To: Tenderer’s
Invitation to Tender
The full tender including the above documents will be issued to interested tenderers after
receipt of the Tender Fee payment along with the duly filled appendicies (i.e. Tenderer
Details Sheet and Confidentiality Agreement, which shall be emailed to
<tenders@oman-gas.com.om>.
In the preparation and submission of the Tender, Tenderer shall comply with the Tender
Documents. Company reserves the right to disqualify the Tender if any of the
requirements included in the Tender Documents are not met.
A receipt confirming deposit and identifying the Tenderers' name and the Tender number
(e.g. Tenderer Co. deposit for Tender OGC/13/2018) must be presented, by hand or
scanned and forwarded via email, to the COMPANY Contact Point before the Tender
Documents can be released to the Tenderer.
3.3 Confidentiality Agreement
3.3.1 Prior to collection of the Tender Document the Tenderer shall sign the attached
Confidentiality Agreement. The Confidentiality Agreement must be completed, signed
by an authorised person, stamped with the Tenderers company stamp, and be
presented, by hand or scanned and forwarded via email, to the Company Contact point
before the Tender Documents can be released to the Tenderer.
5.0 above. Details of the attendees must be submitted to the Company Contact Focal
Point by [TBA]. All visitors must provide and wear required safety equipment during the
Site visit.
Jamaluddin Al-Hafeedh
Contracts Manager
(Authorized signatory)
Schedule T- 02
INSTRUCTIONS TO TENDERERS
Contents
1.0 Definitions
The following definitions shall apply to the Tender Documents, Clarifications and the Tender.
1.1.1 Addenda
Shall mean revisions by Company of the Tender Documents.
1.1.2 Alternative Tender
Shall mean a Tender deviating from the Base Tender.
1.1.3 Base Tender
Shall mean a Tender strictly in accordance with the Tender Documents.
1.1.4 Clarification
Shall mean all correspondence from Company in relation to the Tender Documents issued after
the Tender issue date, with the exception of Addenda.
1.1.5 Clarification Requests
Shall mean all requests by Tenderers for Clarifications and Addenda.
1.1.6 Clarification Request Closing date
Shall mean the latest date/time that Tenderers may submit Clarification Requests. This date shall
be as stated in Section T1 or subsequent Clarification.
1.1.7 Commercial Registration Certificate
Shall mean the certificate issued by the Secretariat General of Commercial Register at the
Ministry of commerce and Industry, establishing that the company doing business in the Sultanate
of Oman is duly registered.
1.1.8 Commercial Tender
Shall mean Tenderer’s submission of commercial information including a completed Schedule of
Rates.
1.1.9 Contractor
Shall mean successful Tenderer.
1.1.10 Enquiry
Shall mean Invitation to Tender.
1.1.11 Invitation to Tender
Shall mean any request by Company for a Tenderer to submit a Tender.
1.1.12 JV or Joint Venture
Shall mean any form of unincorporated partnership.
1.1.13 Offer
Shall mean Tender
1.1.14 Post Tender Clarifications
Shall mean requests by Company after the Tender Closing Date for additional information related
to a Tender.
1.1.15 Quotation
Shall mean Tender.
1.1.16 Request for Quotation (RFQ)
Shall mean Invitation to Tender.
1.1.17 Scope of Work
Shall mean the Work, Services or Materials which form the subject of the Invitation to Tender.
1.1.18 Technical Tender
Shall mean Tenderer’s submission of technical information as requested for in the Tender
Document.
1.1.19 Tender
Shall mean the formal offer by Tenderer for the Scope of Work in the form specified in the Tender
Documents.
1.1.20 Tenderer
Shall mean the party invited by Company to submit a Tender as stated in Section T1.
1.1.21 Tender Closing Date
Shall mean the latest date and time that Tenders may be delivered to Company. This date shall
be as stated in Section T1 or subsequent Clarification.
1.1.22 Tender Documents
Shall mean those documents outlined in Section T1 including any Addenda thereto.
1.1.23 Tender Period
Shall mean the period from issue of the Invitation to Tender until the Tender Closing Date.
2.7 Discrepancies
2.7.1 Tenderer shall notify Company of potential Discrepancies by means of a Clarification Request.
2.12.3 In line with the instructions of Ministry of Oil & Gas, Tenderers shall be registered with Business
Gateways in the Joint Supplier Registration System (JSRS). As such, Tenderers if not registered,
shall complete their registration with Business Gateways and submit JSRS certificate as part of
their technical submission. Refer to the following URL for the registration process.
https://www.businessgateways.com
2.15 Validity
2.15.1 The Tender shall be valid for acceptance by Company for a period of ninety (90) days from the
Tender Closing Date.
C6. It is intended that the design work is used as the basis for engineering and subsequent
realisation of the Work.
2.25.2 In the event that it is Tenderer's opinion that the front end and detailed design as offered is not
constructible, Tenderer shall immediately submit a Clarification Request, outlining areas of
concern. Any Clarification Requests to Equipment line up or Equipment data, shall be advised
immediately to Company during the Tender Period detailing the reason.
Clarification No. …
Tender Reference
Sr. No. (Section, Page no., Query Response by Company
Article no.)
1
T3
DATA TO BE PROVIDED BY TENDERER
Contents
2.18 Qualifications/Deviations
2.18.1 The Company stresses that the tender submission shall be without qualifications or deviations
are this may result in disqualification of the Tender. However, if qualifications are seen necessary
by the Tenderer, whether Commercial or Technical, they shall be listed in a separate section titled
“List of Qualifications/Deviations” as part of the technical tender submission.
2.19 Other technical information
2.19.1 Anything else Tenderer intends to include in the Technical Tender which Tenderer deems
important for Company to understand the way Tenderer will execute the Work or Services.
2.19.2 Anything else Tenderer deems necessary as per the requirements listed in Technical Evaluation
Criteria.
2.20 Alternative Technical Tender
2.20.1 Alternative Technical Tenders should consist as a minimum of:
a) A fully detailed proposal listing all the effects on all information provided under this Section
T3.
b) The particular specifications or requirements included in the Tender Documents that are
changed by the Alternative Tender.
2.20.2 Only those deviations and alterations to the Tender that are specifically mentioned in the
Alternative Technical Tender shall be accepted as part of the Alternative Technical Tender. All
other terms and conditions shall remain unaltered.
Tender No & Title: OGC/13/2018 - EPC Works for Shafa GSS Debottleneck Project
Dear Sirs,
Having carefully examined the Tender Documents we forward our Technical Tender for the Works
conforming to the requirements of the Tender Documents.
This Technical Tender comprises all requested details as listed in Section T3 and is made in full conformity
with all Tender Documents.
* Further we offer under separate cover an Alternative Tender in accordance with Section T2.
We confirm that this Technical Tender contains no commercial information or references.
Full Name:
Position:
Stamp of Tenderer
Ref: Tender No & Title: OGC/13/2018 - EPC Works for Shafa GSS Debottleneck Project
Dear Sirs.
We refer to your Invitation to Tender No: OGC/13/2018 dated …………..2018. Having examined carefully
all Tender Documents, we hereby unconditionally offer to execute the scope of the Tender, in full
compliance with the Documents, for the price set out in commercial proposal or for a total amount of RO
………………………..
If our Base or Alternative Tender is accepted, we shall commence the Work on the day advised to us by
Company and Complete the Work in accordance with the Contract within [Tenderer to complete in line with
Tender submission] days from the Commencement Date so advised and in accordance with Letter of
Award.
* Further we offer under separate cover an Alternative Tender in accordance with Section T2.
We further undertake, should our Tender be accepted, to submit to you, within 10 calendar days of receipt
of Letter of Award, a “Performance Bond”
We agree to unconditionally and irrevocably abide by our Tender for a period of 90 days from the Tender
Closing Date and represent that our Tender shall remain binding upon us and may be accepted at any time
up to the expiration of that period.
Signature: [ ]
Ref: Tender No & Title: OGC/13/2018 - EPC Works for Shafa GSS Debottleneck Project
Tender Bond
To
The Chairman
Tender Committee
P.O.Box 799 Al Khuwair
Postal Code 133
Sultanate of Oman
Dear Sirs,
We hereby confirm that we *have visited the site/’s and have made enquiries, examined and
satisfied ourselves/*are fully aware as to the nature and location of conditions which may affect
our obligations under the Contract.
We *have made enquiries/*are aware as to the nature of all existing roads or other means of
transport or communications and as to possible interruptions thereto and as to access to and
from the Site.
We *have made local and independent enquiries/*are aware as to storms, prevailing winds,
climatic considerations generally and other similar matters.
We *have satisfied ourselves/*are aware as to the sources and means of obtaining adequate
supplies of skilled and unskilled persons and all materials and equipment required for carrying
out our obligations under the Contract.
We *have considered/*are aware of the possible effects on the carrying out of the Contract that
may be caused by any breakdown of communications or by reasons for storms, floods or adverse
weather conditions.
We *have acquainted ourselves/*are aware as to the laws and regulations which are applicable
to the Work to be performed by us under the Contract and to have verified that any permits,
approvals and authorisations, if required, can be obtained.
For
Signature
Position
Date
(* Delete as applicable)
the different locations. The method statement shall identify the construction teams to be
employed on the Work and how they will be deployed to meet the Contract Completion Milestone
dates.
Full equipment list shall be included showing all the construction equipment required together
with a full description of each item and what the equipment will be used for. The proposed welding
process shall be clearly described.
7.0 Quality Assurance
The Tenderer shall submit a preliminary Contract Quality Plan.
The Quality objectives of the Work shall be documented and the proposed approach to Quality
Assurance and Quality Control shall be clearly explained. A brief description of all quality related
aspects of the Work shall be given, including whether verification and inspection activities for all
phases, which will be carried out by in house staff or whether, and to what extent, these activities
will be sub-contracted.
A list of applicable procedures, work instructions, checklists, test and inspection plans and the
like that will be used in the performance of the Work shall be included, together with identification
whether these are existing or to be developed.
Specific quality critical activities for the Contract shall be identified and described together with a
clear statement on how these will be managed. Any specific main Quality audits or design reviews
that are intended to be carried out shall be described stating at which stage these will occur and
the make-up of any review team.
An uncontrolled copy of Tenderer's Quality Manual index shall be included.
If Tenderer's Quality Management System is registered to ISO 9000 a copy of the registration
certificate shall be included. If not registered, the Tenderer shall include details of plans to
acquire such registration by the Effective Date of the Contract.
A preliminary criticality rating shall be carried out for all Materials and results included, showing
clearly the items that will be subject to third party inspection.
8.0 Health, Safety and Environment (HSE)
The Tenderer shall submit a Preliminary Contract HSE Plan. The plan shall demonstrate the
Tenderer's understanding of the HSE requirements of the Contract and indicate how compliance
with these requirements will be achieved. The Preliminary Plan shall be based on the guidelines
stated in the Tender Committee HSE Standards Manual and shall address the following elements
as a minimum:
HSE policy and strategic objectives
HSE objectives and targets for this project, including responsible party within Tenderer's
organisation to ensure compliance with the Company HSE standards.
Outline of Manpower Resources and method of competence assurance.
Methods of management reviews.
HSE Meetings, including procedures and schedules.
HSE Training, including nature and scheduling.
Audits and Inspections, including procedures and schedules.
Critical Areas - control of subcontractors and other parties interfacing with the operation.
Critical Areas - hazardous activities.
Emergency Procedures and Schedules of Emergency Exercises.
The Tenderer shall review all Contract activities, identify any further potential serious hazards,
prepare a hazard analysis and submit detailed proposals to control these hazards, referring to
the relevant training, procedures, supervision and other activities.
The Tenderer shall provide a draft contents list for the Construction Environment Management
Plan.
Tender No. & Title: OGC/13/2018 - EPC Works for Shafa GSS Debottleneck Project
We hereby confirm we have reviewed and verified the data, information, drawings and material requisitions
provided by Company in Section C6 to prove viability and constructability of the project (‘Design
Documentation’).
Based on this review and verification, we accept full responsibility for the safe construction and
commissioning of the Work in accordance with the Design Documentation and other parts of the Tender
Documents.
We confirm that our Contract Price and Rates for the Work take into account all design uncertainties, and
provide for full realisation of the Work in accordance with the Design Documentation and other parts of the
Tender Documents. We agree that our acceptance of such Design Documentation precludes us from any
claims against Company based on any necessity to deviate from such design as a result of an inability to
construct the Work in accordance with the Tender Documents.
Name:
Signed:
Position:
Date:
Stamp of Tenderer
The following describes the Technical Evaluation Criteria and Scoring of the Technical submissions:
1 GENERAL
The following describes the Tender Evaluation Criteria and Scoring methodology of the bidders; which will be
in two parts:
• Part A- Mandatory: Shall be evaluated on the basis of PASS / FAIL criteria, based on the table A. If
Bidder fails in any of the points of the mandatory criteria, then the overall result of the mandatory shall
be considered as FAIL and such bidders will not be subjected to the detailed Technical Evaluation of
Part B.
• Part B - Bidders who have passed mandatory, shall be subject to Part B evaluation. 70% minimum
score has to be achieved to carry out the commercial evaluation. Evaluation criteria shall be as per
Table B
The Part B - Evaluation Criteria consists of three sections as detailed below and the overall score is the sum of
the three individual section scores.
DOCUMENT C-1
FORM OF AGREEMENT
Form of Agreement
OMAN GAS COMPANY S.A.O.C. a closed joint stock company, incorporated in the Sultanate of
Oman under registration number 1/64413 and whose address is P.O. Box 799, Postal Code 133, Al-
Khuwair, Sultanate of Oman (the “Company”), and
[Insert Contractor name] a company, incorporated in under registration number CR.No. xxxxxxxx
and whose Head Office is at xxxxxx, P.O. Box No. xxx, Postal Code No. xxxx, xxxxxxx, Sultanate of
Oman (the “Contractor”)
WHEREAS :
A. The Company requires the Contractor to provide the Work in accordance with the terms and
conditions of this Contract for “EPC Works for Shafa GSS Debottleneck Project”
and,
B. The Contractor represents and warrants that it is willing and able to provide such work in
accordance with the requirements of the Contract;
NOW THEREFORE THE PARTIES HERETO AGREE AS FOLLOWS:
1. The Company hereby unconditionally appoints [Company appointed person], [Designation] as
the Contract Holder having the authorities set forth in General Conditions (Schedule C-3).
3. In this Contract and Schedules thereto, words and expressions shall have the meanings set out
in General Conditions (Schedule C-3) and other Schedules of the Contract.
4. The Work shall be carried out by the Contractor in accordance with the following Schedules
which, together with any documents incorporated by reference therein, shall form the Contract:
The Contractor hereby declares to have full knowledge and understanding of the content of all
documents whether contained or referred to in the Contract.
5. The documents forming part of the Agreement shall be taken as mutually explanatory and
complementary. In case of any conflict or contradiction, and unless otherwise provided for in the
Agreement, the order of priority of the Sections forming the Agreement shall be as that given in
item 4 herein.
6. Provided the Contractor performs and completes the Work in accordance with the provisions
and requirements of the Contract, the Company shall pay or shall cause to pay the Contractor in
exchange and in consideration thereof, the Contract Value in accordance with the provisions of
the Contract and in the manner set out in Schedules of Prices (Schedule C-5)
7. The Parties agree that this Contract shall commence on the date of award letter (or such other
date as mutually agreed in writing between both the Parties) and shall end on the Completion
Date, or date of the Final Acceptance Certificate issued by Company unless terminated earlier in
accordance with the terms of the Contract. (Schedule C-3)
8. The Contractor shall, in accordance with the General Conditions (Schedule C-3), provide the
Company with a Performance Bond in the Company approved format (Schedule C-8)
9. The Contract constitutes the entire agreement between the Parties and supersedes all prior
negotiations, representations, warranties and agreements related to the Contract, whether
written or oral. All other terms and conditions, including but not limited to Contractor's general
terms and conditions, if any, are explicitly rejected and shall not be applicable to the Work or
form part of the Contract.
10. No amendments to the Contract shall be effective, unless evidenced in writing and duly signed
by the authorized representative of the Parties
11. The Contractor agrees that this Contract is not evidence of an exclusive arrangement and that
the Company may purchase similar Work and/or Services from contractors other than the
Contractor.
12. Any notice by either Party to the other concerning the Contract shall be given in accordance with
the General Conditions (Schedule C-3) at the following address:-
13. The applicable law and arbitration shall be as set out in the General Conditions (Schedule C-3)
of Contract.
Signature
Name
Position:
Date:
Signature
Name
Position:
Date:
1. SPECIAL CONDITIONS
1.1. General
The General Conditions can only be amended by the Special Conditions; the Parties shall ensure
that all amendments to the General Conditions are incorporated within these Special Conditions.
2. ADDENDA/CIRCULARS
To the extent that an Addenda amends or varies any Section forming part of the Contract such
Addenda shall have effect as if it was contained in, and formed part of, that Section. In the event
of any conflict or contradiction between the provisions of any Addenda and the Section which is
amended or varied by such Addenda the provisions of the Addenda shall prevail. In the event of
conflict or contradiction between Addendum then the Addenda bearing the later date shall prevail.
4. LETTER OF AWARD
Letter of Award referenced ……………… dated ……………..
Refer to pages No. …….. to ……… attached
Document C-3
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 1 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
CONTENTS
ARTICLE - 1. DEFINITIONS................................................................................................ 3
ARTICLE - 2. INTERPRETATION OF THE CONTRACT......................................................... 6
ARTICLE - 3. WORK .......................................................................................................... 7
ARTICLE - 4. PROGRESS OF THE WORK ........................................................................ 10
ARTICLE - 5. FORCE MAJEURE ...................................................................................... 13
ARTICLE - 6. INSTRUCTIONS AND VARIATIONS TO CONTRACT ...................................... 14
ARTICLE - 7. MATERIALS AND CONSTRUCTION EQUIPMENT ......................................... 15
ARTICLE - 8. INSPECTION AND TESTING ........................................................................ 18
ARTICLE - 9. SUBSTANTIAL COMPLETION AND COMPLETION ........................................ 19
ARTICLE - 10. WARRANTY FOR THE WORK ...................................................................... 20
ARTICLE - 11. SUSPENSION AND TERMINATION .............................................................. 21
ARTICLE - 12. PAYMENT .................................................................................................. 23
ARTICLE - 13. DUTIES AND TAXES ................................................................................... 25
ARTICLE - 14. RIGHT TO AUDIT ........................................................................................ 25
ARTICLE - 15. OMANISATION AND IN COUNTRY VALUE.................................................... 26
ARTICLE - 16. HEALTH, SAFETY AND ENVIRONMENT ....................................................... 26
ARTICLE - 17. LIABILITIES AND INDEMNIFICATION ........................................................... 27
ARTICLE - 18. INSURANCE BY COMPANY (NOT APPLICABLE) .......................................... 29
ARTICLE - 19. INSURANCE BY CONTRACTOR .................................................................. 29
ARTICLE - 20. REPRESENTATIVES OF THE PARTIES ........................................................ 30
ARTICLE - 21. SUBCONTRACTORS & MANUFACTURERS.................................................. 31
ARTICLE - 22. CONTRACTOR PERSONNEL ....................................................................... 31
ARTICLE - 23. LAWS, PERMITS AND REGULATIONS ......................................................... 33
ARTICLE - 24. OWNERSHIP, PATENTS AND PROPRIETARY RIGHTS ................................. 33
ARTICLE - 25. CONFIDENTIALITY ..................................................................................... 36
ARTICLE - 26. BUSINESS ETHICS AND PRINCIPLES ......................................................... 37
ARTICLE - 27. CLAIMS ...................................................................................................... 37
ARTICLE - 28. ASSIGNMENT ............................................................................................. 37
ARTICLE - 29. APPLICABLE LAW AND DISPUTE RESOLUTION .......................................... 37
ARTICLE - 30. NOTICES .................................................................................................... 38
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 2 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
ARTICLE - 1. DEFINITIONS
The following definitions shall apply to the General Conditions and, unless the context requires
otherwise, to the other Sections forming part of the Contract.
1.1. Affiliates
Shall mean:
In respect of Company
Any corporations, partnerships, trusts, or other entities which have a direct or indirect
ownership interest in Company.
In respect of Contractor, Sub-contractor, or Other Contractor
Any corporations, partnerships, trusts, or other entities which are
a) more than 50% owned by Contractor, Sub-contractor or Other Contractor, or
b) owners directly or indirectly of more than 50% of Contractor, Sub-contractor, or Other
Contractor, or
c) more than 50% owned directly or indirectly by the same entity which owns Contractor,
Sub-contractor or Other Contractor.
1.2. Associated Companies
Shall mean an ultimate holding company of any Company Affiliates and the subsidiaries in any
tier in the chain of ownership of such ultimate holding companies where the immediate parent
company has a controlling interest or an ownership interest of fifty percent (50%) or more.
1.3. Capital Area
Shall mean all locations in the area known as Governate of Muscat in the Sultanate of Oman.
1.4. Company Group
Shall mean Company, Company Affiliates and Associated Companies and their respective
directors, officers and employees (including agency personnel), but shall not include any
member of Contractor Group.
1.5. Company Personnel
Shall mean all individuals, whether employees or not, engaged on the Work by Company.
1.6. Confidential Information
Shall mean all knowledge, data or information acquired by Contractor from, or disclosed to
Contractor by, Company, or on behalf of Company, in connection with the Work in writing,
drawings, magnetic tapes, computer programs or in any other way, as well as all information,
data or information derived there from, to the extent that such knowledge, data or information
at the time of such acquisition or disclosure is not either already in the unrestricted possession
of Contractor or part of public knowledge or literature.
1.7. Confidential Record
Shall mean all documents and any other material containing Confidential Information.
1.8. Construction Equipment
Shall mean all transport, construction, testing, inspection and other equipment, tools,
implements, consumables, temporary works and such other items as are required for the
realisation of the Work, but excluding Materials.
1.9. Contract Dates
1.9.1. Commencement Date:
Shall mean the date stipulated in Section C1 after which Contractor shall be ready to
commence executing the Work. If no date has been stipulated in the Contract, the
Commencement Date shall be the Effective Date.
1.9.2. Completion Date:
Shall mean the date stipulated in the Contract, or as amended by a Variation to Contract in
accordance with the terms of the Contract, by which Contractor must achieve Completion of
the whole of the Work.
1.9.3. Effective Date:
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 3 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
Shall mean the date, on which the Contract was awarded or is signed by both parties,
whichever is earlier.
1.10. Contract Holder
Shall mean the person appointed as such by Company and named as such in the Contract,
having the authorities set forth in the Article - 20 herein.
1.11. Contract Manager
Shall mean the person appointed as such by Contractor and named as such in the Contract,
having the authorities set forth in the Article - 20 herein.
1.12. Contractor Group
Shall mean Contractor and its Affiliates, its Subcontractor and their Affiliates, its and their
respective directors, officers and employees (including agency personnel), of the aforesaid,
but shall not include any member of Company Group. Contractor Group shall also mean
subcontractors (of any tier) of Subcontractors who are performing Work at any Site, their
Affiliates, their directors, officers and employees (including any agency personnel).
1.13. Contractor Personnel
Shall mean all individuals, whether employees or not, engaged on the Work by Contractor or
any Subcontractor.
1.14. Contract Price
Shall mean the sum of money stated in the Pricing Summary of C5 Schedule of Prices, subject
to such additions thereto or deductions there-from as may be made under the provisions of
the Contract.
1.15. Documents
Shall mean all drawings, calculations, computer software (programs), patterns, models,
operation and maintenance manuals and all other manuals and information of whatever nature
submitted by Contractor.
1.16. Facilities
Shall mean any of Contractors offices, bases, yards, warehouses, workshops, laboratories,
camps or other installation or facility in the country of operation required to complete the Work.
1.17. Foreign Products
Shall mean all Materials which are not National Products or Products of GCC Origin.
1.18. Instruction
Shall mean communication issued by Company in accordance with the Article - 6 herein
requiring Contractor to alter all or part of the Work.
1.19. Interior
Shall mean all locations in the Sultanate of Oman outside the Capital Area.
1.20. Key Personnel
Shall mean Contractor Personnel occupying positions defined in the Contract as being Key
Personnel.
1.21. Lien
Shall mean a charge or claim by one party on the property of another as security for the
payment of a debt or duty.
1.22. Manufacturer or Vendor
Shall mean the person or company which completes the manufacture and/or assembly of
Materials.
1.23. Materials
Shall mean all materials, supplies, consumables, machinery and other items procured and
supplied by Company and/or Contractor to be incorporated in the Work, including spare parts.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 4 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 5 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 6 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
2.2.7. Contractor shall act as an independent contractor with respect to the Work and neither
Contractor nor any Subcontractor nor any Contractor Personnel shall be deemed to be the
personnel or a representative of Company.
2.2.8. Any reference to statute, statutory provision or statutory instrument shall include any re-
enactment or amendment thereof for the time being in force.
2.3. Effect of illegality
2.3.1. If any provision of the Contract proves unenforceable because it is contrary to any mandatory
rule of law, the validity of the remaining provisions of the Contract will in no way be affected.
In such case, the parties shall be bound to perform as intended by the affected provision as
closely as possible without infringing any mandatory rule of law.
ARTICLE - 3. WORK
3.1. Work and workmanship
3.1.1. Contractor shall, subject to the provisions of the Contract, and with due care and diligence,
carry out the Work and provide all labour, (including the supervision thereof), Materials,
Construction Equipment, consumables and all other items, whether of a temporary or
permanent nature, required for the Work or reasonably inferred from the Contract.
3.1.2. Contractor shall execute the Work in a proper, workmanlike manner with properly equipped
facilities and in accordance with the specifications and standards given in the Contract and in
line with recognised good modern oil and gas industry practice and with the skill to be expected
of a reputable contractor experienced in the types of work to be carried out under the Contract.
3.1.3. Contractor represents that it has the experience, skills, knowledge, capability (including
sufficient and competent supervisory and other Contractor Personnel) and all necessary
facilities and resources to efficiently and expeditiously perform the Work in accordance with
the Contract and that it shall provide such expertise, skills, knowledge, capability, facilities and
resources.
3.1.4. In the event that Contractor provides any Materials or Construction Equipment for which there
is no detailed specification included in the Contract and /or any related Purchase Order then
these Material or Construction Equipment shall be new or as new, of good quality and
workmanship and fit for the intended purpose required under the Contract.
3.1.5. No review, consent, approval or acknowledgement by Company shall relieve Contractor from
any liability or obligation under the Contract.
3.1.6. Notwithstanding the expiry or termination of the Contract, Contractor shall not abandon any
Work in progress and shall complete the Work in accordance with the Contract. The terms
and conditions of Contract shall remain in full force and effect during the period required to
complete the Work.
3.2. Supervision by Contractor
3.2.1. Contractor shall provide all necessary supervision during the performance of the Work. Such
supervision shall be given by competent persons having adequate knowledge of the
operations to be carried out (including the methods and techniques required, the hazards
likely to be encountered and the methods of preventing accidents) as may be required for the
satisfactory performance of the Work.
3.2.2. Contractor shall execute the Work in strict accordance with the Contract and shall comply with
and adhere strictly to Company's Instructions and directions on any matter concerning the
Work.
3.3. Protection of Company's interests
3.3.1. Contractor shall at all times perform the Work in a manner that will safeguard and protect
Company's interests and take all necessary steps to prevent abuse or uneconomical use of
Materials, facilities, or Construction Equipment made available to Contractor by Company.
3.3.2. Where Company or other contractors of Company are working on the Site then Contractor
shall liaise with these other contractors to mitigate any effect or potential effect on the
execution and progress of the Work.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 7 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 8 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
Other Contractors or for any other reason which justifies immediate action, and Contractor is
unable or unwilling to execute such work, repair or remedial action, then Company may call in
Other Contractor and/or utilise such equipment as it requires to carry out any such work, repair
or remedial action which it considers necessary. In such case Company shall be responsible
for the operation of such equipment and be liable for any loss or damage to such equipment.
3.7.2. If the work, repair or remedial action so carried out by Company or an Other Contractor was
Contractor's responsibility then all costs and charges properly incurred shall be recoverable
by Company from Contractor. Company shall, as soon as may be reasonably practicable after
the occurrence of any emergency necessitating urgent action as referred to above, advise
Contractor thereof in writing.
3.8. Setting out of the Work
3.8.1. Contractor shall be liable for the true and proper setting out of the Work in relation to original
points, lines and levels of reference given by Company in writing, for the correctness of the
position, levels, dimensions and alignment of all parts of the Work and for the provision of all
necessary instruments, appliances and labour in connection therewith.
3.8.2. If at any time during the execution of the Work any error appears or arises in the position,
levels, dimensions or alignment of any part of the Work Contractor shall inform Company and
Contractor shall rectify such error at its own cost.
3.8.3. The checking of any setting out or of any line, level, co-ordinate, or position of a marker by
Company shall not in any way relieve Contractor of its responsibility for the correctness
thereof.
3.8.4. Contractor shall be responsible for the preservation of bench marks, pegs or other marks used
in setting out the Work and shall not remove any pegs or marks without properly fixing such
other marks as will enable replacement of them in their original positions. It shall also be the
duty of Contractor to replace all such pegs and marks so removed and if Contractor fails to
replace such pegs and marks when required to do so by Company then the cost of such
replacement shall be for Contractor's account.
3.9. Use of explosives
3.9.1. Under no circumstances will the use of explosives be permitted unless the use thereof has
been provided for in the Contract or Company's written approval has been obtained prior to
the use of such explosives.
3.9.2. When the use of explosives is permitted Contractor shall use utmost care not to endanger life
or adjacent property, and shall comply with all laws, rules, and regulations governing the
hauling, storing, handling or use of such explosives, including the securing of all necessary
permits thereof.
3.10. Support Services and Facilities Provided by Company
3.10.1. Company shall provide to Contractor only those support services and/or facilities, as stipulated
in the Contract, and the provision of such support services and/or facilities is made subject to
availability. In the event that Company fails to provide, delays or suffers interruption in
providing such support services or facilities Contractor shall have an obligation to take all
reasonable measures to mitigate any effect or potential effect on the execution and progress
of the Work.
3.10.2. Unless stated otherwise in the Contract all Company provided support services and/or facilities
shall be charged to Contractor at: -
a) Net cost where facilities and/or services are provided by a third party; or
b) Applicable internal charge, as established by Company.
3.10.3. Contractor shall be responsible for establishing the level and method of charge to be applied
for any Company provided support services or facility prior to its provision.
3.11. Design by Contractor
3.11.1. Contractor shall carry out and be responsible for, the design of the Work, and to the extent
required by the Contract, such design shall be included as part of the Work. Design shall be
completed to the requirements laid down in the Contract. Where such requirements are not
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 9 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
detailed in the Contract then Contractor shall be required to complete the design on a “fit for
purpose” basis to Industry accepted standards and to the extent required by the Contract.
3.11.2. Contractor holds itself, its designers and design Subcontractors as having the experience and
capability necessary for the design. Contractor undertakes that the designers shall be
available to attend discussions with Company at all reasonable times during the Contract
Period.
3.11.3. Documentation
Contractor shall prepare Documents in sufficient detail to satisfy all regulatory approvals, to
provide suppliers and construction personnel with sufficient instruction to execute the Work
and to describe the operation of the completed Work. Company shall have the right to review
and inspect preparation of Documents wherever they are prepared.
Where required by the Contract documents shall, when ready for use, be submitted to
Company for pre-construction review. Unless stated otherwise such review period shall not
exceed twenty-one (21) calendar days from the receipt of Documentation by Company.
If Company instructs that further Documents are necessary to complete the Work, Contractor,
upon receiving Company’s instruction, shall immediately prepare such Documentation in
accordance with the terms of the Contract.
3.11.4. Consent or approval by Company of Design or Documentation in no way relieves Contractor
from the requirement to satisfy itself as to the suitability and capacity of the design and to
satisfactorily execute and complete the Work in accordance with the Contract.
3.11.5. Errors omissions & ambiguities
Errors omissions ambiguities inconsistencies, inadequacies found in the construction
Documents shall be rectified by Contractor and all resulting defects in the Work shall be
corrected at Contractor’s cost.
3.11.6. As-Built Drawing and Operating & Maintenance Manuals
The Contractor shall provide to the Company the as-built drawings, dossiers and operating
and maintenance procedures/manuals.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 10 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
mitigate such delay at no additional cost to Company. Where Contractor, under this Article
considers that a delay affects an agreed time schedule for completion of all or part of the Work,
Contractor shall give notice to Company of any such effect within seven (7) calendar days of
the earlier of the delay being envisaged or occurred. Any impact of such delay on time
schedule shall be agreed between the parties, provided that the correct notices have been
given.
4.2.2. For delays considered to be attributable to Company, Contractor shall at first indication of
delay give notice to Company of any such effect within seven (7) calendar days. Contractor
shall make every effort to re-deploy its resources on the Work in such a way as to mitigate all
effects of delay in progress of the Work and deviation from the Programme and to avoid or to
keep to a minimum any increased costs. Company shall compensate Contractor for the costs
of such remedial measures as Company instructs Contractor to take provided that the correct
notices have been given. Such compensation shall be subject to detailed substantiation of
Contractor's costs and, to the extent possible, be calculated in accordance with the Rates.
4.3. Rate of Progress
4.3.1. If for any reason directly or indirectly attributable to Contractor, Company is of the opinion that
progress of the Work is delayed or progress is not being maintained on items which, if no
actions were taken, would affect the ability of Contractor to achieve Substantial Completion
Date and/or Completion Date, Company shall notify Contractor that it has failed to ensure the
execution of the work and Contractor shall within seven (7) calendar days from the date of the
notice take all steps as are necessary, subject to the consent of Company or, in the event of
failure to do so, shall take such reasonable steps as Company may instruct in writing to
expedite progress so as to correct such deficiencies in the execution of the Work as specified
in the notice from Company. Contractor shall not be entitled to an extension of time and/or
additional cost for taking such steps. If any instruction issued by Company pursuant to this
sub-article causes Company to incur additional costs, such costs shall be recoverable from
Contractor by Company and may be deducted by Company from any monies due or to become
due to Contractor.
4.3.2. Company may issue to Contractor reasonable instructions requiring Contractor to procure an
increase in the rate of progress of the Work in circumstances where Contractor is not in default
so that Substantial Completion and/or Completion dates are achieved prior to the scheduled
Completion Date. Contractor shall be entitled to recover the additional cost incurred in respect
of complying with any such instruction.
4.4. Duty to report
Contractor shall, within twenty-four (24) hours, or as otherwise specified in the Health, Safety
and Environmental Specifications (Section C9), of any incident:-
a) affecting the progress of the Work, or
b) affecting the quality of the Work, or
c) which is a reportable HSE event (as required by Section C9)
send to Company a detailed report of the incident together with copies of any statements or
reports sent by Contractor to any public authority and/or third party excluding those sent to
Contractor's insurance company or its attorneys.
4.5. Summary reports
4.5.1. At the request of Company, Contractor shall submit to Company a summary report of safety
performance and incident/accident statistics related to the Contract. These reports shall
include data in respect of both Contractor and its Subcontractors.
4.6. Inclement weather
4.6.1. “Inclement Weather” means exceptionally adverse weather conditions which could not
reasonably have been foreseen by an experienced contractor and which materially affects the
regular progress of the Work.
4.6.2. In the event of Inclement Weather Contractor shall be liable for all costs and expenses incurred
by Contractor, including but not limited to:
a) protecting the Work;
b) repair and rectification of the Work;
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 11 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
c) re-establishment of Facilities;
d) delay in completion of the Work; and
e) subsequent resulting effects on the Work.
4.6.3. Contractor shall not be liable for the extent to which the Work is delayed because of inclement
weather provided always that Contractor has taken all reasonable steps to protect the Work
and mitigate the effects of the Inclement Weather. Under no circumstances shall the Contract
Price be increased for the financial impact on either party of the Inclement Weather.
4.7. Extension of the Completion Date
4.7.1. If Company by reason of a delay in making the Site available to Contractor, or in supplying
Company supplied Materials or Technical Information or in issuing necessary Company
permits or any other reason which is attributable to Company, causes a delay in the execution
of the Work so as to fairly entitle Contractor, in Company's reasonable judgement, to an
extension of the Completion Date, then, subject to Articles 4.7.2, and 4.7.3, Company and
Contractor shall negotiate an extension of the Completion Date and compensation for any
reasonable additional costs which Contractor shows are directly due to the delay, but
excluding all consequential costs.
4.7.2. An extension to the Completion Date as a result of delay attributable to Company shall only
be granted if it can be demonstrated by Contractor, to the satisfaction of Company, that the
delay suffered by Contractor is a direct consequence of the delay attributable to Company.
Any extension to the Completion Date shall not include for the effect of any concurrent delays
in Contractor’s progress resulting from Contractor’s failure to perform the Contract obligations
diligently.
4.7.3. Company shall be under no obligation to negotiate for, or concede an extension to the
scheduled Completion Date or compensate Contractor for increased costs, unless Contractor
has provided the correct notices and information in accordance with the requirements of
Articles 6.1.4 and Article - 27.
4.7.4. Articles 4.7.1, 4.7.2 and 4.7.3 shall, mutatis mutandis, also apply to claims by Company for a
reduction of the Contract Price or an acceleration of the Completion Date on account of any
alteration to the Work.
4.8. Penalties
4.8.1. If Contractor fails to achieve Substantial Completion of the Work on or before the due date,
Contractor shall pay Company penalties as set out in the Contract for each day or part of a
day that Substantial Completion is delayed beyond the required date up to the maximum of
sixty (60) calendar days or such other limit as may have been stated in the Contract.
4.8.2. Unless stated otherwise in the Contract if a Substantial Completion certificate has been issued
for part of the Work on or before the Substantial Completion Date, the penalties payable shall
be reduced in the proportion which the value of such part of the Work bears to the value of the
whole of the Work.
4.8.3. If Contactor fails to complete any of the items or events listed in Section C5 - Milestones by
the relevant dates included in the Milestones Schedule and/or fails to achieve the requirements
of the Contract in respect of any other item listed in the Milestones Schedule, Contractor shall
be liable for the penalties set out in the Contract.
4.9. Right to recover costs
4.9.1. Where Contractor is in default or, through no fault of Company, exceeds the maximum duration
for application of the penalty, referred to in Article 4.8.1, and regardless of whether or not
Company shall have imposed penalties, Company shall be entitled to recover from Contractor
costs incurred by Company as a result of this. In addition, Company shall have the right to
impose any other penalties as set out elsewhere in the Contract.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 12 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 13 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
5.4. If either party is delayed in performing the Contract by a force majeure occurrence, the
Programme but not the Contract Price, except as otherwise expressly provided in the Contract,
shall be adjusted in accordance with the Article headed “Instructions and Variations to
Contract” and Article 5.5.
5.5. Upon cessation of any force majeure occurrence Contractor shall prepare a revised execution
plan to include for rescheduling of the Work so as to minimise the effects of the delay and
having made due allowance for any instruction to accelerate the Work given in accordance
with the Article headed “Instructions and Variations to Contract”, Company shall authorise a
Variation to adjust the Programme in order to take into account any remaining effects of such
delay.
5.6. Following notification of a force majeure occurrence in accordance with Article 5.3, Company
and Contractor shall meet without delay with a view to agreeing a mutually acceptable course
of action to minimise any effects of such occurrence.
5.7. Obligations of Company and Contractor to pay amounts due to the other party under the
Contract or any Subcontract shall not be excused by events of force majeure.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 14 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 15 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
7.1.2. In respect of Company supplied Materials and Construction Equipment Contractor shall at his
own expense:
a) receive, load, transport to the Site and unload as necessary;
b) on taking delivery from Company, inspect all Materials and/or Construction Equipment to
ensure its conformity with Contract requirements and specifications. Contractor shall
immediately notify Company in writing of any default. If no written notification of default
is issued to Company before Contractor endorses the receipt of the Materials and/or
Construction Equipment, then the Materials and/or Construction Equipment shall be
deemed complete and undamaged and Contractor shall be liable for any damage or
shortage identified at a later date;
c) maintain and store in a proper manner, keep a true and accurate inventory and submit an
updated copy to Company monthly or at Company's request; and
d) account to Company for the use of the Materials and/or Construction Equipment in the
Work and for any discrepancies between the monthly inventory report and the Materials
and/or Construction Equipment supplied and used.
e) maintain, operate and use Materials and/or Construction Equipment strictly in accordance
with manufacturers recommended instructions, industry practice and regulations. Provide
all consumables and spare parts, including oil and fuel, for such maintenance and
operation or use.
7.2. Risk and ownership of Company supplied Materials
7.2.1. Company supplied Materials and/or Construction Equipment listed in the Contract shall at all
times remain the property of Company, irrespective of where such Materials and/or
Construction Equipment are physically located or stored. However, risk of such Company
supplied Materials and/or Construction Equipment will pass to Contractor from the moment
Contractor has taken delivery of such Material and/or Construction Equipment.
7.2.2. Prior to issuance by Company of the Completion certificate, Contractor shall, within a period
specified by Company, return all surplus Materials and/or Construction Equipment supplied by
Company in a neat manner properly labelled and documented in accordance with Company's
requirements to Company storage yard of issue.
7.3. Contractor supplied Materials
7.3.1. Contractor shall furnish at its expense all Materials required for the Work which are not listed
in the Contract as being supplied by Company. Contractor shall be fully responsible for all
aspects of procurement and supply including but not limited to:
• Preparation and despatch of requisitions for tender
• Commercial and technical evaluation of tenders
• Discussions with Manufacturers
• Placing of purchase orders
• Expediting and shipping
• Inspection
• Certification of Manufacturers invoices
• Payment
• Import into Oman
7.4. Suitability and verification of Materials
7.4.1. Material supplied by Contractor shall conform to the requirements and specifications of
Company as provided in the Contract or, if no such requirements or specifications exist, are
subject to approval by Company and, where Company does not exercise such right of
approval, conform to standards generally accepted in the petroleum industry and gas field
practice.
7.4.2. Contractor shall arrange for appropriate warranties enforceable by Company in respect of all
Materials supplied by Contractor. In the event that Materials are supplied which are not in
accordance with the specifications included in the Contract and such non-compliance is
approved by Company, Contractor shall arrange for reasonable and practical additional
warranties, the cost of which shall be for Contractor’s account. The warranties shall only be
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 16 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
enforceable by Contractor during the Contract period and by Company after Final Completion
or after Contract termination.
7.4.3. If, in the opinion of Company any item of Material is not, or is no longer, in accordance with
the requirements of the specifications then Contractor shall at the option of Company, either
make adequate repairs or arrange for immediate replacement. If, in the opinion of Company,
the execution of the Work is slowed down or delayed due to insufficient or below standard
Material, then Contractor shall provide the necessary additional Material to recover such
delays at no additional cost to Company.
7.4.4. Original Replacement Parts.
Where relevant Contractor shall ensure that required rectification work is carried out in
accordance with the related Manufactures’ instructions, supervision and using the original
Manufacturers replacement parts.
7.5. Import and export of Materials & Construction Equipment
7.5.1. Contractor shall gather all information relevant to import, export and any other documentation
required and subsequently obtain the import and export and other licenses required for the
importation into and use in the Sultanate of Oman of all Materials & Construction Equipment
to be supplied by Contractor and made available from sources outside the Sultanate of Oman.
7.5.2. Contractor shall ensure that applications, including all necessary supporting documents for
such import, export and other licenses, are submitted to the appropriate Omani authorities in
sufficient time before the licenses are required. Unless otherwise stated, all imported Materials
& Construction Equipment to be supplied by Contractor shall be imported in accordance with
the procedures for importation of materials and equipment included in the Contract. Contractor
shall be responsible for their due and timely importation, clearance, handling, off-loading,
storage and transportation to the Site.
7.6. Ownership and duty of care
7.6.1. All Materials supplied by Contractor or any Subcontractor shall, on being delivered to the Site,
become the unencumbered property of Company but shall remain in Contractor's care and
custody. Contractor shall be liable for any loss of or damage to all Materials, whilst in
Contractor's care and custody. All Contractor supplied Materials shall be timely but not
prematurely delivered to Site and inspected by Contractor. For the purpose of this Article, Site
shall be deemed to include on board ship and other forms of transportation within Oman.
7.7. Construction Equipment
7.7.1. Contractor shall supply at its expense at the Site all Construction Equipment necessary for the
execution of the Work. Such Construction Equipment shall conform to the requirements and
specifications of Company as provided in the Contract or, if no such requirements or
specifications exist, be subject to approval by Company. At all times preference shall be given
to the use of locally available equipment where such equipment is competitive with respect to
price, safety, quality, delivery time and such like criteria.
7.7.2. Exclusive usage on Site
All Construction Equipment provided by Contractor, when brought onto the Site, shall be, and
shall be deemed to be, intended exclusively for the construction of the Work and Contractor
shall not remove them without the consent of Company.
7.7.3. Suitability of Equipment
If, in the opinion of Company any item of Construction Equipment is not, or is no longer,
suitable for the purpose intended, then Contractor shall at no additional cost to Company and
at the option of Company, either make adequate repairs or arrange for immediate
replacement. If, in the opinion of Company, Contractor does not adhere to the Programme
due to the Construction Equipment being inadequate, then Contractor shall provide the
necessary additional Construction Equipment at no additional cost to Company.
7.8. Use of petroleum products
7.8.1. When undertaking the Work in Oman Contractor shall use lubricants and other petroleum
products which have been manufactured by or sold under any of the brand name of Company
Group provided that prices and quality are competitive. In the event of any conflict between
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 17 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
this Article and the Article headed “National Products” and “Products of GCC Origin”” then the
latter shall prevail.
7.9. National Products and Products of GCC Origin
7.9.1. Where available, Contractor shall use or cause to be used National Products and, where these
are not sufficient or not available, Products of GCC Origin, provided that both shall meet the
pricing, quality and delivery conditions of the Contract.
7.9.2. In relation to price Contractor shall use National Products, where available, provided they are
not more than ten percent (10%) higher in price than equivalent foreign products and shall use
Products of GCC Origin, where available, provided they are not more than five percent (5%)
higher in price than equivalent foreign products.
7.9.3. Contractor shall be responsible for ascertaining whether products are National Products,
Products of GCC Origin or foreign products and shall indemnify and hold harmless Company
in respect of any fine levied for breach of any law or government regulations relating to such
products.
7.9.4. On the written request of Company, Contractor shall provide a list for Company's approval of
all National Products and Products of GCC Origin if any such Materials are to be utilised in the
performance of the Contract.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 18 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
8.4. Testing
8.4.1. Contractor shall at its own cost carry out or cause to be carried out all examinations, tests and
measurements which are specified in the Contract or which may reasonably be required by
Company to determine the quality or quantity of any Materials supplied or any part of the Work
performed by Contractor.
8.4.2. Contractor shall as and when required supply such samples of Materials as may be selected
by Company for testing before the Materials are incorporated in the Work. All samples shall
be supplied by Contractor at its own cost if the Contract provides that it shall so supply them,
otherwise Company shall pay for the samples.
8.4.3. If any test is ordered by Company which either:
a) the Contract does not provide for or may not reasonably be inferred from the Contract to
be required; or
b) though provided for is ordered by Company to be carried out by an independent person
at any place other than the Site or the place of manufacture or fabrication of the Materials
tested
then the costs of and incidental to the test shall be borne by Contractor if the test shows the
workmanship performed or Materials supplied by Contractor not to be in accordance with the
provisions of the Contract. Otherwise the costs shall be borne by Company.
8.5. Search for cause of defects
8.5.1. Contractor shall, if required by Company in writing, search under the directions of Company
for the cause of any defect, imperfection or fault appearing during the progress of the Work or
during the period referred to in the Article headed “Warranty for the Work”. If such defect,
imperfection or fault shall be one for which Contractor is liable, the cost of all investigation and
searching shall be borne by Contractor and Contractor shall in such case repair, rectify and
make good such defect, imperfection or fault at its own expense.
8.5.2. If such defect, imperfection or fault shall be one for which Company is liable, the cost of
searching shall be borne by Company and any repairs necessary to rectify and make good
such defect, imperfection or fault shall also be borne by Company.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 19 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
9.3. Completion
9.3.1. When Contractor considers that the Work has been completed in accordance with the
Contract, Contractor shall so notify Company in writing.
9.3.2. Company shall proceed forthwith to determine whether the Work has been performed and
completed in accordance with the Contract. Within fourteen (14) calendar days of receipt of
the above notification from Contractor, Company shall either:-
a) issue to Contractor a Completion certificate, or
b) notify Contractor that Company has found the Work or part thereof not to have been
performed in accordance with the Contract. Company shall detail in writing the specific
nature of the deficiency and the provision of the Contract which contains the obligation of
Contractor, which Contractor has failed to meet. Contractor shall immediately take all
action necessary to remedy the defect, so as to enable Company to issue to Contractor
a Completion certificate, or
c) notify Contractor that Company has found the Work or part thereof not to have been
performed in accordance with the Contract and that Company requires Contractor not to
remedy the deficiency, in which case Company shall be entitled to the rights and remedies
set out in the Article headed “Suspension and Termination”. In respect of the remaining
Work, Company shall also either notify Contractor in accordance with subparagraph (b)
of this Article or shall issue a Completion certificate.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 20 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 21 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 22 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 23 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 24 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
12.6.2. The advance payment shall be recovered by way of a reduction from the amount payable
under any interim payment certificates submitted at each milestone date following payment of
the advance payment to the Contractor so as to ensure complete repayment of the advance
payment no later than the anticipated date of Completion.
12.6.3. The Contractor shall provide to the Company an advance payment bond in the form set out in
Document C-8 Procedures for Contractor issued by a bank operating in Oman.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 25 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 26 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 27 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
(i) “Other Contractor” shall mean any other contractor engaged by Company to
perform work at the Site and which has entered into contract(s) with Company; and
(ii) “Other Contractor Group” shall mean the Other Contractor, its subcontractors (of
any tier), its and their Affiliates, its and their respective directors, officers and
employees (including agency personnel) but shall not include any member of
Company Group or Contractor Group.
(b) Commencing from the date on which any Other Contractor became bound by an article
effectively containing the same undertaking as this Mutual Waiver and Indemnity, in any
contract which any Other Contractor has entered into with Company, and for the duration
that the Other Contractor remains bound by the provisions of such article, Contractor shall
save, indemnify, defend and hold harmless the Other Contractor Group from and against
all claims, losses, damages, costs (including legal costs), expenses and liabilities in
respect of:
(i) loss of or damage to property of Contractor Group whether owned, hired, leased
or otherwise provided by Contractor Group arising from or relating to the
performance of the Contract: and
(ii) personal injury death or disease to any person employed by Contractor Group
arising from or related to the performance of the Contract; and
(iii) any consequential loss sustained by Contractor Group. Consequential losses shall
mean indirect losses and/or loss of production, loss of product, loss of use and loss
of revenue, profit or anticipated profit, arising from or relating to the performance
of the Contract and whether or not such losses were foreseeable at the time of
entering into the Contract.
(c) All exclusions and indemnities given under this Mutual Waiver and Indemnity shall apply
irrespective of cause and notwithstanding the negligence or breach of duty (whether
statutory or otherwise) of the indemnified party or any other entity or party and shall apply
irrespective of any claim in tort, under contract or otherwise at law.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 28 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
(d) Contractor’s insurances shall be endorsed to provide that underwriters waive any rights
of recourse, including in particular subrogation rights against the Other Contractors and
their respective Affiliates to the extent of the obligations assumed herein.
17.9. Exclusions or Limitations of Liability
17.9.1. From the Effective Date of the Contract and before the Completion Date, Contractor's total
cumulative liability to Company arising out of or related to the performance of Contract shall
be limited to the estimated Contract Price at the Effective Date of the Contract. The above
limitation shall not apply any liabilities assumed by Contractor under the Articles headed
Inspection and Testing, Duties and Taxes, Suspension and Termination, Ownership, Patents
and Proprietary Rights, Insurance by Contractor, Confidentiality, sub-articles headed
Consequential Loss and Mutual Waiver and Indemnity.
17.9.2. After the Completion Date, Contractor’s total cumulative liability to Company arising out of or
related to the performance of Contract shall be limited to Twenty Five Percent (25%) of the
estimated Contract Price at the Effective Date of Commencement of Contract. The above
limitation shall not apply to any liabilities assumed by Contractor under the Articles headed
Duties and Taxes, Ownership, Patents and Proprietary Rights, Insurance by Contractor,
Confidentiality, sub-articles headed Consequential Loss and Mutual Waiver and Indemnity.
17.9.3. Costs arising from any cause of action of Company notified to Contractor before the
Completion Date shall be subject to the limitation described in Article 17.9.1 but not to the
limitation described in Article 17.9.2.
17.9.4. Notwithstanding anything in the Contract to the contrary:
(a) misconduct or illegal or unlawful acts shall not be subject to any limitation or exclusion of
liability, and
(b) no liabilities of Contractor or Company covered by insurance are included in Contractor’s
total cumulative liability for the purpose of determining the limit of Contractor’s liability
under the Contract.
17.9.5. Any limitation or exclusion of liability under the Contract shall exclude or limit such liability not
only in contract but also in tort, including negligence, or otherwise at law.
17.9.6. Any and all limitations of Contractor’s liability included in the Contract shall represent the
aggregate cumulative limitation of the liability of Contractor to Company Group.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 29 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
(b) Employers Liability and/or (where the jurisdiction of where the Work is to be performed or
under which the employees employed requires the same) Workmen's Compensation
insurance covering personal injury to or death of the employees of Contractor engaged in
the performance of the Work to the minimum value required by law;
(c) Third Party Liability insurance for any incident or series of incidents covering the
operations of Contractor or Subcontractor(s) in the performance of the Contract, in an
amount not less than Five million U.S. dollars (US$ 5,000,000) per occurrence and
unlimited as to the number of occurrences;
(d) Third Party and Passenger Liability insurance and other motor insurance as required by
applicable jurisdiction; and
(e) Storage/ transit/ Cargo Insurances in respect of Materials procured by Contractor up to
the time they are delivered at Site areas as directed by Contract Holder.
19.3. Without limitation of Contractor’s obligations and responsibilities, if Contractor subcontracts
any part of the Work, the responsibility and insurance provisions of each Subcontract shall be
consistent with the Contract and the Subcontractors need not carry any insurance, which
would duplicate any insurance provided by Contractor or Company.
19.4. Contractor and its Subcontractors shall not commence the shipment of Construction
Equipment and/or Materials or commence the Work at the Site until all applicable insurances
that Contractor and the Subcontractors are required to provide are in force and the necessary
certificates have been received by Company. Prior to commencing the aforesaid activities,
Contractor shall comply with all Company's and insurers' requirements including, but not
limited to, maximum value concentrations, reports and claim handling procedures.
19.5. Approval by Company of any insurer or terms of insurance proposed by Contractor shall not
relieve Contractor of any obligation or liability under or arising from the Contract or at law.
19.6. Contractor shall furnish to Company certificates of insurance within fifteen (15) calendar days
from the Effective Date for those insurances required by Articles 19.2(a) and (b) and when
requested or becoming necessary for those insurances required by Articles 19.2(c) and (d)
giving evidence of the type and scope of each insurance and a statement from the insurers
that no insurance will be cancelled or materially changed for the duration of the Contract
without thirty (30) calendar days prior written notice from the insurers to Company. Such
certificates or notice shall be marked for the attention of the Contract Holder.
19.7. Should Contractor at any time neglect or refuse to provide any insurance required herein, or
should any insurance be cancelled, Company shall have the right to procure such insurance.
In such event, Company shall authorise a Variation to Contract in accordance with the Article
headed ”Instructions and Variations to Contract” and the Contract Price shall be reduced by
an amount equal to Company's costs in procuring such insurance.
19.8. In the event that any of the insurances are renewable during the performance of the Work,
Contractor shall supply Company with evidence of renewal of any such insurance at least
fifteen (15) calendar days before the date of expiry.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 30 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
20.4. The Contract Manager shall generally represent Contractor with respect to the Contract and
the Contract Manager and Contractor Personnel confirmed as such in writing by the Contract
Manager shall have the authorities that Contractor has under the Contract.
20.5. Persons representing Company shall at all times have access to the Site.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 31 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
perform the Work in accordance with the Contract. Contractor represents that every effort will
be made to minimise the turnover of Contractor Personnel.
22.1.2. Contractor warrants that all Contractor Personnel have the experience and capability to safely,
efficiently and expeditiously perform the Work. Contractor Personnel shall have such linguistic
skills as may be required for the fulfilment of their duties.
22.1.3. Contractor shall, within seven (7) calendar days of the Effective Date, present to Company a
name list of all Key Personnel to be employed in the performance of the Work. This list shall
show each person's qualifications and previous certification obtained. The supervisory Key
Personnel of Contractor and his Subcontractors shall read, write and speak English fluently.
Company reserves the right to reject for proper reasons a person on the original name list and
also any subsequent change to the name list.
22.2. Replacement of Contractor Personnel
22.2.1. Contractor shall ensure that Key Personnel shall not be replaced without the prior written
approval of Company. In order to ensure that continuity of the Work is maintained, where
possible any replacement shall work alongside the person who is to be replaced for a
reasonable hand-over period, at no expense to Company.
22.2.2. Contractor shall at its own expense ensure that all Contractor Personnel and Subcontractor
personnel have been trained sufficiently to perform the Work to the standards required by the
Contract. This training must, as a minimum, include safety, survival and job related training
required by applicable law, the Contract and good practice prior to the start of the Work, and/or
as specified in the specification. Contractor will provide certificates evidencing such training if
so required by Company. Contractor shall maintain records of all training received prior to and
during the Contract. In the case of safety and survival training for Omani personnel, written
training material shall be issued and training shall be conducted by Contractor in Arabic.
22.2.3. Contractor shall, at its own cost, immediately replace any member of Contractor Personnel
whom Company either refuses to allow access to the Site or to perform any part of the Work
or requires to be removed from the Site, provided that Company does not exercise such right
unreasonably. Any Contractor Personnel so replaced shall not be placed on any other
Company work without prior written approval of Company. Contractor shall be responsible for
replacing such persons as soon as possible but no later than thirty (30) calendar days after
the removal of such persons was requested by Company.
22.2.4. Neither Contractor nor any Subcontractors shall, without Company's prior written consent,
engage any labour employed by another contractor working for Company.
22.3. Liability for Contractor Personnel
22.3.1. Unless otherwise expressly stated in the Contract, Contractor shall have full and exclusive
responsibility for the payment of all salaries, wages, commissions, allowances, pension
premiums, end of service benefits, medical treatment and medical termination benefits,
redundancy payments and other remuneration to Contractor Personnel and for the deduction
of the applicable taxes or other levies therefrom for remittance to the authorities concerned,
and the Contract Price shall be deemed to include all of the foregoing.
22.3.2. Contractor shall arrange, provide and maintain at its own expense the necessary visas and
work permits for Contractor Personnel.
22.3.3. Contractor shall maintain good industrial relations and shall provide Company on request with
information on all matters relating to conditions of employment of Contractor Personnel
including but not limited to rates of pay, allowances, amenities and overtime.
22.3.4. Except as otherwise explicitly provided in the Contract, Contractor shall provide suitable
accommodation, messing and catering for Contractor Personnel in compliance with the HSE
Specification and with such regulations and requirements as may exist or be made by the
Government and/or local authorities, and shall provide all transport for Contractor Personnel
to, from and at the Site.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 32 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 33 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
Contractor shall upon Completion of the Work provide Company with a satisfactory, complete
and up to date copy of the software and all other information necessary to ensure that
Company can continue to satisfactorily use the software so provided by Contractor.
Company reserves the right to verify and validate any information contained within the
software within one year from Completion of the Work. Contractor shall remedy any defects
or inadequacies discovered during the said one year, which Company shall notify to Contractor
and such defects or inadequacies shall be remedied within fourteen (14) calendar days of
receipt of such notification.
24.1.2. Company shall retain title to Company provided items and information, including but not limited
to, Technical Information. The Work shall be and remain the property of Company.
24.1.3. All Materials shall become the property of Company upon delivery to the Worksite or payment
by Company whichever is the earlier.
24.1.4. Contractor shall ensure that all Materials and Construction Equipment are free from all liens
and/or retention of title claims from any third party.
24.1.5. Title in any equipment, materials and supplies provided by Contractor which do not comply
with the requirements of the Contract and which are rejected by Company, shall re-vest
immediately in Contractor.
24.1.6. Title in Materials which do comply with the requirements of the Contract and which has not
been rejected by Company but for which no payment has been made by Company and which
are no longer required for the purposes of the Contract, shall re-vest in Contractor.
24.1.7. All items of Company property in the possession of Contractor shall be suitably marked or
clearly identified as the property of Company. As far as possible all such items shall be
segregated from other property.
24.2. Liens, attachments etcetera
24.2.1. Contractor agrees that it will not claim any Lien or charge or the like on the Work or any
property of Company Group, in the possession of Contractor or, at the Site.
24.2.2. If at any time there shall be evidence of any Lien, attachment, charge or claim to which, if
established, the Work, Equipment, Material or Company Group’s property might be subjected
to, and which is made against Contractor or made by any Subcontractor against Company,
then Company shall notify Contractor promptly in order that Contractor may either remove or
bond the said Lien, attachment, charge or claim, failing which Company shall have the right to
retain out of any payment to be made under the Contract, an amount sufficient to indemnify
Company Group completely against such Lien, attachment, charge or claim. Should there
prove to be any Lien, attachment, charge or claim upon the property of Company Group after
all payments hereunder have been made, or where payments due to Contractor are not
sufficient to completely discharge such Lien, Contractor agrees to refund to Company all costs
incurred by Company in discharging any such Lien, attachment, charge or claim imposed on
the property of Company Group in consequence of the breach of Contractor. Contractor shall
immediately notify Company of any possible Lien, attachment, charge or claim, which may
affect the Work or any part thereof.
24.2.3. Without prejudice to the provisions of this Article 25.2, Contractor shall save, indemnify, defend
and hold harmless Company Group from and against all Liens, attachments, charges or claims
by Subcontractors, upon the Work, services, Construction Equipment, Materials or the
property of Company Group in connection with, or arising out of, the Contract. Except as
provided in Article 24.2.2, Company shall have the right to withhold the amount of any such
Lien, attachment, charge or claim from any payment to Contractor under the Contract until
removal of such claim by Subcontractors. If such Liens, attachments, charges or claims fall
within the scope of the insurances of Contractor, it shall remain the responsibility of Contractor
to furnish Company with satisfactory written certification, from the insurer of Contractor, that
any such Lien, attachment, charge or claim is covered by the insurance of Contractor before
Company shall release any money withheld hereunder.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 34 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 35 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
24.3.7. Contractor shall save, indemnify, defend and hold harmless Company Group from all claims,
losses, damages, costs (including legal costs), expenses, and liabilities of every kind and
nature for, or arising out of, any alleged infringement of any patent or proprietary or protected
right, arising out of or in connection with the performance of the obligations of Contractor under
the Contract except where such infringement necessarily arises from the Technical Information
and/or Company’s instructions. Contractor shall use its reasonable endeavours to identify any
infringement in the Technical Information and/or Company’s instructions of any patent or
proprietary or protected right, and should Contractor become aware of any such infringement
or possible infringement, then Contractor shall inform Company immediately. Contractor will
have no liability for any failure to identify any infringement in the Technical Information and/or
Company’s instructions.
24.3.8. Company shall save, indemnify, defend and hold harmless Contractor Group from all claims,
losses, damages, costs (including legal costs), expenses and liabilities of every kind and
nature for, or arising out of, any alleged infringement of any patent or proprietary or protected
right arising out of or in connection with the performance of the obligations of Company under
the Contract or the use by Contractor of Technical Information or any infringement arising from
Company’s instructions.
24.3.9. Subject to Article 24.3.8, where Equipment, designs, processes, methods, information, work
or products specified and used or proposed to be used by Contractor are held to constitute
infringement and its use enjoined, Contractor shall at its own expense either procure the right
to use the same or replace them with non-infringing Equipment, designs, processes, methods,
information, work or products
24.4. Items of geological or archaeological interest
24.4.1. All fossils, coins, articles of value or antiquity and structures and other remains or items of
geological or archaeological interest discovered on the Site shall as between Company and
Contractor be deemed to be the absolute property of Company and Contractor shall take
reasonable precautions to prevent his personnel or any other persons from removing or
damaging any such article or item and shall immediately upon discovery thereof and before
removal acquaint Company of such discovery and carry out at the expense of Company,
Company's orders as to the disposal of the same.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 36 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
25.1.4. Contractor shall return to Company after expiration or termination of the Contract, all originals
and copies of documents, drawings, data and any other information placed with or at the
disposal of Contractor by or on behalf of Company relating to the performance of the Contract.
25.1.5. Contractor shall ensure that the provisions of this Article are incorporated in any Subcontract.
25.2. Press releases
25.2.1. No announcements, press releases, handouts or photographs for publication etc. relating to
this Contract or any part of the Work shall be issued or released without Company’s prior
written approval.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 37 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
29.1.2. Any dispute between Company and Contractor in connection with, or arising out of, the
Contract or the Work shall be resolved by means of the following procedure:
(a) the dispute shall initially be referred to the Contract Holder and Contract Manager who
shall discuss the matter in dispute and make all reasonable efforts to reach an agreement.
The basis of such dispute shall be submitted in accordance with Articles 29.1.7 and 29.1.8;
(b) if no agreement is reached under Article 29.1.2(a) the dispute shall be referred to two
nominated persons, one from each party, and such nominated person shall have seniority
over the Contract Holder and Contract Manager. Such nominated persons may be
replaced by notice to the other party;
29.1.3. In the absence of any agreement being reached on a particular dispute in accordance with
Article 29.1.2 then such dispute shall be finally settled in accordance with the UNCITRAL
Arbitration Rules in force at the Effective Date, by a sole arbitrator.
29.1.4. In the event the arbitrator is not mutually agreed by both parties, then each party shall
nominate an arbitrator and these two arbitrators shall designate a third arbitrator. In the event
that either party fails to nominate an arbitrator, as required above, within two months of that
date, then the other party may apply to the President of the Appeal Competent Court who has
the authority to nominate an arbitrator to represent the defaulting party. Where the two
arbitrators cannot agree on a third arbitrator, either party shall ask the President of the Appeal
Competent Court to nominate the third arbitrator.
29.1.5. The arbitration proceedings shall be conducted in the English language and such proceedings
shall be held in Muscat, Sultanate of Oman. Awards shall be reduced to writing, and shall be
final and binding on the parties from the date they were made without the right of appeal,
unless the award is in conflict with public order or due process or given fraudulently. The
parties undertake to carry out the award without delay. Judgment upon the award may be
entered in any court having jurisdiction.
29.1.6. Whilst any matter(s) is in dispute, both Contractor and Company shall continue to comply with
all the provisions of the Contract, particularly, Contractor shall proceed with the execution and
completion of the Work or part of the Work, which is not in dispute except to the extent that
such continuance would prejudice the legal position and /or rights of either party.
29.1.7. Prior to submitting any dispute in accordance with Article 29.1.2, the party raising a dispute
shall send a letter of dispute which shall contain the following information:
a) a clear summary of the facts on which each matter in dispute is based;
b) the basis on which each matter in dispute is made, identifying the principal contractual
terms and statutory provisions relied on;
c) the nature of the relief claimed; if damages are claimed, a breakdown showing how the
damages have been quantified; if a sum is claimed pursuant to the Contract, how it has
been calculated; if an extension of time is claimed, the period claimed; and
d) any other matter of relevance relating to the dispute.
29.1.8. A party receiving a letter of dispute in accordance with Article 29.1.7 shall send, within fourteen
(14) calendar days, a letter of response either accepting or rejecting the reasons set out in the
letter of dispute including the party’s basis for rejection.
29.1.9. Nothing in this Contract shall constitute an agreement by Contractor Group to engage in any
act or omission which would be a violation of or result in a penalty under the laws or regulations
of the country to which Contractor Group is subject.
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 38 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
General Conditions for Construction & EPC Contracts – Rev. Mar 2017 Page 39 of 39
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
C4 - SCOPE OF WORK
Table of Contents
1. INTRODUCTION ................................................................................................................ 9
1.1 PREFACE............................................................................................................... 9
6. FACILITIES .....................................................................................................................111
6.1 CONTRACTOR’S OFFICES IN OMAN ................................................................111
7. PROCUREMENT .............................................................................................................121
7.1 GENERAL ...........................................................................................................121
7.2 COMPANY APPROVED VENDORS ...................................................................121
7.3 COMPANY APPROVED SUBCONTRACTORS ..................................................122
7.4 MATERIALS AND EQUIPMENT STANDARDS AND CODES (MESC) ................122
7.5 PROCUREMENT MANAGEMENT AND PROCEDURES MANUAL ....................122
7.6 MATERIAL REQUISITIONS ................................................................................123
7.7 PURCHASE ORDERS.........................................................................................123
7.8 PROCUREMENT DOCUMENTATION ................................................................124
8. CONSTRUCTION ............................................................................................................130
8.1 GENERAL ...........................................................................................................130
8.2 SUB-CONTRACTING WORKS ............................................................................130
8.3 PROCEDURES AND METHOD STATEMENTS ..................................................130
8.4 CIVIL WORKS .....................................................................................................132
8.4.1 GENERAL ...........................................................................................................132
8.4.2 TEMPORARY AND PLANT ROADS....................................................................134
8.4.3 STRUCTURAL STEEL WORKS ..........................................................................134
8.4.4 FOUNDATION WORKS.......................................................................................134
8.4.5 EXCAVATION AND EARTHWORKS ...................................................................135
8.4.6 CLEARING AND CARTING AWAY......................................................................135
8.4.7 BORROW PITS ...................................................................................................136
8.5 MECHANICAL/PIPING WORKS ..........................................................................136
8.5.1 GENERAL ...........................................................................................................136
8.5.2 EQUIPMENT INSTALLATION .............................................................................137
8.5.3 ACCESS ROADS ................................................................................................137
8.6 ELECTRICAL WORKS ........................................................................................138
8.6.1 GENERAL ...........................................................................................................138
8.6.2 LOW VOLTAGE SWITCHGEAR: .........................................................................139
8.6.3 AC UPS: ..............................................................................................................139
8.6.4 LOW VOLTAGE CABLES: ...................................................................................139
1. INTRODUCTION
1.1 Preface
Oman Gas Company S.A.O.C. (OGC) is the gas transportation company in Oman delivering
natural gas to main economic sectors and major consumers comprising of Domestic, Power and
Desalination plants, Fertilizer, Methanol, Petrochemical, Refinery, Steel and Cement plants.
The Company transmits and distributes natural gas to the various consumers through a large
network of gas pipelines, compressor stations and gas supply stations. The company's gas
pipeline network is spread across the country with more than 2500 kilometers of high pressure
transmission pipelines and ancillary facilities covering Fahud, Muscat, and Sohar in the north and
from Saih-Rawl to Salalah in the south of the country.
All sections of this Scope of Work document, C-4 and other Contract documents C-1 to C-3, C-5
to C-10 are applicable to all the Project scopes described unless specifically mentioned against
a particular section that it applies to a particular part only.
This document shall be read in conjunction with the remainder of the Contract, including all the
Contract documents, Drawings, applicable Standards and Codes.
The Scope of Work for Shafa GSS Debottleneck Project covers the replacement of existing
Separator (V-5260), Heater (E-5260), replacement of 6” Spur line with launcher/receiver, control
system upgradation and associated civil, electrical, instrumentation and mechanical works.
2.1. Definitions
In this Document C-4 Scope of Work and any subsequent Documents of the Contract the following
words shall have the same meaning as assigned to them herein. Other words used in this
Document which have been defined in previous Documents of the Contract shall have the same
meaning as assigned to them in previous Documents of the Contract.
• “Approval” shall mean that the Contractor shall not finalize procurement activities, claim
milestone completion or start construction without the Company’s written approval.
• “As building” and “As Built” shall mean updating of master drawings to reflect the project as-
built status.
• “Scope of Work” is the work involved in the definition of Management, Engineering,
Procurement, Construction, Commissioning and guarantee run.
• “Engineer” and “Engineering” means all work in respect of developing the design,
performing analysis, technical calculations, drafting, detailing or locating including site visits
and as-built drawings and documentation.
• “EPC” shall mean that the scope of the Contractor is Management, Engineering,
Procurement, Construction, installation, pre-commissioning, Testing, Commissioning,
Guarantee Run and handover.
• "Fabricate" shall include but not be limited to any relevant Engineering, taking delivery,
unloading, examining, handling, accepting materials or equipment supplied by the Company
or Contractor into the Contractor's care and control, maintaining records, preparing necessary
fabrication drawings (including any Engineering) identifying and removing materials from
stores, setting out, preparing, cutting, drilling, prefabricating, bending, welding, preheating,
stress relieving, bolting, temporary access/supports, all consumables, testing and transporting
to area of erection or other specific location.
• “Facility” means all items, units, plumbing, foundations, supports, fences, hard wares, soft-
wares, systems and subject of whatsoever nature is employed for the Shafa GSS
Debottlenecking Project Phase 2 with all associated facilities, whatsoever is going to be
handover and used by Company during the project life cycle.
• “Front End Design” means all documents, reports, calculations, analysis, drawings,
specifications and requisitions produced by the Company and issued to the Contractor for the
purpose of defining the Scope of Work and the basis for Engineering and Detailed Design to
be executed by the Contractor.
• “Include”, “Includes” and “Including” as used in any of the Contract documents it shall be
taken as having the meaning “including but not limited to” and shall not be considered as
creating or inferring any limitation on the description that follows.
• "Install" and "Installation" shall include any relevant Engineering together with all actions
covered by the term Fabricate and site preparation, trenching or provision and installation of
all necessary supports, hoisting/lowering in and locating in position, trial fit, temporary
access/supports and permanent erection/installation in final position, tie-in/hook-up, all
consumables, provision of padding, protective barriers and all backfilling, inspection, testing,
repairing, coating, preservation related activities necessary to attain a mechanically complete
condition, dismantling, clearing away temporary access/supports and surplus/scrap material
and reinstating the site
• “Install”/“Provide” shall also mean design, engineering, manufacture, works testing,
packing for transport by land, sea or air, shipment insurance, delivery to site, unloading at site,
complete erection and Installation, painting, site testing, pre-commissioning and
commissioning, guarantee run as agreed, putting into operation and maintenance prior to
completion.
• “Locate” and “Locating” means the final appointment of an item or system by the Contractor
within the limits or tolerances given by the Drawings and Specifications
• “Manufacturer” means the original party responsible for the manufacture of equipment and
services to perform the duties specified by the Contractor.
• “Not used.” means that the clause or sub-clause shall be deemed not incorporated in this
Contract, wherever stated so immediately adjacent to a clause or sub-clause reference.
• “Pre-commissioning” means all activities required after the installation is over to
commission and operate the plant to demonstrate that the guaranteed operating parameters
are achieved
• "Remove" shall include but not be limited to the provision of temporary access/supports,
excavation, preparation, cutting, unbolting, taking down or lifting, Removal, disposal and
dismantling, clearing away temporary access/supports, backfilling and reinstating the site.
• “Review” shall mean the Contractor shall submit drawings and documents to the Company
in advance of the design completion. The Company reserves the right to make comments to
these drawings and documents if Company standards and procedures are not being adhered
to by the Contractor.
• "Supply" shall include but not be limited to any relevant Engineering, preparation of
specification, issue of enquiries; bid evaluation/analysis; preparation and issue of purchase
orders; cost of materials; office and field expediting; preparation and coordination of
procurement documentation; packaging, preservation and transportation to Site; receipt,
storage, conservation, maintenance, handling and administration at Site; and co-ordination
of vendor / supplier representatives.
• “Handover” shall mean the formal transfer of ownership of a constructed and commissioned
asset that passed initial maintenance period from Contractor to Company, represented by
operations department.
• “Third Party Inspection" shall mean inspection carried out by an accredited inspection
Company independent of both the Company and the Contractor.
• “Vendor” means party responsible for the supply of equipment, materials or product related
services to the Contractor.
• “AVME” : Approved Vendor for Material and Equipment, Contractor shall follow latest PDO
AVME list
2.2. ABBREVIATIONS
3. PROJECT DESCRIPTION
3.1. GENERAL
The Scope of Work for Shafa GSS Debottleneck Project covers the replacement of existing
Separator (V-5260), Heater (E-5260), replacement of 6” Spur line with launcher/receiver, control
system upgradation and associated civil, electrical, instrumentation and mechanical works.
The As-built drawings and documents, advance copies of the existing facilities or ongoing projects
drawings and documents as available with Company are attached for the proposed project. And
if the company As-built information is not sufficient for the Project in that case Contractor have to
do the Project specific As-built for engineering purpose.
The Contractor shall make necessary site visits, study and verify, be responsible and own the As-
built and advance copies of the ongoing projects drawings and documents prior to start of work.
All Scope related drawings are included in the C-6 Document of the Contract.
The Scope generally includes the detail design, engineering, procurement, construction,
inspection, testing, pre-commissioning, commissioning, handing over and guarantee run of the
aforesaid facilities for a totally inclusive lump-sum price with price break up as indicated in C-5
document.
The Scope of Work and all other details given in this Contract are relevant and applicable for the
above Project.
The Front End Engineering Design (FEED) has been prepared for this Project by the Company.
The Contractor shall verify, be responsible and own the FEED before the submission of his tender.
The scope of Shafa GSS modification under this Contract includes but not limited to the following:
The below schematic diagram shows the high level overall project scope
6", 4.2 Km
Launcher Receiver
6" 6"
6"
3"
20" – OGC gas line Gas to Power
E-5260 Station
to Murayrat 6" 6"
V-5260
FMS
ESD 2" PRCA 2" 4" 4"
`` 3"
6" 6" 6"
6" 2" PRCA 2"
• Demolition and handover of the existing control & safeguarding systems, field instrumentation,
old cables and the accessories; but not limited to these items to the company store in Fahud
on completion of the successful guarantee run of the new facility installed under this scope.
• New electrical room and battery room with corridor and integrating with the existing building.
Modification of the existing building to suit to the new electrical and instrumentation
requirement.
• Providing additional foundations, cable trenches, structural supports, trenches for the new
extension.
• Providing AC UPS, (240V, 2x100% static UPS (8 KVA) units working individual as per
DEP 33655031) with its own DB.
• 2x100% battery banks with 8hrs back-up.
• Shifting of earth system from existing to new electrical room and relocated earth pit.
• All existing electrical power & control cables shall be replaced.
• Incoming LV power cables shall be extended up to the new LV switchgear.
• Providing Air Conditioning, emergency lighting, lighting & small power DB’s with all
accessories.
• All the existing window air condition units shall be replaced with split air conditioning
system.
• Split air condition units for new switchgear building.
• Earthing protection.
• Lightning protection (new and existing building).
• Demolition of existing 415V LV switchboard, existing 24V DC UPS, existing lighting services
DB and all associated cables.
• Packing and transport the existing 415V LV switchboard, existing 24V DC UPS including
battery, existing lighting services DB and all cables to OGC Fahud stores.
The Company has performed sufficient FEED to prove the feasibility of the project and to provide
preliminary design in the form of documents and drawings. A summary of the FEED documents
and drawings are included in Document C-6. The Contractor shall base and develop its Design
and Engineering package based on the documents / drawings provided by the Company.
However, the above shall not relieve the Contractor from ensuring the design meeting the
Company operations and design requirements, and any changes during detail design are deemed
to be included in Contractor’s scope, cost and schedule.
The Contractor shall review and verify the FEED documents provided (as listed in Document C-
6), and to ensure clear understanding of the level of Design Work. Contractor undertakes full
responsibility of the same to comply with project requirements.
The Contractor to notify the Company of any errors, omissions, inconsistencies, discrepancies,
non-compliance with international codes or standards prevailing in Oil & Gas industry, for
Company’s information.
A Project Design Basis document giving technical detail of the project is enclosed in Document
C6 of the Contract. As part of Design, the Contractor shall develop the project design basis
throughout the design phase and till the completion of the pre-commissioning of the project,
documenting all the key design requirements, constraints and decisions.
1. Front End Engineering Design (FEED) which has established the basic design and
general specifications for the Work as reflected in the design documents listed document
C-6 “Specifications and Drawings”.
2. DR and HAZOP reviews were carried out by Company during the Project FEED. The
findings of DR and HAZOP studies were incorporated in the FEED.
3. DR and HAZOP procedures shall be prepared by the Contractor during detail engineering
design and submitted to Company for approval prior to the commencement date of DR
and HAZOP study. The DR and HAZOP procedure shall be in accordance with PR-1696,
PR-2059 and EP-95-0313.
Any additional requirement resulting from the DR and HAZOP study during the detail design shall
not be construed as a variation to the Contract by the Contractor in terms of cost and schedule.
IPF study has not been carried out during FEED phase. However, the Contractor shall prepare
IPF review package during the course of detail engineering and shall carry out IPF study as
required. An IPF procedure shall be prepared by Contractor during detail engineering design and
submitted to Company for approval prior to commencement date of IPF study. The IPF procedure
will be prepared in accordance with the requirements of DEP 32.80.10.10 and GU-437. Any
additional requirement resulting from the IPF study shall not be construed as a variation to the
Contract by the Contractor in terms of cost and schedule.
Contractor shall carry out a detailed Quantitative Risk Assessment (QRA) based on the Company
approved scope of work which will be prepared as per the guidelines stipulated in SP-1258. The
QRA study shall be carried out by the Contractor by engaging a Company approved specialist
Contractor. Contractor shall incorporate the QRA recommendations in the detail design to meet
any new requirements coming out of the QRA study without any impact to the LS cost and
schedule agreed with the Company. Any additional requirement resulting from the QRA study
shall not be construed as a variation to the Contract by the Contractor in terms of cost and
schedule.
Contractor shall carry out Environmental Impact Assessment (EIA) study as part of the project.
As the part of EIA, scoping study, population assessment around the pipeline / GSS and safe to
lay the pipeline around these areas to be carried out. The Contractor shall engage the services
The Contractor shall be deemed to have accepted the Company’s documentation as listed in
Document C-6 and shall be responsible for all aspects for complying with Scope of Work
The Work comprises all actions and operations necessary and required in and for the verification
and where necessary, removal of any ‘Holds’ in the Company Documents as appropriate and
amendment of the design provided by the Company, and for the completion of the design,
engineering, procurement, construction, testing, pre-commissioning, commissioning and
guarantee run of the Project along with related facilities, training of Company’s personnel and
performance of all other obligations of the Contractor under this Contract.
The activities and description of the Work included in the following articles of this document shall
be considered representative of the Contractor's Scope of Work. It shall be the Contractor's
responsibility to ensure that all necessary activities are identified, planned for and executed.
The Contractor shall carry out the Work in accordance with sound engineering practice and shall
comply with all Contract requirements. The Contractor shall utilize company approved qualified
and experienced Contractor Personnel in carrying out the Work. All activities shall be carried out
by Company approved suppliers, vendors and Contractors.
The Contractor’s Scope as further defined in these Contract Documents generally covers
provision and Installation of the Project and all its associated facilities as highlighted in this scope
of work C-4.
4.1 General
The Contractor shall perform all detail design and engineering services necessary for the work.
Contractor shall be responsible for verifying and completing the work based on the information
contained in the FEED package provided by Company and additional requirements/scope spelt
out by the Company under C-4.
The contractor shall verify all the submitted drawings within the package available in the C-6 and
as built all the existing drawings (existing facilities) related to the scope of the project and for the
entire station, which include civil, piping, process electrical and instrumentation.
The Contractor shall be responsible for ensuring that the Detail Design Engineering shall enable
to set up the completed fully functional facility satisfying the requirements of all specifications,
standards and performance parameters covered in this Contract and achieve complete integration
with other facilities located outside the battery limits of the plant.
Contractor shall ensure that multi-discipline input is provided as necessary throughout the Work.
The Contractor shall also be responsible for implementing all recommendations from all studies
and reviews. Detailed drawings and documents shall be developed in accordance with the
functional requirements as described in Documents C-4 and C-6.
The Contractor shall be responsible for compliance to the Company contract, specifications,
procedures, guidelines and applicable standards and codes. In the event of any discrepancy, the
more stringent requirement shall be binding on the Contractor. Company’s decision on this shall
be final and binding.
9. Simulation Report including Design Cases, Equipment sizing basis and Heat and Material
Balances.
10. Hydraulics report (Steady State & Transient Analysis)
11. Vent Study Report.
12. Tie-In Philosophy and Battery Limit Table.
13. Material Selection Report
14. Single Line Diagram
15. Control building equipment layout
16. Instrumentation, RTUs, Telecommunication System architecture drawing
17. Any other relevant deliverables not listed above.
The Contractor shall provide the Facilitator and Secretary for the design review, which shall be
attended by the Contractor’s and specific equipment Vendor’s Key personnel for the design along
with Company representatives.
Contractor shall show the design review on the project schedule and shall confirm the dates to
the Company with a minimum of 21 calendar days in advance. Contractor shall issue a Design
Review information pack 10 working days in advance to all participants. The Contractor shall
submit earlier revision of the documents required for the Design Review at least four working
weeks prior to Design Review including the electronic simulations and equipment sizing
calculations.
Contractor shall produce the Design Review report, and shall be responsible for all Design Review
follow-up work and all recommendations of the design review shall be implemented without any
cost and schedule variations. The Contractor shall produce a close-out report with individual
close-out sheets and supporting documents to demonstrate that all design review action points
have been closed out to Company’s satisfaction, and endorsed by Company
All Design Review actions shall be incorporated into the design prior to the HAZOP review. The
Design Review shall be conducted in a 4 star hotel conference room and shall accommodate
about 15 persons with all necessary equipment and arrangement of lunch and snacks for
attendees.
Appointment of HAZOP leader is the responsibility of the Contractor. The leader for HAZOP shall
have 15 years’ experience as process conceptual engineer in upstream oil and gas business and
conducted engineering reviews with an approved certification to conduct HAZOP review and shall
be from a third-party company.
Contractor to note that HAZOP shall be carried out as per relevant PDO/OGC and SHELL
standards by Company approved leaders and secretaries only. The HAZOP shall be conducted
in 4 star hotel conference room and shall accommodate about 15 persons with all necessary
equipment and arrangement of lunch and snacks for attendees.
Contractor shall agree with Company for number of days to conduct HAZOP study.
No positive variations in the scope shall be considered by the Company due to implementation of
Design Reviews and HAZOP findings and recommendations in the detail design during Project
execution.
The Contractor shall carry out a detailed Engineering HAZOP review in accordance with PR-1696
and EP-95-0313. The Contractor shall meet the following requirements and shall issue the
following documents, as a minimum, before carrying out the HAZOP review:
1. Basis of Design Report
2. Design Review Close-out Report with all recommendations from Design Review and
Material Selection incorporated in the drawings and documents, and recommendations
closed out to Company’s satisfaction
3. PFS’s/UFS’s & PSFS’s/USFS’s including Process and Utility H&M Balances.
4. Philosophies including Operating, Control & Safeguarding, Maintenance and Start-up &
Shutdown philosophies.
5. PEFS’s/UEFS’s.
6. Process Safeguarding Memoranda.
7. Control Narrative.
8. Line lists.
9. Plot Plans & Equipment Layouts.
10. Hazardous Area Classification drawings.
11. Material Selection Report.
12. Cause and Effects Diagrams, showing all the alarms and trip logics as well as the
equipment’s and plant shutdown details
13. Legend Details
14. Tie-in Philosophy
15. Simulation Report.
16. Facilities and spur line Hydraulic Report (Steady State & Transient).
17. Final vent Study report including hydraulics, dispersion calculations & Equipment/Piping
MDMT Wall temperature calculations. Vent study shall consider simultaneous opening of
multiple vent globe valves scenarios in the pig launcher and in the pig receiver to address
the requirements specified in the FEED HAZOP Closeout actions 1.01 and 1.02
respectively.
18. Process data sheets with sizing calculations included.
19. Preliminary Fire and Gas Detection Layout
20. Calculations of all relief valves.
21. Interconnection Diagrams and existing PEFS
22. If there is a significant risk to third parties from fire and explosion or pollution then other
information also are required such as:
• Local population densities and infrastructure
• Areas of any particular importance
Contractor shall show the HAZOP review on the project schedule and shall confirm the dates to
the Company with a minimum of 21 calendar days in advance. Contractor shall issue a HAZOP
information pack 10 working days in advance to all participants.
The Contractor shall submit earlier revision of the documents required for the HAZOP at least six
working weeks prior to HAZOP including the electronic simulations and equipment sizing
calculations
Contractor shall produce the HAZOP Review report, and shall be responsible for all HAZOP
follow-up work and all recommendations of the HAZOP review shall be implemented and closed
out for the project without any cost and schedule variations for the Company. The Contractor shall
produce a close-out report with individual closeout sheets and supporting documents to
demonstrate that all HAZOP review action points have been closed out to Company’s satisfaction,
and endorsed by Company.
IPF/SIL info Pack and distribute to the team two weeks prior to start date. The IPF/SIL Info pack
shall contain PEFS, C&E diagrams, Control & Safeguarding Philosophy, Control and
Safeguarding narratives, Safeguarding memorandum and IPF Function list.
The Contractor shall ensure the following activities and documents are completed prior to the IPF
review:
a) IPF Function List
b) Prepare Production Loss Equation (PLE's) for each unit
c) Assign tag to Cause and Effect blocks
d) Enter all IPF's (as described in the narratives) into RRM-IPF tool
e) Enter all drawings details (Rev, date, title etc.)
f) Develop an IPF basis and consequences document which includes all necessary
information for the IPF such as Revenue loss and Equipment loss, Manning and
maintenance levels, Venting and flaring policies, etc. This shall be agreed with the
Company 10 working days prior to the IPF review.
Contractor shall supply RRM-IPF Tool software, IPF facilitator, IPF secretary, project engineers,
and discipline engineers)
A proper implementation plan and close out procedures to be followed as per GU-437.
Implementation /Close out of IPF/SIL Recommendations are deemed to be included in the scope
of the Contractor.
No positive variations in the scope shall be considered by the Company due to implementation of
Design Reviews and HAZOP findings and recommendations in the detail design during Project
execution.
Prior to the IPF Review, the Contractor, as a minimum, shall have completed the following:
a) Approval of IPF/SIL Procedure
b) All recommendations from Company approved HAZOP closeout report and incorporated
into the design
c) Final Control and Safeguarding Narratives
d) Final Plant Cause and Effects diagrams
4.3.4 Environmental Impact Assessment (EIA)
The Company has not carried out the EIA/EIS. Contractor shall prepare the scope of work based
on the project requirements for executing the EIA study which shall be approved by the Company.
The Contractor shall approach Company’s approved list of vendors (Contractors) to execute the
study. Contractor shall provide Company with TBE of received bids for Company’s approval. The
scope shall also include obtaining the Environmental Permit (No Objection Certificate from
MECA). The Contractor shall be fully responsible for renewal of the Environmental Permit from
MECA during the execution of the project. GU-195, 195 and SP-1211 and GMT-HSE-L3-324
requirements shall be complied.
The Contractor shall implement all the requirements and recommendation of the EIA/EIS together
with all necessary changes in requirements, which may arise out of the MECA approval, and issue
of the No Objection Certificate. Such changes shall not form the basis of a Variation (Cost &
Schedule) to the Contract.
4.3.5 Quantitative Risk Analysis (QRA)
The Company has not carried QRA during FEED Stage. Contractor shall submit requisition for
QRA study in accordance to the requirements and guidelines stipulated in QRA EP 95-0352 and
SP-1248 and other relevant International Standards (e.g. IGEM/TD/2) for Company approval. The
final QRA scope of work prepared by the Contractor shall be approved by the Company. The
Contractor shall approach Company’s approved list of vendors (Contractors) to execute the QRA
study. Contractor shall provide Company with TBE of minimum three bids for Company’s
approval. The requisition shall describe but not limited to the followings:
o Scope of Work Schedule
o Service Agreement
o Technical Bid
o Submission of Quotation
o Bid Closing Date
o List of attachments
The Contactor/Company approved sub-Contractor shall conduct QRA as a part of scope of work
during detail design and engineering for the Shafa GSS plot plan and the entire facility including
customer side plot.
The Contractor shall determine the “High Consequence Area” for the whole scope of the project
during the QRA Study which will be carried out by the appointed sub-Contractor during EPC
execution of the project.
A QRA (Quantitative Risk Analysis) Report shall be submitted for Company approval and all
recommendations actions resulting from the report shall be implemented by Contractor without
any extra cost to Company, no variation is acceptable in this regard. If implementation of QRA
recommendation is not practical, the Contractor shall perform ALARP demonstration to prove that
the risk identified is mitigated.
GSS approach area shall also be thoroughly reviewed. Routing constructability review shall be
based on final pipeline layout drawings such as Overall route map, Alignment sheet, Station
approach and Typical construction drawing.
Constructability review to be conducted for on plot area wherein the aspects in the constructability
section of DEP 80.00.10.11 shall be covered.
1) Verification of all the data given in the FEED package submitted with the Contract with
reference to process design and develop all new documents and drawings during the
course of detailed design up to and including “As Built” stage.
2) Project basis of design including all disciplines
3) Process and Utility Flow Schemes (PFS & UFS)
4) Process and utility heat and material/mass balances
5) Process and Utility Engineering Flow Schemes (piping & instrument diagrams) (PEFS &
UEFS)
6) Line List and line sizing report
7) Hazardous Area Classification drawings (to be approved by Senior Technical Safety).
8) Battery Limit Tables and Tie-in Schedules for all process/piping/pipeline/utilities required
for the Work.
9) Process simulation modeling and simulation report.
10) Hydraulic analysis and Report (Both Steady State & Transient).
11) Vent study and report.
12) Performing Vent and Blow-down calculations to determine minimum design metal
temperature.
13) Producing and developing Safeguarding Memorandum and Process Safeguarding Flow
Schemes (PSFS).
14) Utility Calculations and studies including Instrument gas & Water supply system and
producing utility detailed report
15) Operating, Control & Safeguarding Philosophy.
16) Start-up and Shutdown Philosophy.
17) Maintenance Philosophy.
18) Control Narrative.
19) Safeguarding Narrative.
20) Start-up and Shutdown Narrative.
21) Design Philosophy
22) Blowdown, Venting and Shutdown Philosophy. Safeguarding Memorandum and Process
& Utility Safeguarding Flow Schemes (PSFS, USFS).
23) Producing and developing Process Equipment data sheets
24) Producing and developing of Detailed Equipment and Facilities Basis of Design.
25) Producing and developing all modes of Operation.
26) Preparation, review and validation of Interface and Battery Limit Tables and tie-in
schedules and PEFS for all process/piping/utility units and lines.
27) Performing entire on plot and off plot facilities Transient simulation.
28) Performing Relief Valve, Control Valve and Instrumentation Calculations and Datasheets
29) Producing and developing Design Book and Engineering Operating Reference Document
(EORD).
30) Attending and participating in all reviews as defined in this document.
31) Preparing Design Review Report and Close-out report
32) Preparing HAZOP Report and Close out Report
33) Preparing Operating and Maintenance Manual.
34) Check adequacy of all utilities and provide adequate quantity if needed without any
variation to the project cost.
35) Confirm the alarm setting of all instruments as part of the scope.
Contractor shall perform process simulations and hydraulic studies for all required cases.
Contractor shall take full responsibility for the process design of all facilities.
It is the Contractor’s responsibility to obtain the software packages, licenses and all necessary
training. Contractor shall use UNISIM to perform the steady state process simulations which shall
also include the entire facilities The Contractor shall verify all vendor information. It is the
responsibility of the Contractor to acquire all software licenses deemed necessary to perform the
work.
Contractor shall update the process simulation models to reflect actual vendor data and plant
operation modes for the various design cases. The simulation models shall be made available to
Company on a flash disk in the original native file format in which they have been produced, and
6 months prior to Commissioning.
As a minimum the model shall include sensitivity on equipment sizing and pressure drop. The
report shall include the basis for the simulation work, equipment efficiencies, detail of vessel and
equipment sizing. The detailed calculations and models for pressure drop through the plant shall
be provided separately.
To cater for inlet composition uncertainties, the facilities shall be designed to handle a range of
inlet compositions and the entire flow range profile as defined in the basis of design.
The Contractor shall perform all process simulations (steady state, transient and dynamic)
necessary to specify the plant taking full account of the range of inlet stream parameters, new
stream specifications and ambient conditions provided in basis of design document. The number
of design cases shall be agreed with Company to cover all uncertainties. A table shall be made
by the Contractor summarizing all design cases to ensure a robust design over the 25 year
lifespan. The table shall show the equipment sizes for each case. Governing Design Cases shall
be selected by the Contractor (subject to approval by Company) after analysis of the relevant
process sensitivities. A Governing Design Case is one that governs the size of at least one piece
of major equipment.
Although the basis of design document outlines a range of inlet pressures and compositions, in
order to determine the Governing Design Cases, the Contractor shall be responsible for proposing
other cases, if required, to find the actual Governing Design Cases. For example, cases shall be
proposed by Contractor to handle start-up and shutdown scenarios along with transient analyses.
Heat and material balances shall be included with the PFS for all the design cases. The Contractor
shall define each of the cases which govern the sizing of one or more pieces of major equipment.
In addition, a heat and material balance shall be provided based on typical operating conditions
for operator reference. The heat and material balance shall include a line identification tag and
description, mass & actual/standard volumetric, molar flow rates and composition breakdown for
total and each phase, velocity, vapor fraction, molecular weight/compressibility/ density/ viscosity
for each of the phase, Cp/Cv, operating temperature, operating pressure, heat flow, and water
content.
Contractor shall prepare a report documenting the development of the simulation models, all the
cases analyzed, basis and sensitivities of data/correlations/ thermodynamic packages, governing
design cases, selection of equipment design cases, data sources, and vendor performance data.
The report shall be reviewed and available with the electronic models a minimum of four (04)
working weeks prior to the Design Review.
The Contractor shall use PIPESIM software (latest edition) and TG Net software (latest edition).
The scope of the studies shall include rigorous pressure drop and hydraulic calculations with all
equipment including piping, pipeline, valves and fittings.
Heat and material/mass balances shall be produced and included with the PFS/UFS for all
operating modes, and design cases. Each of the cases governs the sizing of one or more pieces
of major equipment and summer and Winter Cases. In addition, heat and material/mass balances
shall be provided based on typical operating conditions for operator reference.
All PFSs, UFSs, PSFSs, USFSs, PEFSs and UEFSs shall be in accordance with company
standards (DEP.01.00.02.11). All PFSs/UFSs shall include a diamond on each line indicating all
process conditions highlighted previously. All drawings shall be reviewed and made available
minimum 4 weeks prior to the Design and HAZOP Reviews for Company comments.
All vents from solenoid, quick exhaust valves, control valve positioners shall be tubed to safe
location (min 3 m height above grade) and reflected on Hazardous Area Classification drawings.
Contractor shall perform vent and blow-down studies and develop a report which shall form a
single reference source for all information related to the design of the vent system. The report
shall include, but not be limited to the following sections:
1. Study Objectives.
2. Summary, conclusions and recommendations.
3. Vent System description.
4. Basis for Design:
i. Basic Process data
v. Update the vent loads and summarize them in the process utility flow schemes of the
vent system.
contractor shall ensure adequate mitigation measure against hot water splash. ALARP shall be
demonstrated by the contractor for the above scenario.
The sizing of equipment shall be as per Contract document C-6. All calculations and process data
sheets shall be provided with the original native electronic spreadsheet, which shall be provided
to the Company for review a minimum of 4 working weeks prior to the Design Review.
i. Operational Flexibility
ii. Venting/Depressurization Philosophy
iii. Modes of Operation
iv. Maintenance Philosophy
v. Isolation Philosophy
vi. Draining Philosophy
vii. Purging Philosophy
viii. Shutdown Philosophy
ix. Safeguarding Philosophy
x. Start Up Philosophy including pressurization
xi. Sampling
xii. Monitoring
xiii. Operating procedure during low inlet Temperature (less than 22 ºC)
The document shall be reviewed and made available a minimum of four (04) working weeks prior
to the Design Review.
The Design of all Plant Facilities, and other associated facilities shall conform to the Company’s
philosophy on sparing, accessibility of equipment, maximum availability and protection systems.
Contractor shall consider isolation valves in vent and drain headers for easy facilitation of
sampling collection operation.
Shutdown requirement shall be identified and analyzed in the initial stage of the project. Partial
shutdown shall be initially agreed with company and necessary actions shall be taken.
Contractor shall prepare, review, update and Start-Up and Shutdown philosophies and detailed
sequences including charts for the entire facility. The document shall be reviewed and made
available a minimum of 4 working weeks prior to the Design Review. The final document shall
include detailed sequences. The document shall be finalized before AFC
4.5.1 General
The Contractor shall verify the FEED and carry out detailed Mechanical/Piping design based on
the FEED documentation and associated specifications and standards.
The Company as a part of the FEED has identified the location of all the new equipment, the
contractor shall verify the size and location of the new equipment with respect to the plot. The
Contractor shall prepare the final Plot Plan in conjunction with Hazardous Area Classification and
QRA recommendations.
1) Verify all the data given in the FEED, with reference to Mechanical/Piping design and update
all documents.
2) Verify and Prepare new specifications, datasheets and requisition for Company approval for
all the mechanical items and equipment including valves, bulk piping items, fittings, flanges,
gaskets, bolts & nuts, and specialty items and packages.
3) Sizing and basic design of static equipment and packages, preparation of data sheets,
specifications and requisitions for materials including scope of supply, interfaces, design
requirements w.r.t. mechanical, electrical and instrumentation related scope, testing,
inspection requirements, installation and commissioning requirements, packing and shipping
29) Review, check and approve vendor equipment / piping and technical documentation and
information to verify compliance with project specifications, codes, standards, and ensure
consistence with interface, design, safety and operability requirements.
30) Producing and developing Commissioning and Operating Manuals.
31) Performing and developing mechanical handling studies and procedures for maintenance
activities.
The Contractor shall also be responsible for compliance to the Company Specifications,
procedures, guidelines, and applicable Codes and Standards. In the event of any ambiguity the
more stringent requirement shall be applied and included on the Contractor scope. Company’s
decision shall be final and binding.
The compliance by Contractor to C-4 and C-6 on specification and the general document format
and numbering is mandatory.
Contractor may use the general format and content of these specifications as general format for
preparing requisitions for other equipment.
The Contractor shall ensure that all Materials (piping, valves, equipment, facilities etc.) shall be
designed and suitable for “sour” service in accordance with SP-2041 and NACE MR-01-75/ ISO
15156.
Piping shall be designed, constructed and tested in accordance with the latest edition of ASME
B31.3 (including addenda) in compliance with DEP 31.38.01.11-Gen, other relevant DEP/PDO
Standards, and all piping specifications/standard drawings referenced elsewhere in the Contract.
Tie in schedule shall be produced for all process and mechanical tie in which shall be in line to
the PEFS, tie in shutdown philosophy, site visit observation etc.
Material of piping, piping components and valves shall be selected in line with shell DEP piping
classes.
All piping Components shall be selected from the applicable piping classes. The use of special
materials and/or piping components not included in the piping classes shall be minimized,
selected materials in accordance with the applicable piping classes shall be used wherever
possible to avoid unnecessary effort during engineering, purchasing, construction, shipping and
storage of piping components.
During detailed design, the Contractor shall verify, update the piping classes indicated in the
PEFSs and select piping classes accordingly. Where a particular piping class with respect to
material selection, temperature, pressure, size or any other parameters are not covered, or
wherever changes are required to the piping classes, Contractor shall modify the piping classes
or generate new piping classes for Company approval / acceptance. All piping classes shall
clearly indicate the additional mandatory requirements, testing and restrictions as per the relevant
MESC description. It is Contractor’s responsibility to obtain the MESC descriptions. Flange
insulating kits shall be provided in case of connecting dissimilar material flange connections
including mono flange valves. The bolt torqueing and tensioning shall be done as per SP-2020.
Any new or modified piping class shall be approved by the Company. As a general rule, non-
MESC components / materials, where needed, shall be in the same lines as similar MESC
components / materials. Non-MESC components, special parts etc. materials requisition shall be
forwarded to the Company for review and approval. For procurement of piping items MESC
systems shall be followed. Procurement of all items shall be from latest PDO AVME list / Company
approved vendors.
Valve design shall meet the latest revision of SP-2154 requirements and OGC standard. If the
seal material specified in the requisition as thermoplastic, it shall be of Lip seal type for ball valves.
On plot Ball Valves shall comply additional technical requirements mentioned in the OGC
document GME-ENG-L2-203-R0.
Plot Plan prepared during FEED is preliminary and needs further detailing. Contractor shall verify,
develop and update the Plot Plan, Equipment Layout and Piping General Arrangement with
respect to requirements of Company, design review, QRA study and recommendations,
operation, maintenance, safety, final piping tie in locations, plant wind direction, access
requirements, piping studies, hazardous area classification, as-building based on site visit etc.
General design requirements are included in Contract Documents. Overall responsibility of
developing and finalizing the Plot Plan and further equipment layouts lies totally with the
Contractor subject to final approval of the Company.
The layouts shall be supported by the results of the QRA study, reviewed and approved by the
Company, and all company comments and requirements included and addressed. The layout of
plant equipment and facilities shall meet or exceed the requirements of SP-1127, DEP
80.00.10.11-Gen, QRA recommendations and the additional requirements specified in Contract
Documents.
The design of Piping General Arrangement shall take following features into consideration:
a) Adding as built information based on site visit information.
b) The pipe track / sleeper minimum height shall be 300mm above grade.
c) The pipe track/ sleeper/ pipe rack shall be designed with 30% extra space for future additions.
d) The pipe routing shall not cause hindrance for future expansion and works as well as
demolition scope.
e) Crossovers, Access Platforms, local gantry shall be provided for access and maintenance of
valves and instruments. It is the Contractor’s responsibility to provide access, gantry wherever
required. Detail operation and maintenance access review to be conducted during EPC.
These shall be indicated in plot plans and piping layouts.
f) Pipe routing shall be finalized as part of detail design based on final vendor drawings and
consideration to satisfying nozzle loading, Piping stress analysis, access for operation /
maintenance and component removal.
g) Process / Hydro-test Vents and drains for locked in sections shall be provided.
h) The Plot Plan, Piping General Arrangement and the entire facility is to be designed in such a
way that any additions to the new facility shall be done without any minor or major shut down.
The facility shall be constructed in such a way that the future expansion construction work is
not hampered. Contractor to note that all the common facilities including but not limited to
drain, vent, pipe tracks, drain channels, drain pits, control room, electrical and instrumentation
shall be designed to handle fully rated design capacity of the facilities.
i) Metallic / GRE piping interface shall be protected by four pole barricade.
4.5.9 Access
The Contractor shall Engineer all facilities such that all equipment, valves, and instruments are
accessible for operations and maintenance. Access platforms shall be provided for all items of
locally operable or maintainable equipment, which cannot be accessed or maintained from ground
level in a safe manner. Upon Company’s request Contractor to conduct an access &
maintainability review to assess that necessary provisions are made by the Contractor for easy
operations & maintenance. Any recommendations from Company shall not be construed as
variation.
Contractor shall ensure detection of any existing facilities prior to excavation of trench to avoid
any damage to the existing facilities. Any damage to the existing facilities and necessary
rectification/repair shall be undertaken by the Contractor immediately at the Contractor’s
expense/cost to the satisfaction of the authorities.
to 5. Internal and external coating and painting for equipment shall be based on relevant
datasheet.
SS components shall be painted based on requirements of SP-1246 and SP-2161.
iv. The records shall describe bore log details with SPT ‘N’ values at each 1.0m depth
increment, each change of stratum and ground water level.
v. Contractor shall check boreholes location for any underground facilities such as cables
and pipelines by employing cable/metal detector prior to commencement of work.
Demolition of the existing foundations for electric heater foundation, Vessel Foundation,
Launcher Foundation , Pipe Supports, foundation ,sleeper associated with it, and access pit
etc. in the Shafa GSS, and demolition of existing Hard stand for Scraper Launcher and
associated pipe support / and foundation / sleeper and Fence at Shafa spur line.
Adequacy of existing sleepers/pipe supports and existing foundations shall be checked before
reusing it.
Contractor has to identify if existing fence and fence post that are effected due to flooding,
demolition of affected fence and re-construction of the fence.
All excavation, backfill, compaction removal of surplus material from the site and making well
and tidying the site on completion etc. shall be in contractor’s scope of works. Excavation and
earthwork shall follow SP-1279 Part C Excavation and Earthworks.
vii. All insert plates and bolts required for steel to concrete connection shall be placed in
the concrete during casting of concrete.
viii. To avoid weakening of the concrete work, use of anchor fasteners shall be avoided.
ix. Foundations for vibrating machines shall be isolated from nearby foundations and shall
be separated from paving.
x. Contractor shall ensure that adequate protection is provided for all concrete surfaces
in contact with the soil. Method and selection of concrete surface shall be in accordance
with SP-1275 and as a minimum Fosroc’s Nitocote PE135 with glass mat in two coats
(400 micron DFT each) shall be applied on top of blinding and all foundation surface up
to 250 mm above grade level. Concrete shall be ready mix from batching plant with
certified mix design and strength test.
xi. All Structural concrete works including slab on grade shall be minimum Grade C35 to
SP-1279, SP-1275 & SP-1282.
xii. All foundations shall be placed on a 50-mm thick blinding layer in concrete Grade C10 to
SP-1279, SP-1275 & SP-1282.
xiii. Reinforcement bars for all concrete works shall be made from hot rolled deformed high
yield bars Grade 460 with a specified characteristic strength of 460 N/mm2.
xiv. Grouting shall be provided below all the structural supports in contact with the concrete
foundations and shall have a minimum compressive strength of 40N/mm2.
x. Tear plates of minimum 8mm thickness shall be used for platforms and trenches.
Gratings used shall be galvanized. All galvanized steel shall have a minimum zinc layer
of 610 g/m2
xi. Design of pipe supports, operating and maintenance platforms, crossovers/walkovers,
etc. shall be as per standards.
xv. Fire dampers shall be provided for the air supply louver to prevent the spread of fire
from the battery room to the adjoining switchgear room.
xvi. All embedded plate items, ladder with cage, sign boards are included in the scope of
work of the building.
xvii. Cage ladder shall be provided for roof access.
xviii. The walkway from the building to the road shall be provided with 1200m wide
interlocking pavement.
xix. The roof shall be waterproofed as per SP-1279-F and UPVC down comers shall be
provided for roof drainage.
xx. RCC cable trenches shall be provide for the electrical room. The connection to the
existing trench inside the control and switchgear building shall be done without
disturbing the existing cables and proper precaution shall be taken not to disturb the
performance and operation of the plant.
xxi. The integration of the extended building and the existing building shall be done
smoothly without disturbing the performance of the plant. The water proofing and
expansion joint for the new extension shall be done ensuring there is no seepage of
water and dust to the inside of the building. The rainwater down comers of the existing
building shall be modified accordingly to prevent any water entering the new
extensions. The slope of the existing building roof shall be modified accordingly to
facilitate the smooth flow of rain water.
xxii. The floor opening in electrical rooms after panel erection shall be covered with 8mm
thick tear plate. The edges of the opening shall be provided with edge angle. Covering
plates shall have lifting facility.
xxiii. For floor, wall and ceiling finishes Contractor shall refer to project drawings & SP-
1279-M
xxiv. Contractor shall ensure that adequate protection is provided for all concrete surfaces
in contact with the soil. Method and selection of concrete surface shall be in
accordance with SP-1275 and as a minimum Fosroc’s Nitocote PE135 with glass mat
in two coats (400 micron DFT each) shall be applied on top of blinding and all
foundation surface up to 250 mm above grade level. Concrete shall be ready mix from
batching plant with certified mix design and strength test.
xxv. All Structural concrete works including slab on grade shall be minimum Grade C35 to
SP-1279, SP-1275 & SP-1282.
xxvi. All foundations shall be placed on a 50-mm thick blinding layer in concrete Grade C10
to SP-1279, SP-1275 & SP-1282.
xxvii. Reinforcement bars for all concrete works shall be made from hot rolled deformed
high yield bars Grade 460 with a specified characteristic strength of 460 N/mm2.
xxviii. Explosion proof and EX type exhaust fans shall be provided for the battery room
xxix. Modification of existing cable trenches inside the control and switchgear room for
erection/ modification of the panels and instruments need to be done by the
Contractor.
xxx. Plinth protection shall be provided for the building with 100mm thick RCC slab and
1000mm wide all around the building.
xxxi. The outdoor units for the air conditions shall be placed on RCC foundation 200mm
thickness.
xxxii. Prefabricates toilet with self-contained water storage tank shall be provided.
xxxiii. Separate septic / holding tank for toilet shall be provided.
4.6.13 Fence
Contractor has to find out effected due to flooding .Effected fence shall be removed or repaired
and new fence shall be insulted such way that flood will not effect. Other fence modification plot
plan shall be followed.
4.6.14 Roads
New graded roads shall be as per plot plan. Latest standard SP & DEP shall be followed.
proposed by the MIV. Contractor shall approach only the MIV’s listed in PDO PGSC List (AVME
# 30.203) for SPEC 200 replacement.
4.7.2 General
Contractor’s scope of work for Instrument Design shall in general be based on the FEED
documents, drawings, specifications, etc. which forms part of this package. Instrument Design
shall be in accordance with relevant Company standards, Codes, Practices, Procedures,
Guidelines and applicable International standards. Scope shall comprise of complete design,
engineering, procurement, fabrication, supply, installation, testing, commissioning and Guarantee
run of various field instrumentation and control system at RIE GSS and SQU GSS. Brief scope of
work is given below and shall not be limited only to the following:
1) Verify all the data/drawings given within the tender documents.
2) Prepare and update all documents during the course of detailed design
3) Provide Detailed Engineering Design, specification, requisition, supply, installation, testing,
commissioning of TÜV SIL-3 certified ICSS system for monitoring, controlling, safeguarding
and Fire & Gas of the process facility. The ICSS to be designed, supplied with the latest
software and all necessary lifetime license, and installed as per the FEED “Main Instrument
Vendor Specification, SP and DEP standards and latest edition.
4) Provide Detailed Engineering Design, specification, requisition, supply, installation, testing,
commissioning of new fully redundant OPC servers and Historical server (server class
hardware and rack type) enabled operating system and based on totally open Microsoft
Windows platform.
5) Provide Detailed Engineering Design, specification, requisition, supply, installation, testing,
commissioning of Fire & Gas detectors (e.g. smoke detectors, sonic leak detectors, open path,
hydrogen detector, siren and beacon) at the entire Shafa process facility including the existing
control building.
6) Provide Detailed Engineering Design, specification, requisition, supply, installation, testing,
commissioning of control building Fire & Gas detectors (e.g. smoke detectors, hydrogen
detector, siren and beacon) at the Shafa GSS control building.
7) Provide Detailed Engineering Design, specification, requisition, supply, installation, testing,
commissioning of a panel mounted MOS/ESD console. MOS/ESD console shall have
switches for individual valve to close and reset push buttons. Test lamp push buttons shall
also be part of the console.
8) Provide Detailed Engineering Design, specification, requisition, supply, installation, testing,
commissioning of One (1) new Operation station, one (1) Engineering Work station in Auxiliary
room and one (1) remote station at MCC for the new ICSS.
9) Provide Detailed Engineering Design, specification, requisition, supply, installation, testing,
commissioning of One IFB panel in switchgear room.
10) Replace of one (1) existing pneumatic positioner in the existing control valve to electrical
positioner.
11) All the signals shall be further transferred to MCC SCADA. Modification of the existing SCADA
(Wonderware ArchestrA) at MCC including software and graphics configuration. This
modification shall be done with coordination from the SCADA approved vendor which will be
advised by company by the time and with Company approved format (graphics and
configuration).
12) All the works related to hook-up of the new field instrumentation, new cables installation from
Junction boxes to control building, commissioning, configuration in ICSS and signals transfer
in MCC SCADA are part of the scope.
13) Provide Detailed Engineering Design, specification, requisition, supply, installation, testing,
commissioning of Fire and gas detectors, the following types shall be considered in the design:
a. Smoke detectors
b. Sonic Leak Detectors
c. Open Path Gas Detectors
d. Beacon
e. Siren
f. F&G detectors shall be hardwired connected to the ICSS control system. Voting logic for
leak detection shall be achieved, 1 detector from each type shall give an alarm.
14) All works related to integration of the PLC with third party equipment, as per system
architecture.
15) Contractor shall conduct the site survey to check the existing system components and system
arrangements and then verify all data given within the existing design documents prior
submission of the new proposed solution.
16) Provide detailed engineering design, specification, requisition, supply, installation of
instrument junction boxes for the new instruments, the method of electrical protection and
certification for field instrumentation shall be EEx’d’ type and the certification authority shall
be ATEX, wherever applicable
17) Provide detailed engineering design, specification, requisition, supply, installation of cables
and bulk materials, as per project requirements.
18) Any other work not mentioned above but required for the satisfactory completion of the work
as per standard engineering practice.
19) After successful transfer of all signals from the new control system to MCC through the
existing telecom cabinet, Contractor shall power off and demolish the SPEC200 control
system & field instruments and transfer it to Fahud store location provided by the Company.
3. Configuration of signals, Graphic display, logics, etc. as required and transfer of signals to
MCC SCADA room for remote control & monitoring.
4. Fire & Gas detection shall be considered as part of the heater package.
5. Vendor drawings / documents review and approval.
6. Complete engineering deliverables package with documents and drawings for procurement,
construction, testing and commissioning activities.
7. Update/As-built all drawings and documentation to reflect the present scope of work for all
related control and automation activities as described herein
8. Management and coordination of tie-in points interfaces
9. Complete engineering deliverables package with documents and drawings for procurement,
construction, testing and commissioning activities.
10. As-built drawings and final handover.
11. FAT and iFAT for ICSS and telecom system.
12. SAT/SIT
13. Pre-commissioning, Commissioning and handover
14. Systems performance test during Guarantee RUN.
4.7.3 Telecommunication
OGC’s Gas Transportation Facilities are continuously monitored (24x7) from the pipeline SCADA
system located in Muscat Control Center. Existing SCADA system is “Wonderware” 2014 R2
version. Shafa GSS are connected to MCC via FO link. This same link shall be utilized to transfer
signals from both locations. All modification work required at MCC in terms of signal configuration,
Graphic display, licenses, etc. shall form part of this project scope.
4.7.6 Deliverables
Control and Automation Engineering Deliverables shall be provided by the Contractor in
accordance with Contract documents and standard SP-1206. Native files of the available master
drawings shall be provided to the successful contractor and it is the contractor’s responsibility to
verify and update the drawings till As-Built stage before final handover. In case of non-availability
of Master Drawing for update, same shall be prepared for project specific scope of work.
The key documents/ drawings; in addition to other mentioned in other section of this Contract, but
not limited to:
4.7.7 Documentations
The following documents shall either be produced or As Built from the existing Shafa GSS
instrument and control system related existing drawings and documents.
The Contractor shall verify the FEED and detail the electrical design for Shafa GSS Scope of work
based on the FEED Documentation and associated specifications. Detailed electrical scope of
work for Supply of Gas to Shafa shall comprise complete design, engineering, procurement,
fabrication, supply, installation, testing and commissioning.
1) Design, supply, installation, testing and commissioning new 415V LV switchboard. 415V
LV switchboard shall be indoor, draw out type, floor mounting and form 4C type of
construction. All the necessary alarms, indication, measurement, graphics and signals
shall be transferred to local DCS and MCC.
2) Design, supply, installation, testing and commissioning new AC UPS power (Minimum 8
KVA, 240VAC Unit, 2x100% static UPS’s units, with distribution boards working individual
as per DEP 33655031) to feed the instrument loads of the proposed GSS at Shafa facility.
The UPS shall have 2x100% rated nickel Cadmium type batteries for 8 hour autonomy
period, dual redundant control circuits, 2x100% redundant chargers and RS 485
communication facilities shall be transferred to local DCS and MCC. All the signals &
alarms shall be as per relevant standards – DEPs / company specifications / IECs, etc.
The UPS distribution board shall have 20% spare feeders for future. UPS output shall be
suitable for solidly neutral earth system.
3) Design, supply, installation, testing and commissioning new gas fired water bath heater
control panel. It shall be 4 stage, each stage 20 KW.
4) Design, supply, installation, testing and commissioning of new Air conditioning DB with
all accessories. It shall be indoor, floor/wall mounting and form 2B type of construction.
DB shall have 2 incomers fed from bus A & B of 415 V switchgear. Incoming feeders shall
be with MCCB’s + ELCB (two incomers with mechanical interlock). A/C incoming &
outgoing feeder shall have facility to trip from fire alarm panel. Air condition units shall
switch on automatically after resetting of fire alarm system as well as upon
resumption/resuming of power supply.
5) Design, supply, installation, testing and commissioning of new lighting & small power DB
with all accessories. It shall be indoor, fixed type, wall mounting and form 2B type of
construction. DB shall have 2 incomers fed from bus A & B of 415 V switchgear. Incoming
feeders shall be provided with MCCB’s (two incomers with mechanical interlock). All
power/convenience socket outlet feeders shall have earth leakage protection.
6) Design, supply, installation, testing and commissioning of new outdoor lighting DB. It shall
be indoor, fixed type, wall mounting and form 2B type of construction with photocell.
Incoming feeder shall be provided with MCCB’s with ELCB.
7) Design, supply, installation, testing and commissioning of new emergency lighting DB. It
shall be indoor, fixed type, wall mounting and form 2B type of construction. Incoming
feeder shall be provided with MCB. Two incomers with interlock and isolating transformer
as common at bus. Incoming supply shall be fed from 240 V AC UPS DB’s.
8) Design, supply, installation, testing and commissioning of A/C split units install in existing
& new control building.
9) Design, supply, installation, testing and commissioning of all low voltage power and
control cables. All existing power and control cables shall be replaced with new cables as
required for this project.
10) The contractor shall be check the adequacy of existing up stream 225A MCCB, if required
to change shall be changed to higher rating, if not required to change it, only replace the
existing cables which are connected between bus bar to 225A MCCB by higher size.
11) Demolition of existing 415V LV switchboard, existing 24V DC UPS, existing lighting
services DB, Window air conditions, heater and all associated cables and batteries.
12) Packing and transport the existing 415V LV switchboard, existing 24V DC UPS, batteries,
existing lighting services DB, window air conditions, heater and all cables; but not limited
to this list to OGC Fahud stores.
13) Existing and New heater graphics shall be upgraded on the existing DCS / MCC.
14) All equipment provided in this project shall be earthed. The existing earth grid of the
station shall be extended with interconnected earth electrodes, new earth pits shall be
provided for the instrument clean and safety earth. Minimum 15 mtrs. Deep copper
electrodes shall be considered.
15) Any other work not mentioned above but required for the satisfactory completion of the
work as per standard engineering practice shall be part of Contractor scope of work.
16) Lightning protection shall be provided as per IEC 62305/ DEP 33.64.10.10-Gen.
17) Requisitions for all electrical long lead equipment’s / materials.
4.8.1 CALCULATIONS
The Contractor shall prepare all calculations required for the Engineering, Procurement and
Construction of the Work and shall incorporate the results of such calculations in the Design.
Such calculations shall not be limited to:
• Earthing calculation.
• Lightning protection.
• Cable sizing.
The Contractor shall use design methods, procedures and formulae in accordance with good
engineering practice and industry norms. The Contractor shall provide sources, references or
bases for all calculations.
The Contractor shall produce a Design Data Book containing all design calculations and computer
print outs. The Contractor shall submit the Design Data Book to the Company within 30 days of
completion of Detailed Design phase of work.
Following Detailed Design, the Contractor shall amend the Design Data Book; clearly marking all
revisions, with the additional calculations carried out during the reminder of the Contract and
submits the amended Design Data Book to the Company as a part of the ‘As Built’ documentation.
4.9.3 Pipeline Project Description for New 6” Spur line installation from Shafa zero point
launcher station to Shafa PRT.
New 6” Spurline from Pig launcher (A-5260) to Pig receiver (A-5261) shall be installed
under this project scope along with necessary tie-in. This new Spur line will be laid
adjacent to the existing 6” shafa gas spurline. The 6”x 4.4 Km (approx.) proposed Spurline
shall be provided with a new Pig Launcher and a Pig Receiver.
To facilitate the pigging operation, Non-Intrusive pig signalers shall be provided both at
the pig launcher and receiver ends and at the inlet and outlet of each of the BVS Stations.
The Pipeline shall be protected with cathodic protection systems (Impressed Current)
along with appropriate external coatings for corrosion. During normal operation, corrosion
monitoring will be done by utilizing corrosion coupons provided in a corrosion monitoring
pit/at the upstream/downstream above ground piping portion. The pipeline shall also be
protected at all road crossings and wadi crossings as per the Owner/PDO Standard
specifications and attached drawings.
Shafa existing 6”
CS buried Spurline
Shafa PRT
(Exist. Spurline receiver location)
Proposed spur line shall be installed adjacent to this existing pipeline retaining a minimum
clearance of 5 meters on access road side in off-plot area and 5 meters adjacent to
existing pipeline on the other side of access road at station approach there by utilizing the
existing pipeline access road and corridor. Rock blasting requirement if any along the
proposed pipeline route shall be further assessed and agreed with Company integrity team
during detail design due to the existing pipeline integrity issue.
The Contractor shall perform the entire Scope of Work, which includes Detailed Design,
Procurement, Fabrication, Inspection & Testing, Packing for shipment, transit insurance,
delivery to site, unloading at site, storage at site, complete Erection and Installation,
Cathodic Protection, Painting, Site testing, Pre-commissioning and Commissioning,
Performance Test, Training of Company staff and handover of the project in full
compliance with the Contract documents.
The work shall include but not be limited to:
• Preparation of all Engineering and Design documents including calculations, specifications,
requisitions, reports, analysis to carry out the work in accordance with Company FEED
documents and project requirements.
• Preparation of all Engineering drawings including construction drawings, demolition drawings,
hydro test drawings, typical drawings, isometrics, sketches, alignment sheets, route maps,
key maps, station approach, marker details, Tie-in schedule etc.
• Hydro testing including supplying and disposal of water with all the associated activities. No
hydro testing shall start without the written approval of hydro testing procedure by Company.
The time of hydrotest water presence in the pipeline shall be clearly documented, controlled
and approved by Company. Hydrotest shall start within one month after introducing the
hydrotest fluid in the pipeline and hydrotest fluid shall be evacuated out of the system and
dried within one month after completion of the hydrotest. The quality of the hydrotest
water/fluid shall be reviewed and approved by the Company. Contractor scope includes all
permits required for sourcing and disposal of hydrotested water.
• Pre-commissioning and commissioning of the pipeline and associated facilities.
• Development of integrity management plans/programs.
• All calculations as per the project requirements.
• All materials shall be supplied and utilized as per Company approved vendors list.
• ROW construction requirement shall be as per SP-1211 and SP-1208.
The Contractor shall ensure that all Materials of all wetted process components (i.e. piping,
pipeline, valves, facilities etc.) shall be designed and suitable for “sour” service in accordance with
SP-2041 and NACE MR-01-75/ ISO 15156.
HIC & SSC tests are mandatory in compliance with the requirements of ISO 15156 & SP 2041.
Contractor shall submit all material/ test certificates/ details prior to any work for Company review
and approval. Any non-approved material shall not be used for the project. Company shall have
the right to inspect the materials if required.
Care shall be taken in the selection and installation of materials and components to minimize the
effects of dissimilar metal corrosion. All pipeline fittings, nuts, bolts and gasket etc. shall be
compatible and match with the pipe material and grade. Insulating kits shall be used in case of
connecting dissimilar materials/metals.
Short buried sections of above ground pipeline/ piping and all underground metallic pipes
including GI pipes (e.g. road crossings, sections likely to be covered by blown sand etc.), shall be
externally protected by using Anti-Corrosion PVC wrapping ( For external corrosion protection)
such as ‘STOPAQ’ wrap tape or company approved equivalent.
Neoprene or any non-metallic sheet shall be provided between the piping and the supports as per
Good Industry Practice.
All isolation ball valves of 4” and higher size shall be provided with sealant injection/ greasing,
cavity and drain points for seat and stem along with necessary fittings and valves. Sealant lines
shall have provisions for sealant injection under full line pressure. Sealant injection line shall have
two valves i.e. one ball valve & one check valve (NRV).
The valve size 12” and higher shall be provided with cavity vent and drain piping with isolation
flanged ball valve with blind flange. The vent and drain connection piping shall be fully welded
into the body, treading fittings shall not be allowed. The drain piping shall be sloped toward the
isolation valve to prevent liquid accumulation within the drain piping.
All above ground valves shall be flanged type and all buried valves shall be welded type with pup
pieces at both side.
Contractor shall submit to the Company for review the technical bid evaluation reports before
placing the purchase order. The Company personnel shall attend in all the procurement Kick Off
meeting. Existing 6” CS buried spur line and associated pig trap facilities having integrity issues
shall be demolished only after successful commissioning and startup of new 6” CS buried
spurline/pig trap system and decommissioning of the existing 6” CS buried pipeline system and
free it from gas.
Pipeline location class shall be evaluated with respect to the latest developments complying
ASME B31.8 code requirement and accordingly the design factor shall be finalized by the
Contractor during detail design. Wall thickness shall be assessed based on this requirement and
all engineering deliverables shall be updated to reflect the same. Irrespective of detail design
calculations, a minimum of 5.6mm pipeline wall thickness (as per GME-IM-L2-222-R0) shall be
considered with no negative tolerance on this value during line pipe manufacturing. In case
Pipeline wall thickness is derived to be higher than 5.6mm as per detail design calculation,
Contractor shall make all necessary changes/procurement accordingly with no extra cost impact
to the Company. Pipeline shall be designed with a minimum corrosion allowance of 1mm.
ROW working strip details shall be clearly identified in the typical construction drawings with
project specific information. Contractor to start the pipeline route designing activities after
collecting as-built information’s along the proposed pipeline route. Pipeline size to be reconfirmed
after process hydraulic study during DD. Elastic bending if used for direction change shall be
design validated in line with ASME B31.8 and SP-1211 requirements and shall pass in stress
analysis. Elastic bending exposure during stringing/lowering and road crossing by HDD/micro-
tunneling/Auger boring shall be evaluated in compliance to minimum requirements as per
Company code of practice GME-IM-L2-222-R0 and relevant code/standards. Typical construction
drawing shall consist of custom made working strip drawings suitable according to the project
requirements.
The area shall be graded and leveled to the satisfaction of Owner in line with SP-1211 and SP-
1208 requirements. Grading and leveling of the working strip shall be carried out prior to trenching
operation. In hilly, mountainous and wadi areas the grading and leveling of the area shall be
carried out for at least 10 meters distance on either side of the pipeline. These details shall be
updated in the alignment sheets. However the Contractor may review the route and finalize the
most economical route option. Existing barriers & markers if any shall be reinstated & relocated
suitably.
The inspection road shall be continuous and adjacent along the pipeline route. The inspection
road shall be constructed in such a way that no steep slopes are present and better visibility is
maintained for the drivers heading each other with the provision of dividers and warning
boards/signs/lights etc. Spur line routing along steep sloping location shall be secured and
stabilized as per SP-1208 requirements. ROW shall be constructed as per SP-1211 and SP-1208
requirement. Prevalent wind direction shall be studied and incorporated in the necessary drawings
during detail design. Contractor shall consider the pipeline actual length from the route map
drawing attached in the C6 with necessary inclusion of all contingency.
Contractor shall submit for Company approval details of each and any proposed re-route for the
Pipeline. All work associated with identifying, managing and implementing such re-routing shall
be deemed to be included in the Scope of Work.
Final detailed pipeline route survey scope of work shall be prepared by the Contractor & approved
by the Owner.
Contractor shall generate new pipeline alignment drawings for the entire surveyed pipeline route
indicating all the information as per FEED requirements in Owner’s standard editable format in
AutoCAD compatible version. The required information shall be shown in the alignment sheet
drawings with terrain and wadi crossing detail information as a minimum. Survey covered for the
50 meters ROW shall include contour mapping in a separate layer for 100 meters with 50 meters
on both sides from the pipeline Centre line covering details of all the existing/planned facilities
within this 100 meters.
Contractor shall conduct a field survey, place offset stakes for Construction reference, establish
and maintain benchmarks and any other activity required for the Works.
Contractor shall check and verify that coordinates of civil, piping, plot plan, isometrics and layout
drawings are consistent before any construction work. The Wadi crosses & other major road &
highway crossing drawings shall also be indicated in the separate crossing drawing.
Pipeline station approach drawings (scale 1:500 or to better scale) shall show the centreline of
the Pipeline approaching the station and shall show the actual location of the surveyed route
marker posts, location for change in the wall thickness of the Pipeline, the bend type and details,
Pipeline route within the station including presence of any existing facility along the route and
diversion / approach of the Pipeline inspection road.
4.9.12 Crossings
The Contractor shall Engineer and locate all crossings including tarmac and graded road
crossings, existing facilities crossings (cable, pipeline etc.), wadi crossings, falaj crossings, sand
dune crossings, rain/storm water drainage channel crossing, subka crossing, marshy area
crossing and overhead line crossings etc.
All permits and authorizations required for carrying out construction and design of the crossings
shall be part of the Scope of work. Any additional requirements requested by the authorities for
crossing their facilities shall not form basis for the Variation to the Contract.
The road crossings shall be designed as per SP-1211, SP-1208, API RP 1102 and Company
standard drawings for the worst possible design case and worst loading condition shall be
followed for Construction. The method of Construction for such crossings shall be approved by
the Company and the local authorities. Actual crossing angles shall be evaluated while performing
road crossing check calculation to confirm API-1102 code and SP-1211 compliance.
The Contractor shall locate, classify and engineer all the wadi crossings coming along the route
of the pipeline as per SP-1211, SP-1208 and Company standard drawings & documents and shall
incorporate the details in the wadi crossing report. Pipeline with a Design Factor of 0.6 shall be
used for all Wadi Type C and most of Type B crossings.
However ASME B31.8 pipeline location class 3 and 4 shall govern over this requirement since it
is more stringent if applicable. Contractor to take care the proposed pipeline ASME B31.8 location
class and wadi type requirements during bidding and detail engineering with proper selection of
wall thickness.
The wadi crossing type identified in the existing pipeline alignment drawings shall be considered
as guidance & reference only. Actual number of wadi crossings and type shall be identified by the
Contractor. The minimum soil cover shall be 1.5 meters for Type A, 2 meters for Type B and C.
The minimum soil cover shall be from the Wadi bed to the top of pipe.
The survey report shall outline the basis of wadi classification along the route, anti-buoyancy
measures, concrete coating thickness calculation or any measures required to be taken to avoid
exposure of the Pipeline during heavy wadi currents. Contractor to note that concrete coating
shall be carried out at a Company approved sub-contractor’s work and not by Contractor at site
or at Contractors facility.
The preliminary overall route map drawing provided is for information only. Contractor shall
prepare a wadi crossing report including the basis and details of the wadi classification and shall
be approved by the Owner prior to implementation and any change in the wadi classifications is
deemed to be included in the Contract Price. Stringing and welding of the sections within the wadi
sections shall require prior Owner approval.
All measures required in order to avoid buoyancy of the Pipeline in the event of rains, flowing
wadi’s and other eventualities shall be undertaken by the Contractor and shall be approved by
the Company as part of the buoyancy report.
The Gabions mesh scope for crossing wadis or any purpose shall be galvanized and PVC coated
wire mesh. Gabion size shall be in line with SP-1208.
The Contractor shall submit the proposed classification of wadis & its design for each type of wadi
crossing to the Company for approval prior to implementation.
The Contractor shall take all suitable precautions during design and engineering to take care of
the meteorological conditions during the execution of the project. The wadi and flood plains design
shall be suitable for the worst meteorological design conditions existing in past 20 years.
As part of Detail Design, Contractor shall perform special studies on wadi classifications and
develop the wadi classification report by the specialist hydrologists / specialist third party
agencies. While classifying the wadis along the proposed routes, required inputs about the rainfall
events in the past around those areas shall be availed from the concerned authorities /
meteorological departments in Oman.
Accordingly, the level of protection shall be designed in accordance with the guidelines specified
in construction specification SP-1208 and Company standard drawings & documents.
The Roads and drain Channels if any shall be designed and engineered by specialist Contractor,
and prior to any Channel Crossings construction, Contractor shall obtain Owner’s Approval.
Whatever required in the Engineering standard and Good Industry Practice to complete this task.
Any additional requirements requested from any other authorities for crossing the existing
channels shall not form basis for the Variation (cost and schedule) to the Owner/Company.
Contractor shall approach the authority during detail design and get all required information to
have proper protection for the pipeline. The Contractor shall maintain a minimum clearance of 2
meters from the top of pipeline and the bottom of the drain channel.
The Contractor shall protect the windrows by providing stone pitching at all livestock openings
and all ends, road crossings and any openings made for the flow of water streams to avoid the
accumulation of water at low points.
Any other facility crossing including existing pipeline/ flowlines crossings, buried cable crossings
and overhead line crossings shall be designed and engineered by the Contractor as per the
Company specifications. The Contractor shall maintain a minimum clearance of 750 mm from the
existing buried facilities (like underground pipelines, cables etc.) to the top of the pipeline at all
crossings which will depend on the owner of the facilities. However buried power cable safe buffer
distance shall be assessed from case to case basis with proper CP mitigation study. The
Contractor shall protect the existing pipelines/utilities by providing concrete slabs or culverts (with
sufficient thickness) or other protection crossing the existing facilities which will depend on the
owner of the facilities. Necessary engineering shall be carried out and approval shall be obtained
before implementation. This shall not be deemed as any variation to Contract. All necessary
permits and regulations requirements shall be duly complied by the Contractor in the design and
execution of such crossings without extra cost to Company.
Contractor shall ensure detection of any existing facilities prior to excavation of trench to avoid
any damage to the existing facilities. Any damage to the existing facilities and necessary
rectification/ repair shall be undertaken by the Contractor immediately at the contractor’s expense/
cost to the satisfaction of the authorities and Company.
All necessary liaison shall be the sole responsibility of Contractor for obtaining third party
permit/approval. All these approval activities shall not compromise agreed project progress and
schedule.
Contractor shall provide Crossover Bridge/ concrete slab at falaj crossings.
Working close to the live pipelines shall be done in accordance with GU-501. The Contractor shall
Engineer and locate all pipeline crossings including:
• The pipeline inspection roads
• Pig trap access roads
• All other temporary and permanent roads and tracks required for the Works
• Crossings of existing pipelines & flowlines (above/ below ground), any communication
cables, utilities and other services in the desert areas
• Wadi and Flood Plains
• Falaj
• Hills
• Sand Dunes
• Overhead power lines
However it is the responsibility of the Contractor to obtain maximum vehicle load and axle
configuration, tyre contact area etc. for road crossing calculation from the concerned authority
during detailed design.
The roads and/or other facilities if disturbed shall be handed back to the concerned authorities in
the same condition as it was before the start of Works.
All road crossings (tarmac, graded, highway etc.) shall be provided with slabs or culverts for the
protection of the pipeline. Culverts shall be provided for pipeline at all new expected
highway/expressway crossings. Main existing Tarmac roads (highway, railway) crossings shall
be by Horizontal Boring / HDD method based on authority’s approval. Casings shall not be
allowed. Wherever open cut is not possible the type of crossings shall be subject to local
concerned authority requirement in addition to the Owner standard/ requirements. This shall be a
part of the scope with no additional cost to the Owner. Bund wall crossing at Shafa PRT end shall
be at 1.5m depth minimum from natural grade level. Bund wall shall be reinstated after pipeline
construction. Pipeline bund wall crossing design shall follow road crossing design. Anticipated
external load shall be collected from the concerned authority and evaluated for pipeline design
during detail design stage. Both bund wall and rain/storm water drainage channel crossing shall
be clearly identified in the typical construction detail drawing. Rain/storm water drainage channel
shall be reinstated to its original condition after pipeline crossing installation.
Existing pipeline when exposed during the proposed pipeline crossing/parallel approach
construction shall be secured properly against induced stress movements and necessary external
protection shall be provided against UV radiation until reinstatement is complete. CP test posts
are tentatively located at 1m from the existing pipeline at access road side. This shall in no case
be disconnected during construction. Proper protection shall be provided to all such facilities
during construction by suitable means or by safety barricade.
• All design calculations, re-arrangement of pipe, addition of loops, etc., to limit pipe
stresses, and add flexibility and to enable maintenance and interchange ability of valves
and other flanged pipe fittings.
• Pig launcher/ receiver design calculation and report.
• Flow Meter design calculation and report.
• Design and location of anchor blocks as necessary to restrain pipe movement
• Pipe support calculations
• Calculations for the Cathodic protection design and earthing requirements
• Blow down, calculation of flow forces and minimum temperature during flaring/ venting.
• Design and adequate protection for crossing hills
• Hydrostatic testing calculations (including the number of test sections) report
• Calculations related for drying of the pipeline
• Pressure drop and erosion velocity checks on all pipe work
• Foundation design
• Design of special construction areas
• UPS AC/DC and Batteries calculation report
• Earthling system calculation report.
The Contractor shall use design methods, procedures and formulae in accordance with relevant
Codes and standards, International Standards, good engineering practice and industry norms.
The Contractor shall provide/ submit sources, references or bases for all calculations.
All the Pipeline items shall be designed for sour service. HIC & SSC tests are mandatory in
compliance with the requirements of ISO 15156 & SP-2041. Project materials such as insulating
flange kits, SPWD gaskets, stud bolts (all MESC) shall be in the scope of Contractor. Materials
required for makers/warning poles/CP test posts/crossing sleeves shall also be procured by the
Construction contractor.
thickness after minus tolerance shall be the selected wall thickness. 6” CS pipeline shall be
seamless DEP 31.40.20.37-Gen/ISO 3183 L450 PSL2.
on the off-plot location of the pipeline shall be flush type for ease of pigging. CMA fittings trim
requirement shall be as per project MSR. PMI requirement shall be as per MSR.
The number of Corrosion Monitoring Access Fittings shall be designed suitably to cover the entire
pipeline and shall be approved by owner/Company and equipped with a minimum of two access
fittings at each identified location. Existing pipeline philosophy may be followed with necessary
recommendation from Company integrity team.
4.9.24 Pigging
The Pipeline and associated facilities shall be designed for intelligent pigging and for regular
cleaning pigs. After mechanical completion of the pipeline cleaning, gauging and water filling
pigging shall be carried out. Caliper and Baseline survey shall be carried out as part of IP
requirement. All mainline items such as valves, isolation joint, flanges and barred tee etc. shall be
full bore and suitable for pigging operation.
The pig signallers shall be provided with battery power supply. The signal from the pig signaller
shall be connected back into RTU system for remote monitoring. Battery shall be ATEX EExd
certified for use in HAC Zone-1 area. Battery life shall be stated by the vendor in the offer and
accordingly spare battery shall be organized for the pipeline design life. Pig signaller assembly
shall be with IP-66 ingress protection and EMC certified. Calibration period shall also be clearly
identified in the offer.
• Pipeline wall thickness, bend thinning, equivalent stress check, vacuum check and
tonnage calculation report
• Road crossing calculation report
• Pipeline Hydrotest Calculation Report
• Specification for Pipeline Ball Valves, Barred Tees, Isolating Joints, Scraper Launcher &
Receiver, Pig Signallers, Flanges, Fittings, CMA fittings, Line Pipe etc.
• Bulk MTO
• Technical Bid Evaluation Report for Topographical Route Survey Contractor, Pipeline Ball
Valves, Barred Tees, Isolating Joints, Scraper Launcher & Receiver, Pig Signallers,
Flanges, Fittings, CMA fittings, Line Pipe etc.
• Demolition Drawings
• Overall Route Map drawing
• Key Plan for Routing Plan
• Key Plan for Alignment Sheet
• Pipeline Alignment Drawings
• Hydrostatic test diagram
• Pipeline Road Crossing Details
• Pipeline UG Crossing Details
• Pipeline Wadi Crossing Details
• Pipeline Construction Drawings as per SP-1208 (All applicable)
• Crossing Matrix
• Piping Plans ( OFF PLOT)
• Plot Plans
• Station Approach Drawings
• Tie in Schedule
• Construction scope of work
• Input to pipeline section of commissioning manual
• As-built Drawings
The Contractor shall produce the drawings and will be reviewed by Company. After the drawings
approved with Code – “A” from Company, Contractor shall issue AFC drawings for site team to
start the construction activities. All AFC drawings when sent to site shall be followed with the latest
hold register status.
shall be studied during detail design (all applicable options shall be considered by the bidder
for bidding).
4. Existing buried FOC (as per preliminary route map drawing attached in C6) shall be
protected against any vehicle movement during construction activities by proper safety
barricade.
5. Existing 20” gas pipeline inside Shafa zero point station, which is having integrity issues
shall also be protected against any vehicle movement during construction activities by
proper safety barricade.
6. PWHT shall be carried out only by Company approved services Contractor (if any).
5. PROJECT MANAGEMENT
5.1 General
The Contractor shall be responsible for all aspects of management for the execution of the
Work including, provision of the Contractor's organization and facilities, access for and
services to the Company and Company's other Contractors/suppliers, and fulfilment of all
project management function including, planning, control, reporting, supervision,
administration, management of sub-Contractors, vendors, QA/QC, HSE management,
security, obtaining permits, development of procedures, and integrity management.
Contractor shall be certified to ISO 9001 or ISO / TS 29001 for all activities related to the
Contract. Contractor shall maintain certification for such system throughout the Operational
Period.
If Contractor utilizes a different, but equivalent quality management system, Contractor shall
supply full details of such system to Company for approval including a copy of a compliance
audit report conducted on Contractor by an accredited certifying body, unless the system has
already been approved by Company in writing before.
The Services shall only be considered complete upon Acceptance by Company. Contractor
shall perform quality assurance and quality control testing on Services and Materials and the
reporting of results as required by Company.
The Contractor shall provide the organization to manage and control the execution of the Work
and shall provide all labor, offices, accommodation, fabrication shops, plant, tools, equipment,
materials, services, spare parts, consumables, temporary structures and any other items or
services necessary for the performance of the Work.
The following shall be officially submitted to Company within One month after the Effective
Date:
a) Project/Contract Execution Plan
b) Project Coordination & Communication Plan
c) Project Organization Chart
d) CVs of Key Staff
e) Updated responsibility matrices
f) Detail Project Schedule
g) List of Project Deliverables
h) Procurement Tracking Register
i) Procurement and Subcontracting Plan
j) Procedure to establish an equipment criticality ranking for procured items.
k) Internal and External Audit schedules addressing requirements defined under
requirements of QSHE-QS-L2-202/SP – 1171. Updated schedule shall be submitted on a
reject or accept even if the Work is planned to be sub-contracted to Company approved sub-
contractors.
The Contractor shall be responsible for maintaining sufficient records, data and calculations
to demonstrate to the Company an auditable trail for decision making and selection. The
Contractor shall at all stages of the Work be able to demonstrate to the Company that the
Work shall meet the functional requirements of the project.
The Contractor shall provide for the participation in and the attendance of personnel at the
audits and reviews specified in the Contract, including preparation and follow-up.
The Contractor shall ensure that all works are executed in compliance with Omani Regulations
and Company Requirements.
The Contractor shall ensure that requirements specified in the Environmental Impact
Assessment (EIA) are implemented / complied with. All conditions specified in the Initial
Environmental Permit (IEP) are to be complied with.
The Contractor shall ensure that all requisite permits/license/approvals are obtained to allow
smooth unhindered progress of the project construction.
Construction, Pre-commissioning,
Material Controller Site
Commissioning phase, Handover
Pre-commissioning
CP Engineer Site
/Commissioning phase
Pre-commissioning
Commissioning Manager Site
/Commissioning phase
Change of Key Personnel without the prior written approval of the Company (minimum 4
weeks’ in advance) shall be subject to a penalty as defined in Contract Document C-8. In the
event of any change in key Personnel, the Contractor shall ensure that there is a minimum of
2 weeks handover period at the location is provided. Failure to ensure a handover period to
the satisfaction of the Company shall be deemed to be change in Key Personnel without
approval and shall also be subject to the penalty as defined in Document C-8.
In the event of a failure by the Contractor to mobilize suitable personnel or replacement
personnel within any time period that is considered by the Company to jeopardize the progress
or quality of the Work, the Company reserves the right to appoint replacement personnel from
whatever alternative sources it considers to be appropriate. In such cases, all costs including
emoluments, Mobilization, Demobilization and third party fees shall be charged to the
Contractor.
The Contractor’s Project Manager shall report to Contractor’s Contract Manager and
Company reserves the right to call Contractor’s team including Contract Manager for at
Muscat or at Site at any time. Any failure by the Contractor to do so shall be treated similar to
the non-availability of the Key personnel and shall be liable for penalties as per Document C-
8.
The number of Construction Supervisors required for each discipline shall be determined by
the Contractor. However for Pipeline, One Pipeline Supervisor per spread; if applicable, is
required. The minimum qualifications and experience requirements for each function shall be
as listed below:
5.8.1 General
The contractor and subcontractors shall have quality assurance system certified to ISO
9001:2008/2015 or latest. Contractor shall implement and maintain all Quality Assurance and
Quality Control requirements specified in the contract. All requirements detailed in Document
C6 including GU-611(latest at the time of bidding) and "Specification for Quality Assurance"
(GME-QS-L2-202) shall be complied with during all phases of work. The Contractor shall
prepare and submit for Company approval a Contract Quality Plan in accordance with
requirements of GME-QS-L2-202.
The Contractor shall:
a) Prepare and submit for Company approval project specific Quality Control Plans in
accordance with requirements of Document C-8 Procedures, C-6 Standards &
Specifications, and ISO 9000:2008 /2015 and “Specification for Quality Assurance"
(GME-QS-L2-202). The Contractor shall not commence any activity until the Quality
Control Plan has been approved for that particular activity. The Contractor shall
implement the approved quality assurance / quality control plans throughout the course
of the project inclusive of mobilization, execution and restoration.
b) Define in the Inspection and Test Plan (ITP) the organization and activities required to
achieve the quality objectives, together with all witness and hold points. Inspection and
Test Plans for all the long lead items (including for MESC items) shall send to Company
for their review/approval well before start of any manufacturing activities. The Quality
Control Plans shall be structured such that the activities are listed sequentially. For all
the Construction works, the Contractor shall ensure that Hold, Witness, Review, Monitor,
Surveillance points are identified in the Quality Control Plans (ITP) for the Contractor,
Supplier, Sub-supplier, Third Party Inspector / Authorized Inspector (for items requiring
certification) and the Company. The Company shall indicate their Hold, Witness, Review,
Monitor, Surveillance points in the Quality Control Plan (ITP). The Company attendance
and participation in inspection and verification at Hold, Witness and Review points do not
relieve Contractor of its Contractual obligations to fulfil and meet all the requirements
specified in the Contract documents. All the non-compliances or deficiencies or defects
revealed at any stage during execution of the Contract shall be corrected by the
Contractor at their cost. The CV of TPI inspector shall be subjected to Company approval
prior to deputing for inspection activity.
c) Subcontracted construction activities shall be clearly identified and the Contractor shall
ensure that construction Subcontractors shall prepare Quality Control Plans for review
by the Contractor and approval by Company.
d) The document and drawing numbering shall be as per Drawing, Document Numbering &
Equipment Tagging Procedure (GME-QS-L3-312).
e) The deviations shall be processed as per procedure for Technical Deviations (GME-QS-
L3-311).
f) Impart relevant training to all concerned employees on QA/QC related subjects.
g) Be responsible for all inspection (including third party inspection), quality control, and
verification related activities and the provision of all associated staff required to assure
and maintain quality throughout all phases of the project.
h) The contractor shall not mobilize QA/QC Manager, QA Engineers, Welding Engineer and
QA/QC Inspectors to site/execution of the work without the written approval of OGC.
i) Contractor QA/QC Manager, QA Engineers, Welding Engineer and QC Inspectors shall
not leave the site without the written approval of OGC.
j) As part of the approved Contract Quality Plan the Contractor shall detail proposals for
each quality audits (including subcontractors and vendors), stating the commencement
date and completion date for each audit. The Company reserves the right to attend any
or all of these audits. The following points shall be considered for the audits;
I. Commencement date of each quality audit shall be within two (2) weeks of
commencement of each relevant operation.
II. Contractor’s internal audit shall be notified to Company at least 10 days prior to
audit date by formal audit notification. Company have the right to participate in
such audits as observer.
III. The completion of each quality audit shall be the date the audit report is submitted
to the Company.
IV. Each quality report is to be submitted to the Company within two (2) weeks of
commencement of each audit.
V. Any alteration in commencement dates for each quality audit shall be subject to
fifteen (15) days prior notice being given to by the Contractor to the Company
before the actual commencement date.
VI. The Company reserves the right to visit, check, inspect and audit the Contractor;
its Sub-contractors and Vendors at any time and any place to ensure full
compliance with the Contract requirements. Company shall issue Non-
Conformance Report (NCR) for any anomalies found and Corrective Action
Requests for non-conformances identified during Company audits. These NCRs.
No completion of the system will be effected unless corrective actions are verified
and closed out.
VII. The Company will also monitor the Contractor's performance through its reporting
procedures and may have Contract Holders and/or Supervisor's present at the
Site(s) and the Contractor's offices at any or all times during the execution of the
Work, including the Engineering phase.
To control the Work, the Contractor shall maintain and use a Quality Management System
that complies with the requirements of the ISO/TS 29001 standard; however if the Contractor’s
quality management system is certified to ISO 9001:2008/2015, the QMS shall also ensure
control of nonspecific ISO 9000 elements such as:
a) Planning and scheduling
b) Progress measuring and reporting
c) Acceptance testing
d) Control of As-Built documentation
Contractor shall implement and maintain all Quality Assurance and Quality Control
requirements specified in the Contract. All requirements detailed in Section C-6 including
GME-QS-L2-202, SP – 1171, SP-1208 and SP-1122 shall be complied with during all phases
of the Work.
The Contractor shall develop a specific Contract Quality Plan (CQP) as required by GME-QS-
L2-202 / SP1171 as applicable to the project shall be addressed in the CQP.
All requirements set out in GME-QS-L2-202/ SP - 1171 shall be complied with during all
phases of the Contract by the Contractor and their Subcontractor(s), Vendor(s)/Supplier(s).
The Contractor shall be responsible for all inspection (including third party inspection – quality
control, and verification related activities) and the provision of all associated staff required to
assure and maintain quality throughout all phases of the project. The staff shall be subject to
review and approval by the Company.
5.9.1 General
Contractor shall be deemed to have full knowledge of, and shall comply with the requirements
of the following documents (copies of the documents are not bound herein but are available
if required). This section describes the requirements and standards for the Contractor's
Quality Assurance System.
All requirements of Company’s Quality Management System for Project Delivery Code of
Practice including documents referenced in C6 Specifications - GME -QS-L2-202, SP-1171,
SP-1122, and ISO/TS 29001 and/or ISO 9001:2008/2015 shall be complied with in all phases
of the Work. Quality assurance and quality control requirements stated in applicable technical
specifications shall be adhered to.
All requirements of Company‘s Project specific document numbering procedure as per QSHE-
QS-L3-318 and Change Management Procedure, shall be complied with by the Contractor.
The Contractor shall prepare a specific Contract Quality Plan (CQP) in accordance with GME-
QS-L2-202/SP1171 that shall interlink the activities and Quality Plans of, Subcontractor’s,
sub- Sub-contractors and Vendors involved in the Contract and submit it to the Company for
review and approval within 30 Calendar days from the Effective Date.
The Contractor shall be responsible for ensuring that its Subcontractors and Sub-
Subcontractors/Vendors comply with the requirements of the Company regarding Quality
Assurance.
The specific Contract Quality Plan shall identify the specific resources and procedures to be
applied in order to assure the quality of the Work. Statements from the Contractor’s
management shall be included confirming the commitment to compliance with the Contract
specifications as well as statutory and regulatory requirements and methodology to be used
to ensure compliance.
The Contractor shall prepare a chart of the organization for the Work, depicting the names,
titles and the functional and reporting relationships of all Key Personnel and Core Personnel
assigned / to be assigned for all phases of the Work. A resume of qualifications and past
experience with the detailed job description and required competencies of all Personnel or
Personnel categories related to Quality Assurance or Quality Control activities of Key
Personnel shall be made available to the Company for review and approval, refer GME-QS-
L2-202 for guidance on personnel qualification requirements.
Once approved by the Company, the Contract Quality Plan shall be duly implemented without
further conditions. However, the Contractor may revise, update and resubmit them for
approval to incorporate any changes occurring during the Contract period. The Contractor
shall make such changes at its own cost.
The Contractor shall immediately notify the Company of any Work done which is not in
conformance with the Quality Plan. The Company shall review the non- conformance and
either agree with the Contractor’s proposed corrective actions or to a concession or reject the
Work. In any event, all corrective actions shall be taken at the Contractor’s expense.
In the event that the Company undertakes to rectify the Work, the Company shall be entitled
to recover from the Contractor or deduct from any sums due to the Contractor the costs of
such rectification.
Company attendance and participation in inspection and verification (as Hold, Monitor,
Monitor, Witness and Review points) shall not relieve Contractor of its Contractual obligations
to fulfil and meet all requirements specified in the Contract. Any non-compliance or
deficiencies or defects revealed at any stage during execution of the Contract shall be rectified
/ corrected by Contractor at his cost.
In accordance with GME-QS-L2-202/SP-1171, Section 2, Contractor shall have 3rd Party
certification of his quality system in accordance with ISO/TS 29001 and/or ISO
9001:2008/2015 and shall be valid for the Contract duration.
All Design work within the Scope of Work shall be done by a Company approved Design
Contractor Contractor/subcontractor. The Design Contractor Contractor/subcontractor shall
have a valid ISO/TS 29001 and/or ISO 9001:2008/2015 certificates covering the Design
activities that Contractor is undertaking.
All Material certification shall affirm compliance with relevant Company technical
specifications and shall be according to DEP31.38.01.31-Gen, latest revision (see also 3.8 for
material traceability), unless otherwise stated in the applicable technical specification or
agreed by Company who is custodian of Material/equipment involved. The Material
manufacturer shall have a quality system certified by a National accreditation body, and
having undergone a specific assessment for Materials.
All welding and NDT activities shall be carried out by qualified welders and qualified NDT level
II operators respectively, according to qualified procedure(s) approved by Company.
Contractor shall qualify, at his own cost, any welding procedures that are required to be
qualified during execution of this Contract. No Material will be supplied by the Company to
Contractor for welding qualification tests.
The Contractor shall develop and supply written procedures to adequately control the quality
of the Work and to ensure compliance with all aspects of the Work and applicable codes,
standards and legislative requirements.
The listing of required procedures shall be subject to agreement by the Company. Procedures
required to complete the Works shall be made available at the point of use prior to
commencement of the relative section of the Work.
The Contractor shall prepare and update on a quarterly basis a schedule of planned internal
and external audits including revisions, audit tracking and close-out. The Company reserves
the right to participate in any quality audit as an observer. All audits shall be included on an
integrated Contract Audit Schedule.
In case any activity is found suspect of affecting the quality requirements of the Work
adversely, the Company has the right to initiate or request the Contractor to audit that area of
activity on a priority basis whether or not the activity was included within the Contract Audit
schedule.
The Contractor shall provide the Company with a copy of all audit reports including any
associated non-conformance reports.
The Contractor shall monitor and report on leading and lagging Quality Key Performance
Indicators.
Procedures describing the control of non-conformities during all phases of the Work shall be
consistent with those for engineering review, inspection and testing, etc., such that all
nonconformities from whatever source are identifiable within the same system.
The Company shall conduct Quality audits and surveillance based on the Contractor’s
approved Contract Quality Plan and Quality Management System as may be deemed
necessary by the Company during the duration of the Contract. The Contractor shall provide
all facilities required by the Company in order to conduct the audits and surveillance in an
efficient manner. The Contractor shall comply with all updates required by the Company.
The Company shall have the right to audit the implementation of the approved Quality Plan,
Quality Management System by the Contractor at any time up to acceptance of the Works.
The Contractor shall forthwith upon receipt of any such audit report at its own cost implement
all remedial actions identified as required in such report.
The Company’s comments, if any, shall not relieve the Contractor from any liability hereunder
and, in responding to such comments by accepting or proposing alternates acceptable to the
Company, the Contractor expressly adopts and warrants the effectiveness of Quality
Assurance Plan and Quality Control Plan.
Before implementation of each phase of the Contract, the Company may conduct a Ready to
Start-Up Audit in order to confirm that all the required procedures and resources are available.
Any shortfalls identified in this audit shall be corrected or a time scale agreed for correction
prior to implementation to the satisfaction of Company.
QS-L2-202/SP-1171, and ISO/TS 29001 and/or ISO 9001:2008/2015. This procedure shall
be approved by the Company.
Contractor shall ensure that all inspection and test plan, its approval and implementation with
respect to GME-QS-L2-202/SP-1171 and PR 1984, as applicable, are established for each
purchased product for permanent installation.
Contractor is responsible to ensure all Materials are meeting Company technical
specification(s).
Contractor shall demonstrate at any time if requested by the Company or its Representatives
that the Materials meet the Company technical specification. In the event of failure to
demonstrate, Contractor is responsible to replace or repair at his cost. The repair is subject to
Company’s agreement.
Contractor shall undertake any additional inspections if required by the Company.
Company reserves the right to determine the level of Company involvement in the inspection
on Contractor’s suppliers/Vendors/Subcontractors/sub-vendors etc. The Company may
change at any time its inspection level, Contractor shall update the inspection test plan
accordingly with no additional cost to Company.
On issuance of pre-inspection, meetings with respect to PR-1984 and GME-QS-L2-202/SP-
1171 shall be realized.
Pre-Inspection meetings shall normally be considered for purchase orders which:
a) Are complex or critical in terms of metallurgy, fabrication welding, testing and assembly
and involve special manufacturing processes and procedures.
b) Involve critical sub-orders requiring source inspection.
c) Involve a Vendor or major sub-Vendor’s who are either unknown or not recently used
by the Contractor.
d) Certification requirements.
e) Require Inspection by Regulatory Authorities.
Note: Contractor is to reference to provided Material Requisition, Section IV for guidance on
the requirement of Pre-Inspection meetings, and interventions as related to inspections.
Pre-Inspection meetings shall address the following points as a minimum:
a) Environmental and Safety measures.
b) Clarifying of relevant requirements between the key parties involved, including
agreement on any noted exceptions / queries.
c) Finalising the inspection and test plans.
d) Making the Vendor aware of the local laws, regulations and statutory requirements
and the inspections that Contractor, Company appointed Third Party Inspector and
other parties shall carry out.
e) Clarifying documentation requirements, communication, reporting, interfaces between
key parties etc.
f) Review of sub-Vendor and suborders.
Contractor shall determine quality assurance requirements based on criticality rating of the
Material. The following are quality assurance requirements:
a) Approval of Vendor quality plan (in accordance with GME-QS-L2-202/SP-1171).
b) Approval of Vendor quality control plan/Inspection & test plan (in accordance with
GME-QS-L2-202/SP-1171).
c) Approval of ITP by Company.
d) Approval of vendor Designs, calculations, drawings, etc.
e) Approval of vendor procedures (e.g. welding, NDT, coating, etc.).
f) QA participation in pre-inspection/kick-off meeting.
g) Review of Material requisition, Purchase Orders by QA.
h) Technical appraisal/ technical clarification of quotations by QA.
i) QA attendance in Kick off meeting.
j) Witnessing key inspections and tests at Vendor premises.
k) QA audits on Vendors.
l) Release of items by QA/TPIA Inspector.
m) Sample inspection at Contractor’s premises.
The extent of application of above quality assurance requirements shall be based on criticality
rating of the Equipment/ Material.
Independent labs (Quality system complying with ISO 17025):
a) For HIC/ SSC/ SCC tests: The testing Lab shall be approved by Company.
b) Note: Labs recognized/ listed by ILAC are acceptable for mechanical tests.
c) For Welding Procedure Qualification testing: The requirements of SP 1177 and SP
1173 shall apply.
d) Non-Company approved or ILAC listed laboratories shall be submitted for review and
approval by Company prior to use.
Review, Monitor points in the inspection and test plan (ITP). The ITP shall be strictly in
accordance with GME-QS-L2-202/SP-1171 and shall be approved before any
manufacturing/production/fabrication starts.
Criticality of Equipment - All criticality items shall be certified by the TPI agency that is
nominated by the Company (at Company’s cost) and the TPI shall issue certification as
required by GME-QS-L2-202/SP-1171. For more detail on equipment specific criticality and
the assigned criticality rating, according to PR-1984, refer to the Material Requisition, Section
IV.
Approved Vendors - All Material/equipment shall be procured from Vendors registered with/by
the Company for the particular category (refer Company approved Vendors list). Otherwise,
Contractor shall ensure the proposed Vendor is approved with the Company before placing
any purchase order on the proposed Vendor following Company standard practices and
procedures.
Section IV of the Material Requisitions provided with the Contract Scope of Work shall be
supplemental to the requirements established within GME-QS-L2-202/SP-1171.
All ITPs for individual parts of the work shall be submitted to the Company for approval at
least 21 days prior to commencement of each part of that work. No construction work shall
commence unless the relevant Construction Quality Control Plan and ITP is approved by
Company.
Sub-contracted construction activities shall be clearly identified and the Contractor shall
ensure that construction subcontractors’ prepare ITPs for review by the Contractor and
approval by Company. The construction quality control plans shall be structured such that
activities are listed sequentially and in a logical order.
Test results of all quality control testing, as part of the ITP, shall be submitted for review and
within 1 working day of receipt by the Contractor when related to construction activities. Where
sequential work is dependent on these results submission should be made as immediately as
possible.
Despite these results and plans being required for review and approval by the Company the
responsibility for the quality of the project meeting the specified requirements remains with
the Contractor.
Inspection and Test Plans shall cover the following as a minimum:
a) Review and approval of manufacturing procedures
b) Review and approval of welding & NDT procedures
c) Incoming material inspections
d) Tests to determine compliance of Material.
e) Witnessing tests or the review and approval of certification of operator's qualification
to carry out the Work required.
f) Visual and dimensional examination of components
g) Non-destructive examination of materials in progress
h) Witness and review of PWHT (where applicable)
i) Installation inspection for construction completion – Punch listing
j) Clearance for flushing and testing
k) Pressure tests and leak tests
l) All painting inspection / test activities in accordance with SP 1246.
m) Insulation inspection and testing
n) Mechanical completion Inspection
o) Release for shipment where off-plot fabrication / manufacture is involved
p) Acceptance criteria for all the inspection and tests listed
q) Contractor’s responsible personnel to perform inspection and testing
r) Inspection and test records / formats (verification document) the same shall be
included in the ITP
s) Hold, Witness, Review & Monitor points for sub-vendor (where applicable), Contractor
and Company
t) Contractor shall give Company notice to attend and participate in the inspection and
verification of Hold, Witness and Review points of the ITPs. Refer to the Section IV of
the Material Requisition for notice period on specific equipment.
No further activities shall proceed until the ‘Hold’ point inspections are completed and
approved unless otherwise agreed in writing by the Company. ‘Witness’ inspection may
proceed if the Company inspector does not attend the inspections at the scheduled time as
per notification as above.
The inspection or test shall be witnessed by the Company inspectors / Company nominated
third party inspectors as per the approved ITP. Any third party certification to meet code
requirements shall be the responsibility of the Contractor.
Company’s acceptance of inspection and tests results or otherwise shall not absolve the
Contractor’s contractual obligations to meet the quality requirements specified therein.
5.10 HSE
Contractor shall comply in all aspects with the HSE requirements stated in the Contract
including, those stated in the Document C-9 - HSE Specifications and SP1208. Contractor
shall ensure that the requirements are understood and implemented by all levels of personnel
within the Contractor's, Sub-Contractors and Vendors organization.
Contractor shall also adhere to the requirements stated in “Planning and Scheduling for
Contractor” documents attached as part of C-8 of this Contract Document.
5.12.1 General
Contractor shall be responsible for obtaining all necessary documents comment and
acceptance from Company and any other relevant parties as and when required. It is to be
noted that obtaining acceptance does not absolve the Contractor from meeting the
requirements stipulated in the Contract.
Contractor shall provide and utilize Electronic Document Management system for the entire
project documentation including document check-in/check-out access controls, review and
approval processes
Contractor shall submit drawings and documents to the Company in advance of the design
completion, procurement activities being finalized, milestone completion and construction
commencing. The Company reserves the right to make comments to these documents and
drawings if the Contract, specification, Company standards and procedures are not being
adhered to by the Contractor.
Documents shall be checked and signed at each revision submittal and shall not be accepted
by the Company unless the applicable boxes on the Revision History have been completed
by the Contractor and signed off by the Company Responsible Engineer.
The Contractor is responsible in ensuring that all project deliverables are included in document
register which will be prepared by Contractor and approved by the Company. Contractor shall
be required to submit additional documentation, drawings, reports, manuals, data, etc. as
requested in the Contract and as required for completion of the work.
The number of documents requiring approval by Company shall be limited in view of the
Contract intent that Contractor shall establish its own internal controls to ensure compliance
with the Contract, Specifications, Scope of Work and quality requirements. Company’s
predominant role shall be one of audit to check that Contractor’s internal controls ensure
controls are properly implemented and adhere to.
All documents shall be submitted to Company under cover of transmittal forms. Company
shall return documents likewise under cover of a transmittal form. The sequential numbering
of these transmittal forms shall be agreed and recorded by both parties.
Contractor shall develop project Documents Review procedure which stipulate level of
responsibility and accountability in both the Company and Contractor, the document shall
describe the procedures to be followed for the Contractor in issuing and for Company in review
and acceptance of the drawings, documents. The procedure shall be reviewed and approved
by both parties.
Documents requiring Company APPROVAL shall be clearly marked ‘FOR APPROVAL’ and
shall be sent by Contractor to the Company with a covering letter under cover of a document
transmittal form.
c) To incorporate interfaces coordination & time requirements into schedule for project
effectiveness & integrity
d) Initiation, Managing & reporting interface coordinating meetings.
e) Resolution of related issues.
f) To establish a communication procedure for effective communication and exchange
information between interface parties & stakeholders.
The Contractor is advised that other engineering, materials handling, construction, testing
and, pre-commissioning and commissioning activities may be underway at the same time as
this Contract Work and in the vicinity of the Work. The Contractor shall be deemed to have
taken account of such works in planning and scheduling and all related interfaces with such
activities.
The Contractor shall be required to interface with others in order to exchange and review
information and plan and co-ordinate the Work.
The Contractor shall prepare and maintain a register of interface related issues and shall
actively expedite the resolution of all such issues.
Execution of the Work by Contractor and by other interfacing Contractors may result in
interface related changes in the Contractor’s activities. All Work associated with identifying,
managing and implementing such changes shall be deemed to be included in the Work and
shall not be the subject of a Variation.
If the Contractor identifies a requirement to change the physical dimensions, material type or
location details of any of the physical interfaces identified on the Company provided
deliverables, the Contractor shall submit the details of the proposed changes to the Company
for approval prior to implementing any changes and such changes shall be deemed to be
included in the lump sum Contract price.
Any interface information required from interface parties, in any form, shall be obtained by
Contractor and shall be part of lump sum Contract price.
The Contractor shall interface with Company’s Operations Department on all matters relating
to, but not limited to:
a) Crossing or working close to existing Company facilities and utilities including pipeline
and cables
b) Working within existing Company facilities
c) Tie-in to existing Company facilities and utilities
d) Pre-commissioning
e) Commissioning of ancillary systems
require interfacing with multiple agencies based upon the mandate/jurisdiction of each
agency.
The Contractor shall undertake quarterly reviews of the projects permitting status and
compliance with permit conditions.
The Contractor shall submit a Permit Plan to the Company for information within 30 days of
the Effective Date. The Permit Plan shall list but not limited to:
a) All required permits, consents and licenses
b) The authority to whom application must be made
c) The planned date for obtaining the consent taking into account the expected time for
the authority to consider the application for consent
d) Any permit required for using the R.O.W of any of the Foreign or Company existing
pipelines.
The Contractor shall report progress on obtaining consents in the monthly report and any
difficulties which delay obtaining consents in the weekly report (see Document C-8 –
Procedures for Contractor). The Contractor shall maintain the Permit Plan up to date and add
any additional requirements as they become known.
Any fees or other costs associated with obtaining any permits, consents, fulfilment of statutory
requirements or licenses are deemed to be included in the Contract Price.
Within the vicinity of Company operations/Interfacing Party operations, the Contractor shall
carry out the work in accordance with the Company's /Interfacing Party’s Permit To Work
(PTW) system, as required. The Contractor's relevant supervisory personnel shall have the
necessary Company certificates to act as Permit Holder. The Contractor should note that the
PTW requires administration input and therefore should plan his works, so as to give the
Company maximum notice for permits; i.e. not less than 48 hours. The Contractor shall make
due allowances in his planning schedule to take care of the time required for the PTW system.
The Contractor is responsible for ensuring that any person carrying out the work for which a
PTW is required fully understands his and his supervisor's obligations under the PTW system
and the Contractor adequately plans for such permits in its working schedule and price.
This section details out the Contractor Responsibilities, but not limited to the Scope of Work
• Permits, Consents and Licenses
a) All permit Work requirements associated with OGC and other regulatory authorities
shall be attained and followed by the Contractor. Contractor shall be fully aware of the
OGC permits requirements and other mandatory requirements of regulatory
authorities to be followed for this Contract.
b) The Contractor shall identify and obtain all necessary permits, consents and licenses
from Government, municipality or other statutory authorities to complete the Scope of
Work. The Contractor shall comply with all conditions or restrictions imposed by any
such consent.
c) The Contractor shall submit a Permit and authority approval Plan to the Company for
information within 30 days of the award date. The Permit Plan shall list:
• All required permits, consents and licenses from government. Municipality and
third parties.
• The authority to which application must be made
• The planned date for obtaining the consent taking into account the expected time
for the authority to consider the application for consent
d) The Contractor shall report progress on obtaining consents in the weekly and Monthly
Report and any difficulties, which may delay obtaining consents in the Weekly Report.
The Contractor shall maintain the Permit Plan up to date and add any additional
requirements, as they become known.
e) Any fees or other costs associated with obtaining any permits, consents or licenses
are deemed to be included in the Contractor’s Lump Sum.
f) The permits, consents and licenses referred to in this Article shall include, but not be
limited to:
i. Consent to extract soil for construction purposes
ii. ROP road passes
iii. Traffic routing plans for transportation of personnel, plant and materials
iv. Camp site approvals
v. Storage site approvals
vi. Consent to extract water
vii. Consent to discharge water
viii. Consent to dispose of wastewater
ix. Consent to dispose of any construction waste
x. Consent to dispose of any other waste.
xi. Any other consent or approval process not listed above.
g) The Contractor shall ensure that all non-Omani employees (including those of any sub-
Contractors) have valid entry visas, residence permits, labor cards or any other
documentation required by the laws of the Sultanate of Oman.
h) The Contractor shall ensure that all employees (including those of any sub-
Contractors) who are required to drive any vehicles as part of their duties are in
possession of a valid driving license acceptable to the ROP, PDO and the Company
whilst carrying out those duties.
i) Visa, residence, labor and multiple entry road permits for working, driving licenses,
Permits to Work, and Journey Management Plans shall not be part of the Permit Plan.
j) Should any permit, consent or license have a limited duration, which expires before
the completion of the activity to which it relates, the Contractor shall include renewal
of the permit, consent or license in the Permit Plan
Company shall not be obliged to provide assistance to the Contractor in securing necessary
permits or data from authorities and /or third party agencies excepting if any OGC paperwork
is required.
6. FACILITIES
shall be responsible to make alternate arrangement for management of waste as per Best
Practices.
All necessary services and utilities, including water, power, security, communications, sewage
treatment, waste collection and waste disposal in accordance with the Company
Specifications including the Environmental Standards. No water and sewage haulage shall be
allowed and permitted even on a temporary basis.
Contractor’s facilities are defined (but not limited to) the following:
a) Plant, equipment, tools and consumables.
b) Access facilities including scaffolding, ladders and stairways.
c) Protection against weather and sand.
d) Safety, first aid, emergency and fire-fighting equipment including all necessary HSE
signs and notice boards.
e) All temporary works.
f) All necessary security systems and fencing to prevent unauthorized access to the
Facility and work areas.
g) Construction communication facilities.
h) Recreational areas and facilities for Contractor and Company personnel.
i) All transport services and facilities for Contractor and Company personnel Ownership of
the camp facilities shall at all times remain vested in Contractor. Any Site furnished to
Contractor shall be restored to original condition (cleared and cleaned), and returned to
Company by the Completion date of the Contract.
The Contractor shall allow unrestricted access for the Company, Company Representatives
and any other persons or companies authorized by the Company to visit the Facility and work
Sites.
The Contractor shall make any arrangements necessary for any required temporary
accommodation and messing until the Contractor’s facilities are completed. The Contractor
shall ensure that any such temporary accommodation and messing facilities meet Company's
HSE requirements.
shall be approved by the Company. The Contractor shall ensure that all necessary permit for
the management of hydro test water are obtained from the regulators prior to outset of testing.
Where the Contractor utilizes a camp or base with a daily effluent discharge from an
equivalent population of greater than 150 people, the Contractor shall provide a Sewage
Treatment Plant (STP) in accordance with the Ministerial Decree 145/93 "Regulations for
Septic Tanks and Holding Tanks". The Contractor shall ensure that all associated Permits to
Discharge are obtained from the Regulatory Authorities.
telephone lines required for the execution of the Work. All associated costs for provision of
equipment, installation and utilization bills shall be paid by the Contractor.
For communication within the Site area, local portable radios can be used. If the Contractor
proposes to use this facility, a written request shall be sent to the Company representative for
authorization. At certain places along the route of the pipeline, a GSM network does not exist.
At all such places, Contractor shall ensure that an emergency communication system is
established and is fully functional.
All communication arrangements are part of the Work and shall include a computer network,
fiber optic cable laying or micro tower installation by Contractor, provision of telecom cabin
and Commissioning of the communication system. The construction communication system
at each of the camp site shall be such that all Company offices and rooms are connected to
Company existing telecom and IT network.
6.2.9 Maintenance
The Contractor shall be responsible for the proper maintenance of his Facilities, Materials,
tools, equipment and all temporary facilities erected within the allocated areas including the
fences, gates and access roads constructed by the Contractor. Maintenance of right of way
and all other temporary access roads during the Construction phase shall also be part of the
Scope of the Contractor.
6.3.1 General
Contractor shall provide the facilities and services for Company as described herein. Unless
specifically stated otherwise, the cost for provision of such facilities and services shall be
included in the lump sum price for project management, including the provision of utilities
(including but not limited to electricity, gas, water and sewage) required for the running of
these facilities.
In addition, Contractor will ensure that all the facilities provided shall include adequate safety
equipment, including but not limited to, fire extinguishers, fire blankets, and the like.
Company may require the number/extent of these facilities and services to be amended during
the lifetime of the Contract. The cost of these changes (increase or decrease) shall be
accounted for via a Variation to Contract (or negative Variation to Contract) using the Rates
in Section C5.
Should the duration of the Engineering & Procurement and/or Construction phases change
from the original Construction Schedule, then the cost of these changes for the facilities and
services described within this Section, will be for the account of that party causing the change.
The costs or savings resulting from changes in the duration of the base scope facilities and
services required in this Section, shall be covered by any subsequent amendment to the lump-
sum price for project management services provided by Contractor. However, the costs or
savings resulting from changes in the duration of additional scope facilities and services
required by Company, shall be covered by a Variation to Contract using the Rates in Section
C5.
Unless stated differently below, all facilities and services provided by Contractor for Company
as described in this Section, will revert to Contractor upon completion of the relevant phase
of the Contract i.e. the Engineering & Procurement and/or Construction phase. Any costs
associated with “wear & tear”, maintenance, repair and refurbishment of the facilities and
services, are to Contractor’s account.
Contractor shall, at its own expense, obtain and maintain his own insurance for all offices,
facilities and equipment provided by Contractor for use by Company outside construction Site
areas during both Engineering & Procurement and Construction phase of the Contract.
All of the facilities and services specified in this section shall be provided within fourteen (14)
calendar of the commencement date of Construction Phase. They shall be subject to
Company’s Site Representative’s approval and shall be maintained by Contractor for use by
Company.
Provision of these facilities is to include all necessary infrastructures, including but not limited
to roads, pathways, parking area, drainage, fencing, waste storage areas, chemical storage
area gates and the like.
Company may require the office, accommodation, associated facilities and vehicles specified
to a greater or lesser degree during the period specified above. The cost of these changes
shall be accounted for via a Variation to Contract using the Rates in Section C5.
The offices shall be located above the external ground level. All offices shall have split-unit
air-conditioning units and have windows with sun blinds to the exterior of the building. The
offices shall be integrated, allowing passage internally to all parts of the office facility i.e. it
shall not be necessary to exit the block to gain access from one part of the facility to any other
parts.
Contractor shall provide full-time cleaners to clean the offices and replenish the entire daily
requirement including soap, towels, toilet rolls and hand dryers. Externally the building and
the car park shall be floodlit and ten (10) shaded car parking spaces shall be reserved for the
sole use of Company. The car parking spaces shall be as close as possible to Company
offices.
The office facility shall be provided with the following amenities:
a) One (1) suitably equipped kitchen;
b) One (1) cleaner’s room;
c) One (1) Gents toilet block containing three Western WCs with ablution sprays, two Asian
WCs with ablution sprays, three urinals, two hand wash basins with running hot and cold
water, soap and towels;
All of the above shall have split-unit air-conditioning units and be ventilated by exhaust fans
to the outside.
The proposed layout of the offices and amenities block for Company's use shall be submitted
to Company Site Representative for approval before any construction starts and shall be
designed and constructed in accordance with SP-1279, SP-1285, & SP-1275. Outside the
office and accommodation blocks Contractor shall erect a sign-board detailing the layout of
each applicable block.
6.3.4.2 IT Facilities
All IT facilities required by the Company at the construction camp during construction phase
shall be provided by the Contractor.
The Contractor shall provide dedicated telephone lines for internet/email use. However, the
costs of the calls will be borne to the Contractor.
The Contractor shall provide one (1) - 2 in one printer/scanner- in each CSR, DC offices and
supply of all required cartridges, maintenance
The Contractor shall supply all power supply, interconnection cables and any other material
required for the purpose and shall also provide overall 24 hrs. Maintenance cover for the
Company IT facilities.
After completion of the Contract, all IT facilities shall become property of the Company and
Contractor shall transport all such facilities to the Company office to be designated by the
Company.
The Contractor shall provide a LAN and network server to link the PC’s with the printers and
the scanner. The LAN shall be implemented using the latest Company acceptable Netware
TCP/IP software. There shall be not less than two (2) spare ports on the LAN to permit
connection by the notebook computers.
7. PROCUREMENT
7.1 General
Contractor shall procure all the mechanical, piping, civil, and electrical and instrumentation
Materials required for the completion of the Work (excluding Company Supplied materials if
applicable), spare parts, equipment, special tools, tackles required for erection,
Commissioning of the ancillary systems, maintenance, first fills, consumables and all
temporary materials, equipment. The materials shall be supplied in accordance with Company
specifications and standards.
Contractor shall procure for Company under the Contract Price all Materials for the Work
including, but not limited to,
1) Pre-commissioning & Commissioning spare parts and consumables
2) 2 year spare parts
3) Spare parts and consumables for start-up, hydrostatic test.
4) Special tools required for erection including hydraulic bolt tensioning equipment
5) Special tools and testing equipment required for maintenance
6) All other consumables
7) Temporary equipment and facilities
8) Tie-in and interface materials
9) Piping spools/ pup piece (ancillary pipes)
10) Jib crane and Pig handling equipment
Contractor shall expedite, inspect, label, handle, insure, ship, import and transport to the
construction site all materials required for the Work.
Procurement shall generally be in accordance with Contractor’s Procurement procedures and
policies, which are to be Company Approved. Contractor’s procurement policy shall be based
on the following primary principals.
• Competitive tendering (subject to Article 7 of Document C-3 General Conditions)
• Standardization
• Lowest overall life cycle cost
• Local market development.
The Contractor shall ensure that, for the duration of the Contract, the selected vendors are
capable of manufacturing and testing the materials to the required standards. Contractor shall
adhere to the latest version of PDO approved vendor list (AVME) and Contractor shall seek
Company’s approval prior to their final award to their Contractors / Vendors.
Selection by the Company’s approved vendors shall not relieve the Contractor of the
Contractor's responsibility for the quality, technical acceptance and delivery of the materials
or services.
Contractor to take note that irrespective of any vendor or manufacturer listed in the AVME list,
materials having its origin and/or manufactured in China shall not be used in this project.
Contractor shall seek Company’s guidance in case of no alternative source available.
The extent of TPI shall be in line with the ITP for the materials, which shall be reviewed and
approved by the Company. However, a minimum level of third party inspection shall be
essentially done on following tests:
a) Factory acceptance inspection and documentation review before packaging for
transportation of all materials above 6”.
b) Witnessing of final hydrostatic testing of completed valve body and pup piece
assemblies
c) Witnessing of functional testing of all actuated valves and instrumentation
d) Company will be responsible for arranging TPI for Company supplied items
The Contractor shall provide the Company with at least 10 working days written notice of the
date of inspection or test at supplier premises.
For Site construction activity inspections and tests, Contractor shall provide Company at least
five (5) working days written notice of the date and time of inspection. The Contractor shall,
at its cost make staff available to assist the Company with these audits, reviews or surveillance
activities and inspection tests.
7.10 Expediting
The Contractor shall perform adequate expediting to ensure timely delivery of Materials to the
Construction sites in Oman. Contractor shall also facilitate for Company expediting visits to
vendor facility, if requested by the Company.
The Contractor shall prepare and submit a bi-weekly expediting report to the Company for
information. The report shall include but not be limited to:
a) Material description
b) Purchase order number
c) Supplier details
d) Expected delivery date
e) Required delivery date
f) Schedule of manufacturing and shipping
g) Material tracking register
h) Area for concern
If the expected delivery date is later than the required delivery date the Contractor shall
describe in the report the actions he is taking to rectify the situation.
7.12 Shipping
The Contractor shall arrange for all necessary shipping and delivery of the Contractor supplied
materials to Oman and shall establish and maintain proper shipping co-ordination.
Contractor shall be responsible for all aspects of clearance, forwarding, and liaison in all
respects with authorities which may include justification of importation of the cargo if a local
Oman source exists. See also Document C-8 Procedure for Contractors Article 11.
The Contractor shall be responsible for establishing the necessity for and obtaining all
approvals from the authorities for transportation of the Materials to the construction site.
Shipping dimensions and weights of each skid, crate or packaged assembly shall take account
of applicable size and weight limitations.
Contractor shall be deemed to be familiar with the relevant laws and regulations of Oman and
all facilities, constraints and damage risks regarding import, clearance, transport and storage
of the materials, and shall be responsible for all packaging, documentation and logistical
arrangements in compliance with these.
The Work includes transportation and supply of all the Contractor supplied materials to the
Site including all aspects of clearance, forwarding, and liaison in all respects with authorities
which may include justification of importation of the cargo if a local Oman source exists and
all related charges including insurance, demurrage for the delivery of all the Materials to the
Sites in Oman safely and in good condition.
Company accepts no liability for custom duties levied.
The Contractor shall at all times protect all Materials against deterioration and damage and
shall provide any necessary temperature and humidity control for preservation and
maintenance as required.
The Contractor shall regularly inspect and maintain all Materials up to issue of the Substantial
Completion Certificate.
In the event that, after receipt by the Contractor, damage occurs to any Materials the
Contractor shall immediately submit a damage report to the Company. The Contractor shall
identify the impact, if any, of the damage or loss on the Construction Schedule and shall notify
the Company of the impact and the Contractor’s proposals to rectify the situation. The
Contractor shall be responsible for all remedial action and associated costs in the event of
damage or loss.
The Company reserves the right at any time, to inspect the Contractor's materials
administration system and storage and preservation methods.
recommendation as specified in the specification prepared during DD. Any unused spare shall
be handed over to Company.
Immediately after placing the purchase order for the relevant equipment, Contractor shall
obtain original letter from the supplier of each equipment indicating a recommended list of
spares required for two years trouble free operation and submit this list to Company in original
form for Company review and approval. Also Contractor submits duly completed Spare Parts
Interchangeability Record (SPIR) forms to Company for approval.
The Contractor shall obtain approval by the Company of all SPIR forms no later than 45 days
prior to Pre Commissioning of the system to which the SPIR forms relate.
Upon receipt of the electronic SPIR forms and supporting drawings from vendors, the
Contractor shall make all necessary calculations to determine the required quantities of
operational spares in accordance with DEP 70.10.90.11-GEN.
Contractor shall procure all operational spare parts and operational consumables necessary
for the two years of operation of the facility as recommended by the supplier of equipment and
approved by Company.
7.17 Standardisation
The Contractor shall ensure that preferably one but no more than two different vendors are
used for the procurement of any single type of material or equipment irrespective of size.
7.19 Reconciliation
At the completion of the Work, the Contractor shall account for all surplus materials. All such
items that Company requires shall be handed over to and become the property of the
Company, which shall be loaded, transported, unloaded and stored properly by the Contractor
to a location identified by the Company. Such materials shall include:
a) Commissioning spare parts and consumables
b) Insurance spares
c) Spare parts and consumables for initial operation
d) Special tools required for erection including hydraulic bolt tensioning equipment
e) Special tools and testing equipment required for maintenance
f) All other consumables
g) Temporary equipment and facilities
h) Tie-ins and interface materials
i) Company supplied spare line pipe and valves
j) Any other surplus material
k) Decommissioned piping material
Contractor shall be deemed to have included in the Price for handling these items and
transporting them to Company nominated Storage area. All items that Company does not
require shall be re-exported by Contractor.
Provision and supply of wooden skids, sand bags, wooden crates and boxes for the storage
of the above spare materials shall also be part of the Work.
Contractor shall include handling these items and for transporting them to the Company
nominated storage area.
8. CONSTRUCTION
8.1 General
Contractor shall perform all activities required to Fabricate, Install, Construct, Test, Pre-
commission, Commission, Handover and Guarantee run of the facilities in accordance with the
Approved for Construction (AFC) drawings, specifications and procedures and any approved
amendments thereto. The scope of such activities shall include, but not be limited to, Civil Works,
Mechanical, Electrical, Air conditioning, telecommunication and Instrumentation Works.
The Contractor shall identify and obtain all permits, certificates, approvals etc. from concerned
authorities necessary for the construction of the project. Company has listed permits, certificates,
approval requirement, however this does not relieve Contractor of the obligation to identify all
permits, certificates, and approvals etc. from concerned authorities. The permits, certificates,
approvals shall include but not limited to:
a) Environmental Permit from the Ministry of Environment and Climate Affairs (MECA)
b) Permit for Combustion Equipment (e.g. DG Sets) - MECA
c) Permits for use of groundwater wells from Ministry of Rural Municipalities and Water
Resources (for confirmation)
d) Pipelines - Permit for Powerline Crossings from Ministry of Electricity & Water -
e) Pipelines - Permit for Telecommunications Crossings from Ministry of Transport &
Communications
f) Pipelines - Permit for Tarmac Road Crossings from Ministry of Transport & Communications
g) Pipeline – Permit for pipeline crossing from PDO
h) Excavation Permit for Borrow pits from MRMWR, concerned Wilayat, MECA
Any permits and approvals not listed above shall be obtained as per Oman law & solely by the
Contractor.
The Contractor shall provide a mobilization plan for all equipment and personnel to Company for
approval and to implement the approved plan.
The Contractor shall provide all necessary labour, supervision, plant, tools, temporary camp and
fabrication facilities, temporary structures, consumables spares, and all other measures
necessary for site clearance, Fabrication, equipment Installation, Construction, testing, pre-
commissioning, commissioning, handover, restoration, de-mobilization and guarantee run.
The Contractor shall supply and install safety equipment as in accordance with the Company
approved Safety Equipment Layout to be prepared by the Contractor as part of the Detailed
Design.
Contractor shall prepare all necessary procedures for the safe and effective conduct of the Work.
Contractor shall submit all such procedures to Company for approval before such work is
commenced. Company will take minimum 14 days to review the document submitted.
Contractor shall prepare the following plans, manuals and procedures as a minimum:
• HSE Plan that covers all phases of the Work and for each phase defines the HSE
activities, training, management and organization to meet the Contract requirements
described in Document C-9 – Particular HSE Specification.
• A project specific quality assurance plan in accordance with requirements of Document C-
8 - Procedures for Contractor.
• Materials Identification, traceability & Control
• Installation of Pipeline (Off-plot)
• Equipment handling, storage and Installation including transportation to site.
• Welding of Pipeline & On-plot works
• NDE including radiography
• Construction – Civil, Structural, Pipeline, Piping, Equipment, Painting/Coating, E&I etc.
• Tie-ins and interfaces
• Complete Testing including functional and acceptance testing of the ancillary systems
including cathodic protection system
• Line pipe handling/transportation
• Cleaning, Gauging, filling, hydrostatic testing, dewatering, Swabbing & Drying of pipelines.
• Cleaning, Filling and Hydro-testing of the piping system
• Pre-commissioning of the new installations and associated systems not limited to all
instrumentation, existing RTU system, SCADA system, CP system and electrical systems.
• Commissioning of the new installations including but not limited to all instrumentation,
existing RTU system, SCADA system, CP system and electrical systems.
• Pipeline manual depressurization/flaring procedure.
• Commissioning plan and procedure including System and Sub-system identifications and
mark-ups.
• Nitrogen-Helium Leak testing
• Guarantee run plan
Contractor shall prepare all other documents required for execution of the Work. Such documents
shall include but shall not be limited to:
• Construction Environmental Management Plan (CEMP).
• Project Execution Plan.
• Construction Management Plan.
• Construction Mobilization Plan
• Inspection test plans
• Permit and regulatory requirements
8.4.1 General
Contractor shall complete all civil works required for the facilities, as described elsewhere within
this Scope of Work and including but not limited to:
1) Grading, Fencing and roads.
2) Concrete works including all equipment foundations, foundation for pipe supports, anchor
blocks, walkovers, structures, concrete pits, etc.
3) Control Building
4) Equipment foundations for Heater and Separator
5) Structural Steel Works including pipe supports, sunshades, etc.
6) Access platforms, walkovers.
7) Access barriers.
8) Excavation.
9) Trenching & backfilling.
10) Supply and installation of marker posts, plates, access barriers and sign boards.
11) Clean up and final grading, restoration of the plots to the original condition.
The following shall also be considered for the Civil and Structural scope of work:
• All concrete works shall be carried out in accordance with BS-EN 1992, Company SP-1279,
Chapter D and DEP;
• All structural steel work shall comply with BS-EN 1993 and Company SP-1279 chapter G. The
painting and coating of structural steel works shall be carried out in accordance with Company
SP-1246;
• Contractor to supply and install sign boards and other safety equipment; any other civil and
structural works required for the satisfactory and successful completion of the project.
• Contractor shall carry out concrete works in accordance with the relevant AFC Drawings and
Chapter ‘D’ of standard SP-1279. This shall include but not limited to the following:
1) Foundations for pipe supports, pipe sleepers, anchor blocks and pedestals.
2) Equipment foundations.
3) Foundations for the entire skid mounted equipment, sunshades, walkovers, platforms,
access barriers, marker posts, ladder etc.
4) Grouting of all equipment bases and base plates.
5) Concrete Pits: Corrosion Monitoring Pits, Drain pits & Valve Pits, etc.
Contractor to ensure all the required materials (foundation bolts, template etc.) for the
successful installation of equipment foundations for flare stacks, cooler etc.
All major equipment shall be installed on the foundation after the concrete attains its 28 days
strength. Cube tests shall be performed to ensure concrete has attained required strength.
Foundations for all major equipment shall be protected below and all-round with Type-B
granular fill material.
Contractor shall ensure that all fittings are made and maintained clean and in proper working
order.
The Contractor shall also, upon completion of the Works, clear away all plant and temporary
Works, to the complete satisfaction of Company.
8.5.1 General
All the Mechanical and Piping works required to complete the facilities construction and
commissioning in accordance with this section (Section C-4) and the specifications under Section
C-6 are included in the Contractor’s scope.
The scope of work includes but is not limited to the installation, testing, painting, and pre-
commissioning of the complete mechanical and piping works as follows:
• Installation and erection of all equipment and Piping System as described in section 1.1 of
this document like water bath heater, Vent stack, and Odorizer injection package etc.
• Performing all welding, welder and NDE qualifications (inclusive of provision of testing
materials)
• Fabrication, testing and installation of all pipe works.
• Fabrication and installation of pipe and equipment supports
• Installation of temporary support during construction as required.
• Installation of wind socks.
• Installation of SS tubing and accessories for sampling connections
• Piping hook-ups and tie-ins.
• Provision of all production welding documentation.
• Nondestructive testing services.
• Supply of all fittings and flanges, valves, etc.
• All required insulation works.
• Painting and color coating of above ground piping and equipment.
• Hydro testing, leak testing and Pre-commissioning of the modified portion of On-plot works.
• Testing and Pre-commissioning of the facility.
• Commissioning and handing over of the modified portion of the On-plot works
Supply and installation of additional safety equipment and signboards as required complementing
the new equipment already available. The safety equipment includes:
• Wheeled dry powder extinguisher 75 kgs with associated hose reel and nitrogen cylinder.
• Dry powder portable extinguishers (9 kgs capacity)
• CO2 extinguishers (5 kg capacity)
• Fire extinguisher and breathing apparatus
• Eye wash stations
Fabrication, welding and testing of on-plot pipework shall be in accordance with the standard SP-
1173 “Welding of Metals - (Amendments/Supplements to DEP 30.10.60.18)”.
Prior to fabrication of piping components, all the Welding Procedure Specifications (WPS) with
their relevant supporting welding Procedure Qualification Records (PQR) shall be submitted to
Company for approval. All welding procedures shall be qualified in accordance with the
requirements of ASME Code Section IX and as per standards.
All necessary procedures/qualifications must start immediately after the commencement of
Contractor’s mobilization to site for Construction activities and must be completed within 5 weeks
accordingly.
All on-plot all pipework shall be finished and hydro tested in accordance with SP-2051. Bolt
torqueing and tensioning shall be as per SP-2020.
Field welds indicated on isometrics shall be checked by the Contractor for site conditions. The
Contractor shall provide additional field welds if required for ease in handling and erection. The
Contractor shall supply temporary supports required.
appropriate permits from the Company or ROP or other statutory authorities or any other third
parties.
The Contractor shall obtain all necessary consents before constructing any additional access road
and shall re-instate the land occupied by the road in accordance with any conditions of the
consents and to the satisfaction of the land owner once the road is no longer required for the
Work.
8.6.1 General
All the Electrical works required to complete the facilities construction and commissioning in
accordance with this section (Section C-4) and the specifications under Section C-6 are included
in the Contractor’s scope. The scope of work includes but is not limited to the installation, testing
and pre-commissioning of the complete as follows –
Contractor shall make his own arrangement for electrical power required for construction, testing,
pre-commissioning, commissioning and guarantee runs works.
The scope of work covers installation, testing and pre-commissioning and commissioning of the
following electrical equipment including all necessary accessories envisaged at Shafa GSS:-
• 415V LV switchboard.
• 240V AC UPS, UPS DB, battery isolating switch fuses, batteries and racks.
• New gas fired water bath Heater control panel
• Demolition of existing electrical heater and associated cables.
• Packing and transport the electrical heater and all cables to OGC Fahud / Mabella stores.
• Air conditioning DB.
• Lighting and small power DB with new area lighting DB.
• Outdoor lighting DB
• Emergency lighting DB.
• Cable laying (field and building), glanding and termination
8.6.3 AC UPS:
UPS requirements shall be as per DEP33655031. UPS shall provide all required signals for
remote wiring to the control system for monitoring the status of UPS with RS485 serial part.
8.7.1 General
Instrumentation Scope of Work includes installation, calibration, testing, pre-commissioning and
commissioning of complete instrumentation scope of works as required for the completion of the
Shafa GSS including but not limited to the following:
• Calibration and installation of pneumatic operated On-Off valves, and all other field
instrumentation including cabling, terminations, tubing and supports etc.
• Installation of junction boxes including cabling and termination.
• Installation of all Control room equipment/instrumentation (e.g. DCS, IPS, IFB,
Workstations, OPC server, etc.) including cabling and terminations.
• Hook-ups (Process/Electrical/Pneumatic).
• Fabrication and Installation of canopy for all electronic instruments.
• The Contractor shall supply and install all equipment, fittings, instrument support, cabling,
breakers, junction boxes, ducting, cable trays, supports and name plates for field
instrumentation and controls.
• The Contractor shall bench check/calibrate all instrumentation prior to installation in
accordance with the relevant Contract Drawings, company standards and individual
instrument datasheet. The calibration shall be witness by the Company and certificates
shall be completed and submitted to the Company for approval.
• Contractor shall carry out meggarring, continuity test at site for each and every cable
conductor.
• Contractor shall leak test with Nitrogen to a pressure equal to the operating pressure all
impulse or instrument gas piping or tubing.
• Contractor shall loop test, functional check and loop checks all instrumentation and logics
for correct operation and accuracy. The loop and function test shall include SCADA
system as part of Shafa GSS.
The Contractor shall supply and install all equipment, fittings, cabling, breakers, junction boxes,
ducting, supports and name plates for instrumentation and controls.
The Contractor is responsible to ensure that after completion of commissioning, sufficient spare
capacity is available in all cable duct and raceways, Junction Boxes, Cabinets and homerun
cables (multi-pair/core) from field to buildings.
Junction boxes, Cabinets free space shall be distributed in such a way that additional terminals,
equipment or modules, may be added to any group of controls and cables. All spare conductors
shall be terminated.
Additionally, installed spares in the future and spare space within all system cabinets and Shelter
shall be permitted as per Project Specifications.
8.8.1 General
The Contractor shall perform all activities required to fabricate, construct, install and pre-
commission the pipeline and the related facilities in accordance with the Approved for
Construction (AFC) drawings, specifications, standards, international codes, procedures and
method statements and any approved amendments thereto.
Construction activities shall include but not be limited to:
1) Pre-Construction Survey.
2) Clearing and grading of the right of way.
3) Trenching, rock blasting and excavating.
28) The Contractor shall provide all necessary labour, supervision, plant, tools, temporary
camp and fabrication facilities, temporary structures, consumables and spares for the
Work.
29) The Contractor shall carry out full performance and function testing of all associated
systems including pipeline system.
30) The Contractor shall take care to avoid any debris entering the pipeline during
Construction. This shall include the fitting of “night-caps” to the open ends of pipe when
work is not in progress on them.
31) Contractor shall ensure the suitability of each pipe for welding and shall accept all
responsibility for all damages however caused. Contractor shall develop and produce
material receipt records.
32) Contractor shall be responsible to return surplus Company supplied materials to Company
designated yard or as directed by the Company without any cost impact to Company.
Contractor shall install road crossings as required. Number of road crossings, location and width
of crossing shall be indicated on the route alignment drawings.
Barriers shall be provided at all manholes, crossings (livestock, graded road etc.) along the
pipeline route. Access barrier shall be welded type”.
Wadi Crossings
The crossing report shall outline the basis of wadi classification along the route, anti-buoyancy
measures, concrete coating (if applicable) thickness calculation or any measures required to be
taken to avoid exposure of the pipeline during heavy wadi currents. Contractor should note that
concrete coating shall be carried out at a Company approved sub-Contractor and not by
Contractor at site or at his facility.
Any changes to the wadi crossing report including the basis and details of the wadi classification
shall be approved by the Company prior to implementation and any change in the wadi
classifications is deemed to be included in the Contractor’s Lump Sum. Stringing and welding of
the sections within the wadi sections shall require prior Company approval.
All measures required in order to avoid buoyancy of the pipes in the event of rains, wadi’s and
other eventualities shall be undertaken by the Contractor and shall be approved by the Company
as part of the buoyancy report.
Crossing of existing and / or future facilities
Contractor shall take full account of the presence of existing pipelines, flowlines and facilities in
the vicinity of the pipeline and shall confirm their exact location. Contractor shall be responsible
to identify any facility crossing the pipeline including underground and aboveground cables,
overhead power lines etc. The Contractor shall be required to get necessary approvals from the
third party. All such works is deemed as part of this Contract.
For Pipeline crossings there shall be a clear separation distance of 750 mm minimum between
the new pipeline and the existing pipeline.
Live Stock Crossings
Combined livestock and light vehicle crossing shall be installed at 2 km intervals in accordance
with SP-1208 & Pipeline Typical Details Contractor shall provide concrete slab over the pipeline
at all Livestock crossings along with the access barriers.
The Contractor shall protect the windrows by providing stone pitching at all livestock openings,
road crossings and any openings made for the flow of water streams to avoid the accumulation
of water at low points
attributable to the Contractor shall be promptly re-instated by the Contractor. Cost of such
reinstatement shall be to the Contractor’s account.
In the event that the existing routes do not provide convenient access to the Site, the Contractor
shall prepare and maintain all additional routes whilst they are required for the Work and reinstate
at completion of the use.
The Contractor shall prepare and submit for Company approval a plan for all such additional
routes indicating why the road is required and the proposed route. Once any such road is no
longer required for the Work, the Contractor shall notify the Company. The Company will instruct
the Contractor on whether the road is to be left in place or the land is to be re-instated.
The Contractor shall obtain all necessary consents before constructing any additional access road
and shall re-instate the land occupied by the road in accordance with any conditions of the
consents and to the satisfaction of the land owner once the road is no longer required for the
Work.
Access roads to the Construction camp shall be maintained by the Contractor during the entire
period of Construction.
ROW grading and Construction of inspection reports shall be done in accordance with Company
specifications including PDO SP-1208.
However, the areas which are used during construction shall cleaned and cleared of any debris,
excess/ used materials, wastes etc. by the Contractor to the satisfaction of the Company.
Right of Way shall be approved by the Company prior to any construction activities, in the case
Contractor proceeds with construction without getting the written approval from Company
representative, any cost or schedule impact due reconstruction of the Right of way shall be borne
by Contractor.
Final grading and levelling of the entire working strip shall be carried out prior to trenching
operation. In hilly, mountainous and wadi areas the final grading and levelling of the area shall be
carried out for at least 10 meters distance on either side of the pipeline.
The inspection road shall be constructed in such a way that no deep slopes are present which
are unsafe and better visibility is maintained for the drivers heading each other. In case the above
said requirements cannot be fulfilled adequate safety measures shall be carried out during the
design of the inspection road by providing dividers and warning boards/signs/lights etc. The
inspection road along the pipeline shall be graded as per SP 1275 prior to hand over to the
Company.
other related HSE aspects. All related costs, approvals and permits required for establishing and
maintaining the marshalling yards shall be part of the Contractor’s Scope.
of existing pipeline. Specific approval shall be obtained from Company integrity authorities prior
to any activities along the existing pipeline corridor.
including SP-1212 and SP-1208. All requirements specified in SP-1212 shall be considered as
mandatory requirement and shall be fulfilled by the Contractor during hydro-testing.
The Contractor shall produce a complete hydrostatic test plan covering all required activities, test
acceptance criteria and water treatment chemicals.
The Contractor shall be responsible for the sourcing, handling, treatment, transportation and
disposal of water for hydro-testing. The rate and amount of water shall be sufficient to ensure
adequate speed of the fillings pigs in line with SP-1212 and SP-1208 requirements.
The Contractor shall arrange for all necessary approvals for obtaining the water and its
subsequent disposal from the appropriate authority. Details of all sources shall be submitted for
Company approval together with a sample of the proposed water a minimum of 15 days before
commencement of hydrostatic testing. Use of water shall be minimized.
The Contractor shall carry out all the required analysis of the water samples to verify the dosage
and the type of chemical inhibitor to be used in hydro-testing. The chemical inhibitor to be used
shall be Company approved and shall be obtained from Company approved sources.
Prior to commencement of hydro-test the Contractor shall demonstrate to the Company that the
interior of the Pipeline is free of debris and sand. The Contractor shall not introduce any water
into the Pipeline until the Company’s approval of a cleaning, gauging, dewatering, drying plan and
other Construction documentation relevant to the Pipeline section has been received.
Contractor shall fabricate the necessary temporary test headers and air pigging headers required
for hydro-testing, gauging and pre-commissioning of the Pipeline.
Either in the event of any damage the Contractor shall gauge the Pipeline and in the event of any
damage determine the cause, location of the damage and make all necessary repairs including
locating the damaged location if the gauging plate shows any damage.
All water disposal or collection pits shall be suitably lined to prevent ingress of water into the
ground.
The hydro testing for the pipeline sections shall be carried out without the inline pipeline valves.
The Contractor shall reinstate all valves and other equipment removed or disconnected for the
purposes of hydro testing.
be included in the scope of work, including the required material. The Contractor shall supply
temporary gaskets for testing the piping/pipelines. Hydro-testing of pipeline will be done without
installation of any valves
The hydro testing for the pipeline sections shall be carried out without the inline valves The
Contractor shall reinstate all valves and other equipment removed or disconnected for the
purposes of hydro testing.
9.1 General
Contractor shall test the entire new installation, interconnection with the existing facilities,
including all main equipment and associated works. This includes hydrostatic testing and pre-
commissioning of the complete installation inclusive of equipment, piping, instrumentation and
electrical installation all in accordance with Company specifications. The testing and pre-
commissioning scope shall include instrument calibration, functional integrity checking loop
checking and (leak testing. Contractor shall provide and install all facilities required for testing.
All materials and equipment used for testing shall be in good condition and of the correct rating.
Pressure gauges on hydrostatic test equipment shall be calibrated at regular intervals to be
agreed with Company Site Representative.
All temporary materials, such as test spades and supports shall be suitably identified to ensure
that they are removed prior to commissioning.
Test results shall be recorded by Contractor in accordance with SP-1171 on Company approved
test sheets and records and shall be submitted to Company for approval.
Contractor shall also be responsible for maintaining complete documentation of all tests carried
out and these shall be submitted to Company upon completion of pre-commissioning activities.
The format of the test packages shall be submitted to Company for approval.
The Contractor shall to obtain all permits, certificates, approvals etc. from concerned authorities
necessary for handing over this project to the Company prior to normal operations. The permits,
certificates, approvals shall include but not limited to:
• Permit to Commission the Project from the Ministry of Environment and Climate Affairs MECA
• Flaring Permit from MECA
• Hydro-testing Permit from MECA
• Final Environmental Permit from MECA
• Fire Safety and Security requirements from Royal Omani Police -Oman Civil Defense
• Climate Affairs Permit from MECA
• Provision of Telecommunication Services and Equipment License from the Ministry of
Transport & Communications
• Any other permits, certificates, approvals not included above.
The Contractor shall calibrate, test and pre-commission the entire Instrumentation system in
accordance with DEP 62.10.08.11, “Inspection and Functional Testing of Instruments”
Following testing and Pre-commissioning instrumentation activities shall be included, as a
minimum:
• Planning, organization and scheduling of pre-commissioning activities with construction and
commissioning staff of Company.
• Developing and generating loop checking procedures for review/approval of Company
Immediately after placing the purchase order for the relevant equipment, Contractor shall obtain
original letter from the supplier of each equipment indicating a recommended list of spares
required for one year trouble free operation and submit this list to Company in original form for
Company review and approval. Also Contractor submits duly completed Spare Parts
Interchangeability Record (SPIR) forms to Company for approval.
Contractor shall obtain approval by Company of all SPIR forms no later than 90 days prior to pre-
commissioning of the system to which the SPIR forms relate.
Upon receipt of the SPIR forms and supporting drawings from Vendors, Contractor shall make all
necessary calculations to determine the required quantities of operational spares in accordance
with DEP 70.10.90.11-Gen.
Contractor shall procure all operational spare parts and operational consumables necessary for
the two years of operation of the facility as recommended by the supplier of equipment and
approved by Company.
9.3 Commissioning
• Contractor CSU team shall prepare systemization procedure for project scope and shall
discuss and agree with OGC
• As per systemization procedure, ECP Contractor shall further discuss and agree with OGC
number of commissioning procedures required for the project.
• System wise Commissioning Procedures shall be prepared by Contractor to give clear
guidelines on how to ensure the Commissioning of the Field Equipment’s and associated
piping within the defined System and sub-system before introduction of process fluids.
• OGC CSU team shall finalize the list of commissioning procedures accordingly Contractor
team shall deliver the procedures for OGC approval.
The Contractor shall note that meeting the Process Guarantee is the essence of the Contract.
The Contractor shall therefore demonstrate full achievement of the requirements of the Process
Guarantee during guarantee run.
Contractor shall carry out the Commissioning in accordance with Facility Commissioning manual,
the manual shall be in accordance with Company specification and any additional requirements
set out in this Contract.
The Contractor shall put in place an emergency response plan specific to Commissioning
activities. Contractor shall refer to Contract Document C-9 HSE Requirements for requirements
for hazard control and emergency response planning requirements.
Contractor shall appoint within its management organization, within one month of the Effective
Date, a full-time Commissioning Engineer who shall be responsible for all aspects of Design and
Construction liaison, planning, attending reviews, coordination of all Commissioning and
performance guarantee tests at the Site. The Commissioning Engineer is classified as Key
Personnel and shall be qualified and experienced in the co-ordination of commissioning and
operation of sour oil and gas treatment facility. The resume/curriculum vitae for the proposed
Commissioning Engineer shall be submitted for Company approval within one month of the
Effective Date.
Contractor shall provide in its organization all personnel required for the facility Commissioning,
performance guarantee tests, and final handover activities. Contractor's Commissioning
personnel shall comply with the minimum Company qualification criteria specified in Contract
document C-4.
Contractor shall also commission all the ancillary systems covered in his scope including but not
limited to the electrical, instrumentation and SCADA & Telecom Tie-in.
Contractor shall make due allowance in Contractor’s schedule and work plans for any restrictions
on the work imposed by Company for the purposes of commissioning all or any part of the scopes
mentioned under this contact document.
Contractor shall ensure that the relevant Vendor experts are present during commissioning for as
long as required in order to assure full satisfaction of Company that all system components are
operating as per the Contract requirement.
Contractor shall supply all items including but not limited to personnel, equipment, tools, test
equipment, consumables etc. for commissioning. Contractor shall employ a dedicated
Commissioning engineer after submitting his CV and obtaining Company’s approval.
Contractor shall submit to Company a detailed commissioning plan along with all procedures for
approval. Contractor to note that Company intends to use gas to air method of commissioning for
the pipelines eliminating nitrogen as a barrier between gas and air.
Contractor to note that preparation of the facilities as mentioned for commissioning shall require
initial purging of station piping and vessels with Nitrogen.
Contractor shall maintain records of all commissioning activities. The normal working hours for
Company operators shall be Saturday to Thursday 08:00 hours to 17:00 hours. If Contractor
requires presence of Company operators beyond these working hours then he shall have to
compensate Company operators for the overtime payments.
Contractor shall include in his lump sum price the complete cost for commissioning. This shall
include but not limited to all costs associated with commissioning of sub-contracted or bought out
package items. This will include all costs involved in bringing the specialist engineers, technicians
required for commissioning of these items. Company shall not allow demobilization of the
specialist engineers, technicians till such time Company is satisfied with successful completion of
commissioning activities.
Contractor shall include in his lump sum price nitrogen test and purging of the pipeline as part of
the commissioning activities.
It is the Contractor responsibility to produce the Commissioning and Start-Up Manual in both
Electronic and hardcopy format and issue to Company for approval at least ninety (90) days
before the estimated Substantial Completion Date.
The Manual shall provide as a minimum a detailed description of:
a) Sub-Contractors/Vendors required for Commissioning and confirmation on availability.
b) Temporary equipment required for Commissioning
c) All major equipment packages, Systems and Sub-systems
d) Define the limits of all Systems and Sub-systems
e) Sequence of Commissioning/Work flow scheme.
f) Chemicals and consumables required for Commissioning.
producing on-spec oil and gas. In the event of a failure in the 72-hour test the Commissioning
shall cease. If, in the opinion of the Company Site Representative, other activities may continue
then Contractor shall correct the failure, restart the 72 hours test , and continue according to plan.
During this test run the Contractor shall maintain a detailed log and shall document performance
measurements. Test reports for each unit and system shall be submitted to Company, for
information, within twenty-four hours of completion of the test and Contractor shall incorporate
the test reports in the Commissioning and Startup Report.
Company shall have the right to nominate modes of operation during testing depending on the
availability e.g. maximum turndown, maximum design flow or maximum available flow at the time
that the Plant is ready 72hours test runs.
The Performance Test and Acceptance Criteria shall be developed by the Contractor. This
performance criterion will define for acceptance of project to be transferred from Project team to
asset owner.
Acceptance test performance criteria shall cover the integrated system performance (not limited
to only specific unit performance). Operating parameters for the performance test shall cover the
overall operating window of the specific equipment (for example: rated capacity, MCF, turn down
– possible upsets in upstream unit)
The Contractor shall meet following design criteria and performance parameters and guarantee
including but not limited to: design pressure and temperature, design margins, process
parameters for the full range of inlet compositions, inlet conditions, ambient conditions and outlet
conditions as defined during the detail design.
i. Achievement of Performance parameters for all equipment installed as stipulated in FEED
document and as a part of the development during the detail design.
ii. Achievement of Performance parameters for all plant interface battery limit conditions as
defined in FEED document and as a part of the development during the detail design.
iii. Achievement of Performance parameters during start-up and shutdown conditions.
iv. Achievement of Performance parameters within the environmental specifications as per
FEED document and as a part of detail design development.
v. The Contractor shall provide the performance parameters for all the equipment installed
along with the issue of AFC documents and drawings.
vi. The procedures by which Contractor will demonstrate achievement of performance
parameters for all the equipment installed shall be developed by the Contractor and shall
be reviewed and approved by the OGC.
vii. Should there be a situation where any specific equipment is not fully meeting the design/
performance parameters; the Contractor shall fix the same prior acceptance of the
equipment by the OGC.
viii. OGC will not commence the 90 days performance test for minor deficiencies on equipment
prior to rectification by the Contractor. In such cases, warranty period of the specific
equipment which is not meeting the design parameters shall start from the date when the
equipment deficiencies are rectified and the performance test starts.
ix. All the necessary work required achieving the performance parameters set points and
performance guarantee points during the Performance Test and during 90 consecutive
days Performance Test shall be part of the Contractor scope of work.
x. The acceptance testing will be carried out by the OGC personnel i.e. the CSU Team. The
testing parameters shall include but not limited to: through puts- flow rates, temperature,
composition and inlet conditions within the design envelope specified in DD documents.
The testing parameters shall be varied during the testing within the design envelope limits
including all the operating modes of the systems.
xi. All test results and detail data captured during the acceptance tests shall be compiled and
attached to the test report which shall be prepared by the Contractor, reviewed by the
OGC and shall be handed over to the OGC as part of the deliverables to successfully
complete the acceptance certificate and handover from Contractor to OGC.
Contractor shall submit all final documentation including ‘mark-up’ drawings, with the exception
of as-built drawings, for Company review 90 days prior to the Scheduled Substantial Completion
Date.
Contractor shall submit all as-built drawings for Company review 45 days prior to the Scheduled
Completion Date.
Contractor shall submit an electronic version of all their final documentation, for Company records.
These shall include, but not be limited to drawings, documents, vendor documents, design
documents, etc.
As part of as-built documentation Contractor shall populate the applicable Formats, “Formats”
and shall develop similar formats for the new items and handover the duly filled formats to
Company in soft copy to enable us to upload in our CMMS database system.
limited to items like MTCs, O& M Manuals, Maintenance schedules, Cost Breakups for materials
including start-up and operational spares.
DOCUMENT - C5A
SCHEDULES OF PRICES
Contents
1.0 PRICING PREAMBLES................................................................................................... 4
1.1. DEFINITIONS........................................................................................................................................ 4
1.2. ALL INCLUSIVE CONTRACT PRICE AND UNIT RATES .............................................................................. 5
1.3. PRICING OF SCHEDULES ...................................................................................................................... 6
1.4. WORKING HOURS FOR SITE ................................................................................................................. 6
1.5. COMPANY PERMITS, RULES AND PROCEDURES .................................................................................... 7
1.6. CUSTOMS DUTY .................................................................................................................................. 7
1.7. CONSUMABLES ................................................................................................................................... 7
2.0 LUMP SUM WORK (SCHEDULES ‘A’ AND 'B') ............................................................. 7
2.1. DESCRIPTIONS FOR IDENTIFICATION ONLY............................................................................................ 7
2.2. ADDITION, OMISSION OR DELETION OF WORK ...................................................................................... 7
2.3. COMMISSIONING AND GUARANTEE RUN ............................................................................................... 8
2.4 ALTERNATIVE PRICES ......................................................................................................................... 8
2.5 PROVISIONAL AMOUNTS ...................................................................................................................... 8
3.0 UNIT RATES FOR VARIATIONS TO THE WORK (SCHEDULE 'C') .............................. 8
3.1. ABBREVIATIONS .................................................................................................................................. 9
3.2. MEASUREMENT ................................................................................................................................... 9
3.3. CIVIL WORK ........................................................................................................................................ 9
3.3.1 Excavation ........................................................................................................................................9
3.3.2 Filling ..............................................................................................................................................10
3.3.3 In situ Concrete ..............................................................................................................................10
3.3.4 Pre-cast Concrete ..........................................................................................................................10
3.3.5 Formwork .......................................................................................................................................10
3.3.6 Reinforcement ................................................................................................................................10
3.3.7 Grouting ..........................................................................................................................................11
3.3.8 Anchor bolts ...................................................................................................................................11
3.3.9 Block work ......................................................................................................................................11
3.3.10 Steelwork ...................................................................................................................................11
3.3.11 Roads ........................................................................................................................................11
3.3.12 Paving and surfacing .................................................................................................................11
3.3.13 Fencing ......................................................................................................................................11
3.4. PIPEWORK ........................................................................................................................................ 11
3.4.1 Fabrication ......................................................................................................................................12
3.4.2 Testing ............................................................................................................................................12
3.4.3 Valves .............................................................................................................................................13
3.4.4 Insulation Work...............................................................................................................................13
3.4.5 Pipework .........................................................................................................................................13
3.4.6 Valve Boxes ...................................................................................................................................13
3.4.7 Protective Coatings ........................................................................................................................13
3.4.8 Pipework .........................................................................................................................................13
3.4.9 Steelwork ........................................................................................................................................14
3.5. ENGINEERING.................................................................................................................................... 14
3.6. MECHANICAL PLANT ......................................................................................................................... 14
3.7. MATERIALS ....................................................................................................................................... 14
3.8. STAND-BY TIME................................................................................................................................. 15
4.0 TERMS OF PAYMENT (SCHEDULE – ‘E’ ) .................................................................. 15
4.1 MILESTONE PAYMENTS (SCHEDULE ‘E1’)........................................................................................... 15
4.2 PENALTY MILESTONES(SCHEDULE C5 - ‘E2’) ..................................................................................... 16
4.3 UNAUTHORIZED DEPARTURE OF KEY PERSONNEL .............................................................................. 16
5.0 CONTRACTOR'S ACCOMMODATION AND FACILITIES ............................................ 17
5.1 MOBILIZATION ................................................................................................................................... 17
5.2 DEMOBILIZATION ............................................................................................................................... 17
1.1. Definitions
In this Document C-5 - Payment Schedules and any subsequent Documents of the Contract
the following words shall have the same meaning as assigned to them herein. Other words
used in this Document which have been defined in previous Documents of the Contract
shall have the same meaning as assigned to them in the previous Documents.
"Fabricate" shall include but not be limited to taking delivery, unloading, examining,
handling, accepting materials or equipment supplied by Company or Contractor into
Contractor's care and control, maintaining records, preparing necessary fabrication
drawings (including any Engineering), identifying and removing material from store, setting
out, preparing, cutting, drilling, prefabricating, bending, welding, preheating, stress relieving,
bolting, temporary access/supports, all consumables, testing and transporting to area of
erection or other specific location.
"Install" & "Installation" shall include all actions covered by the term Fabricate and site
preparation, trenching or provision and installation of all necessary supports,
hoisting/lowering in and locating in position, trial fit, temporary access/supports and
permanent erection/installation in final position, tie-in/hook-up, all consumables, provision
of padding, protective barriers and all backfilling, inspection, testing, repairing, coating,
preservation related activities necessary to attain a mechanically complete condition,
dismantling, clearing away temporary access/supports and surplus/scrap material and
reinstating the site.
“Install” / “Provide” shall also mean design, engineering, manufacture, works testing,
packing for transport by land, sea or air, shipment insurance, delivery to site, unloading at
site, complete erection and Installation, painting, site testing, pre-commissioning and
commissioning, guarantee run as agreed, putting into operation and maintenance prior to
completion.
"Lump Sum Contract Price" shall mean the Contract Price less Provisional Sums.
“Milestone Due Date” shall be the last Company working day of the week identified in the
Milestone Schedule as the date by which the Milestone is to be achieved in all its parts. In
the event that the “Milestone Due Date” falls on a Public Holiday the “Milestone Due Date”
shall be the next working day.
“Penalties” These are sums that if invoked shall be deducted from the value of the
Milestone at the time of the payment of that Milestone.
"Provisional Work" shall mean work which cannot be entirely detailed and for which an
estimated quantity is inserted in the Payment Schedules. Reimbursement of such work
shall be against actual quantities executed. Actual quantities shall be multiplied by the
stated unit rate with no adjustment made to the unit rate for any variance between the actual
quantity and the estimate.
"Standby" shall refer to a situation in which the planned activities of one or more of
Contractor's work crews is unable to continue working as a direct result of Company action
and where Company agrees that such standby is due to circumstances that could not have
been anticipated by Contractor in the planning of the activity and that Contractor is neither
responsible for nor has contributed to the cause of such standby. Standby excludes delays
arising from archaeological finds.
"Supply" shall include: issue of enquiries; bid evaluation/analysis; preparation and issue of
purchase orders; purchase and cost of materials; office and field expediting; inspection,
preparation and coordination of procurement documentation; packing, preservation and all
deliveries from whatever location in or outside the Sultanate of Oman and transportation to
Site; receipt, storage, conservation, handling and administration at Site; coordination of
vendor/supplier representatives.
“Loose ground” shall be defined as ground conditions that for the purposes of trenching
hand excavation is possible to achieve a minimum cover of 1500mm above the pipe.
“Medium ground” shall be defined as ground conditions that for the purposes of trenching
to achieve a minimum cover of 1500mm above the pipe can be excavated to the required
full depth by means of a Caterpillar 235 or similar.
“Hard ground” shall be defined as ground conditions that for the purposes of trenching
require blasting or the use of a rock hammer or similar to achieve a minimum 1000mm cover
above the pipe.
The Contract Price represents full payment to the Contractor for all costs associated with
the Installation of Complete Facilities pertaining as described in the Document C-4 Scope
of Work and Document C-6 Technical Specifications together with all associated facilities
as defined under the Contract.
The Lump Sum prices and Unit Rates entered shall be deemed to be the fully inclusive cost
for the Work and shall include but not be limited to:
i) Direct and indirect labour, wages, overtime, bonus, transportation, messing, traveling,
housing, holidays, pensions, insurance, welfare, allowances, sick pay, protective
clothing, safety equipment, other payments, contributions, taxes, levies or expenses
payable in respect of labour as applicable under and in accordance with law, safety,
health, welfare.
ii) Administration, agents fees, management, telephone, fax, e-mail, communication
supervision costs, setting out, investigation, expenses, site and head office
overheads, control, protection, as built records and information, financing costs,
repairs.
iii) Cooperation with:- other contractors, third parties, local establishments, Walis,
municipality, government agencies, etc.
iv) Establishment costs, services, stores, industrial facilities, workshops, fences,
watching, lighting, safety, security, maintenance, latrines, messing facilities,
accommodation, electricity, air, gas, water, fuel oil, grease cleaning and clearing up
at all times.
v) Plant, machinery, equipment, fuel, lubricants, tools, temporary supports, hoisting and
lifting equipment, staging and weather protection, scaffolding, shelters, transport,
haulage.
vi) Materials, consumables, safe storage, fixing in place, samples, testing, cleaning,
waste, handling and multiple handling, duties.
vii) Other insurance, liabilities, obligations, responsibilities and risks arising out of
Document C-3, General Conditions for Contract and all other documents forming the
Contract.
viii) Lump sum price to include all site clearing and carting away of rubble, waste, cleaning
of all surfaces, etc.
ix) In the execution of the work there will be significant requirements for the Contractor
to plan and interface with a number of other parties. This interfacing will occur
throughout all the phases of the project and will include the need for others to access
the Sites. The Contractor shall allow in his lump sum price for this interface
specification, including registers, management, including preparing for, attending at,
and following up interface meetings as required, and impact on progress during
execution.
x) Contractor shall take into account in his costing any change in routing of Pipelines
from that proposed due to Site conditions.
xi) Site tests, acceptance tests and type tests. The Contractor shall be responsible for all
costs incurred in the attendance at Site by the Vendor representatives.
xii) Rectifications, corrections, restoration of work due to non-compliance or deficiencies
or omissions revealed at any stage during the Contract execution.
xiii) All work not expressly specified here, but necessary for the completion and proper
Installation, maintenance and operation of the equipment and accessories, shall be
Contractor’s responsibility, at no additional cost to the Company and deemed included
in the cost.
xiv) Profit and Overheads.
The Contractor shall be paid in accordance with the Schedule of Prices for Work performed
and services provided.
All Unit Rates and Prices shall be in Omani Rial and shall remain fixed for the duration of
the Contract.
Lump sum Prices or Unit Rates shall be inserted against all items in the Schedules which
have a monetary value. Should the Work or obligations given in such items not be carried
out by the Contractor, the Company shall deduct amounts for the Work not completed
valued in accordance with the Contract.
• 07.00 until 18:00 with 1 hour break for Lunch, Sunday to Saturday inclusive for
site location.
Should the Contractor require to work outside these hours then prior agreement must be
sought from the Company and no additional payment will be made. Extra time coverage at
site by Company personnel shall be charged to the Contractor.
Contractor shall adhere the labour laws of the Sultanate of Oman for the break timings
during the Holy month of Ramadan & summer period.
The Contractor shall include for all necessary requirements for obtaining approvals under
the Company's Permit to Work Procedure (PTW). The Contractor shall take account of the
availability of Company signatories.
Where the Contractor can identify cost savings resulting from streamlining the particular
PTW requirements for the Work, the Contractor shall submit such proposals together with
an evaluation of the proposed savings to the Company for approval. All proposal shall be
subject to written approval by the Company and shall only apply to the stipulated areas of
the Work.
1.7. Consumables
The Contractor shall provide all Consumables required to complete the Work unless
specifically stated otherwise.
For the purposes of this Contract, Consumables are considered to be, items necessary to
complete the Work, but which do not actually form part of the installed equipment, this shall
include, but not be limited to: welding rods, fluxes, grease, gases, incidental non-specialist
lubricants, oils, refrigerants, cleaning agents, corrosion inhibitors, solvents, shell sole, rags,
application equipment, disposable protection and clothing.
Notwithstanding the omission from the description of any operation, the cost of all operations
that may be ascribed to the Work referred to in the item shall be deemed to be included with
that item. No liability will be accepted by the Company for defective description or further
operations, other than those described, being required to complete the Work.
Where applicable the Contractor shall include in his Price for excavating in whatever ground
conditions may be found, and for excavating by hand wherever the Company may deem
mechanical excavation to be unacceptable.
amounts stated against these descriptions shall be deemed the value of such Work. In the
event that such clear identification cannot be established then the addition, omission or
deletion of such work shall be valued in accordance with item 3.0 herein.
The Contractor shall include in the Lump Sum price for maintaining, on Site during this
period, all facilities required for Completion of the Work. This shall include but not be limited
to Contract Management, Site supervision, accommodation, messing, transport and
communication for all required labor to support such facilities.
Only those different methods, Materials or equipment specifically referred to within the
Alternative shall be included within the Contractors price, all other conditions shall remain
unaltered.
Award of an Alternative shall be instructed at the sole discretion of the Company, once
instructed the Alternative shall become the Contract Price for the relevant Work.
The rates contained in Schedule 'C' shall be used to evaluate modifications, omissions,
deletions and/or additions to the Work where these rates result in the most advantageous
price to the Company. In the event of dispute the Company may direct the use of rates
obtained from Schedule ‘C’ and mark-up % stated in Schedule ‘F’ for additional material
procurement or third party services if required by the Company.
All Rates shall apply equally to executing the Work in large or small quantities and difficult
or easy situations and no claim shall be entertained relating to the proportions of the Work
actually falling into these categories.
3.1. Abbreviations
The following abbreviations are used:
cubic metre m3
square metre m2
linear metre m
kilogram kg
tonne t
number no
schedule sch
not applicable n/a
inches “
3.2. Measurement
Quantities shall be measured net on completion. No allowance shall be made in final
measurement for waste or handling of surplus materials.
3.3.1 Excavation
Excavation Work shall be measured by volume. All elevations shall be measured from
agreed ground levels and dimensions in accordance with the Drawings and Specifications.
For measurement purposes, the width of a service trench in any material including rock for
a pipe or cable shall be as detailed in the Specifications.
Rates shall include for additional excavation in any material including rock, subsequent back
filling of over break and working space as required with suitable material (including imported
selected material as necessary) and for all necessary temporary supporting of sides of the
excavation. Rates shall also include for excavation to necessary widths, supporting sides,
trimming and grading bottoms, backfilling and disposal of surplus.
For measurement purposes, rock shall be defined as that material which can only be
removed by means of pneumatic or special hydraulic equipment.
3.3.2 Filling
Filling material shall be measured by volume as equal to the net void to be filled excluding
over break and working space.
Rates for filling shall include for all cutting and excavating of material and sorting where
applicable, loading and transporting to the work area from Company approved borrow pits,
including any double handling which may be required, filling into excavation or spreading,
leveling, watering and compacting in accordance with the Specifications.
3.3.3 In situ Concrete
Concrete shall be generally measured by volume, irrespective of mix, in cubic meters (m³)
No deductions of concrete shall be made for volume of reinforcement and sections of voids
less than 0.10 m³.
Rates shall include for all protective coatings, temporary construction joints, curing and
protecting concrete surfaces from harmful weather conditions and providing, transporting
and testing of concrete cubes including payment of all fees. Blinding concrete shall include
for all supporting edges where required and any necessary preparation work of the ground
below.
3.3.4 Pre-cast Concrete
If the Contractor, with the approval of Company, elects to precast work shown on drawings
as in-situ, this work shall be measured as though the work had been executed in-situ. Pre-
cast concrete units shall be measured by volume in cubic meters ( m³). Rates shall include
for all moulds and reinforcement.
3.3.5 Formwork
Concrete rates shall include for all necessary formwork, regardless of height, position or
any other circumstances.
3.3.6 Reinforcement
Reinforcement shall be measured by weight in kilograms (kg). The weight shall be the net
weight without addition for rolling margins, supports, spacers or tying wire and in the case
of mesh without addition for laps.
Rates shall include for all cutting, bending, notching, and fixing all supports, spacers and
tying wire necessary during the deposition of concrete.
Rates shall include for supplying, cutting, bending and fixing of support chairs in multi-
layer reinforcement where not indicated on the Drawings.
3.3.7 Grouting
No additions shall be made for grouting to underside of base and machinery bed plates or
the like where the area grouted is less than 0.50 m², irrespective of the thickness of grout.
Grouting to underside of base and machinery bed plates or the like exceeding 0.50 m²
shall be measured by volume. Rates for grouting shall include all chamfers and temporary
edge boards.
3.3.8 Anchor bolts
Anchor bolts, inclusive of nuts and washers, shall be measured by weight. Rates shall
include for fixing into concrete, any necessary temporary supports or templates and
leaving ends clean, greased and ready for use.
3.3.9 Block work
Block work shall be measured by area in square meters (m³). No deductions shall be
made for voids not exceeding 0.10 m2. Rates shall include all labour, including cutting,
bonding, building in pipes, ducts and the like and reinforcement.
3.3.10 Steelwork
Steelwork shall generally be measured by weight in kilograms (kg). The weight shall be
the net weight, without addition for rolling margin, laps, welding material, bolts, nuts,
washers or protective coatings and without deduction for holes, splay cuts, notches or the
like. Weights shall be calculated from the particulars given in the relevant standard weight
tables.
Quantities shall be measured net and rates shall include for all fabricating and erecting
costs including cutting, drilling, notching, welding, bolting, hoisting, fixing in position and
any temporary work. Plate/open flooring shall be measured as the net area in square
meters (m²) fixed in position.
3.3.11 Roads
Asphalt roads shall be measured in square meters (m²). Rates shall include all base and
sub-base preparation, asphalt base and wearing coats, culverts, hard shoulders, lining,
rumble strips and all items required to complete the road to the standard called for in the
Specification.
Graded roads shall be measured in square meters (m²). Rates shall include all the
required material, windrows, and grading to meet the specification.
3.3.12 Paving and surfacing
Paving and surfacing shall be measured by area in square meters (m²). Rates shall
include any preparation work of the ground below, provision of sub-base and surfacing
and all associated labours.
3.3.13 Fencing
Fencing shall be measured by length in meters (m). Rates shall include all post holes,
foundations, posts, gates, strainers, protective coatings and the like.
3.4. Pipework
Rates shall exclude the cost of all Material with the exception of consumable Material. The
term "pipework" shall be deemed to include pipe and all associated fittings and ancillaries.
Pipework shall be measured by length on the centre line of the pipe through all fittings and
ancillaries, valves etc. and shall be classified according to material type and schedule or
wall thickness stating the nominal bore. At bends measurement shall be to the intersection
point and branches shall be measured from the wall of the main pipe. Interfield and export
pipework shall be separately measured to on-plot pipework as stated below.
Rates for pipework shall include for installation of all fittings and ancillaries including bends,
elbows, tees, reducers, branches, fittings, screw vents, drains etc.
Flanges, joints, weld branch con fittings, socket-welded fitting valves shall be measured
separately.
The fabrication of special brackets or pipework supports, from standard sections or plate
shall be measured as supporting steelwork.
3.4.1 Fabrication
i). Rates for fabrication of pipework shall include:
a. taking delivery, checking, off loading, storing and distributing;
b. cutting to required lengths and preparing ends including necessary beveling, threading
and the like;
c. fabricating, setting up, aligning, clamping, tacking, welding, NDT and preparation
work, jointing, perforating and the like;
d. temporary capping of open ends;
e. checking dimensions and clearances and determining any additional dimensions
necessary for fabrication and installation;
f. preheating and other heat treating;
ii). Rates for fabrication and erection of internally coated pipework shall be measured as
extra over the pipework to which it applies.
NDT of pipework welds shall be enumerated. In no event shall any welds found to be
defective, and requiring additional NDT after repair, qualify for additional payment.
The fabrication of special brackets or pipework supports, from standard sections or plate
shall be measured as supporting steelwork.
3.4.3 Valves
The installation of valves shall be enumerated as "extra over" the rate for pipework erection.
Rates for erection of valves shall be for valves of all pressures and types except control
valves and actuated ball valves which shall be separately measured. Rates for erection of
valves shall also include all required testing (such as Site Leak Test, etc), trial fitting, jointing,
welding and preparation work and the like.
Control valves and actuated valves shall include actuators.
Rates for insulation shall include for all labours including cutting, bending, scribing, notching,
taping, wiring, strapping, banding, sealing, jointing, overlapping, fixing battens, welding pins,
screws and locking washers, tapping, sealing ends, bevelling back to flanges, marking,
stamping, trial fitting and removing.
Rates shall also include working at any height or location and for work to fittings and
ancillaries, narrow widths, isolated areas, junctions between steelwork sections, stiffeners,
working around doors, hatches, supports and the like, working over pipe joints, removable
access panels, expansion/contraction joints and identification tags and plates.
3.4.5 Pipework
Pipework insulation shall be measured along the centre line for the gross length of pipework
as fixed and shall be measured over bends, elbows, reducers, tees, branches, capped ends,
valves, isolated flanges and similar ancillaries and fittings in the line.
The insulation of reducers shall be included in the measurement of the larger diameter pipe.
Insulation of pipework shall be measured separately according to the diameter of the pipe.
Rates for insulation of pipework shall include all additional costs in insulating bends, elbows,
tees, branches and the like.
3.4.6 Valve Boxes
The boxed insulation of valves, flanges and instruments shall be grouped together,
enumerated and measured as extra over insulation of pipework.
Rates for such boxes shall include for fabricating in sections and for all notching cutting and
fitting. Where valves are flanged, the rate for valve boxes shall include for any additional
costs in insulating the associated flanges.
3.4.7 Protective Coatings
Rates shall include the cost of all Material. Rates shall include for all surface preparation
ready to receive protective coatings, protecting of adjacent Work and application of primer
and coating in accordance with the Specification.
3.4.8 Pipework
Protective coating of pipework shall be measured the gross length as fixed including all
fittings, flanges, valves etc. in the line. Rates shall include for the additional cost due to
extra size and girth at all flanges, valve spaces, supports, anchors, guides etc. Rates shall
also include for picking out valve wheels and other sundry items in contrasting paint.
3.4.9 Steelwork
Painting of steelwork generally, irrespective of profile, shall be measured by weight.
3.5. Engineering
For any Fabrication and Installation elements of work that are the subject of a Variation
Order the Engineering component shall be taken as having been included in the Fabrication
and Installation unit rate in Schedule C applicable to that element of work.
For the supply of material for any element of work that is the subject of a Variation Order
the Engineering component of the supply shall be taken as having been included in the
Schedule ‘F’ Procurement mark up.
If the work that is the subject of a Variation Order is such that an appropriate unit rate cannot
be identified then the Engineering element shall be valued according to Engineering Rates
or by agreement between the parties.
The rates for Engineering shall be comprehensive and include but not be limited to:
a) Wages and all costs, payments and charges including annual and public holidays,
traveling time, expenses, fares and transport and other disbursements including
redundancy payments and any requirements of the Sultanate of Oman labour laws
b) Charges in respect of Site and office supervision and HSESM requirements
c) Site and Head Office overhead charges such as: rent, rates, insurance's, electricity,
gas, fuel, water, printing, stationery, postage, telephone charges, motor car
expenses etc. and repairs, renewals, maintenance and depreciation of premises,
machinery plant etc.
d) Profit
Key Personnel as defined in Document C-8, Procedures for Contractors, will not be
reimbursed for hours expended on Variation work. The cost of such personnel is deemed
to be included in the Contract Price.
The Contractor shall provide for all costs and charges associated with transportation and
haulage to, from and around the Site, of the Contractor Equipment engaged in the subject
work. No separate payment shall be made by the Company to the Contractor for
transportation costs.
3.7. Materials
The percentage additions in respect of Materials shall be fully inclusive of all administration
charges, overheads, profit, import duties, taxes, levies and delivery to Site, where not
previously included in the invoiced cost of Materials.
Unless otherwise justified by the Contractor and approved by the Company the Contractor
shall provide three quotations for the purposes of comparison for each item of material to
be supplied.
In the event that the Contractor is unable, for whatever reason, to provide the Company with
an authenticated copy of the Suppliers invoice against which a percentage addition has
been made the Company reserves the right to make direct
approach to the Supplier for such a copy.
The percentage additions in respect of Third Party Services shall be fully inclusive of all
administration and supervision charges, overheads and profit. (Schedule ‘F’)
3.8.1 The Company shall consider payment of Standby rates only in cases where:
3.8.2 All Standby situations shall be advised to the Company immediately by the Contractor
3.8.3 In the event that the Contractor relocates the affected work party to avoid a Standby
situation already notified to the Company and the Contractor considers the relocation to
have disrupted the Work, the Contractor may submit within 5 working days a substantiated
request to the Company for payment of a disruption allowance. The disruption allowance
shall be a maximum of 50% of the one day Standby rate for the affected personnel and
equipment.
3.8.4 The Contractor may not claim for both Standby rates and the disruption allowance in
connection with a Standby situation.
3.8.5 The Contractor may submit within 5 working days of resumption of the interrupted work a
substantiated request to the Company for payment of a claim arising out of the Standby.
The Company will not reimburse the first 5 hours of Standby and will base the settlement of
the claim on a maximum of 8 hours per working day during the Standby period.
4.1.1 The Company will issue the Contractor with a certificate certifying Milestone Completion on
completion, to the satisfaction of the Company, of all Work including all outstanding HSE
and Quality related audit non-conformances, contained within these Milestone groupings.
4.1.2. On receipt of a Company certified "Certificate of Milestone Completion", the Contractor
shall invoice the Company that percentage of the Lump Sum stated as being due for
Coastal Based:
a. Contract Manager
b. Project Manager
c. Planning & Control Engineer
d. Engineering Coordinator
e. Procurement Engineer
f. QHSE Senior Engineer
g. Discipline Engineers of Engineering Team
Site Based:
a. Construction Manager
b. Quality Control Engineer
c. Planning Engineer
d. HSE advisors
e. Site Construction Supervisors
f. Quality Control Inspectors.
In the event of any delay in mobilization of Key Personnel (to be mutually agreed with the
successful Contractor), in case of Contractor not able to mobilize with in the agreed time,
then a penalty of RO 200 (In words, Two Hundred Rials Omani) per day per position shall
be applicable, subject to a maximum period of 14 days, shall become due to the Company.
In the event that any of the Contractor’s Key Personnel are not available at or demobilized
from site for reasons other than, the work or instruction by the Company, a penalty of OMR
200 (In words Two Hundred Rials Omani) per position, per day that Key Personnel are not
available, subject to a maximum period of 14 days, shall become due to the Company.
In the event that any of the Contractor’s Key Personnel are replaced or un-authorized
personnel posted at Site without the prior written approval of the Company a penalty of OMR
500 (In words Five Hundred Rials Omani) for each event, subject to a maximum period of
14 events, shall become due to Company.
Non Conformance Reports (NCR’s) shall be closed out on the proposed close out date.
Fines shall be applied per day (OR.500 per day / per event) after the proposed close out
date, subject to a maximum period of 14 days per event, shall become due to the
Company
The Contract Price shall include for the provision and maintenance of accommodation for
all Contractor Personnel. The Contract Prices shall include for all temporary facilities being
constructed and operated in full compliance with Company and Oman regulations and
standards for the duration of the Contract.
The Contractor shall include for Mobilisation, maintenance and Demobilisation of all
temporary facilities on Completion of the Work.
5.1 Mobilization
Mobilization shall mean the assembly (including all necessary transportation) and making
ready, operationally fitted for use at the Site, by the Contractor, of all personnel, labor,
accommodation facilities, temporary works and construction equipment for the Work.
The Contractor shall notify the Company when fully mobilized and ready to commence the
Work.
5.2 Demobilization
Demobilization shall mean the disbanding, making good and removal (including all
necessary transportation) from the Site or related areas by the Contractor of all personnel,
labour, accommodation facilities, debris, temporary works and construction equipment for
the Work. The Contractor shall include for cleanup of the Site areas, and camp sites with
nothing left buried.
6.1 Materials
6.1.1 In the event that the Company instructs the Contractor to provide materials for works that
are the subject of a Variation Order the Contractor shall be reimbursed at the net price paid
for the materials, substantiated by an invoice, plus a percentage addition as stated in
Schedule herein. All discounts shall be passed on to the Company.
6.1.2 Invoices for imported materials shall be charged at CIF (Cost, Insurance and Freight) Site
prices. Invoices for locally procured materials shall be charged at invoice cost.
6.1.3 The percentage addition to invoice cost of materials shall include but not be limited to taking
delivery in Oman, insurances, paying all costs, charges and duties, delivery to site,
unloading and storing, inspection, procurement and administration costs, overheads, profit
and any other costs required for procurement and supply of materials.
6.1.4 A minimum of three comparative quotations shall be supplied to the Company for each item
of materials to be supplied unless prior approval for a single source supply has been
obtained in writing from the Company.
6.2.2 The percentage addition to the invoiced cost of third party services shall include but not be
limited to Engineering of Contractor’s Consultant accommodation and messing for third
parties, attendance by the Contractor, overheads, profit and all and any other costs
associated with the provision of the third party services
Schedule Unit of
Description Total Amount in RO (Words) Total Amount in RO (Figures)
A Measure
OPTIONAL PRICE
Unit of
Schedule Description Total Amount in RO (Words) Total Amount in RO (Figures)
Measure
6" coated / bare line pipes (including mother pipes for HIB- Optional)
3.6.2 Lump Sum
including qualification/contingency material.
3.6.3 All Mainline valves (actuators for HOV/Gas Over Oil Valves if any). Lump Sum
Pipeline system includes line pipe, all fittings, ball valves, flanges
3.6.4
Launcher & Receiver and stud bolts/gaskets (MESC), Tie-in's, etc.
Pig Launcher for 6" pipeline including qualification / contingency
3.6.5 Lump Sum
material.
Pig Receiver for 6" pipeline including qualification / contingency
3.6.6 Lump Sum
material.
3.6.7 Pig Signallers for 6" pipeline (Non intrusive). Lump Sum
All 6" Pipeline Fittings including flanges including qualification /
3.6.8 Lump Sum
contingency material.
Isolation Joints for 6" pipeline including qualification/contingency
3.6.9 Lump Sum
material.
Earth work excavation by cutting in all type of soils and rocks of any
height/depth to the required level and filling with approved fill
4.1.02 material in layers and compaction as per recommended standards, Lump Sum
grading levelling etc. complete. Rate shall include for supply of
materials.
4.1.03 All demolition works as per scope of works. Lump Sum
Construction of roads, fence, culverts & crossing, grading, drain pits,
4.1.04 Lump Sum
sleepers, Hard stand, etc.
Supply, fabrication and installation of all pipe supports, platforms and
4.1.05 Lump Sum
crossovers.
Construction of all foundations including supply and construction of
4.1.06 anchor bolts for all type of equipments; Heater, Vessel, transformer Lump Sum
relocation, etc.
Supply fabrication and installation of access barriers and
4.1.07 Lump Sum
miscellaneous structures including bench marks and sign posts etc.
Restoration of all areas traversed like roads and other graded areas
4.1.08 Lump Sum
etc.
Excavation and backfilling for electrical / instrumentation /buried
4.1.09 Lump Sum
pipe/cable trenching, etc.
Supply of all materials and construction of new control building
4.1.10 extension as per the scope of work including all architectural, Lump Sum
structural and finishing requirement.
Supply of all materials and modification of the existing control
4.1.11 building including all architectural, structural and finishing Lump Sum
requirement to bring it integral to the extended building .
All other Civil Works not included in the above and required to
4.1.12
complete the scope of works.
4.2 Mechanical and Piping Works
4.2.01 Erection & hook-up of Gas Fired Water Bath and Separator. Lump Sum
4.5.25 Other testing & Pre commissioning equipment & material completely. Lump sum
Fabrication & Installation of all pipeline Markers posts, boundary
4.5.26 Lump sum
markers, Warning Plates and signs.
4.5.27 Pipeline corridor reinstatement and house keeping. Lump sum
Permit to Work, HSE compliance, approved TPI requirement and
4.5.28 Lump sum
other third party permit requirement.
All the required construction activities not listed but required for
4.5.29 completion of the pipeline mechanical completion, testing, Lump sum
precommissioning and commissioning with listing.
TOTAL CONSTRUCTION CARRIED TO SCHEDULE A.4
0.000
SUMMARY
Supply & install 60 mm thick interlock pavement (after taking the approval from the
Engineer) including excavation or filling with imported filling material to reach the
formation level, grading, leveling, compaction and disposal of surplus materials, 150
1.4.2 m3
mm thick granular sub base (measured separately), 50 mm thick sand bed level and
width to match the level according to Drawings including granular sub base CBR> 45
%, 150mm thk compacted to 95% MDD below pavement.
Supply & install pre-cast concrete kerbstone 150mm x 350 mm including plain concrete
bed and hunching etc including excavation, backfilling, compaction, disposal of surplus
1.4.3 m3
material etc also including the black and yellow painting for kerb stone etc as per
drawings
1.5 Landscape
Supply & construct landscaping work including ground levelling, removal of top soil at
1.5.1 least upto 300mm, removal of stones/boulders etc., filling the excavation with sweet m3
soil, Supply, plantationand maintenance of grass till the lawn is formed etc. complete.
1.6.1 Substructure
Supply & construct plain Poured Concrete with Ordinary Portland Cement Grade as per
1.6.1.1 m3
drawing for blinding concrete
Supply & construct reinforced Poured Concrete with Ordinary Portland Cement Grade
C 35 for all foundations,columns,pedestals,plinth beams,projections etc for
1.6.1.2 m3
buildings,pool walls and other walls,slabs,staircases,utility
trenches,manholes,ramps,including pool bases etc all as per drawing
Supply & construct cold Worked High Yield Steel Reinforcement Conforming BS-4449 -
1.6.1.3 Kg
Reinforcement bar of any dia as per drawing
Supply & construct Mild Steel Reinforcement - Welded Steel fabric Reinforcement ,
1.6.1.4 m2
BRC- mesh A-252 conforming to BS-4483 in ground floor.
Supply and install Shuttering for
Supply and install Shuttering for Foundations,Columns, Column Bases &
1.6.1.5 m2
Pedestals,plinth beams,projections,walls,trenches,ramps and steps etc.
MASONRY
Supply and install precast Concrete Solid Blocks (10.5 N/mm2) in Cement and Sand
(1:4) using Ordinary Portland Cement
1.6.1.6 200mm wall m2
1.6.1.7 Blockworks for steps, ramp etc. m2
SUNDRIES
Supply & install precast Concrete Hollow Blocks (min. 7.5 N/mm2) in Cement and
Sand (1:4) using Ordinary Portland Cement (including butterfly ties)
350mm thick cavity walls with 100mm wall outside and 200mm wall inside including
1.6.2.4 50mm thick Polystyrene insulation board and GI butterfly ties built in two block work m2
and concrete.
1.6.2.5 200mm thick walls including parapet m2
1.6.2.6 100mm thick wall m2
Supply & install decorative cavity walls with combination of 100mm wall and 200mm
1.6.2.7 wall as shown in drawing, including Polystyrene insulation board filling in the cavity, and m2
GI ties of suitable length built in two block work and concrete.
1.7 THERMAL AND MOISTURE PROTECTION COVERINGS AND LININGS
Supply & install roof covering comprising 300mmx300mmx 30mm cement roofing tiles
laid to slope on a cement mortar (1:4) bed (measured separately) of minimum 30mm
thick, over the bituminous water proofing system, comprising of 4mm thick torch
1.7.1 applied membrane with primer over roof screed of minimum 30 mm thick (measured m2
seperately slope 1 in 80) and insulation with 50mm thick expanded polystyrene board
over 1000 g polythene sheet, over Geotextile fibre mesh roof membrane, as specified.
(10 years warranty)
Supply & construct minimum 150mm high upstand to parapets including 50x50mm
triangular fillet at slab and upstand junction, cutting of groves, chasing, flashing,
1.7.2 m2
pointing with mastic sealant, protective solar shield etc. complete as specified (10yrs
warranty).
Supply & make necessary Provision and treatment for cut outs in slabs, closing of
1.7.3 sanitary pipes etc. for drainage and other services including construction of necessary m2
upstand block work, selant, flashing etc. complete (10 yrswarranty).
Supply & construct 600mm high expansion joint on roof with 200mm thick block wall on
1.7.4 both side of the joint, RCC coping on top, 20mm thick compressible filler board, mastic m2
sealant etc. complete including covering with waterproofing membrane and flushing.
DOORS,GLAZINGS& WINDOWS (Remeasurable)(rates shall include supply and
1.8
installation)
Note: i) The rates of doors and windows,including frames and linings etc, generally shall
include for all joinery shop/factory/site applied painting, decorative finishes and
protective paintings for frames, anti termite treatment for timber etc. in
accordance with the drawings, schedules and specification and for on-site touching up
of installation marks, etc. to the Engineer's approval.The sizes referred to for doors and
windows are structural opening sizes.
ii) The rates for Doors and Windows shall include supply, fitting & fixing of all frames,
linings, sub-frames,boards, flashings, architraves, stops, beads, panelling, mouldings,
flyscreens, vision panels, glazings, air transfer grills, rims, weather bars, inserts dust
seals, intumescent strips, smoke seals, fixings, dpc's pointing, sealants, and the like,
fixing accessories, rails etc. with fixing of Ironmongeries including painting, complete in
accordance with the drawings and Specifications.
iii) The rate shall include supply and fixing of all Ironmongeries for all doors and
windows, except wooden doors, as per Manufacturer's recommendation, unless
otherwise specified. For wooden doors, fixing of ironmongeries shall be included.
iv) All timber and veneers shall be well conditioned, seasoned, dried and vacuum
treated all as specified
v) Fire doors are to include intumescent strips, smoke seals and plugs etc., all as
specified.All fire rated doors should comply with specification and R.O.P regulations
WOODEN DOORS
44mm thick solid core flush door shutter with 4mm thick commercial plywood on
both sides, including 10 mm hardwood lipping all round, veneer facing /
lamination, as mentioned in drawing, with frames and decorative architraves,
including lining, strips, mouldings, louvers, glazings mastic sealant as specified
and directed.
1.8.1 Door Type D-1' No
1.8.2 Door Type D-3b No
1.8.3 Door Type D-4 No
1.8.4 Door Type D5 No
1.8.5 Door Type D5a No
1.8.6 Door Type D-6 No
Powder coated Aluminium windows in heavy duty frame and shutter double
glazed as shown in drawing complete with all necessary neoprene gaskets,
Ironmongeries and other accessories, glazing including assembling frames and
fixing architrave on walls and pointing with polyshulphide sealant etc. as shown
in the drawing including Ironmongeries and other accessories as per
manufacturer's specification.
1.9.25 Slip resistant extruded stoneware tiling of size 244 x 199 x 6 mm thick to pool base. m2
1.9.26 Slip resistant extruded stoneware tiling of size 244 x 199 x 6 mm thick to pool wall sides m2
1.9.27 Slip resistant extruded stoneware tiling of size 244 x 244 x 6 mm thick to pool deck m2
1.9.28 Pool coping 220 mm wide with rounded edge m2
PAINTING & DECORATIONS(rates shall include supply and construction)
Approved paint applied on internal walls including all necessary primer, putty etc.
1.9.29 m2
complete as per drawing (Full height of wall).
750mm x 600mm Stainless steel Emblame for Oman Gas Company SAOC, finished to
1.10.4 the approval of the Employer, mechanically fixed on the front of podium, with all m2
necessary fixing accessories, finishes etc. complete in all respect
Expansion Joint(rates shall include supply and construction)
20 mm thk comprssible filler board with mastic sealant & width as per junction depth,
1.10.5 for expansion joints set on edge between two adjacent structures with sealant as per m2
requirement.
HAND RAIL FOR STAIRS, RAMPS ETC.(rates shall include supply and
construction)
Note: Rates are to include hand rails with necessary balustrades, baluster, middle rails,
all fittings, fixings, welds etc., protective treatment and/or decoration.(shop drawings
must be submitted and to get approval)
Hand Rail For Stair Cases
Approved quality uPVC pipework (Soil,Waste & Storm water) including all fittings,
fixing, accessories, etc. conforming BS 4660, BS 5481 & BS 4514(as required)
complete with all necessary concrete encasing, road crossings, thrust block,
warning tape etc. complete as per drawing and specification
Supply & laying of HDPE pipe/duct, DIN 8074 including all necessary works,
accessories, concrete encasing, road crossings, thrust block, warning tape etc.
Supply, laying, testing & commisioning of Bowser line Class 'C' G.I pipe
confirming BS 1387 including all the necessary fittings.Complete in all respect.
Supply, Erection & fixing of competition type aluminium anodized Tenis posts on either
2.5.13 side of court with outer tightning system and complete with Tenis Net and ground m2
sleeves complying with International Standard, including all associated works
Synthetic Turf for Football Pitch
Supply and Installation of Multi coloured Synthetic Grass turf suitable for outdoor
surface with infill SBR rubber and silica sand system with 2-Star status, as approved by
2.5.14 FIFA, for Training Football Pitch, complying with International Standard, with in built m2
pitch, track, other lines, marks, points, etc marking with different coloured turf. Colours
shall match the International Standard for relevant sports.
Tennis Court Flooring
Supply and Installation of Synthetic surface Tennis court flooring including primer,
resurfacer, colour codes and white line marking, complying with International Standard
2.5.15 m2
with in built track, marks, points, etc marking with different coloured turf. Colours shall
match the International Standard for relevant sports.
3 HVAC
Supply Installation, Testing and Commisioning
3.1 1.5 TR DX- split type AC IDU & ODU No
3.2 2.0 TR DX- split type AC IDU & ODU No
3.3 2.5 TR DX- split type AC IDU & ODU No
3.4 2.0 TR 4 way Cassette type AC IDU& ODU No
3.5 Exhaust fans 80LPS with shutter No
3.6 Exhaust fans 125LPS with shutter No
3.7 Exhaust fans 300LPS with shutter No
4 Electrical
Supply and Installation Lighting and Circuit accessories
4.1 Lighting Points, Normal No
4.2 Lighting Points, Emergency No
4.3 Lighting switch points, 1 gang, one way switch No
4.4 Lighting switch points, 2 gang, one way switch No
4.5 Lighting switch points, 3 gang, one way switch No
4.6 Lighting switch points, 1 gang, two way switch No
4.7 13A twin switched socket No
4.8 13A single switched socket No
4.9 13A single switched socket outlets (W/P) No
4.10 13A W/P fused spur outlet No
4.11 20A DP switch with neon indicator No
4.28 TYPE A+EM- Same as Type 'A' but with Emergency Kit For 1 Lamp For 3 Hours. No
4.3 TYPE A1+EM- Same as Type 'A1' But with Emergency Kit For 1 Lamp For 3 Hours. No
TYPE A2- Surface Mounted, 1x36W T8 3000K Fluorescent Lamp, Pre- Enamelled
Galvanized Steel With Polyester Resin Body & Die-Cast Aluminum End Caps, in White
4.31 No
Aluminum Reflector With Dust Proof, UV Stabilized, Anti-Yellowing Prismatic
Polycarbonate Diffuser, Electronic Ballast, 220-240V/50Hz,IP-40.
4.32 TYPE A2+EM- Same as Type 'A2' But with Emergency Kit For 1 Lamp For 3 Hours. No
TYPE C- Ceiling mounted hanging type Pendant luminaire. The luminaire housing shall
4.37 No
be made of Antique color polished gmetal frame 3x26W CFL warm light lamp.
TYPE D- 2x18W CFL- 4L-2pin, Warm White Surface Mounted Fitting With Built In
4.38 Electronic Control Gear, High Gloss Anodized 99.8%Aluminium Reflector With UV No
Stabilized Vandal Resistant Opal Type Polycarbonate Diffuser 230V, 50Hz, IP-44.
4.39 TYPE D+EM- Same as Type 'D' But with Emergency Kit For 1 Lamp For 3 Hours No
TYPE E- 1x13W CFL-4L-2pin, Surface Mounted Downlight Fitting With 200mm Dia Of
Die-Cast Aluminium Body, 99.9% Pure Anodised Aluminium Reflector, White
4.4 No
Lacquered Concave Aluminium Ring Including 3mm Frosted Glass Plate, Stainless
Steel Clips Etc. Dimmable Type, 230V,50Hz,IP-44.
TYPE F- 1x24W -4L-4pin (Horizontal Position) Recessed Downlight Fitting With
4.41 200mm Dia Of Die-Cast Aluminium Body, 99.9% Pure Anodised Aluminium Reflector, No
With Cross Vane Anti Glare Louvre,Dimmable Type, 230V, 50Hz, IP-20.
TYPE G- 1x13W CFL-4L- 2pin, Surface Mounted Downlight Fitting With 200mm Dia Of
Die-Cast Aluminium Body, 99.9% Pure Anodised Aluminium Reflector, White
4.42 No
Lacquered Concave Aluminium Ring Including 3mm Clear Glass Plate, Stainless Steel
Clips etc. 230V,50Hz,IP-44.
4.43 TYPE G+EM- Same as Type 'G' But with Emergency Kit For 1 Lamp For 3 Hours. No
TYPE I- Decorative Hanging Type Wall Bracket Light Fitting Made Up Of Cast
4.44 Aluminium With Antique Finish Suitable To Hold 70W SON-T Lamp ,220V , 50Hz, IP- No
55.
TYPE J- A Small Square Ground Recessed Luminaire, With 2x6W LED Source, For
Walkover Guidance Applications. Die-Cast Aluminium Body With Powdered Paint
4.45 No
Finish. Frame: Painted Aluminium, 3mm Thick. Frosted Toughened Glass, 8mm Thick,
Recessing Box: Polypropylene. Integral Control Gear. Rated IP67.
TYPE K- A Robust, Wall-Mounted Up/Downlight With 2 X 6W White LED. The Grey
4.46 Aluminium Body, With Integral Gear and Sealed To IP65, Frosted Glass, 230V AC, No
50Hz.
TYPE L- Wall Light Fitting Made of White Chrome Plated With Three Ply Opal Glass
4.47 No
Suitable For 1x18W CFL Lamp, 230V AC, 50Hz.
TYPE M- 1x21W 4pin Compact Fluorescent CFL Lamp (40000/K) type Wall Mounted
Luminaire With Die Cast Aluminum Body And Thin Bezel in White Metallic, Opal
4.48 No
Polycarbonate Diffuser, Top Half Covered By Eyelid, Electronic Control Gear, 220-
240V/50Hz.
4.49 TYPE M+EM- Same as Type 'M' But with Emergency kit For 1 Lamp for 3 Hours. No
TYPE N- 70W SON-T Wall Mounted Bulk Head With Die Cast Aluminum Body And
Stainless Steel Inserts With Three Ply Opal Type Poly Carbonate Diffuser Black Color
4.5 No
Body Oval Shape With Grill , Top Half Covered By Eyelid, Vandal Proof, Electronic
Control Gear IP65 rating. 260 Mm dia And 155 mm Projection,220-240V/50Hz.
TYPE O- 1x26W, Surface mounted Saucer type luminaire, 200mm Dia, Body made of
4.51 Poly Carbonate, Diffuser made of Honey Comp Prismatic type with 1x26W CF lamp No
(4000°K) of HFP-Electronic Control gear,220-240V/50Hz, IP-44.
TYPE P- 1x26W CFL- 4L-2pin, Surface Mounted Downlight Fitting With 200mm dia of
Die-Cast Aluminium Body, 99.9% Pure Anodised Aluminium Reflector, White
4.52 No
Lacquered Concave Aluminium Ring Including 3mm Frosted Glass Plate, Stainless
Steel Clips etc. 230V,50Hz,IP-44.
TYPE Q- 1x26W (1m Length Minimum) Mirror Light Fitting With Opal Diffuser And Bowl
4.53 No
in Injected Moulded Clear Prismatic Polycarbonate, 220-240v, 50hz
TYPE R- 1x8W(350mmlength) Mirror Light Fitting With Opal Diffuser And Bowl in
4.54 No
Injected Moulded Clear Prismatic Polycarbonate, 230V, 50Hz.
TYPE S- 4x18W-40000/K Recessed Mounted T8 Linear Fluorescent Luminaire with
Dimmable Electronic Ballast Compatible To DALI System White Sheet Steel Continues
4.55 No
Housing, 99.9% Pure Anodised Aluminium Reflector With Poly Carbonate Opal
Diffuser . 220-240V, 50Hz, IP-40.
4.56 TYPE S+EM- Same as Type 'S' But with Emergency kit For 1 Lamp for 3 Hours. No
TYPE T- 4x14W -3000°K Square Type Smooth Edge Light Fittings With Metal
4.57 Installation Plate Polycarbonate Compact Tough Housing With Opal Polycarbonate Anti- No
Yellowing, Ant-Aging Diffuser With Integral Electronic Gear.240V,50Hz, IP-54
4.58 TYPE T+EM- Same as Type 'T' but with Emergency kit For 1 Lamp for 3 Hours. No
TYPE U- 2x18W Square Type Smooth Edge Light Fittings With Metal Installation Plate
4.59 Polycarbonate Compact Tough Housing With Opal Polycarbonate Anti-Yellowing, Ant- No
Aging Diffuser With Integral Electronic Gear.240V,50Hz, IP-54.
4.6 TYPE U+EM- Same as Type 'U' But with Emergency kit For 1 Lamp for 3 Hours. No
TYPE V- 1x13W , 2D Lamp Decorative Saucer type Surface mounted Ceiling light
4.61 fitting diffuser made of Polycarbonate with Sheet Steel White Stove Enameled Base, No
IP-20.
4.62 TYPE V+EM- Same as Type 'V' but with Emergency kit For 1 Lamp for 3 Hours. No
TYPE W- Adjustable Spot Light With Multiphase Adaptor, Dimmable Electronic
Transformer Using IGBT Technology. Made Of Die Cast Aluminum Suitable to Fix on
4.63 Light Track From Ceiling 330° Reflection Around The Vertical Axis And 90° Reflection No
Around The Horizontal Axis Equipped with a Locking mechanism for Horizontal
Positioning and with a Vertical Friction Position Control,12V,50W, IP20.
TYPE X- Ceiling Mounted Surface Type Pendant Luminaire. The Luminaire Housing
4.64 Shall Be Made of Polished Gold Lacquer With 4280 Handmade Lead Crystal Glass No
number of Light is 6x11W CFL(warm white) B15, dimmable type.
TYPE X1- Ceiling mounted Surface type Pendant Luminaire(650mm Dia). The
4.65 luminaire housing shall be made of Polished Gold lacquer with 4280 handmade lead No
Crystal glass number of light is 9x11W CFL, dimmable type (warm white) B15.
TYPE RL- A Robust Light Post For Luminaries of 3.5m Height Die-Cast Aluminum
Base And Canopy, UV Stabilizes Polycarbonate Globe Type Opal Diffuser, Black
4.66 No
Corrosive Resistant Finish, With 100W, HIE, E-40, HIT Electronic Control Gear, Timer
Control,230V/50Hz, IP-65
TYPE Z- 400W(HIT Lamp) Metal Halide Flood Light Body Made of Black Color
Polypropylene Reinforced With Fibre Glass With Self-Extinguishing Polycarbonate
4.67 No
Viser; Reflector Made of Dimpled Polished, Oxidised, Anodised Aluminium Sheet,
Electronic Control Gear, Asymmetrical Reflector, Sealed to IP65, 220-240V/50Hz.
TYPE HL- 10M HIGH LIGHT POLE OF HOT DIP GALVANIZED POLYGONAL
SECTIONED CONICAL POLE SUITABLE FOR MOUNTING 4 NOS.400W LED FLOOD
LIGHT, PROTECTIVE LADDER AND TWO SIDED PROTECTIVE BASKET SUPPLY
WITH ALL ACCESSORIES LIKE FOUNDATION BOLTS,WASHERS, NUTS AND
ANCHOR PLATES ETC. 400W LED SPORTS FLOOD LIGHT LUMINAIRE HOUSING
4.74 MADE OF DIE CAST HAMMERED ALUMINIUM WITH COOLING FINS , HINGS, No
PENING, STAINLESS STEEL SEALING LATCHES DIFFUSER, 5mm THICK
TEMPERED GLASS, THERMAL RESISTANT, SHOCK IMPACT IK-08, GLASS
TILTED BY 180/ TO OBTAIN EXCELLENT ASYMMETRIC, ANODICALLY OXIDIZED
AND POLISHED WITH 530/ TILT ANGLE AND PANEL MOUNTED ELECTRONIC
BALLAST BOX 230V, 50Hz, IP-65.
Supply,laying, testing and commissioning of LV Cables
4.75 1Cx 630Sqmm Cu/XLPE/AWA/PVC Cable m
4.76 4Cx240sq.mm Cu/XLPE/SWA/PVC Cable m
4.77 4Cx150sq.mm Cu/XLPE/SWA/PVC Cable m
4.78 4Cx120sq.mm Cu/XLPE/SWA/PVC Cable m
4.79 4Cx70 sq.mm Cu/XLPE/SWA/PVC Cable m
4.8 4Cx35 sq.mm Cu/XLPE/SWA/PVC Cable m
4.81 4Cx25 sq.mm Cu/XLPE/SWA/PVC Cable m
4.82 4Cx16 sq.mm Cu/XLPE/SWA/PVC Cable m
4.83 4Cx10 sq.mm Cu/XLPE/SWA/PVC Cable m
4.84 3Cx10 sq.mm Cu/XLPE/SWA/PVC Cable m
4.85 1Cx 120 sqmm Cu/PVC Y/G Cable m
4.86 1Cx 95 sqmm Cu/PVC Y/G Cable m
4.87 1Cx70sq mm CU/PVC Y/G cable m
4.88 25 mm x 3 mm standard bare copper tape m
Supply and installation of Glanding, Termination of LV Cables
4.89 1Cx 630Sqmm Cu/XLPE/AWA/PVC Cable No
4.9 4Cx240sq.mm Cu/XLPE/SWA/PVC Cable No
4.91 4Cx150sq.mm Cu/XLPE/SWA/PVC Cable No
4.92 4Cx120sq.mm Cu/XLPE/SWA/PVC Cable No
4.93 4Cx70 sq.mm Cu/XLPE/SWA/PVC Cable No
4.94 4Cx35 sq.mm Cu/XLPE/SWA/PVC Cable No
4.95 4Cx25 sq.mm Cu/XLPE/SWA/PVC Cable No
4.96 4Cx16 sq.mm Cu/XLPE/SWA/PVC Cable No
4.97 4Cx10 sq.mm Cu/XLPE/SWA/PVC Cable No
The below percentage mark-up shall apply for additional purchasing or third party services % mark-up %
DOCUMENT C-06
Table of Contents
1. GENERAL................................................................................................................................................................. 3
1. General
1.1 All work and services shall conform to the requirements of the specifications and drawings
listed within this section or any contract document/ specification along with section C-4
Scope of Work.
1.2 Documents listed in this section form part of the Contract Documents. All PDO/Shell
standards listed in this specification are referred as Company Standards. Contractor is
deemed to be in possesion of the applicable issues of referred standards.
1.3 The Contractor is deemed to be cognizant of all specifications, codes of practice and
standards referenced in the Contract documents regardless of whether a copy of any such
document has been provided by the Company.
1.4 Where any conflict arises between the requirements of this Section C-6, the following order
of precedence shall apply unless otherwise decided by the Company in writing:
a. Laws and decrees of the Government of Sultanate of Oman.
b. Document C-9 - Health, Safety and Environment Specifications
c. Document C-4 - Scope of Work
d. Project Specific Specifications
e. Project Specific Reports
f. Project Drawings
g. Company Specifications and Documents – (See article 1.5)
h. Company Standard Drawings
i. Shell Group Standards - DEPs
j. National Codes and Standards
k. International Codes and Standards
1.5 In the event of any conflict or contradiction between the Company Technical Standards and
Procedures the order of priority of the documents shall be as follows:
1 - SP’s
2 - ERD’s
3 - PR’s
4 - GU’s
5 - DEP’s
6 - EP’s
1.6 In the case of conflicting requirements or discrepancies within the document; the more
stringent requirement shall apply unless agreed otherwise by the Company in writing. The
Contractor shall review all Contract Documents within 30 days of the Effective Date and
shall notify the Company of any conflicting requirements in the documents.
1.7 In addition to the Specifications listed herein, Contractor shall comply with the Procedures,
Specifications and Guidelines listed in Section C-9 (HSE Specifications).
1.8 It is the responsibility of the Contractor to ensure that he has the latest applicable revision
of any document/ Codes and Standards.
1.9 The Contractor shall be responsible to collect the required existing Engineering drawings
and documents of Manah from the Company’s drawing office during the office hours.
The Contractor shall be responsible to generate all the required Engineering Documents as part of
their scope of work.
Process
Document No Title Rev Date
SP-1079 Process Safeguarding Specification (ERD-08-13) Latest
SP-1125 Isolation of Process Equipment Specification ( ERD-08-11 ) Latest
SP-1126 Drain Systems Specification ( ERD-08-10 ) Latest
SP-1127 Plant Equipment Layout Specification (ERD-09-03) Latest
Specification for Identification of on-Plot Pipe work (ERD-43- Latest
SP-1166
05)
SP-1190 Design for Sour Service Specification (ERD-08-04) Latest
PR-1232 Design Integrity Review Procedure Latest
SP – 1074 Preparation of Plant Operating Manuals - Specification Latest
SP – 1132 General Specification for Plant Design Reference Manual Latest
DEP 01.00.01.30 Definition & Determination of Temp. & Press. Levels Latest
Preparation of process flow schemes and process engineering Latest
DEP 01.00.02.11
flow schemes
DEP 01.00.02.12 Prep of Safeguarding Memoranda & P.S.F.S's Latest
DEP 20.00.10.10 Basic Data and Phase Behaviour Methods Latest
DEP-31.22.05.11 Gas / Liquid Separators - Type Selection and design rules Latest
DEP 31.40.10.14 Pipeline Overpressure Protection Latest
Area Classification (Amendments/Supplements to IP 15) Latest
DEP 80.00.10.10
(Amendment 56/2001)
Pressure Relief, Emergency Depressurising & Flare Systems Latest
DEP 80.45.10.10
(Amended by Circular No. 32/98)
Latest
DEP 80.45.10.11 Overpressure and under pressure – prevention and protection
Latest
DEP 80.45.10.12 Emergency depressurising and sectionalising
DEP 80.47.10.30 Assessment of the fire safety of onshore installations Latest
EP95-0312 HAZID Hazard Identification technique Latest
EP95-0313
Hazard & Operability technique Latest
HAZOP
EP2007-5644 Safeguarding Specification Latest
Electrical
SP-1099 Electrical Installation Practice
SP-1100 Specification for Testing & Commissioning of Electrical Equipment
Civil
Civil & Structural
SP-1274 Specification for Civil & Building Construction- Material Testing Latest
SP-1275 Specification Criteria for Design of Civil & Building Works Latest
SP-1277 Specification for transportable Accommodation Units Latest
SP-1279 Specification for Civil & Building Construction Latest
SP-1281 Engineering Specification for Safe Road Works Latest
Specifications for Reinforced Concrete – Production & Latest
SP-1282
Construction
Specification for Signs & Signboards – Standard Signs Latest
SP-1284
catalogue
GU-628 Guide to Civil & Building Standard Drawings Latest
Guideline for Application & Selection of Standard Pipe Latest
GU-629
Supports
DEP 34.00.01.30 Structural Design & Eng. Of Onshore Structures Latest
Pipeline
GU-195 Environmental Assessment Guideline Latest
GU-368 Guidelines for The Protection Of Buried Sections Of Latest
Surface Laid Pipelines/Flowlines
GU-501 Guidelines for Excavating and Working Around Live Latest
Pipelines
GU-629 Application & Selection of Standard Pipe Supports Latest
GU-706 Piping Stress Analysis Design Basis Latest
PR-1146 Engineering and Operations Flowline Cold Cutting Latest
PR-1984 Criticality Rating Procedure Latest
SP-1128 Specification for Cathodic Protection Design Latest
Specification for construction, installation and Latest
SP-1129
commissioning of cathodic protection systems
SP-1130 Specification For Cathodic Protection Materials And Latest
Equipment’s
SP-1136 Specification for Cathodic Protection Standard Drawings Latest
Specification for Quality Assurance of Design, Latest
SP-1171
Construction and Engineering Works
Specification for welding of on plot pipe work Latest
SP-1173
(Amendment/Supplement to API 1104)
SP-1177 Specification for Welding of Class 1 Pipelines Latest
SP-1201 Procurement Specification for Pipeline Ball Valves Latest
SP-1208 Pipeline Construction Specification Latest
SP-1210 Pipeline Integrity Management Latest
SP-1211 Onshore Pipeline Engineering Latest
SP-1212 Hydrostatic Pressure Testing of New Pipelines Latest
SP-1236 Pipeline Isolating Joints Latest
Specification for painting and coating of oil and gas Latest
SP-1246
production facilities (Part 1 – 5)
Specification for Flange Connections, Bolt Torquing and Latest
SP-2020
Tensioning
SP-2156 Specification for use of non-metallic material Latest
Specification for Civil & Building Construction- Excavation Latest
SP-1279C
& Earthworks
Selection of Cracking Resistant Materials for H2S Latest
SP-2041
Containing Environment
DEP 31.36.00.30-Gen Pipeline transportation systems – Pipeline valves Latest
(Amendments/Supplements to ISO 14313)
DEP 31.38.01.15-Gen. Piping classes - exploration and production Latest
General Requirements
Design/Draughting
ESS 001/88 Preparation of Vendor Drgs for Single Equipment Items Latest
Specifications for Earthmoving and Construction Latest
SP 1143
Equipment
Specification for Hand over and As Built Latest
SP-1131
Documentation (ERD-00-05)
SP-1132 Plant Design Reference Manual (ERD-00-12) Latest
Specification for Preparation and Content of Latest
SP-2047
Engineering Drawings
Preparation & Content of Engineering Drawings Latest
ERD-00-06
(Amendment No. 03/94)
ERD-00-14 Project Drawing Procedures Latest
DEP 00.00.06.06 Index to Standard Drawings Latest
Content and drafting of a functional specification, and a Latest
technical specification, and the classification of
DEP 00.00.07.30
products, processes and services (endorsement of ISO
13879, ISO 13880 and ISO/TR 13881)
DEP 30.10.01.10 Requisitioning Latest
Guidelines for Vendor-Project Documentation Latest
GU-556
Deliverables
Project Engineering Latest
SP-1171 Specification for Quality Assurance of Design, Latest
SP-1171
Construction and Engineering Works.(ERD-84-02)
Handover and as-built requirements for pipeline Latest
SP-1229
systems
ERD-00-18 Vendor Documentation Latest
Instructions for Packing and Corrosion Prevention of Latest
ERD-06-01
Plant Equipment and Machinery
General Spec for Detail Design & Engineering of Latest
ERD-10-04
Oil/Gas Facilities
ERD-26-02 Construction Specification for Facilities Latest
Pre-commissioning of On-plot mechanical equipment Latest
ERD-84-01
and piping, flushing, hydro testing and pickling.
PR-1150 Project Close Out Procedure Latest
PR-1153 Field Trouble Report Procedure Latest
PR-1169 Initial Start-up Procedure Latest
PR-1247 Project Change Control Procedure Latest
DEP 70.10.90.11 Spares Parts Latest
DEP 70.10.90.81-GEN Electronic Spare Parts and Interchangeability Records Latest
ERD-88-02 Fire and Explosion Risk Management Latest
Approved Vendors List Latest
Approved Vendors of Materials and Equipment for Oil Latest
PGSE
and Gas Facilities
4. International Standards
Latest issue dates of following standards shall be followed for this project.
International Standards
AGA – 8 Compressibility Factor of natural gas and other related Hydrocarbon Gas
Compressibility and Super compressibility Factor of natural gas and other
AGA – 9
related Hydrocarbon Gas
API 6D Specification for Pipeline and Piping Valves
API RP 1007 Recommended Pipeline Maintenance Welding Practices
Recommendations for Liquid Petroleum Pipelines Crossing Railroads and
API RP 1102
Highways
API RP 1104 Standard for Welding Pipelines and Related Facilities
API Spec 5L Specification for Line Pipe
ASME B16.5 Pipe Flanges and Flanged Fittings
ASME B16.47 Large Diameter Steel Flanges
Factory Made Wrought Steel Butt-Welding Induction Bends for
ASME B16.49
Transportations
ASME B16.9 Factory Made Wrought Steel Butt Weld Fittings
ASME B31.3 Chemical Plant and Petroleum Refinery Piping
ASME B31.8 Code for Gas Transmission and Distribution Piping Systems
ASME Sec V Non-Destructive Examinations
ASME Section VIII ASME Boiler and Pressure Vessel Code
ASME Section IX Welding and Brazing Qualifications
ASTM A 370 Standard Test Method and Definition for Mechanical testing of steel.
BS EN 1993 Design of steel structure
BS 8010 Code of Practice for Pipelines, Section 2.8 Steel for Oil & Gas
BS EN 10025 Hot rolled products non alloy structural steel.
BS EN 1991 Action on structure
BS EN 1992 Design of concrete structure
CENELEC/IEC International Standards & Conformity Assessment Related Services Code
DIN 500 49 Documents on materials testing
IEC 654-1, Cl D2 Industrial Process Measurement & Control Equipment Operating conditions
Electrical Apparatus for Explosive Gas Atmospheres – Part O General
IEC 79
Requirements
IEC 1131-3 Compatibility
IEC 1158-2 Physical Layer Standard for field bus
IEC 61158 Parts 2, 3,
Field buses
4, 5, 6
Institute of Petroleum Model Code of Safe Practice; Part 15 - Area
IP – 15
Classification Code of Petroleum Installation
ISO 9000 Quality Systems
ISO 9001-2000 Quality Systems
ISO 9001-2015 Quality management systems — Requirements
Inspection documents for the Delivery of metallic Products (DIN 50049, EN
ISO 10474
10204)
Petroleum and natural gas industries - Pipeline transportation systems -
ISO 14313
Pipeline valves
Petroleum and Natural Gas Industries-Induction Bends, Fittings and
ISO 15590-1
Flanges for Pipeline Transportation Systems. Part-1 Induction Bends
Petroleum and natural gas industries —Induction bends, fittings and flanges
ISO 15590-2
for pipeline transportation systems —Part 2:Fittings
ISO 15590-3 Petroleum and natural gas industries —Induction bends, fittings and flanges
The Contractor shall be responsible to generate all the required Engineering Drawings and
Requisitions as part of their scope of work.
Civil / Structural
GEN-02-1483-01-A3 Concrete Structure Platform and Ladder Foundations
GEN-02-1631-01-A1 Typical Pipeline Details Pipeline/Road Crossing
GEN-02-1632-01-A3 Pearson Survey Earthing Point
GEN-02-1633-01-A1 Standard Access Barrier for Pipelines
STD-02-0201-01-A3 Standard Marker Board for Underground Services
STD-02-1626-01-A3 Typical Access Barrier Details
STD-02-3421-01-A4 Wear Plate Details
STD-02-3417-01-A3 Clamp On Pipe Shoe Details
STD-02-3704-01-A3 Axial Stop With Pipe Clamp
STD-02-3817-01-A3 'U' Bolt (Pipe Gripped) Details
STD-02-3818-01A3 I U' Bolt (Pipe Not Gripped) Details
Electrical
STD-04-0101-01-A4 Index of Drawings of Electrical Power System
STD-04-0102-01-A4 Cable Trench In Unpaved Areas Typical Cross Section
STD-04-0103-01-A4 Cable Trench Section
STD-04-0104-01-A4 Cable Trench Section
STD-04-0105-01-A4 Cable Trench Section
STD-04-0106-01-A4 Cable Route Marker Installation Details
STD-04-0107-01-A4 Sleeve Details
STD-04-0108-01-A4 Cable Markers - Above Ground and Underground - Installation Details
STD-04-0304-01-A4 Earthing Boss for Steel Structures, Tanks, Vessels, Etc.
STD-04-0306-01-A4 Earthing Detail Gate and Fence
STD-04-0310-01-A4 Earthing Detail Earth Electrodes - Steel Pipe Pit
STD-04-0315-01-A3 Typical Mounting Details of Earth Connection
STD-04-0315-02-A3 Typical Mounting Details of Earth Connection
C7 - IN COUNTRY VALUE
Contents
1. DEFINITIONS ....................................................................................................................................... 3
4.9 Development of National Training, Education and R&D Institutions Table G in Appendix A .. 12
1. DEFINITIONS
“ICV” means In-Country Value and is defined as “The total spend retained in country that benefits business
development, contributes to human capability development, and stimulates productivity in Oman’s
economy”.
“ICV Plan” means a plan prepared by the Contractor and delivered as part of Agreement execution. The
Plan sets forth strategy and actions aimed at the participation of Omani nationals and local goods and
services, and in the development of local assets, skills, suppliers and institutions associated with the oil and
gas sector in Oman.
“ICV Reporting Schedule” means an inventory of activities and milestones on a quarterly basis that, when
delivered across the full period of contact execution, deliver the commitments made in the ICV Plan,
including, but not limited to, Tables A to G.
“Nationally-Registered Supplier” means a supplier of goods and services that is a company, subsidiary
or branch incorporated under Omani law in Oman and/or registered to operate in Oman under a renewable
license; and whose offices or facilities associated with producing manufactured or assembled goods or
providing services to the Company are located in the Sultanate of Oman.
“SMEs” means Small and Medium Enterprise and are defined as below:
Number Annual Turnover
Company Size
of Employees (R.O.)
Micro 1 to 5 Less than 100,000
Small 6 to 25 100,000 to 500,000
Medium 26 to 99 500,000 to 3 Million
“Scholarships” – means the tuition fees required for general education diploma graduate to complete the
prescribe programme for first university degree including the foundation programme
"Senior Management" means a member of the decision-making executive of a function within Contractor
or sub-Contractor Company.
"Professional" means an individual who has completed related tertiary education and achieved status
within a professional body. Includes chartered engineers and accountants, lawyers, architects,
procurement professionals. Engineers who are also middle managers should be categorised as
“Professional”, not “Supervisory”.
"Supervisory" means a worker who manages a team of at least two subordinates (but who is not
considered part of the Senior Management team, nor a Professional). Supervisors include construction
foreman, equipment overseers, business administration team leaders, etc.
"Skilled" means a worker with a high level of technical expertise accumulated over a number of years (but
not a member of a recognised 'profession'). A skilled worker may have attended a Technical College or
learned their skill via a formal apprenticeship or on-the-job over a number of years. Includes: electricians,
scaffolders, welders, crafts, business administrators, personnel assistants, computer programmers, and
equipment and machinery operators.
“Semi-skilled” means workers with a skill set acquired in a short space of time (a few weeks or months).
Following short periods of training a casual labour may become semi-skilled. Semi-skilled positions include
secretaries, drivers, meet and greet services, fencing, block laying, basic construction skills, etc.
"Unskilled" means casual labour with no skills required and not yet trained other than in initial workplace
induction and HES.
“Headcount” means the number of full-time equivalent employees or in-house contractors/agency staff
within the Contractor or 3rd Party Sub-Contractor who will be involved in execution of the Contract.
“Man-hours” means the number of hours of work undertaken in execution of the Agreement (only the actual
hours written, or to be written, to Agreement execution are included).
“USD$ Compensation” means the sum of Man-hours multiplied by associated All-Inclusive Average Hourly
Rate.
“All-Inclusive Average Hourly Rate” means the average hourly rate of pay for a particular category of job
position (e.g., skilled, semi-skilled), including: base pay rate/hour, overtime increment on base rate, social
taxes, overheads on base rate or at a fixed rate, and benefits, and profit margin.
“Made-in-Oman good” means a product, material or equipment that is included in the List of goods of
Omani origin issued by the Ministry of Commerce.
“Fixed Asset” the term Fixed Assets (FA) here refers to the long-term assets, tangible assets used in the
oil and gas business in Oman such as properties, plants and equipment. Examples of fixed assets are
lands, buildings, manufacturing facilities, repair and maintenance facilities, manufacturing equipment, office
equipment, and vehicles.
“Billed Rate”: means the quoted price or cost of goods or services provided by a contractor in a free
market. For example, it can be the full value of a labor-hour, including all overhead, burden, and profit
2. COMPANY COMMITMENT
2.1. Nothing contained in this attachment shall contradict or relieve The Tenderer from any statutory
obligation in accordance with the relevant laws and regulations of the Sultanate of Oman. The Tenderer
should make sure that it is fully aware of its legal obligations.
2.2. The Company is committed, through its expenditure on personnel, goods and services, to increase In-
Country-Value (“ICV”) in Oman. ICV is defined as:
“The total spend retained in country that benefits business development, contributes to human
capability development, and stimulates productivity in Oman’s economy”.
2.3. In line with this aim, the Company expects its Tenderer, sub-contractors and suppliers to seek to:
• maximise and develop employment opportunities for Omanis and placements for Omanis on
vocational or professional training courses, both in Oman and overseas, with a principal focus on
skilled and managerial positions;
• maximise and increase over time expenditure on goods and services produced or provided by
Omanis working for companies registered in Oman with a physical presence in Oman;
• maximise and develop locally-produced - Made-in-Oman - materials, products and equipment that
increase value-added in-country, introduce new technologies and grow Oman’s export industries;
• develop the capabilities of the local small and medium scale enterprise (SME) sector, both during
contact delivery and in the longer-term;
• Assist with developing world class capability in vocational and professional education, training and
research institutions in Oman, matched to actual industry opportunities.
3. ICV PLAN
To facilitate the above aim,
3.1. The Tenderer shall submit an ICV Plan as an integral part of its Tender. The ICV Plan shall constitute
an elaboration of each of the ICV components stipulated herein in Articles 4.2 to 4.8 in conjunction with
Tables A to H in Appendix A.
3.2. The Tenderer shall submit their ICV Plan as a single, stand-alone, document containing all responses
and supporting and qualifying information, and including completed Tables A to H within the relevant
section of the ICV Plan.
3.3. Prior to award of Contract, if requested by the Company, Tenderer shall provide additional information
clarifying, validating or updating the submitted ICV Plan.
3.4. The quality and comprehensiveness of the Tenderer ICV Plan shall play a material part in the award of
the Contract.
3.5. All costs associated with delivering the ICV Plan shall be deemed to be included within the Contractor’s
base bid price.
3.6. Within the Tenderer base bid price, costs associated with implementing the ICV Plan shall be itemised.
3.7. The Tenderer shall take note that Company shall convert the information submitted in the Tenderer
ICV Plan into binding contractual commitments, including the completed Tables A to H.
3.8. The Tenderer shall maintain a true and auditable set of records pertaining to the ICV Plan, including
the assumptions and calculations used to generate the figures entered into Tables A to G.
3.9. The Company shall have the right to verify and audit the information contained in the ICV Plan in
accordance with the standard ICV requirements contained in the ITT C7.
3.10. ICV shall be measured as a percentage in case of any work variations from the original contract value;
in case of any variations in scope of work and/or contract value, whether plus or minus, the overall
originally committed ICV value will be measured as a percentage of the original contract value, or as
per agreed between contract parties.
4.1. Overview
i. a concise overview of the level of ICV the tenderer proposes to deliver in delivery of the contract,
and any compelling strategies or programmes in relation to ICV that the tenderer wishes to draw to
the attention of the company; and
ii. a detailed breakdown of the Tenderer proposed ICV levels, following the form set out in Appendix
A
i. The Company requires the Tenderer to commit to certain minimum levels of ICV as set out in Table
1 “Minimum ICV Requirements”. The Tenderer is encouraged, if appropriate, to submit an ICV
Plan with ICV levels higher than the Minimum ICV. Any higher levels of ICV will be taken into
account in the evaluation of the Tender. To fail to commit to these Minimum ICV Requirements
within the Tenderer ICV Plan will be considered as non- compliance in the tender evaluation
process.
ii. Tenderer is to make a statement, if awarded the contract, Tenderer commits to deliver the Minimum
ICV as set out in Table 1 “Minimum ICV Requirements” and the other ICV KPI elements in their
ICV Plan as part of contract execution.
Sr. Minimum
Category Key Performance Indicator
No Requirement
* Senior Management
* Professional Tenderer is encouraged to maximize Omanization at
different job levels including Senior Management, and
* Supervisory Professional level.
* Skilled
$ expenditure on Made-in-Oman goods used in
Local sourcing of Goods execution of the Contract, as % of total Contract value
2 6%
(Made In Oman) (contractor & 3rd Party Sub-Contractor/Supplier) Refer to
4.6
Number of trainees
5 Training of Omanis 1
Refer to 4.5.1 & 4.5.2
iii. The guidance below should be used to assist the Tenderer with preparing the ICV Plan
4.3.1. The Company aims to maximise ICV during the execution of the Contract and beyond. Investments
by the Tenderer in operational offices, manufacturing facilities, service facilities or other fixed assets
related to the contract nature in Oman is key to achieving this objective.
4.3.2. The Tenderer shall complete Table A in Appendix A describing in detail any;
i. past capital investments made by Tenderer in the past three (3) years to purchase, construct
or rehabilitate fixed assets in Oman, in relation to the development of industry in Oman (e.g.
transport-related, logistics-related, manufacturing facility, repair and maintenance facility,
office/depot construction/ refurbishment, physical infrastructure, training centres, research
establishments); and/or
ii. planned capital investments to be made by the Tenderer in similar fixed assets over the next
three (3) years
i. made directly by the Tenderer from its own or raised capital; and
All of these submissions must be supported by appropriate evidence (e.g. copy of balance
sheet in respect of past investments).
The following things should not be included within the above categories:
i. any capital investments in fixed assets that have been (or are planned to be) directly charged
to the Company (or another entity in Oman in the case of past capital investments), in whole or in
part;
ii. any expenditure on corporate social responsibility projects, unless in the form of capital
investments in fixed assets intended explicitly to increase ICV; or
iii. any investments in fixed assets included in the information submitted in Table G of Appendix
A in relation to support for national training or R&D institutions.
The Tenderer shall complete Table B in Appendix A with figures for the total level of Omanisation to be
utilised by Tenderer and 3rd Party Sub-contractors in execution of the Contract, as Headcount, Man-hours
and USD$ Compensation, for the following categories of job position (see Definitions):
o Senior Management
o Professional
o Supervisory
o Skilled
o Semiskilled
o Un skilled
4.4.1. Should the Tenderer not provide hourly rates in Table B, the Company will consider its input as
Zero and therefore will lose any potential ICV credit out of that area.
4.4.2. Where the Tenderer is to involve Omani citizens residing outside Oman in the execution of the
Contract, these may be included in Table B. In its overall ICV Plan document, the Contractor shall
clarify which figures, or proportion of figures, in Table B relate to overseas Omanis.
The Tenderer shall comply with “Minimum ICV Requirements” No. 1” Table 1 of 25%
Omanisation (Senior Management, Professional, supervisory and skilled workforces) headcount
of Omani nationals utilised in contract execution as % of total Headcount.
The Tenderer shall complete Table C in Appendix A. The Tenderer shall describe details and attach
documentation of their proposed programme of recruitment, training and progression of Omani Nationals
during the term of the Contract in the different categories of job positions given in Article
The hours included in Table C training hours both on-the-job and class-room training (e.g., induction,
EHS/HES and technical and professional skills, internships and apprenticeships (scholarships are not to
be included)) and the cost of training as an average hourly rate (USD$) should be provided
Tenderer shall provide evidence of a well-structured and sustainable recruitment and training programme
for each category of position covered by the scope of the Contract, including:
i. outreach activities and procedures for maximizing the direct hiring of Omani Nationals;
ii. Identified career paths for Omani Nationals- In particular, progress into Senior Management,
Supervisory and Skilled positions over the Contract term. The ultimate aim should be
succession of Omani Nationals into expatriate positions, once they are suitably qualified.
These career paths should include things such as:
iii. Skills training in respect of key skill sets identified by the Tenderer for Omani Nationals (whether
trained in Oman or overseas) during the term of the Contract. Details provided should include:
o Training programmes covering formal training and on-the job training (e.g.
apprenticeship schemes and cooperation with local training schools);
o Details of courses to be delivered;
o Anticipated number of participants;
o Duration of courses; and
o The qualifications to be attained.
iv. Post-training employment- The Tenderer should include details of any suitable employment
opportunities which may exist, either in Oman or overseas, for Omani National employees once
they have completed their training. The Tenderer should also provide details of how it will
assist the Omani Nationals to discover these opportunities (e.g. through targeted programmes
or a public database of skills and experience).
In addition to above the Tenderer shall comply with the Minimum ICV requirement No.5 &6 as stipulated
herein in Articles 4.5.1 & 4.5.2
The Tenderer shall train Omani youth in technical jobs. In order to enhance value addition, the
Tenderer is to fund the training of Omani high school or Vocational Training Institute graduates on
“training for development” basis.
To facilitate this entire process and to control the quality of the training, The Company has identified
Takatuf Oman(TO) as its preferred provider and to manage of this training.
The Tenderer is responsible to fund for the entire training programme. Funding shall be directed
through TO. The Tenderer is also responsible to finalize the funding agreement with TO within 30
days from the Effective Date.
The Tenderer shall fund the training as specified for a minimum of 1 Omani Nationals.
Not Applicable
4.6.1 The Tenderer shall complete Table D1 in Appendix A with all Made-in-Oman materials, products,
commodities and equipment to be utilised in execution of Contract.
4.6.2 The Tenderer should list as many items as possible (and in any event no less than five (5) per
category) and must also include the billed rate for each item.
4.6.3 The Tenderer is eligible to include within table D1 any anticipated expenditure on Made-in-Oman
goods to be utilized in execution of Contract that the Company has already committed to use
through a Frame Agreement, Term Agreement or similar “ring-fenced” arrangement.
4.6.4 To comply with the Minimum ICV requirement No.2 Table 1 the Tenderer must allocate 6% of the
total contract value to local sourcing of goods (Made-in-Oman). In addition Tenderer shall as a
minimum allocate 10% of its total Contract Price to local sourcing of goods (Made-in-Oman) and
service from SMEs.
4.6.5 The following are sources of information concerning the availability of local products and services
in the Oman market:
o MoCI – Ministry of Chamber and Commerce
o PAIPED – Public Authority for Investment, Promotion and Export Development
o PEIE – Public Establishment for Industrial Estates
o PASMED – Public Authority for SMEs Development ( Riyada)
4.6.6 The Tenderer shall complete Table D2 in Appendix A listing as many Non-Made-In-Oman Goods
(materials, equipment, products and commodities) as are possible (and in any event no less than
five (5)) for each category. Details of these Non-Made-In-Oman Goods should be included whether
they are to be sourced from either 3rd Party Nationally-Registered Suppliers or 3rd Party Foreign-
Registered Suppliers. The Tenderer must also indicate the Billed Rate for each item.
4.7.1 The Tenderer shall complete Table E in Appendix A with the amount paid for services that are to
be sourced from 3rd Party Nationally-Registered Sub-contractors for utilisation in execution of the
Contract. For clarity, only those services used in Contract execution that are provided by 3rd Party
Nationally-Registered Suppliers are to be included in Table E.
4.7.2 To comply with the Minimum ICV requirement No. 3 & 4 Table 1 the Tenderer must allocate 100%
of services to National Registered Suppliers (contractor & 3rd Party Sub-Contractor/Supplier) of
those items set out in section 4.7.
4.7.3 In Addition, Tenderer shall as a minimum allocate 10% of its total Contract Price to local sourcing
of goods and service from SMEs.
The Tenderer shall complete Table F in Appendix A and include values monetising the level of
support (either actual or in-kind expenditure), to support the development of 3rd Party Nationally-
Registered Sub-contractors/Suppliers. Only those anticipated expenditures
which are to be made directly by the Tenderer from its own financial resources should be included
and any expenditure which is to be charged directly to the Company should be excluded. The
Tenderer must also include details (including expected outcomes) and attach documentation
evidencing its proposed programmes of support which should include evidence of both short term
programmes: during the term of the Contract that underpin the percentage levels of Omanisation,
Made-in-Oman goods and expenditure with National Suppliers committed in Tables D and E, and
long term programmes: post-Contract execution that contribute to greater levels of ICV being
retained in the Omani economy through expenditures in the oil and gas sector which could include
things such as:
(a) Short Term Participation of 3rd Party National Suppliers during Contract execution:
(ii) upgrading National Suppliers and partners to meet project and international standards for
capability, capacity, HES and quality through improvements in operational process, efficiency
and quality assurance;
(iii) skills training and competency development of employees of National Suppliers and
partners;
(iv) towards the end of the Contract period, provide support for the best-performing National
Suppliers to access other opportunities and markets; and
(v) Collaboration with other organisations, such as other operators and contractors, public
institutions and non-governmental organisations.
(b) Longer-Term Development of 3rd Party National Suppliers post Contract execution:
4.9 Development of National Training, Education and R&D Institutions Table G in Appendix A
The Tenderer shall complete Table G in Appendix A with a description of their past and proposed
programmes to develop the capability and capacity of Omani public and private institutions,
including:
(i) vocational and technical training institutions (including scholarships);
(ii) tertiary education establishments, e.g., teaching part of universities (including scholarships);
(iii) National R&D institutions, e.g., research part of universities, investments in research centres
(excluding fixed assets already included in Table A).
The Tenderer should include values that monetise the level of this support (either actual or in-kind
expenditure). Any amounts included should exclude any expenditure to be directly charged to the
Company. The Tenderer should also describe the expected benefits to Oman of this support, e.g.
in number of citizens benefiting, any new research capability, new technologies developed
APPENDIX A - ICV
PLAN (TABLES A to H).xlsx
# Head Count
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
# Manhours
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Al l -i ncl us i ve a ve ra ge Al l -i ncl us i ve a ve ra ge Al l -i ncl us i ve a ve ra ge Al l -i ncl us i ve a ve ra ge Al l -i ncl us i ve a ve ra ge Al l -i ncl us i ve a ve ra ge Al l -i ncl us i ve a ve ra ge Al l -i ncl us i ve a ve ra ge Al l -i ncl us i ve a ve ra ge Al l -i ncl us i ve a vera ge Al l -i ncl us i ve a vera ge Al l -i ncl us i ve a vera ge
hourl y ra te (USD$) hourl y ra te (USD$) hourl y ra te (USD$) hourl y ra te (USD$) hourl y ra te (USD$) hourl y ra te (USD$) hourl y ra te (USD$) hourl y ra te (USD$) hourl y ra te (USD$) hourl y ra te (USD$) hourl y ra te (USD$) hourl y ra te (USD$)
USD$
Compensation
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Senior Management Professional Supervisory Skilled Semi-skilled Unskilled Senior Management Professional Supervisory Skilled Semi-skilled Unskilled
# National # National # National # National # National # National # National # National # National # National # National # National # National # National # National # National # National # National # National # National # National # National # National # National
man-hours training man-hours training man-hours training man-hours training man-hours training man-hours training man-hours training man-hours training man-hours training man-hours training man-hours training man-hours training
(from T3) man-hours (from T3) man-hours (from T3) man-hours (from T3) man-hours (from T3) man-hours (from T3) man-hours (from T3) man-hours (from T3) man-hours (from T3) man-hours (from T3) man-hours (from T3) man-hours (from T3) man-hours
100 0 0 0 0 0 0 0 0 0 100 0
0.0% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0.0% #DIV/0!
TABLE E - Local Sourcing of Services from Nationally-Registered 3rd Party Sub-Contractors Utilised in Contract Execution
10
11
TOTAL
$ - $ - $ -
(weighted by total amount to be paid)
Short Term Support for Participation of 3rd Party National Suppliers in Contract Execution Long Term Development of 3rd Party National Suppliers
1 $0.0 1 $0.0
2 $0.0 2 $0.0
3 $0.0 3 $0.0
TABLE G - Support to National Institutions to Development the Omani Oil and Gas Sector
1 $0.0 1 $0.0
2 $0.0 2 $0.0
3 $0.0 3 $0.0
1 $0.0 1 $0.0
2 $0.0 2 $0.0
3 $0.0 3 $0.0
National R&D
Past three (3) years Support by CONTRACTOR to National R&D Planned next three (3) years Support by CONTRACTOR to National R&D
1 $0.0 1 $0.0
2 $0.0 2 $0.0
3 $0.0 3 $0.0
6.5.1 The Contractor shall be required, at its own expense, and shall require its sub-contractors and
suppliers to obtain assurance that commitments to expenditure on Made in Oman Goods included
in Table D1 are assigned to, and only to, products, materials and equipment that are included in
the List of goods of Omani origin issued by the Ministry of Commerce.
6.5.2 The Company reserves the right to request copies of such assurance obtained by the Contractor
to support ICV claimed in any subsequent ICV performance reports submitted by the Contractor.
6.2.1 Within fourteen (14) days from the Effective Date of the Agreement, Contractor shall prepare an
ICV Reporting Schedule (to be incorporated as Appendix C to the Exhibit here within). This
Schedule shall detail the planned ICV activities and timeline (i.e., milestones) for key deliverables
of the ICV Plan, for approval by the Company. For this purpose, the Contractor shall detail
milestones on a quarterly basis that, when delivered across the full period of contract execution,
achieve all commitments made in the approved ICV Plan, inclusive of the commitments made in
Tables A to G (Appendix A). For clarity, the agreed Reporting Schedule shall be fully consistent
with the approved ICV Plan.
6.2.2 In accordance with the approved ICV Reporting Schedule, the Contractor shall provide an ICV
contract performance report to the Company on a quarterly basis from the Effective Date of the
Agreement detailing performance in delivery of commitments in the ICV Plan directly associated
with contract execution, namely progress against commitments to: (i) Omanisation in the workforce
(Table B); (ii) training of Omanis (Table C); (iii) expenditure on local goods and 3rd party services
(Tables D and E); (iv) short-term support for participation of 3rd Party National Suppliers in contract
execution (Table F – short-term). Contractor shall use for this purpose the reporting templates
provided in Appendix A: Quarterly ICV Contract Performance Reporting Template and Appendix
D: Quarterly ICV Sub-Contract Performance Reporting Template.
6.2.3 At the time of submission of the final invoice for execution of the Agreement, Contractor is to provide
a whole of contractor ICV performance report detailing (i) overall progress in Omanisation of the
Contractor’s workforce and expenditure on local goods and services, and (ii) delivery of longer-
term commitments made by the Contractor in the ICV Plan, namely: long-term development of
National Suppliers (Table F – long-term); and support to national institutions to develop the Omani
Oil and Gas Sector (Table G). Contractor shall use for this purpose the reporting templates provided
in Appendix E: Whole of Contractor ICV Reporting Template.
6.2.4 At any reasonable time during the term of the Agreement and for two years thereafter Company
may request Contractor to provide a whole of contractor ICV performance report as detailed in
Article 6.2.3 above.
6.3.1 During the term of the Agreement and for two years thereafter, Contractor shall maintain and
preserve, and as required shall cause its sub-contractors and suppliers to maintain and preserve,
a true and accurate set of records pertaining to the approved ICV Plan (Appendix A), including, but
not limited to, the assumptions and calculations used to generate the commitments made in Tables
A to G.
6.3.2 Without limiting any of Company’s rights under the Agreement, at any reasonable time during the
term of the Agreement and for two years thereafter, the Company shall be allowed access to
Contractor's records for purposes of verifying the commitments made in the approved ICV Plan
(APPENDIX - B).
6.3.3 Without limiting any of Company’s rights under the Agreement, during the term of the Agreement
and for two years thereafter, Contractor shall maintain and preserve, and as required shall cause
its sub-contractors and suppliers to maintain and preserve, a true and accurate set of records
pertaining to the information provided in the Contractor’s quarterly ICV contract performance
reports and whole of contractor ICV performance report.
6.3.4 Without limiting any of Company’s rights under the Agreement, at any reasonable time during the
term of the Agreement and for two years thereafter, the Company shall be allowed access to
Contractor's records for purposes of an audit of the information provided in the Contractor’s
quarterly ICV contract performance reports and whole of contractor ICV performance report.
6.4 NON-CONFORMANCE
6.4.1 Non-conformance by the Contractor in delivering the agreed milestones in the approved ICV
Reporting Schedule (Appendix C) shall trigger the following non-conformance and corrective action
process (Articles 6.4.2 to 6.4.5).
6.4.2 The Contractor shall ensure that the Company is promptly notified of any such ICV non-
conformance, and the corrective measures the Contractor has already, or intends, to put in place
to deliver the associated milestones.
6.4.3 Company shall approve corrective measures to be implemented by the Contractor, and the time
line for their delivery.
6.4.4 The Contractor shall maintain an ICV non-conformance register against delivery of the approved
ICV Reporting Schedule. This register shall be kept up to date and shall summarise the status of
all non-conformance and progress of associated corrective actions. The non-conformance register
shall be reported to the Company as part of the Contractor’s quarterly ICV contract performance
reports and whole of contractor ICV performance reports.
6.4.5 Failure by the Contractor to carry out the corrective measures in accordance with the time line
agreed under Article 6.4 shall be deemed a material breach of the Contract and the Company shall
have the right to withhold a part of its next payment until such noncompliance is corrected to the
Company’s satisfaction. The percentage of payment to be withheld will be pro rata to the level of
non-compliance so that if the Contractor is, for example, 90% compliant it will only receive 90% of
the payment to which it would otherwise have been entitled and this will be determined in the sole
discretion of the Company.
APPENDIX C - ICV
REPORTING SCHEDULE.xlsx
APPENDIX D - ICV
CONTRACT PERFORMANCE REPORTING TEMPLATE.xlsx
Name (OOC Sub/ Project): Contract Category Other category Contract Awarded Value $ Quarterly Payment received Value $ Contract start date Contract end date
Contractor (Title/Name): Actual Monthly Figures.
Date: 00/00/0000 ICV Plan October November December
Head Count Manhours All-inclusive average hourly rate Head Count Manhours All-inclusive average hourly rate (USD$) Head Count Manhours All-inclusive average hourly rate (USD$) Head Count Manhours All-inclusive average hourly rate (USD$)
Workforce by Job Position Omanis Expatriates Omanis Expatriates Omanis Expatriates Omanis Expatriates Omanis Expatriates Omanis Expatriates Omanis Expatriates Omanis Expatriates Omanis Expatriates Omanis Expatriates Omanis Expatriates Omanis Expatriates
Contractor Senior Management
Professional
Supervisory
Skilled
Semi-skilled
Unskilled
Total 0 0 0 0 $0 $0 0 0 0 0 $0 $0 0 0 0 0 $0 $0 0 0 0 0 $0 $0
Sub-Contractors Senior Management
Professional
Supervisory
Skilled
Semi-skilled
Unskilled
Total 0 0 0 0 $0 $0 0 0 0 0 $0 $0 0 0 0 0 $0 $0 0 0 0 0 $0 $0
Workforce by Job Position Omanis Expatriates Omanis Expatriates Omanis Expatriates Omanis Expatriates Omanis Expatriates Omanis Expatriates Omanis Expatriates
Contractor Senior Management $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 0
Professional $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 0
Supervisory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 0
Skilled $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 0
Semi-skilled $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 0
Unskilled $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 0
Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 0
Sub-Contractors Senior Management $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 0
Professional $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 0
Supervisory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 0
Skilled $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 0
Semi-skilled $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 0
Unskilled $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 0
Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 0 0
Omanisation Total $ $0.00 $0.00 $0.00 $0.00 0 0 0 0
$0.00
Made-in-Oman Goods
Non-Made-in-Oman Goods Sourced from Nationally-Registered Suppliers
$0.00
or 3rd Party Sub-Contractors / Suppliers
Non-Made-in-Oman Goods Sourced from Foreign-Registered Suppliers or
$0.00
3rd Party Sub-Contractors / Suppliers
* Go to Cell A88 and fill the table
SME's $0.00
Investment in Fixed Assets (Oman) ICV Plan ’000 (USD $) October’000 (USD $) November’000 (USD $) December ’000 (USD $)
Planned Three (3) Years Capital Investments.
Total $0.00 $0.00 $0.00 $0.00 $0.00
Support to Develop 3rd Party National Suppliers ICV Plan ’000 (USD $) October’000 (USD $) November’000 (USD $) December ’000 (USD $)
Short-Term Participation progress of 3rd Party (National) $0.00
Long-Term Development Prgress of 3rd Party (National) $0.00
SME's Development $0.00
Total $0.00
Support to National Institutions to Develop the Omani Oil and Gas Sector ICV Plan ’000 (USD $) October’000 (USD $) November’000 (USD $) December ’000 (USD $)
Planned Three (3) Years Support for Vocational and Technical Training $0.00
Planned Three (3) Years Support for Tertiary Education Establishments $0.00
National R&D $0.00
Total $0.00 $0.00 $0.00 $0.00 $0.00
APPENDIX E -
WHOLE ICV REPORTING.xlsx
Cells to be completed
Contractor Company
Omani Nationals in Workforce: Omani Omani Nationals in Workforce: Omani Non-Nationals in the Workforce: Non-Nationals in Workforce: Expat In-
Direct Employees In-house Individual Contractors Resident Expats House Individual Contractors
# Headcount 0 0 0 0
0 0
Contractor Company
# Head Count 5 5 4 18 4 18 15 80 15 80 20 20
# Manhours 12,000 12,000 10,000 40,000 20,000 40,000 40,000 200,000 40,000 20,000 30,000 30,000
All-inclusive average All-inclusive average All-inclusive average All-inclusive average All-inclusive average All-inclusive average
hourly rate (USD$) hourly rate (USD$) hourly rate (USD$) hourly rate (USD$) hourly rate (USD$) hourly rate (USD$)
USD$
$200 $200 $150 $100 $100 $50 $15 $30 $10 $20 $5 $0
Compensation
Contractor Company
$ value of Training $0 $0 $0 $0 $0 $0
DOCUMENT C-08
PROCEDURES FOR CONTRACTOR
1 INTRODUCTION .................................................................................................................................. 3
12 MATERIALS .......................................................................................................................................20
12.1 PERSONNEL................................................................................................................................................. 20
12.2 CHECKING AND INSPECTION OF MATERIALS ....................................................................................................... 20
12.3 MARKING AND STORAGE OF MATERIALS ........................................................................................................... 21
12.4 CONTRACTORS SITE RECORDS ......................................................................................................................... 21
13 ATTACHMENTS ..................................................................................................................................22
13.1 "CHANGE ORDER" ....................................................................................................................................... 22
13.2 "INTERIM PAYMENT CERTIFICATE"................................................................................................................... 23
13.3 "CERTIFICATE OF COMPLETION" ...................................................................................................................... 24
13.4 "VARIATION TO CONTRACT"........................................................................................................................... 25
13.5 “PERFORMANCE BOND” ................................................................................................................................ 26
13.6 “ FORM OF ADVANCE PAYMENT BOND (IF APPLICABLE)” ..................................................................................... 28
13.7 “ CORRESPONDENCE NUMBERING PROCEDURE” ................................................................................................ 30
13.8 “FORMAT FOR MINUTES” ............................................................................................................................. 31
13.9 "SITE INSTRUCTION" (IF APPLICABLE) .............................................................................................................. 32
13.10 “ PERSONNEL CATEGORIES” ........................................................................................................................... 33
C-08 - Procedures for Contractors - Rev. May 2017 Page 2 of 33
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
2 Contractor’s Organisation
3.1 Correspondence
3.1.1 Unless specifically stated otherwise all correspondence and communications in the execution
of the Contract shall be addressed and directed by the Contractor Contract Manager to the
Company Contract Holder and vice versa.
3.1.2 All Correspondence shall be dealt with by Letter or acknowledged e-mails, in that order of
preference. All Letters, E-Mails and Facsimiles shall be acknowledged by return and bear the
following headings:
Date:
Contract No.:
Title of Contract:
Sequential Reference Number (see Attachment 13.7
Subject:
Letters shall be sent to: Address stated in C1 – Form of Agreement
Faxes shall be sent to: Address stated in C1 – Form of Agreement
Attn: Contract Holder/Contract Manager
3.1.3 Unless specifically agreed otherwise exchange of reports, drawings, and other documents
shall be accomplished by means of a transmittal note. The recipient shall sign the transmittal
note and return the copy of the transmittal note to the initiator. The initiator shall ensure that
all transmittals have been acknowledged as received by the recipient.
3.1.4 The Contractor shall maintain a correspondence log of all correspondence, originating from
both the Contractor and the Company, which shall include a summary of relevant details plus
any actions and their status. The Correspondence Log shall be in an electronic format,
suitable for sorting and reporting against.
3.1.5 All instructions, notifications, agreements, authorisations, approvals, acknowledgements and
general correspondence shall be in English and shall be in writing.
3.1.6 All written correspondence shall include either the statement "For Your Action," if a written
response is required, or "For Your Information" for other correspondence.
3.1.7 Contractor shall establish a system, for approval by Company, for raising and resolving site
queries both within Contractor's organisation and with Company.
3.3.9 The Contractor shall allow a period of not less than fourteen (14) days for the Company to
review/approve all project documents and drawings.
3.3.10 The Company’s review, approval or acceptance of any document shall not relieve the
Contractor’s responsibilities and obligations under the Contract.
3.4 Meetings
3.4.1 Meetings shall be conducted in the English language
3.4.2 The Contract Holder or his nominated representative shall chair all meetings. The Contractor
shall prepare an Agenda and review material required for each meeting.
3.4.3 Minutes of meetings shall be dated and numbered consecutively, record all action items
discussed or agreed during the meeting and shall indicate the party to take the required action.
3.4.4 Discussion of minutes of previous meeting shall be the first agenda point of the subsequent
meeting, and previous minutes shall be approved or amended accordingly.
3.4.5 Progress review meetings between the parties will be held fortnightly, or as requested by
Company, for the purpose of:
a) Keeping all parties fully informed of all aspects of the Work.
b) Reviewing progress, status, scheduling and HSE aspects of the Work; and
c) Reviewing technical or financial subjects.
3.4.6 Minutes of each meeting shall be prepared by the Contractor and circulated to the Company
within two (2) working days following the day of the meeting. The Company Contract Holder
or Project Manager will review the minutes and make any changes necessary. The Contractor
shall incorporate any changes required by the Company and reissue the minutes within one
(1) working day. The Company Contract Holder or Project Manager and Contractor’s Contract
Manager shall sign the minutes, which shall then be deemed a true record of that meeting.
3.4.7 Whenever possible the action list and significant decisions shall be agreed before the meeting
breaks up.
3.4.8 The Contractor shall maintain action registers for all meetings indicating the action party, the
required action, the required completion date of the action, and the status of progress against
the action item.
3.4.9 The Company or the Contractor may call separate specific meetings as may be necessary
during the performance of the Work. Such meeting requests shall be advised two (2) working
days in advance.
3.4.10 Histogram technical review meetings shall be held between Company Representative and
Contractors lead engineers/section leaders. The requirements for reporting and follow up of
the technical review meetings shall be as for the progress review meetings. Separate action
registers shall be maintained.
4.6 Payment
4.6.1 The Work executed shall be assessed and valued in accordance with the deliveribles given
in the Pricing Preambles to the Schedules of Rates. The Contract Holder will certify these
Interim payments.
5 Sub-Contracts
5.1 In accordance with the Article headed Sub-Contracts, in Document C-03 General Conditions,
the Contractor shall, within thirty (30) days of the Effective Date, submit a Sub-Contract plan
which shall include a description of and schedule for the anticipated Sub-Contracts (Sub-
Contracts includes Sub-Subcontracts). The Company will review and advise the Contractor
of the Sub-Contracts which the Company will require to approve.
C-08 - Procedures for Contractors - Rev. May 2017 Page 6 of 33
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
5.2 The Contractor shall allow a period of not less than fourteen (14) days for the Company to
review the Sub-Contract plan.
5.3 For Sub-Contracts requiring the approval of the Company, the Contractor shall submit to the
Company, for review and approval prior to issuing any enquiry documents, a procurement
plan indicating:
a) the scope of work of the Sub-Contract;
b) the proposed list of Contractors;
c) the proposed timetable for the Sub-Contract; and
d) the proposed quality system standard.
5.4 Company shall have the right to review Contractor's pre qualification of Contractors and the
proposed Sub-Contract documents.
5.5 Contractor shall allow a period of not less than fourteen (14) days for Company to review the
above information.
5.6 Company shall either notify Contractor that Contractor or Sub-Contractor may proceed with
the issue of the enquiry documents, or submit written comments on the proposed Sub-
Contract for action by Contractor and/or Sub-Contractor prior to issuing any enquiry
documents.
5.7 The Contractor shall assume all responsibility for the performance in all respects of all Sub-
Contractors, irrespective of whether such Sub-Contractors are approved by Company. The
Contractor shall be deemed to be aware that certain Company approved Contractors may
have financial restrictions in terms of the size of contract that the Company would enter into
with such companies. The Contractor shall be responsible for ensuring acceptable financial
strength of all Sub-Contractors prior to entering into any Sub-Contract.
5.8 Should the Contractor, or any of his Sub-Contractors, propose to include additional
Contractors on any Sub-Contract list of Contractors then, in addition to the procurement plan
for the Sub-Contract, submit the following documents for each additional proposed
Contractor:
a) details of Contractors' QA system;
b) Contractors' safety record;
c) Contractor's, or Sub-Contractor's, previous experience with proposed Contractor.
5.9 The Contractor shall allow a period of not less than thirty (14) days for Company to review the
above information and revert on the acceptance, or otherwise, of proposed additional
Contractors and consequent approval of the associated procurement plan for the Sub-
Contract.
5.10 The Company shall have the sole right to approve or reject proposed additional Contractors
and shall be under no obligation to justify to the Contractor why any Contractor is rejected.
5.11 The Contractor shall, for all Sub-Contracts requiring Company approval, submit its
recommended Sub-Contractor for Company approval prior to award of the Sub-Contract.
5.12 The Contractor's and Sub-Contractor's evaluation of tenders shall as a minimum, address
Contractors';
a) project organisation and management;
b) method for performing the work;
c) schedule for the work;
d) manpower availability;
e) experience;
f) QA System;
g) safety;
h) Omani content; and
i) price.
5.13 The Company shall have the right to review the Contractor's or Sub-Contractor's evaluation
of tenders and the proposed award of a Sub-Contract. The Contractor shall allow a period
of not less than fourteen (14) days for such review. Pricing information shall only be provided
for Sub-Contracts which are reimbursable by the Company.
6.1.1 Scheduling
The number of activities shall be adequate to clearly define and show the critical path (in red
colour as the default of the Primavera Software), the Payment Milestones (specified under
Document C-5), Penalty Milestones, all external interfaces, and cover the total Scope of Work
including critical verification checkpoints and safety analyses/reviews. Contractor shall show
all the contract milestones in their schedules and work to meet these milestones.
Each activity shall be uniquely numbered and assigned a distinct code with reference to the
Work Breakdown Structure (WBS) number. No activity is to cover work scope from more than
one Work Package of the WBS.
The main titles to be covered shall include the following as a minimum:
Project Management Site Construction Support
Engineering (if any) Transportation
Procurement Site Pre-Commissioning &
Commissioning Support
Temporary Site Establishment QA/QC Activities
Fabrication
Contractor’s planning, scheduling and schedule control activities shall encompass all phases
of the WORK, including those performed by its Subcontractors and Suppliers. Contractor
shall be fully responsible for all detailed planning and scheduling necessary to ensure that the
WORK is completed in accordance with the Contract. The proposed methodology for
progress measurement must be agreed with the Company.
Contractor shall perform and maintain the scheduling at 3 different levels in accordance with
the requirements set out below. These schedules, at all 3 levels, must be computerized in
such a way that planned and actual progress can be aggregated and automatically loaded
from the lowest level (Level 3) up to the highest level (Level 1). Progress shall be measured
based on physical progress on deliverables and not on resources expended.
Associated with each activity at the different Levels shall be 3 sets of data: "planned", "actual"
and "forecasts". This data shall describe the 'dates' and the 'resources' required to meet the
'dates'.
"Planned" data shall constitute the baseline program and shall remain fixed for the whole
Contract upon initial approval of the WORK Program by Company. The Start Date of the
schedules shall be defined as the Effective Date of the Contract.
Contractor shall update the Level 1 schedules once a month and the Level 3 schedules
biweekly and additionally as may be requested by Company. Such updating shall be subject
to approval by Company.
All schedules and updates issued by Contractor shall be signed by Contractor Representative.
The format of the scheduling, progress measurement and reporting shall be subject to
Company's approval. However the presentation of the schedules progress measurement and
reporting or parts thereof shall be:
On A1 or A2 sized paper as applicable unless agreed otherwise by the Company.
Along the top of the sheet the timescale in weekly increments.
Each activity shall be represented by:
1. A bar for the fixed "originally planned, Target" duration.
2. A bar for the "actual, current" duration up to "time now".
Each Milestone shall be represented by "originally planned", "actual" or "forecast"
date, each in different styles in line with the styles used for the activities.
Superimposed on the other information on the sheet, two S-Curves totaling progress
over all activities shall be shown, one S-Curve for "originally planned", and one S-
Curve built in two parts; one part for "actual achieved" from Effective Date up to "time
now" and one part for "forecast" from "time now" to arrival of equipment to site (in
addition to the anticipated; construction supervision activities and commissioning
support activities).
The Network shall also clearly identify the interrelationships between activities that belong to
the different phases of the execution of the Work, like the linkage between Engineering,
Procurement, Fabrication, QA/QC, and Shipping activities in addition to construction
supervision, and commissioning support.
- Cathodic protection/painting
the Commissioning Support activities shall be broken down into the following:
- Engineering support (deliverables of manuals/drawings as specified and
agreed by Company)
- Commissioning
- Start-Up
- Initial operation
- Performance Tests
In addition Contractor shall perform adhoc planning and schedule “what if” studies as
requested by the Company.
6.1.12.1 Organization
Contractor shall prepare as part of the work Program organization charts for each phase of
the WORK identifying the key positions on the chart.
6.1.16 Project Materials Progress Report (where materials to be supplied by the construction
contractors)
Contractor shall issue a monthly Project Materials Progress Report with the same cut-off and
issue dates as the monthly progress report. The format of the Report shall be submitted for
approval within one month from Contract Award. The Report shall be generated from the
Materials Planning and Tracking System.
C-08 - Procedures for Contractors - Rev. May 2017 Page 15 of 33
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
issue date. A progress S-curve shall be included; the ‘Y-axis’ of which shall be the ‘Number
of E-SPIRs’.
6.2 Materials
All the above data per individual requisition shall be combined on the same sheet. A narrative
shall highlight the important changes from the previous report.
7 Key Personnel
7.1 All Key Personnels as identified in Document C-4. In the event that the Company requests a
change in Key Personnel, or that the Contractor requests a change in Key Personnel and the
Company gives such authorisation, there shall be an adequate handover period during which
both the outgoing and the incoming person shall be engaged on the Work. The Company
shall specify the length of the handover period required for the change of the Key Personnel
in the notification giving authorisation for the change. All costs associated with the change of
Key Personnel are deemed to be included in the Lump Sum for the Work.
7.2 In the event that the Contractor or the Company requests a change in Key Personnel, the
Company may require an interview with the proposed Key Personnel. All Contractor's
expenses involved in such interviews, whether they are held, at the request of the Company,
in the Contractor's or the Company's offices, shall be for the account of the Contractor.
7.3 The Contractor shall ensure that only suitably experienced and qualified personnel are utilised
in the performance of the Work. Should the Company require the replacement of a person
where , in the Company’s opinion, such person is either negligent, incompetent or working in
such a way as to make continued presence on the Work undesirable, then the provisions of
Clauses 7.1 and 7.2 above shall apply irrespective of whether such person is part of Key
Personnel or not.
7.4 Failure to Moblise / avaiablity at site Key Personnel for this contract
In the event the Contractor (and/or Sub-Contractor) fails to comply with clause 7.1,7.2 & 7.3
and further any key personnel demobilised from this contract without proper approval from
Company then following amount / Penalty shall become due to the Company as per Document
C5A – Price Preamble.
9.1 Definitions
For the purpose of these guidelines, "Fuel" shall be defined as Petrol or Diesel for use in
motor vehicles or other equipment. The guidelines do not cover the use of associated gas,
aviation fuel, or clean crude used in power generation activities, air, or drilling activities.
The Contractor shall be deemed to be familiar with the local laws, regulations, constraints,
damage risks, clearance, transport and storage of materials and equipment and shall be
responsible for all packing, documentation and logistic support.
All Customs duties and costs related to the importation of materials and equipment shall be
to the Contractor's account.
12 Materials
12.1 Personnel
The Contractor shall provide a dedicated Material Supervisor of senior staff status.
Appointment of the Material Supervisors will be subject to Company approval. The Company
reserves the right to reject the Materials Supervisor if his performance is considered below
standard by the Company.
12.2.1 General
On receipt of Material at Site the Contractor shall open packages and check the contents
against any of the following Company standard delivery documents.
Field Consignment Note
Material Receiving Sheet
Transfer and Issue Vouchers
Vendor Packages
13 Attachments
CHANGE ORDER
Contract no: C.O NO:
Contract title:
Contractor:
Date …… /…….. / ………
Note: Contractor shall confirm with the Company about latest revision of this form prior usage.
3. CHANGE ORDERS
Note: Contractor shall confirm with the Company about latest revision of this form prior usage.
CERTIFICATE OF COMPLETION
Contract no: Certificate Of Completion No:
Contract title:
Contractor:
Date …… /…….. / ………
APPROVED
AUTHORISED BY
CONTRACT HOLDER
Note: Contractor shall confirm with the Company about latest revision of this form prior usage.
VARIATION TO CONTRACT
Contract no: VTC NO:
Contract title:
Contractor:
For internal use only
R.O.
Contract commencement
....date
/ ... / … Contract awarded value If applicable nitial
Contract expiry date .... / ... / … Value of preceding VTC Con Eng. ref.
For and on behalf of the company For and on behalf of the contractor
Ref Ind. Of contract holder: Name:
Position Position
Signature Signature
Date Date
Original: (Contractor/Co. Rep) Copies: (Proj. Engineer/Q.S/Contract Holder/Finance)
Note: Contractor shall confirm with the Company about latest revision of this form prior usage.
8. Any notice hereunder shall be deemed to be duly given when delivered (in the case of personal
delivery) or 48 hours after being despatched by prepaid registered post or recorded delivery (in
the case of letter) to our address appearing on this Performance Bond or such other address as
we may notify to you by not less than five business days prior written notice.
9. Without increasing the limit of our liability hereunder the benefit of this Performance Bond may be
assigned by you as you may think fit to the agent for and on behalf of any financial institutions
and export credit agencies which have agreed to extend credit and guarantee facilities to you in
connection with the Contract. Prior to any such assignment you shall notify us in writing with the
relevant details of the assignee.
10. This Performance Bond shall be governed by and shall be construed in accordance with the laws
of the Sultanate of Oman and the Guarantor submits to the non-exclusive jurisdiction of the
Commercial Court in Oman.
1. At the request of [ ], (the "Contractor"), we hereby issue our irrevocable and unconditional
guarantee no. [ ] (“this Advance Payment Bond”) in favour of Oman Gas Company SAOC
(“the Company”) for an amount of R.O[ ] representing 10 per cent of the Contract Price.
2. We have been informed that this Advance Payment Bond relates to the performance of the
Contractor under a contract dated [ ] made between the Company and the Contractor for the
performance of work and services to be rendered under an engineering procurement and
construction contract in respect of the …………………………………………………………
(the “Contract”).
3. We undertake to pay the Company as beneficiary under this Advance Payment Bond up to a
maximum amount of R.O[ ] being the amount of the advance payment made to the Contractor
under the Contract reduced to the extent that the advance payment is repaid by the Contractor
to the Company pursuant to the Contract (from time to time the "Guaranteed Amount") on
receipt of your first written demand accompanied by your statement that (i) the Contractor has
failed to fulfil any one or more terms or conditions of the Contract and that you are entitled to
claim payment of the amount claimed from the Contractor under the Contract and (ii) the amount
claimed is less or equal to than the Guaranteed Amount. Such demand and statement together
will be accepted by us as conclusive evidence that the amount claimed is due to you, without
any proof or procedure.
4. This Advance Payment Bond shall be valid until the receipt by us of a copy of a written statement
signed by a duly authorised representative of the Company stating that the advance payment
has been repaid in full to the Company or that the Guaranteed Amount has been reduced to
zero. When the validity period of this Advance Payment Bond has expired, it must be returned
to us for cancellation, but we shall be released from any further obligation hereunder even if, in
breach of this provision, that return has not taken place. Such release will be without prejudice
to any liability under this Advance Payment Bond which arose prior to such date.
5. Any payment by us hereunder shall be in immediately available and freely transferable funds
free and clear of and without any deduction, withholding, set-off or counterclaim whatsoever for
or on account of any present or future taxes, levies, imposts, duties, charges, fees, set off,
counterclaims, deductions or withholdings of any nature whatsoever and by whomsoever
imposed.
6. Our obligations hereunder are of a continuing nature, constitute direct, primary, irrevocable and
unconditional obligations, shall not require any previous notice to or claim against the Contractor
and shall not be discharged or otherwise prejudiced or adversely affected by:
(i) any time, indulgence, waiver, concession or forbearance which you may grant to the
Contractor or any neglect by you in enforcing any right of action or remedy you may
have against the Contractor under the Contract;
(ii) any amendment, modification or extension which may be made to the Contract or the
works performed thereunder or any suspension of such works;
(iii) any intermediate payment or other satisfaction made by us;
(iv) any change in the constitution or organisation of the Contractor;
(v) any termination of the Contract or of the employment of the Contractor;
(vi) any other bond, security or guarantee held or obtained by you for any of the obligations
of the Contractor under the Contract or any release or waiver thereof;
(vii) any act or omission of the Contractor pursuant to any other arrangement with ourselves;
(viii) any defences, claims or cross-claims which may be available to the Contractor; or
(ix) any other matter or thing which in the absence of this provision would or might have
that effect except a discharge or amendment of this Advance Payment Bond expressly
made or agreed to by you in writing.
7. Any notice hereunder shall be deemed to be duly given when delivered (in the case of personal
delivery) or 48 hours after being despatched by prepaid registered post or recorded delivery (in
the case of letter) to our address appearing on this Advance Payment Bond or such other
address as we may notify to you by not less than five business days prior written notice.
8. The benefit of this Advance Payment Bond may be assigned by you as you may think fit to the
agent for and on behalf of any financial institutions and export credit agencies which have
agreed to extend credit and guarantee facilities to you in connection with the Contract. Prior to
any such assignment, you shall notify us in writing with the relevant details of the assignee.
9. The Advance Payment Bond shall be governed by and shall be construed in accordance with
the laws of the Sultanate of Oman and the Guarantor submits to the non-exclusive jurisdiction
of the Commercial Court in Oman.
Executed by
(Name of Issuing Bank)
All correspondence between Contractor and Company and between Company and Contractor shall
have a unique reference number as described below.
Correspondence from Contractor to Company shall bear a reference of the form:
CON/OGC/XYYY where;
- CON is a three letter abbreviation of the name of Contractor's Company
- X defines the type of correspondence and shall be
L for Letter
F for Fax
T for Telex
N for Note or Memo
- YYY is a sequential number, starting from 001, independent of the correspondence type
Transmittal forms shall be numbered CON/OGC/TRZZZ where;
- ZZZ is a separate sequential number from YYY above, starting at 001.
Minutes of meeting shall have a separate sequential numbering system starting from M001.
Correspondence from Company to Contractor shall follow the same principles as described above but
shall be in the format OGC/CON/XYYY
CONTRACT TITLE:..
MINUTES OF MEETING
(Reference No. 1
(Subject)
(Place)
(Time) (Date)
PRESENT:
-------------------------------------------------------------------------------------------------------------
Copies to: Those Present Company subject code( )
(others) (or as advised)
-------------------------------------------------------------------------------------------------------------
Note: Contractor shall confirm with the Company about latest format of this form prior usage.
SITE INSTRUCTION
Contract no: S.I. NO:
Contract title:
Contractor:
Date …… /…….. / ………
INSTRUCTION
CONTRACTOR is requested to carry out the following with reference to:
This Site Instruction does not represent any monetary value. If this Site Instruction has an effect on the Estimated
Contract Price, the Contract Price or the Schedule, the Contractor shall, at the earliest possible opportunity and
within the time period as specified in the Contract, but not later than fourteen days after receipt of this Site
Instruction, advise the Company thereof by requesting a Variation to Contract. If no such request is made within
the stipulated time then this Site Instruction is deemed to be included in the Contract Scope of Work and no
Variation shall be applicable.
Authorised By Company: Acknowledged By Contractor:
NAME: _____________________ NAME: _____________________
REF. IND ___________ TITLE: ___________
SIGNATURE:____________________________ SIGNATURE:________________________
___
ORIGINAL:
COPY: QS: COPY: CSR COPY: CoContract Holder:
CONTRACTOR
Note: Contractor shall confirm with the Company about latest revision of this form prior usage.
**********
CONTRACT DOC,,MLIFVf
HSE SPECMCATIOKS
ID)
(C9 HSE FICA 'MO
Prepared By : (HSE
Reviewed By: (HSE Manager) Approved Bs : GMS )
Engineer)
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 2 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 3 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
1. PURPOSE
The purpose of this document is to specify the requirements, which shall be met by all
Contractors working for OGC during mobilization, execution and restoration activities covered
in the contract scope of work.
2. SCOPE
This document shall be a part of the Tender document issued to all Contractors prior to the
award of the contract. This document is generally attached as 9th part of the Contract
Document by title ‘C9 HSE Specifications’. This shall include all HSE Specifications apart from
those mentioned in C4 Scope of Work of the Contract Document.
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 4 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
Contractors shall manage HSE referring to OGC HSE Documents, the list of which is attached
as Appendix 1. The Contractor shall be in compliance with all the conditions stipulated by the
documents enlisted in Appendix 1 throughout the course of the execution of the project
commencing from mobilization until restoration.
4.2 MOBILIZATION
HSE Kick off meeting shall be conducted and the conclusions of the meeting shall be recorded
with target dates as explained in QHSE-CON-L2-201, HSE Requirements to be met by the
Contractor.
The Contractor shall arrange the HSE Workshop at their cost. All key personnel of OGC and
the Contractor shall attend the HSE Workshop. The conclusions of the HSE Workshop shall
be recorded as explained in QHSE-CON-L2-201, HSE Requirements to be met by the
Contractor.
The Contractor HSE Plan shall comply with all HSE Standards specified in Appendix 1.
The Contractor HSE Plan shall be prepared referring the template attached as Appendix 2.
The Contractor HSE Plan shall address all the issues highlighted in Appendix 2.
The Contractor HSE Plan shall have action plan summary explaining HSE Inspection Matrix,
HSE Audit Matrix, HSE Meeting Matrix, HSE Training Matrix, Emergency Drill Matrix etc
identifying responsible persons for implementing the activity within a targeted period.
The contract HSE plan shall be revised as an when there is a major change related to project
HSE requirement and/or at least once in 12months.
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 5 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
Pre-Start Audit notification will be issued by OGC to Contractor once the contractor intimates
that they are ready for Pre-Start Audit. The Pre-Start Audit by OGC will be focused towards
contractor’s capability to manage the activities in a safe manner as per the OGC HSE
Procedures, Specifications and Guidelines.
Contractor’s camp shall comply with OGC HSE Specifications stipulated by ‘Contractor Camp
HSE Specifications, QHSE-CON-L2-203’ throughout the project commencing from
mobilization until restoration.
Approval of Contractors camp is a pre-requisite for issuance of HSE Certificate. OGC HSE
Manager shall inspect the camp for the approval by OGC.
The Contractor shall not occupy the camp until it is approved by OGC.
The Camp shall be inspected by OGC at any time as and when required during execution
phase.
Contractor shall form a welfare committee with representation from the Company to look into
the living standards of the workforce to include: food quality, laundry, sports/recreation,
cleanliness of living quarters, housekeeping in the camp, etc.
Contractor’s vehicles shall comply with OGC HSE Specifications stipulated by ‘Road
Worthiness Assurance Standards of Vehicles, QHSE-GHSE-L2-212’ and OGC procedure of
‘Maintaining Road Worthiness Assurance Standards of Vehicle, QHSE-RSTF-L3-304’,
throughout the project commencing from mobilization until restoration.
All Contractors vehicles shall be RAS certified and OGC RAS Stickers shall be displayed in all
vehicles indicating date of RAS Inspection and expiry.
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 6 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
The Contractor shall not utilize the vehicles for project related activities till the vehicles are
approved by OGC.
The Vehicles shall be inspected by OGC at any time as and when required during execution
phase and OGC shall have the right to demobilize vehicles from the project if found unsafe.
All vehicles running in interior/ROW shall be replaced when it exceeds mileage of 150,000
KM.
All vehicles running in black top roads shall be replaced when it exceeds mileage of 200,000
KM.
All contractor vehicles under OGC operation shall be equipped with IVMS.
Contractor shall create a separate group for the fleets and drivers under this particular contract
in their IVMS and shall provide access log-in for the OGC project IVMS focal point into the
IVMS for monitoring driving behavior of the drivers in the contract at any point of time.
The Contractor shall submit list of Equipment along with copies of certification.
The Contractor shall not utilize the Equipment for project related activities till it is approved by
OGC.
The Equipment shall be inspected by OGC at any time as and when required during execution
phase.
All equipment operating in process/hydrocarbon facility shall be fitted with spark arrester.
All plant and equipment under OGC operation shall be RAS approved.
Contractor’s Industrial Yard/Workshop shall comply with OGC HSE Specifications stipulated
by ‘Workshop and Industrial Yards HSE Specification, QHSE-GHSE-L2-214’ throughout the
project commencing from mobilization till restoration.
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 7 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
The Contractor shall not utilize the Industrial Yard/Workshop till it is approved by OGC.
The Industrial Yard/Workshop shall be inspected by OGC at any time as and when required
during execution phase.
Contractor shall ensure that all C-9 requirements are equally applicable in all pre-fabrication
workshops and sites.
Approval of Contractors HSE Training Matrix is a pre-requisite for issuance of HSE Certificate.
The Training Matrix shall be audited by OGC HSE Manager.
One HSE Advisor as a minimum is required for one site location. However, if the number of
persons increase to above 50 then additional HSE Advisor is required. This must be repeated
for every increase of 50 people.
All HSE Advisor (s) must be site based.
The contractor HSE Advisor shall have all the qualifications stipulated by ‘HSE Requirements
to be met by the Contractor, QHSE-CON-L2-201’.
The Contractor HSE Advisor shall be mobilized only after written approval from OGC HSE
Manager.
One HSE Manager as a minimum is required. However, if the number of persons increase to
above 500 then additional HSE Manager is required. This must be repeated for every
increase of 500 people.
The contractor HSE Manager shall have all the qualifications stipulated by ‘HSE Requirements
to be met by the Contractor, QHSE-CON-L2-201’.
The Contractor HSE Manager shall be mobilized and demobilized only after written approval
from OGC HSE Manager.
All HSE Manager (s) must be site based.
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 8 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
Issuance of HSE Certificate is a mandatory requirement for the contractor to start activities.
HSE Certificate shall be issued only after contractor fulfilling the conditions explained in item
HSE Certificate, Appendix 3.
HSE certificate shall be issued only after submitting compliance status report by OGC HSE
Manager.
Contractors shall fix targets of all HSE Performance Indicators highlighted in item 4.1.6, ‘HSE
Requirements to be met by the Contractor, QHSE-CON-L2-201, and indicate it in HSE Plan
for the approval by OGC.
Contractor shall submit monthly reports. Contractor’s HSE Performance shall be reviewed by
OGC comparing Target Performance Indicators mentioned in HSE Plan against the Actual
Performance Indicators achieved.
OGC shall have the right to take disciplinary measures against Contractor if they fail to achieve
the Target Performance Indicators.
Contractor shall report all incidents within agreed time frame inclusive of Near Miss Incidents
as per the OGC HSE Procedure ‘Incident / Accident Reporting & Investigation, QHSE-SFT-L3-
301’.
Contractors shall send Incident notification to HSE Manager within 24 hrs on occurrence of the
incident in OGC formats available in Incident / Accident Reporting & Investigation, QHSE-SFT-
L3-301.
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 9 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
Contractor shall submit Accident Investigation Report for all medium potential and high
potential accidents as per ‘Incident / Accident Reporting & Investigation, QHSE-SFT-L3-301.
Contractor shall directly inform the Royal Oman Police (ROP) immediately in the event of a
major HSE incident which includes the following categories. Company will issue an instruction
to the Contractor in case of any further updates on the categories of the incidents to be
reported to ROP.
Contractor shall report all work-related injuries and occupational diseases directly to the
department of Safety and Occupational Health in the Ministry of Manpower within the
stipulated time-frame stated in the Ministerial Decision No. 286/2008.
Contractors shall ensure that all HSE Meetings scheduled as per Contractor’s HSE Plan are
carried out and findings of the meeting are implemented. The minutes of meeting shall be
submitted to OGC within 7 days.
OGC representatives shall attend Contractor HSE Meeting as and when required.
The contractor’s corporate HSE Manager shall attend all the meetings.
Contractors shall ensure that all HSE Inspections and Audits scheduled as per Contractor’s
HSE Plan are carried out and corrective actions are implemented.
Compliance of PTW
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 10 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
Excavation
Hot Works
Working at Heights
Adherence to PPE
Waste Management
Housekeeping
Office inspection
Vehicle maintenance
Scaffolding
Journey Management
Contractors shall take corrective actions and submit reports to OGC if requested by OGC.
OGC may conduct HSE Inspections and IMS Audits as and when required.
Contractor shall follow OGC PTW System stipulated by PTW System Manual, QHSE-PTW-L1-
101 and attached Job HSE Plans.
Contractor shall have a detailed Hazard Management Plan as explained in item 4.1.5, ‘HSE
Requirements to be met by the Contractor, QHSE-CON-L2-201’ and it shall be approved by
OGC.
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 11 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
Contractor should prepare Job HSE Plan referring to OGC Job HSE Plan and attach with
Permits.
Contractor shall conduct Tool Box talks before the commencement of any activity the major
discussion being Job Safety Plans and the record shall me maintained.
Contractor vehicles shall adhere to vehicle speed limits stipulated by ‘Vehicle Speed Limits,
QHSE-GHSE-L2-215.
Contractors employees shall undergo mandatory HSE Training as indicated in HSE Training
matrix attached as Appendix 4.
All Contractor employees shall undergo mandatory OGC HSE Training from OGC approved
Training Institutes.
All Contractor employees shall undergo HSE Induction prior to deployment for work.
Contractor shall ensure that there will be at least one First Aider at each site/locations. 10% of
the Contractor employees shall undergo Basic First Aid.
All those driving OGC approved Vehicles and those driving on ROW shall undergo Defensive
Driving Skill.
Contractors shall have adequate number of trained Fire Wardens (at least 10%), trained Gas
Testers, approved PTW Holders and Applicants.
Contractor shall carry out all monthly HSE awareness sessions as per approved project
specific HSE plan to maintain competency and HSE awareness within entire project staff. This
shall be maintained all throughout the project.
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 12 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
Contractor shall have adequate training facilities/resources on site to cover site specific HSE
inductions and other necessary in-house HSE awareness sessions.
Contractor shall produce fit for purpose HSE Induction package to cover all HSE aspects of
relevant project’s activities.
Issuance of Restoration Certificate is a mandatory requirement for the contractor prior to de-
mobilization. Restoration Certificate shall be issued only after contractor has fulfilled the
following conditions explained in the Restoration Certificate, Appendix 5:
This is applicable only if location for a temporary construction camp has been provided by
OGC. If the location is provided by OGC, OGC shall inspect the site and ensure that the site is
clear of all Contractor Assets and satisfactory restoration has been attained.
This is applicable only if location for a temporary Industrial Yard has been provided by OGC. If
provided by OGC, OGC shall inspect the yard and ensure that the yard is clear of all
Contractor Assets and satisfactory restoration has been attained.
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 13 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
OGC shall inspect all Company sites inclusive of ROW, GSS, PLSs, BVSs, Launcher/Receiver
Stations and Office premises and ensure that:
OGC HSE Manager shall issue Restoration certificate only after submitting compliance status
report.
Repeated failure by Contractor to comply with the Contract HSE obligations may result in the
removal from Site of the relevant Contractor’s supervisory and/or managerial Personnel.
In the event that Company considers that Contractor has failed to comply with the latest
approved Contract HSE management plan, or other Contract HSE requirements, then
Company shall issue Contractor with an HSE default notice.
An HSE default notice is any written notification issued by Company detailing specific aspects
of the Services that do not comply with either the latest approved Contract HSE management
plan or other Contract HSE requirements.
For each HSE default notification an amount of [Determine based on Contract Currency: OMR
500/USD 1300] will become due to Company.
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 14 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
a) Where an HSE default notice contains several incidences of default, each incident
shall be considered as a separate HSE default notice.
b) Where HSE default persists for a period longer than twenty-four (24) hours, or any
other period as stated in the HSE default notice, then the applicable fine shall be
repeated for each subsequent twenty-four (24) hour or other specified period that
the default continues.
Where repeated HSE default notices are served by Company relating to the same HSE default
then the following remedies are available to Company:-
for the same default) for the relevant service group of the
Contract
Any non-availability at work site location of any of key staff such as HSE Manager / HSE
Advisor / Journey Manager / Camp Boss / etc. as per the HSE Plan organization chart
requirement or project contractual requirement shall be treated as a default. Each day shall be
deducted same amount for each non-available discipline/person.
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 15 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
5. REFERENCES
QHSE-CON-L2-201, HSE Requirements to be met by the Contractor
6. RECORDS
Form Ref. Description Medium Location Minimum Responsibility Disposal
Retention of Instructions
& Authorities
7 APPENDIXES
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 16 of 32
6;+, 40-2J1 iL-J14-6 .
OMAN GAS COMPANY 5.A.C.0 HSE SPECIFICATIONS
APPENDIX 1
OGC HSE DOCUMENTATIONS
(USE THE LATEST PUBLISHED DOCUMENTS) (THIS IS ONLY EXAMPLE)
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 17 of 32
6;+, 40-2J1 iL-J14-6 .
OMAN GAS COMPANY 5.A.C.0 HSE SPECIFICATIONS
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 18 of 32
6;+, 40-2J1 iL-J14-6 .
OMAN GAS COMPANY 5.A.C.0 HSE SPECIFICATIONS
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 19 of 32
6;+, 40-2J1 iL-J14-6 .
OMAN GAS COMPANY 5.A.C.0 HSE SPECIFICATIONS
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 20 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 21 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 22 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 23 of 32
6;+, 40-2J1 iL-J14-6 .
OMAN GAS COMPANY 5.A.C.0 HSE SPECIFICATIONS
APPENDIX 2
TEMPLATE FOR HSE PLAN
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
R5 10-10-2016
CONTRACT DOCUMENT Page 24 of 32
OMAN GAS COMPANY S.A.O.0
HSE SPECIFICATIONS
APPENDIX 3
HSE CERTIFICATE (THIS IS ONLY SAMPLE)
Contract Title
Contractor Contract No.
Notes:
On behalf of the Contractor, I confirm that the activities stated above have been carried out and we are capable of
performing the work in a safe, healthy and environmentally responsible manner.
We hereby agree that the HSE status of this Contract allows work to proceed, subject to the above exceptions.
Notes: Contractor shall implement the actions mentioned in the list of Exceptions on a date mutually agreed by
Contractor and Company.
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
CONTRACT DOCUMENT R5 10-10-2016
Page 25 of 32
6r.uh
OMAN GAS COMPANY S.A.O.0 HSE SPECIFICATIONS
APPENDIX 4
Spec.
Ref. Course Title Target Population Duration Refresher Pre-Requisites Assessment
Number
4.1.1 OGC HSE Induction:
Formal HSE OGC/ Contractor and Sub- 4 Hours N/A Able bodied to work in OGC Not Required
Induction (Class Contractor / Employees working environment
Session)
Site Specific HSE All personnel who are fist Short N/A None Not Required
Induction entering a site facility
(Briefing)
OGC HSE OGC staff based in Muscat
head office and not involved in Short HSE None Not Required
induction for Head any site activities Team
Office Staff
4.1.2 H2S Awareness & OGC and Contractor staff who 4 Hours 3 Years Formal OGC-HSE Induction Required
Escape will enter H2S designated areas
4.1.3 Gas Testing OGC and Contractor personnel 4 Hours 3 Years Formal OGC-HSE Induction Required
who are designated as
Authorised Gas Testers
4.1.4 Defensive Driving - All OGC/Contractor and Sub- 12 Hours N/A Formal OGC-HSE Induction Valid Required
Light Vehicles Contractor personnel who are (1½ day) light vehicle driving license
Blacktop Roads required to drive light vehicles in accepted by the Royal Oman
the performance of their duties. Police.
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
CONTRACT DOCUMENT R5 10-10-2016
Page 26 of 32
6r.uh
OMAN GAS COMPANY S.A.O.0 HSE SPECIFICATIONS
Spec.
Ref. Course Title Target Population Duration Refresher Pre-Requisites Assessment
Number
4.1.5 Defensive Driving Contractor personnel who are 12 Hours N/A Formal OGC-HSE Induction Required
Heavy Vehicles - required to drive Heavy vehicles (1½ day) Valid Heavy Vehicle driving license
Blacktop Roads (Heavy Goods or Heavy Buses) accepted by the Royal Oman
in performance of their work Police.
duties.
4.1.6 Defensive Driving – All OGC/Contractor personnel 4 Hours 3 Years Formal OGC-HSE Induction Required
Interior/Desert who are required to drive light Valid vehicle driving license
/Graded Roads - Light vehicles on graded roads in accepted by the ROP.
Vehicle drivers Oman as part of performing
their job. Defensive Driving Permit-
Blacktop roads (Heavy or Light)
4.1.7 Defensive Driving – Contractor Personnel driving on 4 Hours 3 Years Formal OGC-HSE Induction Required
Interior/ Desert/ graded roads and Right Of Valid Vehicle driving license
Graded Roads - Ways. accepted by ROP
Heavy Vehicle drivers Contractor personnel who are
Defensive Driving Permit-
required to drive heavy vehicles
Blacktop roads (Heavy or Light)
on graded roads in Oman as
part of performing their job.
4.1.8 Defensive Driving - Contractor personnel who are 4 Hours 3 Years Formal OGC-HSE Induction Required
Bulk Tanker (Light required to drive light/heavy Valid Vehicle driving license
and Heavy) bulk liquid tankers, including accepted by ROP
vacuum tankers, on blacktop or Defensive Driving Permit-
graded roads in Oman as part Blacktop roads (Heavy or Light)
of performing their job.
4.1.9 Defensive Driving - Contractor personnel who are 4 Hours 3 Years Formal OGC-HSE Induction Required
Bus Module (Light required to drive light or heavy Valid Vehicle driving license
and Heavy) buses on blacktop or graded
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
CONTRACT DOCUMENT R5 10-10-2016
Page 27 of 32
6r.uh
OMAN GAS COMPANY S.A.O.0 HSE SPECIFICATIONS
Spec.
Ref. Course Title Target Population Duration Refresher Pre-Requisites Assessment
Number
roads in Oman as part of accepted by ROP
performing their job. Defensive Driving Permit-
Blacktop roads (Heavy or Light)
4.1.10 Safe-Journey Designated OGC Personnel 8 Hours N/A Formal OGC-HSE Induction Required
Management and Contractor Journey
Managers
4.1.11 Basic Life support Designated OGC/ and 24 Hrs N/A Formal OGC-HSE Induction Required
Contractors First Aider (3 days)
4.1.12 Basic Life support All OGC and Contractors First 24 Hrs 3Years Formal OGC-HSE Induction Required
(Refresher) Aiders (3 days)
4.1.13 Fire Wardens Designated OGC and 4 Hours N/A Formal OGC-HSE Induction Required
Contractor personnel Basic Fire Fighting
4.1.14 Basic Fire Fighting Designated OGC and 4 Hours N/A Formal OGC-HSE Induction Required
Contractor designated Fire
Wardens.
All OGC Contractor
personnel involved in hot
works.
All Contractor Camp Boss
in-charges
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
CONTRACT DOCUMENT R5 10-10-2016
Page 28 of 32
6r.uh
OMAN GAS COMPANY S.A.O.0 HSE SPECIFICATIONS
Spec.
Ref. Course Title Target Population Duration Refresher Pre-Requisites Assessment
Number
4.1.15 Basic Fire Fighting Designated OGC and 4 Hours 3 Years Formal OGC-HSE Induction Required
(Refresher) Contractor designated Fire
Wardens.
All OGC Contractor
personnel involved in hot
works.
All Contractor Camp Boss
in-charges
4.1.16 Scaffolder Contractor personnel who are 2 days N/A Formal OGC-HSE Induction Required
required to erect/ work on & Reasonably fit with no fear of
dismantle scaffolds heights
Working crew
4.1.17 Scaffold Inspection / OGC and Contractor personnel, 3 days N/A Formal OGC-HSE Induction Required
Supervisor who are required to inspect / Scaffolder course
supervise, audit & maintain
register.
4.1.18 Incident Investigation OGC and Contractor Key 2 Days N/A Formal OGC-HSE Induction Required
and Reporting personnel
4.1.19 Job Hazard Analysis Contractor Foreman level 8 Hours 3 Years Formal OGC-HSE Induction Required
personnel
4.1.20 Chemical Hazard Contractor Supervisor level 8 Hours 3 Years Formal OGC-HSE Induction Required
Awareness personnel involved in receipt Basic knowledge of chemical
and dispatch of chemicals, properties commonly in use in
transportation (drivers) and
OGC operations
handling of chemicals, working
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
CONTRACT DOCUMENT R5 10-10-2016
Page 29 of 32
6r.uh
OMAN GAS COMPANY S.A.O.0 HSE SPECIFICATIONS
Spec.
Ref. Course Title Target Population Duration Refresher Pre-Requisites Assessment
Number
in chemical storage areas, and
handling chemicals in
operational areas
4.1.21 Managing HSE OGC and Contractor key 8 Hours N/A Formal OGC-HSE Induction Not Required
Workshop for New personnel
Projects
4.1.22 Permit to Work OGC and Contractor personnel 16 Hours N/A Formal OGC-HSE Induction Required
Holders who will work as PTW Holders (2 Days) Job Hazard Analysis
Gas Testing
4.1.23 Permit to Work OGC and Contractor personnel 16 Hours 3 Years Formal OGC-HSE Induction Required
Holders (Refresher) who will work as PTW Holders (2 Days) Job Hazard Analysis
Gas Testing
4.1.24 Permit to Work OGC and Contractor personnel 16 Hours N/A Formal OGC-HSE Induction Required
Signatories who will fulfil a role within the (2 Days) Job Hazard Analysis
PTW System of permit Holder,
Applicant, Area authority or Gas Testing
Responsible supervisor
4.1.25 Permit to Work OGC and Contractor personnel 16 Hours 3 Years Formal OGC-HSE Induction Required
Signatories who will fulfil a role within the (2 Days) Job Hazard Analysis
(Refresher) PTW System of permit Holder,
Applicant, Area authority or Gas Testing
Responsible supervisor
4.1.26 Supervising Safety All OGC and Contractor 16 Hours N/A Formal OGC-HSE Induction Required
Supervisors (2 Days)
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
CONTRACT DOCUMENT R5 10-10-2016
Page 30 of 32
6r.uh
OMAN GAS COMPANY S.A.O.0 HSE SPECIFICATIONS
Spec.
Ref. Course Title Target Population Duration Refresher Pre-Requisites Assessment
Number
4.1.27 Self-Contained OGC and Contractor 16 Hours 3 Years Formal OGC-HSE Induction Required
Breathing Apparatus personnel who are required (2 Days) Basic Life Support
to use SCBA for entry to
confined space or as Physically fit and able to drag
standby during confined and lift casualties and should
space entry operations. not suffer from vertigo or fear of
darkness
Designated Rescue
Personnel.
4.1.28 Confined Space Entry OGC and Contractor personnel 4 hrs N/A Formal OGC-HSE Induction Required
who are required to enter Basic Life Support
confined space
4.1.29 Heavy Lifting OGC and Contractor personnel 4 hrs N/A Formal OGC-HSE Induction Required
who are required to lift heavy Job Hazard Analysis
equipment using cranes
4.1.30 Heavy Lifting OGC and Contractor personnel 4 hrs 3 Years Formal OGC-HSE Induction Required
(Refresher) who are required to lift heavy Job Hazard Analysis
equipment using cranes
4.1.31 Banksman/Rigger OGC and Contractor personnel 4 hrs N/A Formal OGC-HSE Induction Required
who are required to act as a Job Hazard Analysis
banksman / Rigger
4.1.32 Banksman/Rigger OGC and Contractor personnel 4 hrs 3 Years Formal OGC-HSE Induction Required
(Refresher) who are required to act as a Job Hazard Analysis
banksman / Rigger
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
CONTRACT DOCUMENT R5 10-10-2016
Page 31 of 32
6r.uh
OMAN GAS COMPANY S.A.O.0 HSE SPECIFICATIONS
Spec.
Ref. Course Title Target Population Duration Refresher Pre-Requisites Assessment
Number
4.1.33 Environment OGC and Contractor personnel 4 hrs N/A Formal OGC-HSE Induction Required
Awareness based on the nature of work
Users are responsible for ensuring the use of correct revision of this document
GMS-HSE-L2-220
CONTRACT DOCUMENT R5 10-10-2016
Page 32 of 32
ulJ Jl jLclliS}w
OMAN GAS COMPANY S.A.O.O HSE SPECIFICATIONS
APPENDIX 5
SITE RESTORATION CERTIFICATE (THIS IS ONLY SAMPLE)
Contract Title
Notes:
On behalf of the Contractor, I confirm that the activities stated above have been carried out and we have restored the sites
according to contractual requirements.
We hereby agree that the HSE status of this Contract allows the Contractor to demobilize, subject to the above exceptions.
Notes: The complete payment shall be finalized only after implementing the actions mentioned in the list of
Exceptions.
Users are responsible for ensuring the use of correct revision of this document
OGC/13/2018
EPC Works for Shafa GSS Debottleneck Project
SCHEDULE - C10
1. GENERAL
The data provided by the Contractor within this Section C-10 shall form part of the Contract.