0.20 m
1,50
0.30 m 0.30 m 0.30 m 0.30 m 0.30 m 0.30 m 0.29 m 0.29 m 0.29 m 0.29 m 0.29 m 0.29 m
0.18 m
0.20 m
As distr. 1Ø 1/2" @ 29 cm
0.18 m
0.20 m
10.00
Pilar de
0.18 m
0.20 m
Concreto
As temp 1Ø 1/2" @ 0.30 m
0.18 m
0.20 m
As(-) princ. 1 Ø 1/2" @ 18 cm As(+) princ. 1 Ø 1/2" @ 20cm
0.18 m
0.20 m
1,13 1,81 2,72 1,81 2,72 1,81 2,72 1,81 1,13
17,67
DETALLE ACERO LOSA SUPERIOR DETALLE ACERO LOSA INFERIOR
ESC: 1/25 ESC: 1/25
W = 45 cm
2,00
Pilar de
m
h = 10 m
L = 80 cm
0m
Concreto d = 1.60 m
80
Viga r = 5,00 cm
Cabezal acero 1"
# = 28 und Capas = 5
D=1.60 D=1.60 D=1.60 D=1.60
f'c = 280 kg/cm2
Ec =256 017.097 kg/cm2 ei = 10 mm
D= 1.60 Es = 2040000,00 kg/cm2
fy = 4200 ee = 4 mm
H =75 mm
Zunchos = 6
75 mm
450 mm
6 Ø 1/2" 6 Ø 1/2"
6 Ø 1/2" 6 Ø 1/2" DETALLE NEOPRENO
160 cm
160 cm
ESPECIALIDAD
FACULTAD DE INGENIERIA
ESTRUCTURAS
ESCUELA DE INGENIERIA CIVIL AMBIENTAL
PLANO
Dimensionamiento
Puente Cajón
E-3
200 cm
200 cm
indicada DICIEMBRE - 2018