence Provided Ast is ok
((68.175*10^3)/(1000*232)
Percentage of Reinforcement = 0.43 %
(100*1005.312/1000/232)
Design shear strength = 0.458 N/mm
2
Ast Required =
2
Ast Required = 247.03 mm
(IF(200>500,250,200/2))
Minimum Reinforcement = 350.000 mm
2
2
Ast Provided = 392.700 mm
(1000/200*0.7854*10*10)
Hence Provided Ast is ok
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.6
(((10.45*10^6)/137.96)/392.7)
2
Concrete stress 'fc' = 4.19 N/mm
(2*10.45*10^6)/(1000*36.13*137.96)
Distance 'a' = 200 mm
Strain Es in steel for the stress of = 0.00096445 mm
(192.89/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0013880 mm
(((200-36.134)/(150-36.134))*0.00096445)
Strain due to stiffening effect of concrete ε2
(0.07<0.2)
Client Contractor
Vertical Reinforcement (Earth Face) & Horizontal reinforcement(both faces) (200 thk wall):
Rebar diameter = 10 mm
Spacing = 200 mm
Cover = 45.00 mm
Minimum Reinforcement = 0.35 %
Depth of surface zone = 100 mm
Minimum Reinforcement = 350.000 mm
2
2
Ast Provided = 392.700 mm
(1000/200*0.7854*10*10)
Hence Provided Ast is ok
((24.54*10^3)/(1000*150)
Percentage of Reinforcement = 0.26 %
(100*392.7/1000/150)
Design shear strength = 0.458 N/mm
2
Note:
Additional Bar in Heel top slab is provided to match the wall reinforcement.
Client Contractor
R
de
4.85 m
d
c
b
a
(86.84-8.75)
Net upward pressure @ b = 60.18 kN/m
2
(68.93-8.75)
Net Pressure at "d" distance from stem = 62.13 kN/m
2
(70.88-8.75)
Depth of toe slab = 350 mm
Clear cover = 50 mm
Client Contractor
Diameter of bar = 20 mm
2
Ast Required = 1523.93 mm
2
Ast Provided = 2513.280 mm
(1000/125*0.7854*20*20)
Hence Provided Ast is ok
Distribution Bar:
Diameter of bar = 12 mm
2
Ast Provided = 753.984 mm
(1000/150*0.7854*12*12)
Hence Provided Ast is ok
(146.7*1000)/(1000*290)
Percentage of Reiforcement = 0.87 %
(100*2513.28)/(1000*290)
2
Design Shear Strength tc = 0.85 N/mm
(0.85*2)
Hence safe against shear
(1.7>0.51)
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
2
Self weight of Heel Slab = 11.25 kN/m
2
Downward Liquid pressure = 53.53 kN/m
Client Contractor
(10.1*5.3)
2
Total Downward Pressure = 64.78 kN/m
(53.53+11.25)
Net Downward pressure @ c = -0.65 kN/m
2
(65.43-64.78)
Net downward pressure @ d = 19.59 kN/m
2
(64.78-45.19)
Diameter of bar = 16 mm 0
2
Ast Required = 388.3 mm
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)+((1000/200*0.7854*0*0)
Hence Provided Ast is ok
Client Contractor
Distribution Bar:
Diameter of bar = 16 mm
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)
Hence Provided Ast is ok
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.61
(((43.41*10^6)/360.793)/1005.312)
2
Concrete stress 'fc' = 2.57 N/mm
(2*43.41*10^6)/(1000*93.621*360.793)
Distance 'a' = 450 mm
Strain Es in steel for the stress of = 0.00059840 mm
(119.68/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0007147 mm
Strain due to stiffening effect of concrete ε2
(0<0.2)
Client Contractor
1.60 m
0.20 m 1.20 m
1 0.150 m
0.20 m 1.80 m
3 5.30 m
0.285 m 1.20 m
3.50 m
4 2.30 m
0.45 m
5
Structural Properties
(259.07*(4.45-1.26)
Client Contractor
Overturning Moment
Maximum pressure due to water = 53.53 kN/m
2
(10.1*(5.3))
Load due to water pressure = 141.85 kN
((0.5*53.53*(5.3))
Overturning Moment due to water = 318.03 kN-m
and cantilever projection(Mo) (141.85*((5.3/3)+0.45)+3.6)
Factor of Safety against overturning = 0.9* MR(DL)
MO
= 2.34
((0.9*826.4333)/318.03)
FOS is greater than 1.5. Hence Safe against overturning
(2.34 > 1.5)
(141.85+43.1)
Resisting Force (FR) = 259.07 kN
0.9*μ* FR
Factor of Safety against sliding =
FS
MR(DL + LL) + MO
Distance of R from the heel =
R (DL + LL )
= 2.44 m
Client Contractor
Eccentricity e = 0.215 m
(2.44-(4.45/2))
= 75.090 kN/m
2
= 41.34 kN/m
2
Eccentricity e = 0.215 m
b/6 = 0.74 m
No tension occurs
(0.215 < 0.74)
Ast Required =
2
Ast Required = 2604.35 mm
= 2
Ast Provided 3459.687 mm
(1000/200*0.7854*25*25) +(1000/200*0.7854*16*16)
Hence Provided Ast is ok
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.61
((254.2*10^6)/340.846)/3459.687)
2
Concrete stress 'fc' = 9.63 N/mm
((2*254.2*10^6)/(1000*154.962*340.846)
Distance 'a' = 450 mm
Strain εs in steel for the stress
215.57ofN/mm2 = 0.00107785 mm
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0013388 mm
Strain due to stiffening effect of concrete ε2
Note:
Since the wall design is similar, design is not repeated. For detailed wall design refer to
external wall
((212.775*10^3)/(1000*380)
Percentage of Reinforcement = 0.91 %
(100*3459.687/1000/380)
Design shear strength = 0.748 N/mm
2
4.45 m
a h
d f
b
g
e
c
2
Self weight of Toe Slab = 11.25 kN/m
Net upward pressure @ c = 63.84 kN/m
2
(75.09-11.25)
Net upward pressure @ e = 48.67 kN/m
2
(59.92-11.25)
Client Contractor
(63.33-11.25)
Depth of toe slab = 450 mm
Clear cover = 50 mm
Diameter of bar = 16 mm
Main Bar :
Ast Required =
2
Ast Required = 1061.4 mm
2
Ast Provided = 2010.624 mm
(1000/100*0.7854*16*16)
Hence Provided Ast is ok
Distribution Bar:
Diameter of bar = 16 mm
(1000/200*0.7854*16*16)
Hence Provided Ast is ok
(((117.67*10^6)/350.279)/2010.624)
2
Concrete stress 'fc' = 5.37 N/mm
(2*117.67*10^6)/(1000*125.164*350.279)
Distance 'a' = 450 mm
Strain Es in steel for the stress of = 0.00083540 mm
Strain at the level considered ε1 = (h-x)/(d-x)*Es
Strain at the level considered ε1 = 0.0010170 mm
Strain due to stiffening effect of concrete ε2
Crack Width
Diameter of bar = 16 mm 0
Main Bar :
Ast Required =
Client Contractor
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)+(1000/200*0.7854*0*0)
Hence Provided Ast is ok
Distribution Bar:
Diameter of bar = 16 mm
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)
Hence Provided Ast is ok
(((36.87*10^6)/360.793)/1005.312)
2
Concrete stress 'fc' = 2.18 N/mm
(2*36.87*10^6)/(1000*93.621*360.793)
Distance 'a' = 450 mm
Strain Es in steel for the stress
101.65ofN/mm2 = 0.00050825 mm
Strain at the level considered ε1 = (h-x)/(d-x)*Es
Strain at the level considered ε1 = 0.0006070 mm
Strain due to stiffening effect of concrete ε2
Client Contractor
Note:
Additional Bar in Heel top slab is provided to match the wall reinforcement.
Client Contractor
1.20 m
0.50 m 0.50 m
1 0.125 m
0.20 m 1.80 m
5.30 m
1.20 m 3
0.285 m
2.30 m 3.50 m
4 6
0.45 m
5 0.125 m
Structural Properties
(10.1*(5.3))
Load due to water pressure = 141.85 kN
((0.5*53.53*(5.3)))
Overturning Moment due to water = 315.06 kN-m
and cantilever projection(Mo) (141.85*((5.3/3)+0.45)+0.63)
Factor of Safety against overturning = 0.9* MR(DL)
MO
= 2.29
FOS is greater than 1.5. Hence Safe against overturning
(141.85-0)
Resisting Load(FR) = 254.15 kN
Resisting Force(μ* FR) = 88.95 kN
Factor of Safety against sliding = 0.9*μ* FR
FS
= 0.56 (0.56<1.4)
MR(DL + LL) + MO
Distance of R from the heel =
R (DL + LL )
= 2.51 m
Eccentricity e = 0.285 m
(2.51-(4.45/2))
Client Contractor
= 79.060 kN/m
2
<97
Minimum Pressure = / (1−6 / )
= 35.17 kN/m
2
<97
Hence Safe
Eccentricity e = 0.285 m
b/6 = 0.74 m
No tension occurs
(0.285<0.74)
Ast Required =
2
Ast Required = 2569.48 mm
0.35*1000*225/100
= 2
Ast Provided 3459.687 mm
(1000/200*0.7854*25*25) +(1000/200*0.7854*16*16)
Hence Provided Ast is ok
= 2
Ast Provided 1130.976 mm
(1000/100*0.7854*12*12)
Hence Provided Ast is ok
Check for Crack width
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Client Contractor
(((251.23*10^6)/340.85)/3459.687)
2
Concrete stress 'fc' = 9.51 N/mm
((2*251.23*10^6)/(1000*154.962*340.85))
Distance 'a' = 450 mm
Client Contractor
(0.194<0.2)
Note:
Since Water is on both sides, the same reinforcement is provided on both sides
Ast Required =
2
Ast Required = 722.44 mm
(142.5*1000*0.35/100)
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)
Hence Provided Ast is ok
Horizontal Reinforcement (Water Face):
Rebar diameter = 12 mm
Spacing = 200 mm
Cover = 45.00 mm
Depth of the section = 285.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 234 mm
Minimum Reinforcement = 0.35 %
Depth of surface zone = 142.5 mm
(IF d >500,250,d/2))
Minimum Reinforcement = 498.750 mm
2
= 2
Ast Provided 565.488 mm
(1000/200*0.7854*12*12)
Client Contractor
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.61
(232-(69.162/3))
2
Steel Stress, 'fs' = 219.37 N/mm
(((46.08*10^6)/208.95)/1005.312)
2
Concrete stress 'fc' = 6.38 N/mm
((2*46.08*10^6)/(1000*69.162*208.95))
Distance 'a' = 285 mm
Strain Es in steel for the stress of = 0.00109685 mm
Strain at the level considered ε1 = (h-x)/(d-x)*Es
Strain at the level considered ε1 = 0.0014538 mm
Strain due to stiffening effect of concrete ε2
Ast Required =
2
Ast Required = 247.03 mm
(100*1000*0.35/100)
2
Ast Provided = 392.700 mm
(1000/200*0.7854*10*10)
Hence Provided Ast is ok
= 2
Ast Provided 392.700 mm
Client Contractor
(1000/200*0.7854*10*10)
Hence Provided Ast is ok
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.61
(((10.45*10^6)/137.95)/392.7)
2
Concrete stress 'fc' = 4.19 N/mm
((2*10.45*10^6)/(1000*36.145*137.95))
Distance 'a' = 200 mm
Strain Es in steel for the stress of = 0.00096450 mm
Strain at the level considered ε1 = (h-x)/(d-x)*Es
Strain at the level considered ε1 = 0.0013881 mm
Strain due to stiffening effect of concrete ε2
(0.07<0.2)
Note:
Since Water is on both sides, the same reinforcement is provided on both sides
Client Contractor
R
de
4.45 m
c
b
f
a
Note:
Additional Bar in Heel top slab is provided to match the wall reinforcement.
Client Contractor
R
de
c
b
f
a
2
Self weight of Heel Slab = 11.25 kN/m
2
Downward water pressure = 53.53 kN/m
(10.1*5.3)
2
Total Downward Pressure = 64.78 kN/m
(53.53+11.25)
Net downward pressure @ c = 9.88 kN/m
2
(64.78-54.9)
Net upward pressure @ d = 35.17 kN/m
2
(64.78-35.17)
Depth of heel slab = 450 mm
Clear cover = 50 mm
Diameter of bar = 16 mm
Client Contractor
Main Bar :
Ast Required =
2
Ast Required = 203.45 mm
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)
Hence Provided Ast is ok
Distribution Bar:
Diameter of bar = 16 mm
((71.415*1000)/(1000*392))
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.61
((46.2*10^6)/360.793)/1005.312)
2
Concrete stress 'fc' = 2.74 N/mm
(2*46.2*10^6)/(1000*93.621*360.793)
Distance 'a' = 450 mm
Strain Es in steel for the stress
127.37ofN/mm2 = 0.00063685 mm
Strain at the level considered ε1 = (h-x)/(d-x)*Es
Strain at the level considered ε1 = 0.0007606 mm
Strain due to stiffening effect of concrete ε2
(0.01<0.2)
Client Contractor
(79.06-11.25)
Net upward pressure @ b = 48.08 kN/m
2
(59.33-11.25)
Net Pressure at "de" distance from stem = 52.03 kN/m
2
(63.28-11.25)
Depth of toe slab = 450 mm
Clear cover = 50 mm
Diameter of bar = 16 mm
Main Bar :
Ast Required =
2
Ast Required = 1133.13 mm
2
Ast Provided = 2010.624 mm
(1000/100*0.7854*16*16)
Client Contractor
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)
Hence Provided Ast is ok
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.61
(((122.6*10^6)/350.27)/2010.624)
2
Concrete stress 'fc' = 5.59 N/mm
((2*122.6*10^6)/(1000*500*350.27))
Distance 'a' = 450 mm
Strain Es in steel for the stress
174.08ofN/mm2 = 0.00087040 mm
Strain at the level considered ε1 = (h-x)/(d-x)*Es
Strain at the level considered ε1 = 0.0010596 mm
Strain due to stiffening effect of concrete ε2
(0.14<0.2)
(79.06-11.25)
Net upward pressure @ f = 57.95 kN/m
2
(69.2-11.25)
Net Pressure at "de" distance from stem = 57.95 kN/m
2
(69.2-11.25)
Depth of toe slab = 450 mm
Clear cover = 50 mm
Diameter of bar = 16 mm
((67.81+57.95)*0.5)*(1-(0.45-(45/1000)))
Main Bar :
Ast Required =
2
Ast Required = 287.49 mm
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)
Hence Provided Ast is ok
Distribution Bar:
Diameter of bar = 16 mm
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)
Hence Provided Ast is ok
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.61
(((32.28*10^6)/360.79)/1005.312)
2
Concrete stress 'fc' = 1.91 N/mm
((2*32.28*10^6)/(1000**360.79))
Distance 'a' = 450 mm
Strain Es in steel for the stress
89.00 of
N/mm2 = 0.00044500 mm
Strain at the level considered ε1 = (h-x)/(d-x)*Es
Strain at the level considered ε1 = 0.0005315 mm
Strain due to stiffening effect of concrete ε2
(-0.04<0.2)
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
2
Compressive Strength of concrete = 30 N/mm
2
Yield strength of steel = 500 N/mm
Cantilever slab =
Mu/bd2 = 0.121
For M30 and Fe500, percentage of reinforcement,
pt = 0.5*Fck/Fy*(1- (1-(Mu/bd2)*4.589/Fck)* 100
= 0.028 %
Ast = Pt/100*b*d
= 0.028/100*1000*125
2
= 35 mm
Assumed diameter of the slab reinft = 12 mm
Minimum % of reinforcement = 0.35 %
2
Minimum area of reinforcement = 350 mm
Spacing of 12mm dia bars = Af/Ast.*1000
= 323.14 mm
= 300 mm
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
x/d = 0.32
x = 24.15 mm
Eh = (D-x)/(d-x)*es = 4.76E-04
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = -3.73E-04
Calculating crack width at critical positions
Effective Cover p = 50 mm
Bar dia /2 y = 5 mm
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
am=(p^2+(x/2))^2)^0.5-y] = 106.80 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = -0.054 mm
safe
SLAB RESULT:
2
Compressive Strength of concrete = 30 N/mm
2
Yield strength of steel = 500 N/mm
Cantilever slab =
Mu/bd2 = 0.518
For M30 and Fe500, percentage of reinforcement,
pt = 0.5*Fck/Fy*(1- (1-(Mu/bd2)*4.589/Fck)* 100
= 0.122 %
Ast = Pt/100*b*d
= 0.122/100*1000*150
2
= 183 mm
Assumed diameter of the slab reinft = 8 mm
Minimum % of reinforcement = 0.35 %
2
Minimum area of reinforcement = 350 mm
Spacing of 8mm dia bars = Af/Ast.*1000
= 143.62 mm
= 125 mm
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
x/d = 0.29
x = 28.61 mm
Eh = (D-x)/(d-x)*es = 1.86E-03
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 9.85E-04
Calculating crack width at critical positions
Effective Cover p = 50 mm
Bar dia /2 y = 5 mm
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
am=(p^2+(x/2))^2)^0.5-y] = 106.80 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.156 mm
safe
SLAB RESULT:
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
Client Contractor
1 0.125 m
5.300 m
0.50 m
0.15 m 5.175 m
3
6
1.90 m 1.40 m
8
7
0.50 m
5
Structural Properties
Length of Wall = 22 m
(5.3*10.1)
Load due to water pressure = 141.85 kN
(0.5*53.53*5.3)
Cover = 45.00 mm
Depth of the section = 450.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 392.5 mm
Ast Required =
2
Ast Required = 2465.4 mm
2
Ast Provided = 3459.687 mm
(1000/200*0.7854*25*25) +(1000/200*0.7854*16*16)
Hence Provided Ast is ok
(((251.23*10^6)/340.85)/3459.69)
2
Concrete stress 'fc' = 9.51 N/mm
(2*251.23*10^6)/(1000*154.962*340.85)
Distance 'a' = 450 mm
Strain Es in steel for the stress of = 0.00106525 mm
(213.05/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0013231 mm
(((450-154.962)/(392.5-154.962))*0.00106525)
Strain due to stiffening effect of concrete ε2
((212.775*10^3)/(1000*392.5)
Percentage of Reinforcement = 0.88 %
(100*3459.687/1000/392.5)
Design shear strength = 0.71 N/mm
2
Tension Reinforcement
Client Contractor
Rebar diameter = 16 mm 0
Spacing = 200 mm 200
Cover = 45.00 mm
Depth of the section = 450.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 397 mm
Ast Required =
2
Ast Required = 837.26 mm
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok
(((93*10^6)/365.57)/1005.31)
2
Concrete stress 'fc' = 5.4 N/mm
(2*93*10^6)/(1000*94.297*365.57)
Distance 'a' = 450 mm
Strain Es in steel for the stress of = 0.00126530 mm
(253.06/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0014868 mm
(((450-94.297)/(397-94.297))*0.0012653)
Strain due to stiffening effect of concrete ε2
((109.38*10^3)/(1000*397)
Percentage of Reinforcement = 0.25 %
(100*1005.312/1000/397)
Design shear strength = 0.71 N/mm
2
Rebar diameter = 16 mm
Spacing = 200 mm
Cover = 45.00 mm
Minimum Reinforcement = 0.35 %
Depth of surface zone = 225 mm
Minimum Reinforcement = 787.500 mm
2
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)
Hence Provided Ast is ok
Client Contractor
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
0.285 m 3
1.90 m 3.50 m
6 2.30 m
FGL
Soil H= Water H = 1.40 m
4
0.90 m
8
0.500 m
0.50 m 5
Structural Properties
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Restoring Moment
Distance of resultant vertical force from heel = 2.11 m
(843/399.63)
Restoring Moment (MR(DL)) about toe = 1614.51 kN-m
(399.63*(6.15-2.11)
Overturning Moment
Maximum pressure due to water = 53.53 kN/m
2
(10.1*5.3)
Load due to water pressure = 141.85 kN
(0.5*53.53*5.3)
Overturning Moment due to water = 322.16 kN-m
and cantilever projection(Mo) (141.85*((5.3/3+0.5))+0.63)
0.9* MR(DL)
Factor of Safety against overturning =
MO
= 4.51
((0.9*1614.51)/322.16)
FOS is greater than 1.5. Hence Safe against overturning
(4.51 > 1.5)
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
0.9*μ* FR
Factor of Safety against sliding =
FS
= 1.37 (1.37<1.5)
((0.9*0.35*399.63)/)
= 2.87 m
((843)+(322.16+0.63))/(399.63+6)
Eccentricity e = -0.205 m
(2.87-(6.15/2))
= 77.980 kN/m
2
< 97
Minimum Pressure = / (1−6 / )
= 51.98 kN/m
2
< 97
Hence Safe
iv) Check for Tension
Eccentricity e = 0.205 m
b/6 = 1.03 m
No tension occurs
Client Contractor
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Ast Required =
= 2
Ast Required for Moment 2465.4 mm
= 2
Ast Provided 3459.687 mm
(1000/200*0.7854*25*25) +(1000/200*0.7854*16*16)
Hence Provided Ast is ok
Client Contractor
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.6
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
(((251.23*10^6)/340.86)/3459.69)
2
Concrete stress 'fc' = 9.52 N/mm
(2*251.23*10^6)/(1000*154.922*340.86)
Distance 'a' = 450 mm
Strain Es in steel for the stress of = 0.00106520 mm
(213.04/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0013230 mm
(((450-154.922)/(392.5-154.922))*0.0010652)
Strain due to stiffening effect of concrete ε2
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Ast Required =
= 2
Ast Required for Moment 40 mm
= 2
Ast Provided 1130.976 mm
(1000/200*0.7854*12*12) +(1000/200*0.7854*12*12)
Hence Provided Ast is ok
Check for Crack width
2
Characteristic cube strength of concrete, fck = M30 N/mm
Client Contractor
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
(((4.62*10^6)/365.85)/1130.98)
2
Concrete stress 'fc' = 0.25 N/mm
(2*4.62*10^6)/(1000*99.46*365.85)
Distance 'a' = 450 mm
Strain Es in steel for the stress of = 0.00005585 mm
(11.17/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0000654 mm
(((450-99.46)/(399-99.46))*0.00005585)
Strain due to stiffening effect of concrete ε2
(-0.095<0.2)
Client Contractor
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Rebar diameter = 12 mm
Spacing = 100 mm
Cover = 45.00 mm
Minimum Reinforcement = 0.35 %
Depth of surface zone = 225 mm
Minimum Reinforcement = 787.500 mm
2
2
Ast Provided = 1130.976 mm
(1000/100*0.7854*12*12)
Hence Provided Ast is ok
((212.775*10^3)/(1000*392.5)
Percentage of Reinforcement = 0.88 %
(100*3459.687/1000/392.5)
Design shear strength = 0.62 N/mm
2
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Ast Required =
2
Ast Required = 722.44 mm
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)
Hence Provided Ast is ok
Client Contractor
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.6
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
(((46.08*10^6)/208.95)/1005.31)
2
Concrete stress 'fc' = 6.38 N/mm
(2*46.08*10^6)/(1000*69.14*208.95)
Distance 'a' = 285 mm
Strain Es in steel for the stress of = 0.00109680 mm
(219.36/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0014537 mm
(((285-69.143)/(232-69.143))*0.0010968)
Strain due to stiffening effect of concrete ε2
(0.198<0.2)
Client Contractor
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Rebar diameter = 12 mm
Spacing = 200 mm
Cover = 45.00 mm
Minimum Reinforcement = 0.35 %
Depth of surface zone = 151.5 mm
Minimum Reinforcement = 530.250 mm
2
2
Ast Provided = 565.488 mm
(1000/200*0.7854*12*12)
Hence Provided Ast is ok
((68.175*10^3)/(1000*232)
Percentage of Reinforcement = 0.43 %
(100*1005.312/1000/232)
Design shear strength = 0.458 N/mm
2
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Ast Required =
2
Ast Required = 247.03 mm
2
Ast Provided = 392.700 mm
(1000/200*0.7854*10*10)
Hence Provided Ast is ok
Client Contractor
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.6
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
(((10.45*10^6)/137.96)/392.7)
2
Concrete stress 'fc' = 4.19 N/mm
(2*10.45*10^6)/(1000*36.13*137.96)
Distance 'a' = 200 mm
Strain Es in steel for the stress of = 0.00096445 mm
(192.89/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0013880 mm
(((200-36.134)/(150-36.134))*0.00096445)
Strain due to stiffening effect of concrete ε2
(0.07<0.2)
Client Contractor
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Vertical Reinforcement (Earth Face) & Horizontal reinforcement(both faces) (200 thk wall):
Rebar diameter = 10 mm
Spacing = 200 mm
Cover = 45.00 mm
Minimum Reinforcement = 0.35 %
Depth of surface zone = 100 mm
Minimum Reinforcement = 350.000 mm
2
2
Ast Provided = 392.700 mm
(1000/200*0.7854*10*10)
Hence Provided Ast is ok
((24.54*10^3)/(1000*150)
Percentage of Reinforcement = 0.26 %
(100*392.7/1000/150)
Design shear strength = 0.458 N/mm
2
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
R
de
6.15 m
d
c
b
a
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
(77.98-12.5)
Net upward pressure @ b = 54.3 kN/m
2
(66.8-12.5)
Net Pressure at "d" distance from stem = 55.52 kN/m
2
(68.02-12.5)
Depth of toe slab = 500 mm
Clear cover = 50 mm
Diameter of bar = 20 mm
2
Ast Required = 1477.44 mm
2
Ast Provided = 2513.280 mm
(1000/125*0.7854*20*20)
Hence Provided Ast is ok
Client Contractor
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Distribution Bar:
Diameter of bar = 12 mm
2
Ast Provided = 753.984 mm
(1000/150*0.7854*12*12)
Redeisgn
(176.505*1000)/(1000*440)
Percentage of Reiforcement = 0.57 %
(100*2513.28)/(1000*440)
2
Design Shear Strength tc = 0.85 N/mm
(0.85*2)
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
2
Self weight of Heel Slab = 12.5 kN/m
2
Downward Liquid pressure = 53.53 kN/m
(10.1*5.3)
2
Total Downward Pressure = 66.03 kN/m
(53.53+12.5)
Net Downward pressure @ c = 1.41 kN/m
2
(64.62-66.03)
Net downward pressure @ d = 14.05 kN/m
2
(66.03-51.98)
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Diameter of bar = 16 mm 0
2
Ast Required = 424.68 mm
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)+((1000/200*0.7854*0*0)
Hence Provided Ast is ok
Distribution Bar:
Diameter of bar = 16 mm
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)
Hence Provided Ast is ok
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.1279 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.61
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
(((53.56*10^6)/408.599333333333)/1005.312)
2
Concrete stress 'fc' = 2.62 N/mm
(2*53.56*10^6)/(1000*100.202*408.599333333333)
Distance 'a' = 500 mm
Strain Es in steel for the stress of = 0.00065195 mm
(130.39/200000)
Client Contractor
Project: Design and Construction of 92.5 MLD TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at Ujjain STR DC - 2001 A 1
for Ujjain Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
(0<0.2)
Client Contractor
DESIGN OF RAFT AT DECANTER AREA (Without water) -For wall W1 & W1a
1 0.125 m
0.45 m 2.80 m
3
2
1.325 m
0.15 m 0.55 m 5.30 m
14
0.30 m
6
2.80 m 1.40 m 0.80 m 2.50 m
7 0.90 m 8 0.62 m
12
0.50 m
0.20 m 5
Structural Properties
Length of Wall = 1m
a) Check for Stability of structure CASE(1) : When 36 ton acting upwards
Dead Load
Distance
No. Values Load Moment
from the Toe
Resisting Moment
W1 1.2 x 0.125 x 25 x 1 3.75 2.63 9.8625
W2 5.175 x 0.45 x 25 x 1 58.22 2.63 153.1186
W3 3.3 x 5.3 x 10.1 x 1 0 4.5 0
W5 6.15 x 0.5 x 25 x 1 76.88 3.08 236.7904
W6 0.15 x 2.8 x 25 x 1 10.5 0.825 8.6625
W7 0.5 x 0.05 x 2.8 x 25 x 1 3.5 0.83 2.905
Floor. F 1.2 x 2 x 1 2.4 2.63 6.312
W8 1.4 x 1.5 x 10.1 x 1 0 1.65 0
W12 360 (Assume to disperse for 4m) -90 0.800 -72
Live 1.2 x 5 x 1 6 2.63 15.78
Overturning Moment
W13 0 0 0.00 0
W14 75 (Assume to disperse for 1.75m) 42.86 1.47 63.0042
Restoring Moment
Restoring Moment (MR(DL)) about toe = 361.43 kN-m
Overturning Moment
Maximum pressure due to water = 0 kN/m
2
(10.1*5.3*0)
Load due to water pressure = 0 kN
(0.5*0*5.3*0)
Overturning Moment (MO) due to water = 0 kN-m
Overturning Moment (MO) due to decanter = 63 kN-m
0.9* MR(DL)
Factor of Safety against overturning =
MO
= 5.16
((0.9*361.43)/63)
FOS is greater than 1.5. Hence Safe against overturning
(5.16 > 1.5)
= 1.69
((0.9*0.35*71.25)/42.86)
FOS is greater than 1.5. Hence Safe against Sliding
(1.69 > 1.5)
= MR(DL + LL) - MO
Distance of R from the toe
R (DL + LL )
= 4.19 m
Eccentricity e = 1.115 m
1 0.125 m
0.45 m 2.80 m
3
2
1.325 m
0.15 m 0.55 m 5.30 m
14
0.30 m
6
2.80 m 1.40 m 0.80 m 2.50 m
0.90 m 8 0.62 m
7 12
0.50 m
0.20 m 5
Structural Properties
Length of Wall = 1m
a) Check for Stability of structure CASE(1) : When 36 ton acting upwards
Dead Load
Distance
No. Values Load Moment
from the Toe
Resisting Moment
W1 1.2 x 0.125 x 25 x 1 3.75 2.63 9.8625
W2 5.175 x 0.45 x 25 x 1 58.22 2.63 153.1186
W3 3.3 x 5.3 x 10.1 x 1 176.649 4.5 794.9205
W5 6.15 x 0.5 x 25 x 1 76.88 3.08 236.7904
W6 0.15 x 2.8 x 25 x 1 10.5 0.83 8.715
W7 0.5 x 0.05 x 2.8 x 25 x 1 3.5 0.83 2.905
W1 1.2 x 2 x 1 2.4 2.63 6.312
W8 1.4 x 1.5 x 10.1 x 1 21.21 1.65 34.9965
W10 0 0 0.000 0
W12 360 (Assume to disperse for 16.75m) -21.49 3.650 -78.44
W1 1.2 x 5 x 1 6 2.63 15.78
Restoring Moment
Restoring Moment (MR(DL)) about toe = 1184.96 kN-m
Overturning Moment
Maximum pressure due to water = 53.53 kN/m
2
(10.1*5.3)
Load due to water pressure = 141.85 kN
(0.5*53.53*5.3)
Overturning Moment (MO) due to water = 321.53 kN-m
Total Overturning Moment (MO) = 406.0 kN-m
0.9* MR(DL)
Factor of Safety against overturning =
MO
= 2.63
((0.9*1184.96)/405.96)
FOS is greater than 1.5. Hence Safe against overturning
(2.63 > 1.5)
(0+42.86-49.98+141.85)
= 0.79
((0.9*0.35*337.62)/134.73)
FOS is less than 1.5. Hence Remaining lateral force is transferred to grade slab
(0.79 > 1.5)
= MR(DL + LL) - MO
Distance of R from the toe
R (DL + LL )
= 2.31 m
Eccentricity e = 0.765 m
= / (1+6 / )
Maximum Pressure
= 95.870 kN/m
Maximum Pressure per meter = 95.870 kN/m
2
Resisting Moment
Resisting Moment (MR(DL)) about toe = 1341.84 kN-m
Overturning Moment
Maximum pressure due to water = 53.53 kN/m
2
(10.1*5.3)
Load due to water pressure = 141.85 kN
(0.5*53.53*5.3)
Overturning Moment (MO) due to water = 321.53 kN-m
Client Contractor
0.9* MR(DL)
Factor of Safety against overturning =
MO
= 5.09
((0.9*1341.84)/237.1)
FOS is greater than 1.5. Hence Safe against overturning
(5.09>1.5)
(0+-42.86-49.98+141.85)
= 2.45
((0.9*0.35*380.6)/49.01)
FOS is greater than 1.5. Hence Safe against Sliding
(2.45 > 1.5)
MR(DL + LL) - MO
Distance of R from the toe =
R (DL + LL )
Client Contractor
= 2.9 m
Eccentricity e = 0.175 m
Maximum Pressure = / (1+6 / )
= 72.450 kN/m
2
R
de
6.15 m
d
c
b
a
(95.87-12.5)
Net upward pressure @ b = 51.39 kN/m
2
(63.89-12.5)
Net Pressure at "de" distance from stem = 57.39 kN/m
2
(69.89-12.5)
Depth of toe slab = 500 mm
Clear cover = 50 mm
Diameter of bar = 20 mm
Main Bar :
Ast Required =
2
Ast Required = 1761.08 mm
2
Ast Provided = 3141.600 mm
(1000/100*0.7854*20*20)
Hence Provided Ast is ok
Distribution Bar:
Diameter of bar = 16 mm
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)
Hence Provided Ast is ok
(253.365*1000)/(1000*440)
Percentage of Reiforcement = 0.71 %
(100*3141.6)/(1000*440)
2
Design Shear Strength tc = 0.5756 N/mm
(0.5756*2)
Hence safe against shear
(1.1512>0.57583)
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.12788 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Client Contractor
2
Self weight of Heel Slab = 12.5 kN/m
2
Downward Liquid pressure = 53.53 kN/m
(10.1*5.3)
2
Total Downward Pressure = 66.03 kN/m
(53.53+12.5)
Net Downward pressure @ c = 8.13 kN/m
2
(57.9-66.03)
Net downward pressure @ d = 52.1 kN/m
2
(66.03-13.93)
Diameter of bar = 20 mm 20
Client Contractor
Main Bar :
Ast Required =
2
Ast Required = 1715.68 mm
2
Ast Provided = 3141.600 mm
(1000/200*0.7854*20*20) +(1000/200*0.7854*20*20)
Hence Provided Ast is ok
Distribution Bar:
Diameter of bar = 16 mm
2
Ast Provided = 1005.312 mm
(1000/200*0.7854*16*16)
Hence Provided Ast is ok
(100*3141.6)/(1000*440)
2
Characteristic cube strength of concrete, fck = M30 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(f = 27386.12788 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 14.61
(((204.68*10^6)/386.58)/3141.6)
2
Concrete stress 'fc' = 6.61 N/mm
(2*204.68*10^6)/(1000*160.251*386.58)
Distance 'a' = 500 mm
Strain Es in steel for the stress of = 0.00084265 mm
(168.53/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0010234 mm
Strain due to stiffening effect of concrete ε2
(0.19<0.2)
CLIENT: CONTRACTOR:
UJJAIN MUNICIPAL CORPORATION. TATA PROJECTS LIMITED.
UJJAIN.
SECUNDERABAD.
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
m*pt = 0.038
em - Average strain at the level where the crack is considered
x - Depth to NA assuming as cracked section
D - Overall depth of section
Cmin - Minimum Cover
acr - Dist. from the point considered to the surface of the nearest longitudinal bar
wcr - Design Surface crack width
x/d= - m*pt+((m*pt )*(2+m*pt))^0.5
x/d = 0.24
x = 36.14 mm
z (lever arm) = d-x/3 = 137.95 mm
Calculating average surface strain at tension face
2
fs= Ms/Ast*z stress due to bending moment = 0.00 N/mm
2
Stress due to tension force = 222.82 N/mm
2
fs= Ms/Ast*z = 0.00 N/mm
Strain es = fs /Es = 1.11E-03
Eh = (D-x)/(d-x)*es = 1.60E-03
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 6.02E-04
Calculating crack width at critical positions
Effective Cover p = 50 mm
Bar dia /2 y = 5 mm
Spacing of bar = 200 mm
am=(p^2+(x/2))^2)^0.5-y] = 106.80 mm
wm=3*am*emh = 0.193 mm
safe
CLIENT: CONTRACTOR:
UJJAIN MUNICIPAL CORPORATION. TATA PROJECTS LIMITED.
UJJAIN.
SECUNDERABAD.
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
Mu/bd2 = 0.792
For M30 and Fe500, percentage of reinforcement,
pt = 0.5*Fck/Fy*(1- (1-(Mu/bd2)*4.589/Fck)* 100
= 0.188 %
Ast = Pt/100*b*d
= 0.188/100*1000*200
2
= 376 mm
Assumed diameter of the slab reinft = 10 mm
Minimum % of reinforcement = 0.35 %
2
Minimum area of reinforcement = 350 mm
Spacing of 10mm dia bars = Af/Ast.*1000
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
= 208.88 mm
= 200 mm
Minimum area of reinforcement = 0.35 %
Rounding off to = 450
= 200 mm
Required 10mm dia @200mm c/c
x/d = 0.32
x = 47.32 mm
Eh = (D-x)/(d-x)*es = 1.58E-03
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 1.07E-03
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
am=(p^2+(x/2))^2)^0.5-y] = 84.70 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.179 mm
safe
SLAB RESULT:
Load Calculations
DESIGN OF BEAM B2
Eh = (D-x)/(d-x)*es = 4.85E-04
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 2.23E-04
Calculating crack width at critical positions
Effective Cover p = 40 mm
Bar dia /2 y = 10 mm
Spacing of bar = 140 mm
am=(p^2+(x/2))^2)^0.5-y] = 70.62 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.037 mm
safe
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
DESIGN OF COLUMN C2
Provided:
Eh = (D-x)/(d-x)*es = 1.15E-03
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 7.55E-04
Calculating crack width at critical positions
Effective Cover p = 50 mm
Bar dia /2 y = 10 mm
Spacing of bar = 200 mm
am=(p^2+(x/2))^2)^0.5-y] = 101.80 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.191 mm
safe
CLIENT: CONTRACTOR:
UJJAIN MUNICIPAL CORPORATION. TATA PROJECTS LIMITED.
UJJAIN.
SECUNDERABAD.
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
fy = 500 N/mm
2
Dimensions
Thickness of Wall D = 200 mm
Clear cover to rebar C = 45 mm
Dia of main rebar = 10 mm
Eff. Thickness of Wall d = 150 mm
(200-45-10/2)
Height of Liquid /wall = 1900 mm
((478-476.1)x1000)
3
Unit weight of sewage = 10.1 kN/m
Vertical reinforcement (Water Face)
Water pressure = 19.19 kN/m
2
(1900x10.1/10^3)
Moment @ base M = 11.55 kNm (19.19x1900^2x/(6x10^6))
Shear force = 18.23 kN (19.19x1900/(2x10^3)
Unfactored moment = 11.55 kNm
Load factor = 1.5
Mu 17.3 kNm (11.55 X 1.5)
Percentage of steel required = 0.183 %
(0.5x30/500x(1-SQRT(1-4.6x17.325x1000000/(30x1000x150x150)))x100
Area of steel reqd = 275 mm
2
(0.183x1000x150/100)
Depth of Surface Zone = 100.000 mm As per IS3370-Part 2
Min. percentage of steel for wall = 0.35 %
Area of steel reqd = 350 mm
2
(0.35x1000x100/100)
Spacing of reinft. Reqd. = 224 mm (0.7854x10x10/350x1000)
Spacing of reinft. Provided = 200 mm
Area of steel provided = 393 mm
2
Safe
(1000/200x0.7854x10x10)
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
fy = 500 N/mm
2
Dimensions
Thickness of Wall D = 200 mm
Clear cover to rebar C = 45 mm
Dia of main rebar = 12 mm
Eff. Thickness of Wall d = 149 mm
(200-45-12/2)
Height of Liquid /wall = 2675 mm
((478.9-476.1-0.125)x1000)
3
Unit weight of sewage = 10.1 kN/m
Vertical reinforcement (Water Face)
Water pressure = 27.02 kN/m
2
(2675x10.1/10^3)
Moment @ base M = 32.22 kNm (27.02x2675^2x/(6x10^6))
Shear force = 36.14 kN (27.02x2675/(2x10^3)
Unfactored moment = 32.22 kNm
Load factor = 1.5
Mu 48.3 kNm (32.22 X 1.5)
Percentage of steel required = 0.551 %
(0.5x30/500x(1-SQRT(1-4.6x48.33x1000000/(30x1000x149x149)))x100
Area of steel reqd = 821 mm
2
(0.551x1000x149/100)
Depth of Surface Zone = 100.000 mm As per IS3370-Part 2
Min. percentage of steel for wall = 0.35 %
Area of steel reqd = 350 mm
2
(0.35x1000x100/100)
Spacing of reinft. Reqd. = 138 mm (0.7854x12x12/820.99x1000)
Spacing of reinft. Provided = 100 mm
Area of steel provided = 1131 mm
2
Safe
(1000/100x0.7854x12x12)
Client Contractor
Tata Projects Ltd.,-
Ujjain Municipal Corporation-Ujjain.
Secunderabad.
DOCUMENT NO. REV
Project: Design and Construction of 92.5 MLD Sewerage
TPL - 340062 - UJN - STP - CVL - SBR -
Networks & Sewage Treatment Plant at Ujjain for Ujjain 1
STR DC - 2001 A
Municipal Corporation.
DESIGNED CHECKED APPROVED SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
Mu/bd2 = 0.814
For M30 and Fe500, percentage of reinforcement,
pt = 0.5*Fck/Fy*(1- (1-(Mu/bd2)*4.589/Fck)* 100 = 0.193 %
2
Ast = Pt/100*b*d 0.193/100*1000*76 = 146.7 mm
Mu/bd2 = 0.81
Modification factor = 0.55+(477-fs)/(120*(0.9+M/bd2)) <=2
fs = (0.58*fy*As req/ As prov)
= 2.35
Allowable Deflection = 2*20
= 40.00
Actual DeflectionL/d = 20.74
< 40 SAFE
SLAB RESULT:
Eh = (D-x)/(d-x)*es = 1.12E-03
emh=Eh -(b*(D-x)^2/(3*Es*As*(d-x) = 3.10E-04
Calculating crack width at critical positions
Effective Cover p = 49 mm
Bar dia /2 y = 4 mm
Spacing of bar = 125 mm
am=(p^2+(x/2))^2)^0.5-y] = 75.42 mm
wm=3*am*emh/(1+((2*(am-Cmin))/(D-x))) = 0.044 mm
safe
CLIENT: CONTRACTOR:
UJJAIN MUNICIPAL CORPORATION. TATA PROJECTS LIMITED.
UJJAIN.
SECUNDERABAD.
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
1. DEAD LOAD
2 LIVE LOAD
A.LIVE LOAD ON STAIRCASE
Live load considered = 5.00 kN/m^2
Length of the Staircase Slab = 3.67m
Udl on landing beam due to live load = 9.16kN/m
Reinforcement provided
Reinforcement provided
Reinforcement provided:
Ties - T8 AT 175mm
Client Contractor
Ujjain Municipal Corporation-Ujjain. Tata Projects Ltd.,-Secunderabad.
DOCUMENT NO REV
Project: Design and Construction of 92.5 MLD Sewerage Networks
TPL - 340062 - UJN - STP - CVL -
& Sewage Treatment Plant at Ujjain for Ujjain Municipal 1
SBR -STR DC - 2001 A
Corporation.
DSGN CHK APP SHEET
wf
2550
B
1200
wf
Mu
Required area of steel Ast reqd = 0.87 f z
y
pt prov = 1.06 %
22.4 kN/m
15.6 kN/m 15.56 kN/m
RA 40.35 kN RB 41.73
Maximum bending moment Mu = 44.8 kNm
pt min = 0.12 %
Area of steel required Ast min = 210 mm2
Mu
Required area of steel Ast reqd = 0.87 f y z
RA 26.9 kN RB 27.82
Maximum bending moment Mu(s) = 29.9 kNm
Ast reqd(s) = 515 mm2
Waist slab
Main reinforcement Provide Y16 mm @ 150mm c/c
Secondary reinforcement Provide Y8 mm @ 200mm c/c
175 mm thk.
Design of footing
2.500 m
0.300 m
474.00m LVL
X 1.10m
3 3
Density of Concrete = 25 KN/m Density of Soil = 17 KN/m
Size of Footing (Lx * Ly) = 1.1m X 1.1m Depth of Footing = 2.800 m
Size of Column (Cx * Cy) = 0.30m X 0.30m
2
Net SBC = 100 KN/m
2
Gross SBC = 142.5 KN/m (100+(17*2.5)
Legends
FGL Finished Ground Level
1 3 DL+LL -0.389 102.329 0 1.00 9.075 48 0.389 1.00 142.50 131.74 0.92 OK
0 0 0 0 1.25 9.075 48 0 1.00 178.13 47.17 0.26 OK
0 0 0 0 1.25 9.075 48 0 1.00 178.13 47.17 0.26 OK
0 0 0 0 1.25 9.075 48 0 1.00 178.13 47.17 0.26 OK
0 0 0 0 1.25 9.075 48 0 1.00 178.13 47.17 0.26 OK
0 0 0 0 1.25 9.075 48 0 1.00 178.13 47.17 0.26 OK
0 0 0 0 1.25 9.075 48 0 1.00 178.13 47.17 0.26 OK
0 0 0 0 1.25 9.075 48 0 1.00 178.13 47.17 0.26 OK
0 0 0 0 1.25 9.075 48 0 1.00 178.13 47.17 0.26 OK
0.92
Client Contractor
Ujjain Municipal Corporation- Tata Projects Ltd.,-Secunderabad.
Project: Design and Construction of 92.5 MLD DOCUMENT NO REV
TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at 1
STR DC - 2001 A
Ujjain for Ujjain Municipal Corporation. DSN CHK APP SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
Ws = Weight of soil = 48 kN
Pa = Ultimate axial load from column = 153.493 kN (Load taken from ultimate
load condition)
P = Design vertical load on footing = 210.6 kN
3
W soil dry = Unit weight of dry soil = 17 kN/m ( soil above w.t)
Size Of Base :
Z
Lx
Y
Lz
X
Cz
DF
C d D
X
PLAN SECTION
D = Overall depth of base,d = Effective depth of base, DFd = Depth of foundation from Ground Level.
Pmax = P Mz * 6 Mx * 6
+ Q + + 2
A Lx2 * Lz Lz * Lx
= 184.02 kN/m²
Pmin = P Mz * 6 Mx * 6
+ Q - -
A Lx2 * Lz Lz2 * Lx
= 184.02 kN/m²
Lx/6 = 0.18 m
Lz/6 = 0.18 m
Lx
b
Lz
Cz
a Pmin
PLAN P' Pmax
SECTION
= 0.4 m
= 184 kN/m²
= 184 kN/m²
= 15 kN-m
= 15 kN-m
Muz = 0.2453
B*(d2 )
Percentage of reinforcement
pt = 0.057%
= 360 mm²/m
% of steel = 0.214 %
Mux = 0.245
B*(d2 )
Percentage of reinforcement
pt = 0.0570%
= 360 mm²/m
% of steel = 0.214 %
L
Lz
Cz
2
Design pressure at the critical section = Pcr = 184.02 kN/m
C
Effective thickness of footing at the critical section = dx = 245 mm
( Pmax+P
Upward shear force on footing at the critical section = cr ) * shorter side of footing * [max cant. length - 1.0dx]
2
Vt = 31.38 kN
2
Area of footing at Critical Section = dx * Lz = Ax = 269500 mm
2
v = Vt*1000 = 0.12 N/mm
Ax
Client Contractor
Ujjain Municipal Corporation- Tata Projects Ltd.,-Secunderabad.
Project: Design and Construction of 92.5 MLD DOCUMENT NO REV
TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at 1
STR DC - 2001 A
Ujjain for Ujjain Municipal Corporation. DSN CHK APP SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
2
Permissible shear stress at the critical section == 0.34 N/mm
Therefore, V<Vc, OK
Punching shear is consider along a vertical section on the perimeter at a distance 0.5d from the
face of column, where d is the average effective depth of the reinforcement spanning in the two
dir.
Lx
Lz
0.5
= 235 mm
= 35 kN
2
Shear stress = Vud = 0.07 N/mm
b*d
2
Permissible shear stress at the critical section == 1.37 N/mm
Therefore, V<Vc, OK
Client Contractor
Ujjain Municipal Corporation- Tata Projects Ltd.,-Secunderabad.
Project: Design and Construction of 92.5 MLD DOCUMENT NO REV
TPL - 340062 - UJN - STP - CVL - SBR -
Sewerage Networks & Sewage Treatment Plant at 1
STR DC - 2001 A
Ujjain for Ujjain Municipal Corporation. DSN CHK APP SHEET
Title : SBR-Structural design calculation at STP 92.5MLD SVK JTP
Concerning eccentrically loaded foundn, it shall always be ensured that the overall stabilizing
moment (Mstab.) calc. at the lower side of the base, is greater than the overturning moment
(Mover.)
Z
A Y
X
A
B B
A
X
A
PLAN SECTION
= [ ( P ) + Psoil ] * ( Lx /2 )
= 115.8 kN-m
Mstab = =
F.O.S against overturning 115.8 > 1.5 Safe
Mover
= [ ( N ) + Psoil ] * ( Lz /2 )
= 115.8 kN-m
DOCUMENT NO REV
Design and Construction of 92.5 MLD Sewerage Networks &
.
PROJECT: Sewage Treatment Plant at Ujjain for Ujjain Municipal
TPL - 340062 - UJN - STP - CVL - SBR 1
Corporation.
-STR DC - 2001 A
DESIGNED CHECKED APPROVED SHEET
TITLE: SBR-Structural design calculation at STP 92.5MLD
SVK JTP
1.Dead Loads
30 % of the pipe empty load is considered as horizontal load along the pipe.
Horizontal load (0.3 x 3.128) = 0.938 kN
Reinforcement provided
Reinforcement provided
Reinforcement provided
Reinforcement provided
Reinforcement provided
Reinforcement provided