Вы находитесь на странице: 1из 11

UNIVERSIDAD JOSE CARLOS MARIATEGUI

ESCUELA PROFESIONAL DE INGENIERIA CIVIL

TEMA:

METRADO DE UNA VIVIENDA

DE 2 NIVELES

ASIGNATURA:

COSTOS Y PRESUPUESTOS

DOCENTE:

Ing. Jorge Lama Cordova

Estudiante:

Gustavo Beingolea Villarreal

Ilo - Moquegua
UNIVERSIDAD JOSE CARLOS MARIATEGUI – INGENIERIA CIVIL

INDICE

PLANOS DE ESTRUCTURAS……………………………………………………………………………………….. 2

METRADOS DE ACERO…………………………………………………………………………………………….. 4

ZAPATAS…………………………………………………………………………………………….……. 4

VIGAS DE CIMENTACION………………………………………….………………………………. 4

ESCALERA………………………………………………………………….……………………………… 5

CISTERNA…………………………………………………………………………………………………. 6

VIGAS………………………………………………………………………………………………………. 8

METRADOS DE CONCRETO……………………………………………………………………………………. 10

COLUMNAS……………………………………………………………………………………………… 10

LOZAS……………………………………………………………………………………………………… 11

METRADO DE ENCOFRADOS………………………………………………………………………………….. 12

COLUMNAS…………………………………………………………………………………………….. 12

LOZAS……………………………………………………………………………………………………. 12

COSTOS Y PRESUPUESTOS Página 1


UNIVERSIDAD JOSE CARLOS MARIATEGUI – INGENIERIA CIVIL

METRADOS – ACERO

ELEMENTO LONG POR


DISEÑO DE ACERO CANTIDAD
ZAPATAS DIAMETRO

DETALLE DETALLE Ɵ LONGITUD PARCIAL TOTAL 1/2
VECES
REFUERZO EN ZAPATA
Z-1, ACERO
4 1/2 1.05 12 48 50.4
LONGITUDINAL Y
TRANSVERSAL
REFUERZO EN ZAPATA
Z-2, ACERO
12 1/2 0.85 10 120 102
LONGITUDINAL Y
TRANSVERSAL
LONGITUD TOTAL DE 1/2 152.40
PESO ACERO DE 1/2 0.99
PESO TOTAL 151.49

ELEMENTO LONG POR


DISEÑO DE ACERO CANTIDAD
VIGAS DE CIMENTACION DIAMETRO

DETALLE DETALLE Ɵ LONGITUD PARCIAL TOTAL 1/2
VECE
5.10 30.60
REFUERZO EN VIGA 4.40 26.40
DE CIMENTACIÓN VC - variable 2.65 15.90
1 1.5 1/2 6 6
101, ACERO 4.20 25.20
LONGITUDINAL 4.20 25.20
4.20 25.20
PESO TOTAL DE ACERO LONGITUDINAL 1/2 148.50

DETALLE DETALLE Ɵ LONGITUD PARCIAL TOTAL 3/8
VECE
dobles 0.10 26.00 26.00 36.14
altura 0.31 22.00 22.00 30.58
REFUERZO EN VIGA
ancho 0.19 16.00 16.00 22.24
DE CIMENTACIÓN VC - 1 3/8 1.39
22.00 22.00 30.58
101, ESTRIBOS
22.00 22.00 30.58
23.00 23.00 31.97
LONGITUD TOTAL DE 3/8 182.09
PESO ACERO DE 3/8 0.56
PESO TOTAL DE ACERO LONGITUDINAL 3/8 101.97
PESO TOTAL (1/2 + ACERO DE 3/8) 249.58

COSTOS Y PRESUPUESTOS Página 2


UNIVERSIDAD JOSE CARLOS MARIATEGUI – INGENIERIA CIVIL

ELEMENTO
LONGITUD
ESCALERA
DISEÑO DE ACERO CANTIDAD SEGÚN EL
( TRES TRAMOS POR
DIAMETRO
PISO)

DETALLE DETALLE Ɵ LONGITUD PARCIAL TOTAL 1/2
VECES

2 1/2 1.55 5.00 10.00 15.5

2 1/2 1.35 5.00 10.00 13.5

2 1/2 2.25 5.00 10.00 22.50


REFUERZO
DEL PRIMER
TRAMO DEL
1º PISO A LA
AZOTEA 2 1/2 1.70 5.00 10.00 17.00

2 1/2 1.25 5.00 10.00 12.50

2 1/2 0.95 8.00 16.00 15.20

LONGITUD TOTAL DE ACERO 96.20


PESO ACERO 0.99
PESO PARCIAL 95.62

COSTOS Y PRESUPUESTOS Página 3


UNIVERSIDAD JOSE CARLOS MARIATEGUI – INGENIERIA CIVIL

REFUERZO 2 1/2 3.95 7.00 14.00 55.30


DEL SEGUNDO
TRAMO DEL
1º PISO A LA
AZOTEA 2 1/2 1.25 8.00 18.00 22.5

2 1/2 3.70 5.00 10.00 37.00

2 1/2 1.70 5.00 10.00 17.00

REFUERZO
DEL TERCER
TRAMO DEL 2 1/2 1.1 5.00 10.00 11.00
1º PISO A LA
AZOTEA

2 1/2 1.60 5.00 10.00 16.00

2 1/2 2.05 5.00 10.00 20.50

2 1/2 0.95 17.00 34.00 32.30

LONGITUD TOTAL DE ACERO 211.60


PESO ACERO 0.99
PESO PARCIAL 210.33
PESO TOTAL DE LOS TRES TRAMOS Y TRES PISOS 305.95

COSTOS Y PRESUPUESTOS Página 4


UNIVERSIDAD JOSE CARLOS MARIATEGUI – INGENIERIA CIVIL

LONGITUD
ELEMENTO
DISEÑO DE ACERO CANTIDAD SEGÚN EL
CISTERNA
DIAMETRO

DETALLE DETALLE Ɵ LONGITUD PARCIAL TOTAL 3/8 1/2
VECES

1 1/2 2.85 9 9 25.65

1 1/2 2.85 9 9 25.65

1 1/2 5.10 9 9 15.90


REFUERZO
LONGITUDINAL Y
TRANSVERSAL EN
CISTERNA
1 1/2 4.85 9 9 43.65

2.30 11.00 11.00 25.30


3.15 10.00 10.00 31.50
1 3/8
3.15 8.00 8.00 25.20
3.15 11.00 11.00 37.95
1/2 2.4 11.00 11.00 26.40
½ 2.4 11.00 11.00 26.40
1
3/8 3.45 9.00 9.00 31.05
3/8 3.45 9.00 9.00 31.05
LONGITUD TOTAL DE ACERO 182.05 193.65
PESO ACERO 0.56 0.99
PESO PARCIAL 101.95 192.49
PESO TOTAL 294.44

COSTOS Y PRESUPUESTOS Página 5


UNIVERSIDAD JOSE CARLOS MARIATEGUI – INGENIERIA CIVIL

LONGITUD
ELEMENTO
DISEÑO DE ACERO CANTIDAD SEGÚN EL
VIGAS
DIAMETRO

DETALLE DETALLE Ɵ LONGITUD PARCIAL TOTAL 5/8 1/2
VECES
4.34 11.00 22.00 95.48
5.27 2.00 4.00 21.08
2 1/2 3.38 3.00 6.00 32.28
REFUERZO EN 5.53 3.00 6.00 33.18
VIGA VP - 101, 5.57 2.00 4.00 22.28
ACERO 4.34 11.00 44.00 190.96
LONGITUDINAL 5.27 2.00 8.00 42.16
4 5/8 5.38 3.00 12.00 64.56
5.53 3.00 12.00 66.36
5.57 2.00 8.00 44.56
1.24 8.00 32.00 39.68
7.80 6.00 24.00 187.20
REFUERZO EN 3.10 4.00 16.00 49.60
VIGA V-A, 2.05 2.00 8.00 16.40
4
ACERO 3.70 1.00 4.00 14.80
LONGITUDINAL 11.35 2.00 8.00 90.80
8.40 1.00 4.00 33.60
3.90 1.00 4.00 15.60
8.10 2.00 8.00 64.80
REFUERZO EN
2.35 4.00 16.00 37.60
VIGA V-S,
4 1/2 5.10 3.00 12.00 61.20
ACERO
3.60 1.00 4.00 14.40
LONGITUDINAL
2.30 1.00 4.00 9.20
REFUERZO EN
2 1/2 8.00 2.00 4.00 32.00
VIGA V-S',
ACERO
2 1/2 4.95 2.00 4.00 19.79
LONGITUDINAL
LONGITUD TOTAL DE ACERO 408.60 890.97
PESO ACERO 1.55 0.99
PESO PARCIAL 634.15 885.63
PESO TOTAL 1519.8

COSTOS Y PRESUPUESTOS Página 6


UNIVERSIDAD JOSE CARLOS MARIATEGUI – INGENIERIA CIVIL

LONGITUD
ELEMENTO
DISEÑO DE ACERO CANTIDAD SEGÚN EL
VIGAS
DIAMETRO

DETALLE DETALLE Ɵ LONGITUD PARCIAL TOTAL 1/4 3/8
VECES
22.00 22.00 27.72
REFUERZO
27.00 27.00 34.02
TRANSVERSAL
1 3/8 1.26 28.00 28.00 35.28
EN VIGA VP -
101, ESTRIBOS 28.00 28.00 35.28
29.00 29.00 36.54
8.00 8.00 6.88
42.00 42.00 36.12
REFUERZO 20.00 20.00 17.20
TRANSVERSAL 14.00 14.00 12.04
1 3/8 0.86
EN VIGA V - A, 22.00 22.00 18.92
ESTRIBOS 61.00 61.00 52.46
44.00 44.00 37.84
22.00 22.00 18.92
45.00 45.00 20.70
REFUERZO
14.00 14.00 6.44
TRANSVERSAL
4 1/4 0.46 28.00 28.00 12.88
EN VIGA V - S,
21.00 21.00 9.66
ESTRIBOS
15.00 15.00 6.90
REFUERZO 45.00 45.00 14.40
TRANSVERSAL
1 1/4 0.32
EN VIGA V - S, 27.00 27.00 8.64
ESTRIBOS
LONGITUD TOTAL DE ACERO 79.62 369.22
PESO ACERO 0.25 0.56
PESO PARCIAL 19.75 206.76
PESO TOTAL 1746.3

COSTOS Y PRESUPUESTOS Página 7


UNIVERSIDAD JOSE CARLOS MARIATEGUI – INGENIERIA CIVIL

METRADOS – CONCRETO

COLUMNAS

DESCRIPCIÓN CANT. LARGO ANCHO ALTURA SUB TOTAL TOTAL

COLUMNAS
Primer Piso
C-1 3 0.25 0.25 3.70 0.69
C-1' 1 0.05 3.70 0.19
C-2 11 0.25 0.25 3.70 2.54
C-2' 1 0.05 3.70 0.19
C-3 3 0.25 0.15 3.70 0.42
Segundo Piso
C-1 3 0.25 0.25 2.60 0.49
C-2 9 0.25 0.25 2.60 1.46
Azotea
C-1
3 0.25 0.25 2.60 0.49
C-2
6 0.25 0.25 2.60 0.98
TOTAL CONCRETO EN m3 7.44

COSTOS Y PRESUPUESTOS Página 8


UNIVERSIDAD JOSE CARLOS MARIATEGUI – INGENIERIA CIVIL

LOZAS

DESCRIPCIÓN CANT. ALTURA SUB TOTAL TOTAL


LOSAS
Losas Aligeradas
Concreto f'c=210 kg/cm2
1º Piso 70.45 0.20 14.09
2º Piso 68.70 0.20 13.74
Azotea 27.12 0.20 5.42
Volumen de concreto 33.25
Número de ladrillos 8.33 166.27 1385.03
Volumen que ocupan ladrillos 0.01
Volumen total 18.70
Volumen de concreto en m3 14.56

COSTOS Y PRESUPUESTOS Página 9


UNIVERSIDAD JOSE CARLOS MARIATEGUI – INGENIERIA CIVIL

METRADOS – ENCOFRADO

COLUMNAS

DESCRIPCIÓN CANT ANCHO ALTURA SUBTOTAL TOTAL


ENCOFRADO
PRIMER PISO
C-1 12 0.25 3.70 11.10
C-1' 1 0.79 3.70 2.90
C-2 44 0.25 3.70 40.70
C-2' 1 0.79 3.70 2.90
C-3 12 0.15 3.70 6.66
SEGUNDO PISO
C-1 12 0.25 3.70 11.10
C-2 36 0.25 3.70 33.30
AZOTEA
C-1 12 0.25 3.70 11.10
C-2 24 0.25 3.70 22.20
TOTAL ENCOFRADO 141.97

LOZAS

DESCRIPCIÓN CANTIDAD EN METROS CUADRADOS TOTAL


ENCOFRADO
1º Piso 70.45
2º Piso 68.70
Azotea 27.12
Total encofrado en m2 166.27

COSTOS Y PRESUPUESTOS Página 10

Вам также может понравиться