Вы находитесь на странице: 1из 1

KALUPUR PROGRESS CHART AS ON 25.11.

2018
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18
01 02 03 04 05 06
19
07 08 09 10 11 12 13 14 15 16 17 18 19
Engineer
G+1

OLD BUILDING
UG WATER TANK

POLYMER TANKS
TANK 6

TANK 3
300cfm Return Polymer
FABRICATION YARD compressor tank
2.5m*2.5m 6m*3m*2.5m

BORE
WELL

0.6m
Polymer mixing

6m*3m*2.5m
TANK 4

tank

Fresh Polymer tank


12m*3m*2.5m

Fresh Polymer tank


12m*3m*2.5m
Fresh water tank
6m*3m*2.5m
TANK 5

TANK 1
TANK 2
LABOUR'S
REST ROOM

FOOTP

Delivery Room
TICKET BOOKING OFFICE
RAILWAY GOODS
01 02 03 04 05 06 07 08 09
BUILDING-2 10 11 12 13 14 15 16 17 18 19

51.01M
51.075M
GUIDE WALL
51.145M DIAPHRAGM WALL
51.21M
51.23M

+46.019M
BOTTOM OF ROOF SLAB

+46.019M
BOTTOM OF ROOF SLAB

+40.769M
CONCOURSE SLAB TOP

+40.769M
CONCOURSE SLAB TOP

+32..919M
BASE SLAB TOP LEVEL

+32.919M
BASE SLAB TOP LEVEL

D-WALL TOE

D-WALL TOE

PHYSICAL PROGRESS
LEGEND:
DESCRIPTION UOM TOTAL CUMULATIVE
SCOPE ACHIEVED

01 Barrettes Nos 33 12

Diaphragm NOS
02 86 81
Wall

Excavation CUM 24695 6240


03
(RoofSlab)

Concreting
04 SQM 4448 516
(Roof Slab)

Вам также может понравиться