THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
DESCRIPTION
6600036980
UPGRADE JU’AYMAH SHOPS
MAINTENANCE SHOPS NORTHERN AREA
BI-10-01545
JO/EWO
DATE
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
PREPARED BY:
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
SAS SYSTEMS ENGINEERING
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Rev. date Description of Revision Prepared By: Checked By: Approved By:
(DCC) NO. _____________________
pr Pipe Internal Flushing / Cleaning Procedure DWG.TYPE PLANT NO. INDEX DOCUMENT NO. SHT.NO. REV.NO.
REVISION
TABLE OF CONTENT
1 Purpose ............................................................................................................................................. 4
2 Scope ................................................................................................................................................. 4
3 References ........................................................................................................................................ 4
4 Definition .......................................................................................................................................... 5
5 Responsibilities ................................................................................................................................. 5
6 Operatives ......................................................................................................................................... 6
7 Water Flushing and Pipe Internal Cleaning....................................................................................... 7
8 General Procedure- Water Flushing ................................................................................................. 7
9 Acceptance Criteria ........................................................................................................................... 8
10 Documentation ................................................................................................................................. 8
11 Attachments...................................................................................................................................... 8
Doc. Ref. No.
UPGRADE JU’AYMAH SHOPS PROJECT
UJS-CON-E-30135
PIPE INTERNAL FLUSHING/ CLEANING Revision: 00
PROCEDURE Page No.: Page 4 of 8
Date: 27-OCT-2018
Contract No. 6600036980 BI-10-01545
1 Purpose
2 Scope
3 References
The current editions of the following documents have been referenced in the
preparation of this procedure and shall be considered a part of this
procedure as applicable.
4 Definition
5 Responsibilities
6 Operatives
6.4 Scaffolders
• Screw Driver
9 Acceptance Criteria
9.1 No leak is permitted and the water should remain clean at the end of
procedure.
9.2 Inspection requirements will be as per SAIC-L -2017.
9.3 Witnessing of flushing test is hold point for both Contractor QC and
Saudi Aramco inspector.
9.4 Flushing shall not proceed until Saudi Aramco inspector witness the
test.
9.5 After witnessing flushing test both Contractor QC and Saudi Aramco
inspector shall sign flushing test report.
10 Documentation
This document is distributed by the Site QC Inspector to all the involved site
personnel. The original issue of this procedure will be kept by the Quality
Assurance Department.
11 Attachments
• SATIP-S-050-01; Building Sprinkler and Standpipe System
• SATIP-A-004-02; Hydrostatic Testing of On-Plot Piping
• SATR-A-2008; Internal Cleanliness Report (Piping Systems & Equip)
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
3.0 INSTALLATION
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
See See
3.3 Cathodic Protection Refer to SATIP-X series as applicable
Remarks Remarks
SAIC SAIC Saudi Aramco shall be notified on start of this activity for
3.4 Sprinkler and Standpipe Installation
S-4062 S-4062
W W each Building / Area
Hangers and supports Installation SAIC SAIC Saudi Aramco shall be notified on start of this activity for
3.5
Inspection S-4061 S-4061
W W each Building / Area
Location and Spacing Installation SAIC SAIC Saudi Aramco to be notified on start of this activity for
3.7
Inspection S-4024 S-4024
W W each building / area
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
See See
3.12 Fire Detection and Alarm System See SATIP-B-014-01 Fire Detection / Alarm
Remarks Remarks
Motor Operated Valves and Control See See See SATIP-J-700-01 Motor Operated Valves and Control
3.13
Valves Remarks Remarks Valves
4.0 PRE-COMMISSIONING
NFPA-13
Fig. 8-1 (a) Requirements for Hydrostatic Test of the system shall be
4.1 Sprinkler System Acceptance Test NFPA-13 93
Fig. 8-1 (b)
H H in accordance with SATIP-A-004-002
Forms
NFPA-14
Fig. 8-1 (a) Requirements for Hydrostatic Test of the system shall be
4.2 Standpipe System Acceptance Test NFPA-14 96
Fig. 8-1 (b)
H H in accordance with SATIP-A-004-002
Forms
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
SAIC SAIC
4.3 Final system Inspection
S-4026 S-4026
H H
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1 levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection
1.0 DOC REVIEW SPECIAL PROCESS (PRESSURE TESTING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS.
1.1 Hydrostatic Testing Procedure SAIC-A-2001 SAIC-A-2001 RH RH Submit Sample Test Pkg & Procedure together
3.0 APPLICATION
INSPECTION RESPONSIBILITY
4.0 POST- TEST
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1 levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
For Test Package Preparation & review on large projects, each new system designed for testing is thoroughly reviewed & approved. All subsequent packages within a given system shall be built
6 following the "Copy & Paste" theme for Test Package efficiency and then R1 (Contractor) & R2 (Company Sample Review of documents) Inspection may be performed.
LEGEND
H 100% Hold Point for QC Inspection or Test. R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.
DRAWING NUMBER (P&ID/ISO) / REV. No. PIPE CLEANING DIAGRAM (If applicable) LOCATION WORK PERMIT REQD?
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME
SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No. TEST IN ACCORDANCE WITH: a) Procedure No. b) Supporting SAIC No.
System Description:
Service Fluid: MAOP: System Material Type:
Internal Cleanliness Report for On-Plot Piping & Equipment (See Remarks)
Method of internal cleaning
(For piping systems and equipment)
Type Of Debris
(sand, mill scale, electrodes, debris, etc.)
RESULT (ACC/REJ)
REMARKS: Note 1: Items in italics above are for guidance in completion of forms prior to pressure testing.
N ote 2: Valves should be installed in systems after pressure testing whenever possible during system reinstatement. Code fabricated test implements can easily replace
valves during system hydrotests. Cavities & other low points in the line where debris can accumulate require special attention during cleaning. Typical flushing with air or
water is inadequate in the removal of debris from valve cavities and low points. This accumulated debris (sand, scale, metal shavings, slag, etc) creates serious corrosion
and operational problems for COMPANY. Cleaning methods shall demonstrate adequate cleaning for all piping system components and equipment. Where items such as
valve cavities exhibit an inadequate level of cleanliness, adequate cleaning & inspection shall be performed at earliest opportunity and addressed no later than immediately
after hydrotest. Avoid flushing lines through valves & install field hydrotested valves "after" system testing where possible.