RESUMEN DE PRESUPUESTO
Codigo COMPONENTE / ACTIVIDAD Unidad Meta Total Meta Total Monto s/.
1 INFRAESTRUCTURA
1A_EDUCATIVA
1A.1_Trabajos Generales GLB 1 S/. 4,405.70 S/. 215,689.68
1A.2_Modulo 01 Aulas Inicial GLB 1 S/. 211,283.98
COSTO DIRECTO : S/. 215,689.68
GASTOS GENERALES : (11 % ) S/. 23,725.86
SUB TOTAL S/. 239,415.54
SUPERVISION : (5%) S/. 11,970.78
COSTO TOTAL DEL PROYECTO : S/. 251,386.32