Вы находитесь на странице: 1из 6

Date :

WELDING INSPECTION RECORD

Project : Client :
Item Name :

STAGE ITEM RESULT REMARKS


1. Tack Weld Condition
2. Welding Method
Before Welding
3. Welding Equipment Condition
4. Welder Performance
1. Weld Size
After Welding
2. Visual Of Weld
NDT 1. Liquid Penetrate Examination

……………………………………………. ………………………………………….
INSPECTOR

Date : …………………………….. Date : ……………………………………..


DIMENTIONAL INSPECTION REPORT
Project Title : Client :
Item Name : Date :

LENGTH/DISTANCE ACCESSORIES HOLE AND DISTANCE RESULT


NO COMP MARK QTY POSITION
SD ACTUAL TOL SD ACTUAL DIA Ø SD ACTUAL TOL Accepted Rejected

PT.MITRA PEMUDA
Prepared by : Known by:

……………………………...……. ……………………………………….
Date : Date :
PT. Mitra Palmil
ENGINEERING & STEEL CONSTRUCTION
Date :

WELDING INSPECTION RECORD

Project : Client :
Item Name :

STAGE ITEM RESULT REMARKS


1. Tack Weld Condition
2. Welding Method
Before Welding
3. Welding Equipment Condition
4. Welder Performance
1. Weld Size
After Welding
2. Visual Of Weld
NDT 1. Liquid Penetrate Examination

……………………………………………. ………………………………………….
INSPECTOR

Date : …………………………….. Date : ……………………………………..


PT. Mitra Palmil
ENGINEERING & STEEL CONSTRUCTION

DIMENTIONAL INSPECTION REPORT


Project Title : Client :
Item Name : Date :

LENGTH/DISTANCE ACCESSORIES HOLE AND DISTANCE RESULT


NO COMP MARK QTY POSITION
SD ACTUAL TOL SD ACTUAL DIA Ø SD ACTUAL TOL Accepted Rejected

PT.MITRA PALMIL
Prepared by : Known by:

……………………………...……. ……………………………………….
Date : Date :
PT. Mitra Palmil
ENGINEERING & STEEL CONSTRUCTION

PAINTING INSPECTION REPORT

Client :
Project : Date :
Method Type of Paint and Standard
Blasting
Wire Brust
Coat No. Type of Paint and Standard Thinner
st
Coat # 1
Coat # 2nd
Coat # 3rd
th
Coat # 4
Thickness Check
No / Spot Comp. Mark Remark
1 position 2 position 3rd position
st nd
Average
1
2
3
4
5
6
7
8
9
10

Prepared By Known By

Date : Date :
PAINTING INSPECTION REPORT

Client :
Project : Date :
Method Type of Paint and Standard
Blasting
Wire Brust
Coat No. Type of Paint and Standard Thinner
st
Coat # 1
Coat # 2nd
Coat # 3rd
th
Coat # 4
Thickness Check
No / Spot Comp. Mark Remark
1 position 2 position 3rd position
st nd
Average
1
2
3
4
5
6
7
8
9
10

Prepared By Known By

Date : Date :

Вам также может понравиться