1. A REVIEW OF KSK CoW 2012 Dear Investor
• Activity review
We have initiated these to suspension pending the release
newsletters because of the many of the remaining forestry permits.
2. DRILL PROGRAM requests we get from you for more
In April and May mobilization
• Completed 12,895 M detailed information about what
• 2 x LF 130 Long Year rigs commenced in earnest with
we are doing on site. In future
capable of 1800 M the building of our base camp
newsletters we will take a deep dive
• 2 x Delineation rigs at Marinyoi. This required the
into our onsite operations, focusing
construction of a jetty at Tumbang
on details of particular activities. Manggu, a river crossing about
3. FIELD GEOLOGY PROGRAM As the New Year gets 70 km south of the Marinyoi base
• 7 target prospects mapped underway, we would like to give camp. The AS350 B3 Squirrel
• 8 more prospects you an update on our KSK CoW – Eurocopter helicopter was
scheduled progress and activities in 2012. We mobilized and flown from Papua
• 17 field geologist assigned via Manado to our site arriving on
had an excellent year and we are
confident 2013 will be even better. 21 April. The B3 can lift 900 kg
4. CORPORATE SOCIAL While we were waiting for
RESPONSIBILTY our Forestry Permit, the beginning
• YTS working in 21 Dayak of 2012 was spent building our
villages.
supply base and core sheds near
• Mercury capture program
Palangka Raya at KM 37. We
reviewed and updated all our
digital data and plotted all GIS
data. We recovered our old core
from the field, re-boxed it and
completed Magsus and pulp data
collection for the old core. We Hangar at Marinyoi for Helicopter
rebuilt and tested our two small
rigs to be used for definition drilling giving us the ability to move all
in preparation for mobilization. We rigs by helicopter. The deep rigs
also completed and won all our old are broken down into packages
tax cases originating from 2007. for moving, the largest of which is
the engine and control panel that
We received our phase one
weighs 700 kg.
Borrow–and-Use Forestry permit
(Pinjam Pakai) in mid March for We negotiated access to our
an area totalling 7,422 hectares base camp through a forestry
of the KSK CoW. The remaining concession owned by a logging
53,581 ha of the CoW was put in company PT Dwima. We also

Kalimantan Gold News 2013 www.kalimantan.com


INVESTOR NEWSLETTER ISSUE N°1 JANUARY 2013

had to negotiate the use of the


land for the base camp owned
by indigenous landholders. The
Marinyoi base camp area is
completely uninhabited and very
remote. From Marinyoi to Beruang
Drill camps is a distance of 30
km, which is only accessible by
helicopter.

Typical access road river crossing.

Rather than cutting down any


trees in this area we purchased
legal timber from government
certified timber suppliers 200km
south of us and trucked the timber
to site.

Map

getting used to the safety boots


Marinyoi Base Camp and gear mandatory on site having
spent their life moving freely
We also started recruiting through the forests barefooted.
labour from the surrounding We started training for some of
villages further south. They are the skilled roles such as Helicopter
provided with a medical check-up Load Supervisors and Fire Crews.
before starting. All new hires are We established our Emergency
given rigorous safety inductions Medical facilities working with
and medical checks. About 25% SOS Medika, our medical support First Medical Centre
of the staff that have the medical specialists. All our staff are covered ceremonies at the base camp for
check-up are found to be unfit by Medical and Life insurance our safety and success.
largely due to Hepatitis or TBC. which provides more cover
About 60% of our field crews than the state based Jamsostek After very long prayers and
have never worked for a company subscriptions. We carried out anointings we asked the priest
before ~ some have difficulty customary Dayak religious and priestess what they prayed

Kalimantan Gold News 2013 www.kalimantan.com


INVESTOR NEWSLETTER ISSUE N°1 JANUARY 2013

for “Higher wages!” they replied for being assayed in Jakarta by offices and began to prepare them.
grinning. Geoessay, with checks done by Drilling and field survey were now
Intertek. This was completed mid in full swing, with the core lab at
We immediately started our
June. Marinyoi and prep lab at KM 37 all
baseline environmental studies
working in unison.
and water sampling from the By the end of June all four
rivers. We were surprised by some rigs were mobilized and drilling.
We had issues with our helicopter
support, as the provider struggled
to get the paperwork right and
all the required permits to fly. The
sample preparation lab was in full
operation by this time.

Regent visits Drill Locations

Stream Sampling at Beruang Kanan


The Bupati (Regent) of Gunung
Mas visited our site by helicopter
extremely acid results (ph3.5) from in August to inspect our field
one river in Beruang Kanan caused operations. He was extremely
by naturally occurring very high pleased that we were employing
sulphidation rocks. We opened our and providing opportunities
First Core Sheds at KM 37
two other main drill camps and to 300 local villagers. He was
established weather stations in all
three locations.
We completed our first drill
pads and drilling commenced May
28 ~ a day to be commemorated!
Shortly after this our first field
geology program started with soil
grids, soil samples, rock chips and
mapping at Low Zone. We built
and set up our core logging facility Chalcopyrite and covelite veins Beruang Drill Camp Alpha.
at Marinyoi. In the meantime,
at our supply base and sample impressed with the health and
preparation facilities at KM 37, safety processes and the very high
quality camp facilities and food. By
this time all the drivers of vehicles
and trucks had received defensive
driver training and weekly
safety meetings for all staff were
underway. August brought huge
forest fires. It is the time of year
Porphry related quartz stockwork veining. that Dayaks burn land to clear the
forest for planting. We lost several
days flying because of the dense
The Sample Prep Lab July brought the Islamic month smoke and reduced visibility.
of fasting ~ Ramadan ~ which
we built our core-sheds to receive didn’t slow us down at all. Our Also in August we had a
core from Marinyoi and set up the offices in Palangka Raya had workshop with 14 NGO’s to
Sample Preparation Laboratory to explain in detail what we were
become too small for the new scale
process the core in preparation doing and to see how we could
of operations, so we identified new

Kalimantan Gold News 2013 www.kalimantan.com


INVESTOR NEWSLETTER ISSUE N°1 JANUARY 2013

platforms are covered with chicken affected our river-crossings further


wire so that they are not slippery in downstream.
the wet. We installed hot water and
Our consulting geologist John
air conditioning at the Marinyoi
Allen arrived in November and
base camp. We had our drilling
began his review of all core drilled
operations audited by a third-party
to date. This required many weeks
drilling specialist for safety and
at KM 37, as each piece of core
performance. Not many changes
was reviewed. Many samples
were suggested other than carrying
were taken for thin sections and
more spares for the smaller drill
Orphans open the office rigs. We finished making our safety
work together with them in Central and helicopter safety videos for
Kalimantan. We moved into our new recruits.
new office by having a small A SOS medic went missing
celebration where we invited a at Beruang Tengah for 24 hours,
local orphanage to come and eat after walking away from a drill
at the office. camp and deliberately leaving a
walkway. All camps were stood
down and the Emergency Search
and Rescue process activated. A
command centre was immediately

Drill pads
Our new office
 

We converted our old office


into a mess for our field staff as Core Logging Hall at Marinyoi
they transit Palangka Raya on their
way to base camp. We also closed established in Palangka Raya to
our old mess in September, as the coordinate all activities and log
reports at 5-minute intervals.
lease expired. In September on
The medic was eventually found
site, we were building walkways in a river gully. He had become
between our drill pads. These disorientated and lost direction. The drill pads and campsites are immediately
wooden walkways ensure that After walking for a long while, replanted & regreened after use.
the drill crews are safe and don’t he followed his training, found a
get lost. The wooden steps and river where he could drink and petrographic studies. The results
remained in one location. will be used to build our geological
models at Beruang Kanan and
By October we had spent US$7
Beruang Tengah. Subsequent initial
million and our partner committed
indications are that Beruang Kanan
to continue to sole fund the project.
is a Volcanogenic Hosted Massive
Our average monthly expenditure
Sulfide (VHMS) style submarine
had now reached US$1.6 million
deposit, potentially related to a
per month. The Indonesian Tax
deep porphyry source.
Office requested a visit to our sites
to audit activities. The rainy season We initiated a media campaign
arrived, putting out all fires but in Indonesia to try to help with
Stay on the tracks or get lost! causing flooding in the rivers that obtaining our Forestry Permits.

Kalimantan Gold News 2013 www.kalimantan.com


INVESTOR NEWSLETTER ISSUE N°1 JANUARY 2013

We obtained security clearance for our gravity and


high-resolution magnetic survey that will use a
specially rebuilt DC3 that flies at very low altitudes
of 60 m above ground level. We also had a 3-day
training workshop to train our eight Community
Relations staff. We also started an in-depth review
of our Baroi copper gold, base metal prospect data.
By now we were flying on average 110 hours
a month moving about 500 passengers and 200
tonnes per month. Our field employees peaked at
267 on site.
In November we also completed a high
resolutions laser LIDAR topographic survey over
25,000 ha to define geological structure in all KSK
primary prospects, including:Beruang Tengah,
Beruang Kanan, Tumbang Hoi, Rinjen, Focus 1,
Mamuring, Baroi, and Mansur.
A safety inspector from the USA arrived in
December to carry out a full Health & Safety audit
of all operations. The two LF 130 Long Year super
rigs that are capable of drilling to 1,800 m or 1
mile arrived in Indonesia from Australia.

Drilling Program

Two Duralite drill rigs provided by Pontill


have been utilized on the deep porphyry copper
program, and two smaller Jackro rigs have been
assigned to the Beruang Kanan near-surface
LIDAR Survey Coverage
delineation drilling program. Nine deep holes
have been completed.

Kalimantan Gold News 2013 www.kalimantan.com


INVESTOR NEWSLETTER ISSUE N°1 JANUARY 2013

Drilling Results

Planned Current
Hole ID Rig Type Date Started Date Completed Remarks
Depth Date

BTD05-01 Deep 1200 23-05-2012 28-05-2012 97.3 Stopped

BTD05-02 Deep 1200 06-06-2012 13-08-2012 1389 Completed

BKD01-01 Deep 1200 07-06-2012 30-08-2012 1169.5 Completed

BK030-01 Definition 300 03-07-2012 29-07-2012 301 Completed

BK029-01 Definition 300 06-07-2012 01-08-2012 300 Completed

BK032-01 Definition 300 03-08-2012 23-08-2012 300.5 Completed

BK031-01 Definition 300 05-08-2012 23-08-2012 300.2 Completed

BKD02-01 Deep 1000 12-08-2012 27-08-2012 377.8 Stopped

BTD06-01 Deep 1200 30-12-2012 24-09-2012 1281 Completed/ Assay Pending

BK033-01 Definition 300 31-08-2012 21-09-2012 282.1 Stopped

BK034-01 Definition 300 31-08-2012 17-09-2012 300.7 Completed/ Assay Pending

BKD02-02 Deep 1200 05-08-2012 18-10-2012 1200 Completed/ Assay Pending

BK035-01 Definition 300 27-09-2012 14-10-2012 300 Completed/ Assay Pending

BK036-01 Definition 300 23-09-2012 12-10-2012 300.2 Completed/ Assay Pending

BK037-01 Definition 300 19-10-2012 07-11-2012 300.4 Completed/ Assay Pending

BK038-01 Definition 300 16-10-2012 02-11-2012 300.8 Completed/ Assay Pending

BKD03-01 Deep 1200 26-10-2012 13-12-2012 1147.9 Completed/ Assay Pending

BTD07-01 Deep 1200 30-10-2012 12-12-2012 1140.5 Completed/ Assay Pending

BK040-01 Definition 300 07-11-2012 29-11-2012 300.4 Completed/ Assay Pending

BK039-01 Definition 300 10-11-2012 25-11-2012 300.7 Completed/ Assay Pending

BK041-01 Definition 300 05-12-2012 19-12-2012 300.1 Completed/ Assay Pending

BK042-01 Definition 300 05-12-2012 18-12-2012 300 Completed/ Assay Pending

BTD08-01 Deep 1200 19-12-2012 940.50 In Progress

BK043-01 Definition 300 22-12-2012 07-01-2013 300.90 Completed/ Assay Pending

BK044-01 Definition 300 22-12-2012 06-01-2013 301.30 Completed/ Assay Pending

BKD03-02 Deep 600 24-12-2012 752.40 In Progress

BK045-01 Definition 300 13-01-2012 23-01-2013 301.00 Completed/ Assay Pending

BK044-02 Definition 300 12-01-2012 23-01-2013 301.30 Completed/ Assay Pending

14,887.5

Kalimantan Gold News 2013 www.kalimantan.com


INVESTOR NEWSLETTER ISSUE N°1 JANUARY 2013

Drilling Locations Of The Two Duralite/Deep Drill Rigs At The Ksk Copper Project

sample checks by PT Intertek (ISO


certified). Both labs include routine
Canadian Certified Reference
Materials (CCRM), in-house
standards, and blank samples
are inserted with each sample
submission. Low level analysis of
gold in rocks and soils was carried
out by 50 g fire assay fusion with
AAS finish, and base metals were
determined by triple acid digestion
and ICP-OES finish.

Corporate Social Responsibility (CSR)


Program
Yayasan Tambuhak Sinta (YTS)
is working in 21 Dayak villages,
located along the Kahayan River,
Delineation Drilling These programs have just outside of the KSK concession
produced a total of 1,243 soil, 50 area. YTS’s program is focused on
The operation of the two
shallow drill rigs belonging to KSK stream sediments, and 1,292 rock strengthening governance in the
has been focused on the central chip samples. area, and is helping communities
mineralized zone of Beruang take greater responsibility for their
Kanan. Eighteen holes have been own development agenda through
participatory planning, institution
completed.
strengthening and economic
This drilling continues to development.
test the strong silica clay pyrite
altered volcanic breccia that
contains chalcopyrite and covellite
mineralization in strongly sheared
and silica flooded zones with
irregular white quartz veining. Two meter silica and silica-clay alteration zone
with pyrite veins.

Field Geology Programs Lab Facility for Preparation of Samples


As part of a campaign to The core sampling facility
investigate all areas of interest in and sample prep lab commenced
Pig husbandry training
a systematic manner, field geology operation in early July. To date, a
programs have been initiated. total of 8,818 samples have been
Seven target prospects have been This initiative enables
sent to Tangkiling preparation
mapped and sampled and another communities to engage more
laboratory and 9,279 pulps have
eight are scheduled. The programs effectively with local government in
been sent to Geoassay analytical
include follow-up sampling, grid order to access improved services
laboratory in Cikarang, Jakarta, and programs in education,
soil sampling, and geological Intertek Jakarta and Sucofindo
mapping. The field geology has health, infrastructure and economic
Kuala Kencana, Timika. livelihoods.
generated data to support defining
additional drill hole targeting in the Assays are carried out in YTS provides training and
prospects. Jakarta by PT. Geoassay, with technical assistance to improve

Kalimantan Gold News 2013 www.kalimantan.com


INVESTOR NEWSLETTER ISSUE N°1 JANUARY 2013

• Village Institutional INVESTOR NEWSLETTER


Development
Investor Newsletter is a
• Kalimantan Kids Club -- a
scholarship program monthly newsletter of
• Information & Communication PT. Kalimantan Surya Kencana,
Media and Events a mineral exploration company
The YTS CSR budget for the KSK affiliated with Kalimantan Gold
CoW has been increased to a total Corporation.
of $521,000 for 2013.

PUBLISHED BY
Mercury use in small-scale gold mining YTS Mercury Capture Program PT. Kalimantan Surya Kencana
the capabilities of villagers in The benefits of distributing Jl. Rajawali VII, Srikandi III,
growing crops, raising animals, recycling equipment to small scale No. 100, Bukit Tunggal,
and managing local resources. In gold mining communities are Palangka Raya 73112
2012, this support concentrated on immediate and wide-reaching: Kalimantan Tengah
vegetables, fish, pigs and rubber. providing economic, health, and Indonesia
environmental benefits for the
In collaboration with the mercury users themselves, as well
local credit union, YTS provided
training on savings, credit, and
as the surrounding communities. Contact
Each piece of equipment we newsletter@kalimantan.com
small business development. By provide can improve the well-
joining the credit union, people www.kalimantan.com
being of hundreds of people. www.borneomercury.com
establish savings accounts and can
access credit for their household or In addition to providing www.tambuhaksinta.com
business. retorts and condensers, YTS is
also demonstrating mercury-free
At district level, YTS has a processing techniques to miners,
two-year program to improve and spreading awareness about
the capacity of district staff to the dangers of mercury pollution
improve their annual planning through a widespread health-
and budgeting mechanism. This awareness campaign.
will result in delivering better
support programs and services to In 2012, interventions were
communities. performed in six major towns,
fifteen villages, and eight remote
The YTS Community field sites. Over the course of the
Development Program accounted year, YTS distributed one hundred
for 4% of expenditure and includes: and twelve retorts and installed
• Village Development Planning eighty-seven condenser systems.
• Village Development Fund & Our equipment is now recycling
Technical Support for Economic more than one thousand kilograms
Livelihoods of mercury each month.

Kalimantan Gold News 2013 www.kalimantan.com

Вам также может понравиться