PROBLEM : Heavy Sedimentation from
Keduang River at Intake
)
SOLUTION : Divide Reservoir to Two Areas
Sediment Storage Reservoir and Wonogiri Main Reservoir
Sediment Storage
Reservoir
Reservoir
Wonogiri
Wonogiri
Wonogiri Main
Reservoir
Existing
Spillway
Power Station
)
New spillway (743 m)
Closure
Dike
Alignment
- Dike A
- Dike B
- Overflow
- Dike C
Contract Package 2-1
Construction of Closure Dike and Overflow Dike
Project Components:
Closure Dike A – 700m long, earth-fill with Deep Mixing Soil Improvement
(DMSI, L = 455 518 m) foundation improvement
Closure Dike B – 700 m long, earth-fill.
Overflow Dike – 298 m long concrete fixed weir.
Closure Dike C – 402 m long, earth-fill.
Contractor:
HAZAMA ANDO Corp – PT WIJAYA KARYA (Persero) Tbk. Joint Operation
Contract Start : 27-Oct-2016
Duration : 1196 Calendar Days
Completion Date : 4-Feb-2020
Closure Dike Alignment on Soft Foundation
New Spillway
Existing
Spillway
Typical Section Closure Dike A
2500 130
Elevation(m)
1500
DD Design Compressive 125
2017 Trial Mix
1000 Strength (Minimum)
500
3500
Strength Development C=300kg/m3, W/C=80%
120
3000
2017 Trial Mix
Compressive Strength(kN/m2)
2500
115
2000
qu(90)=2524 (kN/m2)
1500 (Average)
Cu = quck/2 x IR
Where: Cu = Cohesion
quck = Design Compressive strength of DMSI Column
= 1/3 of Compressive Strength Trial Mix = 700 kN/m2
Cohesion Cu in kN/m2 for various Improvement Ratios (Design Strength DMSI = 700kN/m2)
IR = 20% IR =26% IR = 28% IR = 30% IR=32%
70 91 98 105 112
DMSI Improvement Ratio Stability