Вы находитесь на странице: 1из 1

SPOTTING LCM PILL IN THE ANNULUS

Well: Well Site Supervisor:


Rig: Date:

I Well Data:
Measured Depth 3505 m Last Casing Shoe Depth 2743 m
Open Hole Diameter 8 1/2 in Last Casing ID 8.755 in
Interval to cover with the LCM Pill From 2804 To 2926 m
II Drill String Data:
OD ID Depth Length
DP 5 in 4.276 in 3303.55 m 3303.55 m
HWDP 5 in 3 in 3361.15 m 57.6 m
DC1 6 1/2 in 2.25 in 3505 m 143.85 m
DC2 2.25 in 3505 m m
III Pump Data: IV Annular Lengths
Make: GARDNER DENVER Below the Pill Covered by the Pill
Model: PZ11 579 m 122 m
f Liner: 5 1/2 in TP 0 m 33 m
Stroke Length: 11 in HWDP 42.25 m 192 m 2050
Volumetric Efficiency 95% DC1 65.8 m 0 m
Strokes per Minute 90 DC2 27.95 m 0 m

IV Calculations:

a. Pump Displacement: 0.07682 bls/stk.


2200
b. Volume Inside Drill String 196.46 bls = 2558 Strokes

c. Annular volume to Displace the Pill: 19.09 bls = 248 Strokes

d. Vol for Displacing Pill From 2804 to 2926 = 216 bls

Consequently, it is required 2806 strokes for diplacing the pill to de desired interval in the annulus

e. Volume of LCM Pill: 28.09 bls = 366 strokes

2336
Notes: Input Data in BLUE. Calculations are shown in RED

Вам также может понравиться