REVISION CERTIFICATE EDSD VERIFICATION REV. NO.

DATE JO/EWO DESCRIPTION ENG’G CERT PMT OPRNS

DATE
DATE
THIS INDICATES THAT REV. NO ____B____ ____________________

DATE
DATE
DATE
B 05/07/2015 BI-10-01055-0004 CHANGES INCORPORATED AS PER RKM VGD TBD TBD
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER REVISED ETP SCHEME AND ISSUED
FOR APPROVAL
APPROVAL/CERTIFICATION REQUIREMENTS A 06/30/2013 BI-10-01055-0004 ISSUED FOR REVIEW VRS VRD TBD TBD

AGENCY
R MATLANI
PROJECT
BY:_________________

SAPMT-TBD
ENGINEER
ENGINEER

CERTIFIED
DISCIPLINE

K.PERIASAMY

OPERATIONS
BY DRAWING COMPLETION CERTIFICATE

05/07/2015

CONSTRUCTION
VITHAL DESHPANDE
05/07/2015
05/07/2015
(DCC) NO. _________ DATE:_______________

JAZAN
JAZAN REFINERY & MARINE TERMINAL
B

NORTH TANK FARM AND LOADING ARM FACILITIES


MECHANICAL DATA SHEET FOR SLUDGE DECANT TANK
B
DAT
DWG. TYPE

SAUDI ARABIA
29-MAY-2015
FOR

J55
PLANT NO.

JO / EWO:
BJ55-D-0501 & 0505

D
SLUDGE DECANT TANK

ISSUED FOR 60% DESIGN REVIEW

INDEX
SAUDI ARABIAN OIL COMPANY

MECHANICAL DATA SHEET

DOC.
REFERENCE FEED DATA SHEET No. : J55-D-VE-526232 Rev C1

BI-10-01055-0004
VE-756373
NORTH TANK FARM AND LOADING ARM FACILITIES

5
1
of
SHT.

B
REV.

B0
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco SDS-ME-09528 (05/2005)
REVISED ETP SCHEME AND ISSUED FOR APPROVAL
SAUDI ARAMCO

UNTIL CERTIFIED AND DATED


USED FOR CONSTRUCTION
THIS REVISION IS NOT BE

THIS DRAWING AND THE INFORMATION CONTAIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAUDI ARAMCO STORAGE TANK DATASHEET (API 650 STORAGE TANK) (NOTE- 1.6)
CHANGES INCORPORATED AS PER

Date: 05/07/2015
REVISION DESCRIPTION

GENERAL INFORMATION (TO BE COMPLETED BY PURCHASER)


1. PURCHASER/AGENT SAUDI ARAMCO
ADDRESS JAZAN
CITY STATE ZIP CODE PHONE
2. USER
3. ERECTION SITE: NAME OF PLANT JAZAN REFINERY & MARINE TERMINAL PROJECT
LOCATION JAZAN, SAUDI ARABIA
B
4. TANK NO. J55-D-0501 / 0505 (NOTE- 1.5) MAX. CAPACITY 133 (NOTE 1.14) m3 NET WORKING CAP. 118 (NOTE- 1.4) m3

5. PUMPING RATE: IN B 22 m3/HR. OUT B 22 m3/HR.


B
JOB ORDER/EWO NO.

o
6. MAXIMUM OPERATING TEMPERATURE 60 C
BI-10-01055-0004

o
C
05/07/2015

7. PRODUCT STORED OILY SLUDGE DESIGN SPECIFIC GRAVITY 1.1 AT 50


DATE

B VAPOR PRESSURE 5608.44 2039.4


o
DESIGN METAL TEMPERATURE 88 (NOTE- 1.2) C mm WATER
B
8. CORROSION ALLOWANCE: SHELL 3.2 mm ROOF 3.2 mm
BOTTOM 3.2 mm STRUCTURAL (ROOF) NA mm
REV.NO

9. SHELL DESIGN: (NOTE- 1.11) n BASIC STANDARD API 650 o APPENDIX A o APPENDIX F o APPENDIX M
0.03 / -0.005
B DESIGN PRESSURE 0.01/-0.0025 bar g

10. ROOF DESIGN: n BASIC STANDARD API 650 o APPENDIX C (EXTERNAL FLOATING)
05/07/2015
BY/DATE
OTHER

o APPENDIX G (ALUMINUM DOME) o APPENDIX H (INTERNAL FLOATING)


FRANGIBLE ROOF JOINT ? o YES o NO

11. ROOF DESIGN INFORMATION: NA


UNIFORM LIVE LOAD NA N/m2
OPERATIONS/DATE
o REQUIRED (SAUDI ARAMCO)
REVIEW FOR KEY DRAWINGS

N/m2
TBD

SPECIAL LOADS (PROVIDE SKETCH) NA

INSULATION LOAD NA N/m2

o
MAXIMUM DESIGN ROOF TEMPERATURE NA C
CONST. AGENCY/DATE

GASES IN THE VAPOR SPACE NA


SAPMT-TBD

12. EARTHQUAKE DESIGN n YES o NO (APPENDIX E) ROOF TIE RODS o YES n NO


SEISMIC ZONE (NOTE- 1.1) B IMPORTANCE FACTOR 1.5
ZONE FACTOR (TABLE E-2) (NOTE- 1.1) SITE COEFFICIENT (TABLE E-3) (NOTE- 1.1)
CERTIFIED/DATE

13. WIND LOAD: VELOCITY 45.83 (NOTE- 1.3) m/sec


05/07/2015
DESIGN CERTIFICATION
( DESIGN AGENCY )

PROVIDE INTERMEDIATE GIRDER (5.9.7) (*) o YES o NO


14. ENVIRONMENTAL EFFECTS: MAXIMUM RAINFALL 90 mm / day
TOTAL SNOW ACCUMULATION N/A mm
ENGG./DATE

05/07/2015

15. SIZE RESTRICTIONS: MAXIMUM DIAMETER 5.0 m. MAXIMUM HEIGHT 7.0 m.


B
16. FOUNDATION TYPE: (NOTE- 1.12) o EARTH o CONCRETE RINGWALL n OTHER

ENGINEERING NOTES:
1.1 SHORT PERIOD ACCELERATION (Ss)= 43.5%g, 1SEC. ACCELERATION (S1)= 12.4%g SUG III PER API 650 & SITE CLASS D, IN ACCORDANCE WITH SAES-A-112.
1.2 MINIMUM DESIGN METAL TEMPERATURE IS 16˚C.
1.3 WIND DESIGN PER ASCE 7-05, EXPOSURE CATEGORY = C, IMPORTANCE FACTOR 1.15. Occ. Cat.IV
APPROVAL AND CERTIFICATION REQUIREMENTS,

B 1.4 NET WORKING CAPACITY BASED ON 5 DAYS AVERAGE EFLUENT SLUDGE BETWEEN LLL & HLL.
PER SAEP-334, UNDER DRAWING COMPLETION
THIS REVISION NO. B IS COVERED FOR ALL

1.5 SIZE BASED ON 2 x 100% TANKS.


REVISION VALIDATION

1.6 SI UNITS SHALL BE FOLLOWED


1.7 SHELL COURSE SHALL BE FLUSH STACKED ON THE INSIDE.
1.8 DESIGN LIFE OF THE EQUIPMENT SHALL BE 25 YEARS.
1.9 MINIMUM SHELL COURSE WIDTH SHALL BE 1800 MM
1.10 ALL WETTED C.S. INTERNAL SURFACES SHALL HAVE 3.2 MM CORROSION ALLOWANCE.
B 1.11 SHELL / ROOF DESIGN SHALL BE IN ACCORDANCE WITH API 650 APPENDIX-J & 32-SAMSS-030. SHELL TO BOTTOM CONE JOINT, CONE
THICKNESS CALCULATIONS AND SUPPORTING ARRANGEMENT SHALL BE IN ACCORDANCE WITH GOOD ENGINEERING PRACTICE. CONTD….
CERTIFICATE NO.

MECHANICAL DATA SHEET FOR SLUDGE DECANT TANK DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

NORTH TANK FARM AND LOADING ARM FACILITIES DAT


J55 D VE-756373 2
JAZAN REFINERY & MARINE TERMINAL of B
B0
JAZAN SAUDI ARABIA JO / EWO: BI-10-01055-0004
5
Saudi Aramco SDS-ME-09528 (05/2005)

SAUDI ARAMCO

UNTIL CERTIFIED AND DATED


USED FOR CONSTRUCTION
CHANGES AS PER REVISED ETP SCHEME

THIS REVISION IS NOT BE Date: 05/07/2015

THIS DRAWING AND THE INFORMATION CONTAIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CONSTRUCTION DETAILS (TO BE COMPLETED BY MANUFACTURER AND/OR PURCHASER)
REVISION DESCRIPTION

RE-ISSUED FOR APPROVAL


INCORPORATED AND

1. MANUFACTURER *
ADDRESS *
CITY * STATE * ZIP CODE * PHONE *
SERIAL NO. *
2. FABRICATOR *
ADDRESS *
CITY * STATE * ZIP CODE * PHONE *
SERIAL NO. *
JOB ORDER/EWO NO.

3. MATERIAL SPECIFICATIONS: SHELL A36/EQ. AS PER API 650


BI-10-01055-0004
05/07/2015

(ALSO REFER SHEET-5 OF 5) ROOF A36/EQ. AS PER API 650


DATE

BOTTOM A36/EQ. AS PER API 650


STRUCTURAL A36/EQ. AS PER API 650
4. NO. OF SHELL COURSES BY TANK MANUFACTURER
REV.NO

5. PLATE WIDTHS AND THICKNESS (INCLUDING CORROSION ALLOWANCE), IN MM.


1. * 4. * 7. *
2. * 5. * 8. *
3. * 6. * 9. *
05/07/2015
BY/DATE
OTHER

6. TANK BOTTOM: PLATE THICKNESS * mm o LAP n BUTT SEAMS (*)


SLOPE SEE SHEET 5 OF 5 n TO o FROM CENTER
7. MINIMUM WIDTH AND THICKNESS OF BOTTOM ANNULAR PLATES (5.5), IN mm.: N/A
OPERATIONS/DATE

8. ROOF-TO-SHELL DETAIL (FIGURE F-2) *


o REQUIRED (SAUDI ARAMCO)
REVIEW FOR KEY DRAWINGS

9. INTERMEDIATE WIND GIRDER? o YES n NO (*) TOP WIND GIRDER FOR USE AS WALKWAY? n YES o NO (*)
TBD

10. ROOF TYPE: o SUPPORTED n SELF-SUPPORTED o OPEN o FLOATING


SLOPE OR RADIUS NA mm (CONE ROOF)
11. ROOF PLATE: THICKNESS * mm o LAP o BUTT JOINT
CONST. AGENCY/DATE

12. PAINT: (NOTE-15) REFER SHT. 5 OF 5


B
SAPMT-TBD

SHELL EXTERIOR? n YES o NO INTERIOR? n YES o NO


SURFACE PREPARATION REFER PROJECT SPEC.J60-A-VE-755085 / 755086 & SAES-H-001
BOTTOM UNDERSIDE? n YES o NO INTERIOR? n YES o NO
SURFACE PREPARATION REFER PROJECT SPEC.J60-A-VE-755085 / 755086 & SAES-H-001
STRUCTURAL STEEL EXTERIOR? n YES o NO INTERIOR? n YES o NO
CERTIFIED/DATE

SPECIFICATION REFER PROJECT SPEC.J60-A-VE-755085 / 755086 & SAES-H-001


05/07/2015

13. TANK BOTTOM COATING: INTERIOR? n YES o NO MATERIAL


DESIGN CERTIFICATION
( DESIGN AGENCY )

APPLICATION SPECIFICATION REFER PROJECT SPEC.J60-A-VE-755086 & SAES-H-001


14. INSPECTION BY: SHOP COMPANY / CONTRACTOR FIELD COMPANY / CONTRACTOR

15. WELD EXAMINATION: RADIOGRAPH AS PER API 650 AND 32-SAMSS-030/ (*) FOR BOTTOM & SAES-W-017
ENGG./DATE

SUPPLEMENTARY LIQUID PENETRANT OR ULTRASONIC


05/07/2015

16. FILMS PROPERTY OF COMPANY

17. LEAK TESTING: BOTTOM (*) ROOF NA


SHELL AS PER 32-SAMSS-030

18. MILL TEST REPORTS: REQUIRED? n YES o NO


PLATE STRUCTURAL SHAPES

19. PURCHASER REFERENCE DRAWING REFER SHEET 5 OF 5


APPROVAL AND CERTIFICATION REQUIREMENTS,

20. TANK SIZE: B DIAMETER 5.0 m HEIGHT 7.0 m


PER SAEP-334, UNDER DRAWING COMPLETION
REVISION VALIDATION

21. DATE OF STANDARD 650 EDITION/REVISION 11th EDITION 2007 + ADDENDUM 3 & ERRATA OCT 2011 (Note 1.11)
THIS REVISION NO. B IS COVERED FOR ALL

ENGINEERING NOTES : CONTD FROM SHEET 2 of 5 ( * )TO BE CONFIRMED BY TANK MANUFACTURER.


1.12 TANK SHALL BE SUPPLIED WITH SUPPORT LUGS/RINGS (REQUIRED PER DESIGN CALCULATION) FOR SUPPORTING ON CIVIL FOUNDATION.
1.13 TANK MOUNTING STRUCTURE INCLUDING SUPPORTING LEGS & MOUNTING BOLTS SHALL BE SUPPLIED BY OTHERS, HOWEVER
TANK MANUFACTURER TO PROVIDE THE LOADINGS AND DETAILS FOR CIVIL FOUNDATION DESIGN.
1.14 MAX CAPACITY IS BETWEEN BOTTOM TAN TO HHLL.
CERTIFICATE NO.

REV.
MECHANICAL DATA SHEET FOR SLUDGE DECANT TANK DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO.
NO.
NORTH TANK FARM AND LOADING ARM FACILITIES DAT 3
J55 D VE-756373
JAZAN REFINERY & MARINE TERMINAL of B0
B
JAZAN SAUDI ARABIA JO / EWO: BI-10-01055-0004
5
Saudi Aramco SDS-ME-09528 (05/2005)

SAUDI ARAMCO

CHANGES AS PER REVISED ETP SCHEME

UNTIL CERTIFIED AND DATED


USED FOR CONSTRUCTION
THIS REVISION IS NOT BE
Date: 05/07/2015
REVISION DESCRIPTION

RE-ISSUED FOR APPROVAL


APPURTENANCES (TO BE COMPLETED BY MANUFACTURER AND/OR PURCHASER)
INCORPORATED AND
1. STAIRWAY STYLE: n CIRCULAR o STRAIGHT ANGLE TO HORIZONTAL * DEGREES
NOTE - 9,11 LADDER *

THIS DRAWING AND THE INFORMATION CONTAIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2. WALKWAY: WIDTH * mm LENGTH * mm

3. DRAWOFF SUMP: STANDARD NA SPECIAL


4. BOLTED DOOR SHEET? o YES o NO (APPENDIX A TANKS ONLY)
5. SCAFFOLD HITCH

6. INTERNAL PIPING: SWING LINE NA SUCTION LINE


JOB ORDER/EWO NO.

BI-10-01055-0004
05/07/2015

HEATING COIL SURFACE AREA NA mm2


DATE

7. ROOF DRAIN: HOSE NA JOINTED NA


SIPHON NA
REV.NO

8. NO. AND SIZE OF SHELL MANHOLES SEE SHEET 5 OF 5

9. NO. AND SIZE OF ROOF MANHOLES


05/07/2015
BY/DATE
OTHER

10. SHELL NOZZLES AS PER API: (*)

FLANGED THREADED ORIENTATION HEIGHT FROM


MARK SIZE SERVICE
SGL DBL SPL A B C D E N=0 BOTTOM
OPERATIONS/DATE
REQUIRED (SAUDI ARAMCO)
REVIEW FOR KEY DRAWINGS

SEE SHEET 5 OF5


CONST. AGENCY/DATE
o

CERTIFIED/DATE

11. ROOF NOZZLES, INCLUDING VENTING CONNECTION (SEE FIGURES 5-19 AND TABLE 5-14a ):
05/07/2015

ORIENTATION DISTANCE
MARK SIZE FLANGED THREADED REINFORCEMENT SERVICE
N=0 FROM CENTER
DESIGN CERTIFICATION
( DESIGN AGENCY )

ENGG./DATE

05/07/2015

SEE SHEET 5 OF5


APPROVAL AND CERTIFICATION REQUIREMENTS,
PER SAEP-334, UNDER DRAWING COMPLETION
REVISION VALIDATION

THIS REVISION NO. B IS COVERED FOR ALL

REMARK- 1 : TANK MANUFACTURER SHALL ENSURE THAT STRESSES AT TANK NOZZLES DUE TO PIPING LOADS AS PER PROJECT SPECIFIACTION
ARE WITHIN ALLOWABLE LIMITS.
REMARK-2 : TANK MANUFACTURER SHALL CONSIDER HIGHER ALLOWABLE NOZZLE LOADS AS PER CLAUSE No. 6.3 OF THE SPEC. J95-A-VE-758384

(*) TO BE CONFIRMED BY TANK MANUFACTURER.


CERTIFICATE NO.

MECHANICAL DATA SHEET FOR SLUDGE DECANT TANK DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

NORTH TANK FARM AND LOADING ARM FACILITIES DAT 4


J55 D VE-756373
JAZAN REFINERY & MARINE TERMINAL of B0
B
JAZAN SAUDI ARABIA JO / EWO: BI-10-01055-0004
5
BY VENDOR / LSTK CONTRACTOR

SET PRESSURE OF PVRV (Bar g) = 0.022 / -0.002 B NO. DESCRIPTION QTY ORDER No. DESIGN AND CONSTRUCTION NOTES
SET PRESSURE OF EMERGENCY HATCH (Bar g) =NOTE 17 SLUDGE DECANT TANK B 2 1. SERVICE OILY SLUDGE
1 BOTTOM CONE 2. CAPACITY: MAXIMUM 133 m³ NET WORKING 118 m³
SHELL PLATES COURSES #1 #2 #3 B 3. MAX. PUMPING RATE - IN = 22 m³/hr OUT = 22 m³/hr
2
BEVELING IN ACCORDANCE WITH DC-950014 TANK MANUFACTURER SHALL MARK EACH UNIT WITH ORDER NO. AND ITEM No.
3 ROOF WITH SUPPORTS
SPECIFICATIONS AND STANDARDS:
32-SAMSS-030 MANUFACTURE OF SMALL ATMOSPHERIC METALLIC TANKS
BOTTOM APPURTENANCES SAES-A-112 METEOROLOGICAL AND SEISMIC DESIGN DATA
4 PIPE INTERNALS WITH ITS SUPPORTS SAES-B-054 ACCESS, EGRESS AND MATERIALS HANDLING FOR
PLANT FACILITIES
SAES-H-001 COATING MATERIAL SELECTION AND APPLICATION
SYPHON BREAKER
REQUIREMENTS FOR INDUSTRY PLANTS & EQUIPMENT
40mm thick PP SAES-J-300 LEVEL
insulation
SAES-M-001 STRUCTURAL DESIGN CRITERIA FOR NON-BUILDING
STRUCTURES
5 SHELL APPURTENANCES AND ACCESSORIES SAES-X-500 CATHODIC PROTECTION OF VESSELS AND TANK INTERNALS
6 WELDED SHELL NOZZLE SAES-W-017 WELDING REQUIREMENTS FOR API TANKS
7 TOP CURB ANGLE SAES-P-111 GROUNDING
8 WIND GIRDER WITH HANDRAIL AND STIFFENERS SAES-D-109 DESIGN OF SMALL METALLIC STORAGE TANKS
9 ELECTRICAL CABLE SUPPORTS SAES-L-109 SELECTION OF FLANGES, STUD BOLTS AND GASKETS
10 SUPPORT LEGS AND BOTTOM CONE STIFFENERS ( For Piping Reference Only)
11 LIFTING ARRANGEMENT
12 SPIRAL STAIRWAY WITH MID & TOP LANDING PLATFORMS SAUDI ARAMCO STANDARD DRAWINGS:
B AND RAILINGS AA-036322-001 ANCHOR BOLT DETAILS (INCH AND METRIC)
13 WELDED INTERNALS AS SHOWN IN THE SKETCH AB-036387-001 TANKS GROUNDING
DC-950014-001 BEVELING DETAILS FOR API 650 TANKS
DC-950102-001 STANDARD DETAILS OF CIRCUMFERENTIAL STAIRWAY FOR
CONE ROOF TANKS
ROOF APPURTENANCES AND ACCESSORIES DD-950005-001 VORTEX BREAKER DETAIL.
14 ROOF NIPPLE/ NOZZLE AC-036630-001 INSTALLATION OF JACK SCREWS FOR FLANGED JOINTS
15 WELDED ROOF MANWAY B AD-036061-001 ROOF CENTER VENTS
16 WELDED ROOF MANWAY AA-036504-001 ASSEMBLY & DETAILS OF GAGE WELL AND GUIDE POLE
17 EMERGENCY VENT FOR FLOATING ROOF TANKS
18 VAPOUR TIGHT GAUGE HATCH AB-036003-001 MANWAYS AND VENTS FOR TANKS
40mm thick PP 19 ROOF HANDRAILS ALL AROUND
insulation
20 GAUGE WELL PROJECT SPECIFICATIONS:
4200(HOLD 3 ) 21 LIQUID LEVEL INDICATOR J95-A-VE-758384 SPECIFICATION FOR ALLOWABLE NOZZLE LOADS.
J60-A-VE-755085 SPECIFICATION FOR EXTERNAL PAINTING
J60-A-VE-755086 SPECIFICATION FOR INTERNAL LINING
HOLD(S):
1. SIZE UNDER HOLD
2. INSTRUMENT NOZZLE SIZES & ORIETATIONS OF ALL NOZZLES ARE UNDER HOLD.
3. HOLD
DELETED
B
4. LOCATION
DELETEDOF N7
5. EXTERNAL CATHODIC PROTECTION.
6. TANK LEVELS ARE UNDER HOLD.
ENGINEERING NOTES:
QTY : 2 1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS OTHERWISE NOTED. MATERIAL SPECIFICATION ( TANK MANUFACTURER TO CONFIRM)
2. TANK SHALL BE PROVIDED WITH FOLLOWING INTERNALS AS A MINIMUM: NOZZLE NECK A 106 Gr. B/ A 36
- VORTEX BREAKER. FITTINGS A 234 WPB
- DIP PIPES. BOLTING (INT/EXT) A 193 Gr. B8 , A 194 Gr. 8 / A 193 Gr.B7,A 194 Gr.2H
SR. SIZE ASME B16.5 / PROJECTION - INTERNAL PIPES FOR LEVEL GAUGES AND TEMPERATURE SENSOR. NOZZLE FLANGES (ASME/API) A 105/ A 36
NOZZLE MARK NO. QTY (*)
ELEVATION (*) REMARKS
NO. (NB) B16.47 SR.A 3. THE FOLLOWING EXTERNAL ITEMS SHALL BE PROVIDED AS A MINIMUM: R.F.PAD SAME AS SHELL/ROOF
1 SLUDGE INLET N1 6" 150# SORF 1 ** *** - GROUNDING LUGS 4-OFF MINIMUM. INTERNAL PIPES A 106 Gr.B
2 DIRTY BACKWASH INLET N2 6" 10" 150# SORF 1 ** *** - NAMEPLATE AND ITS BRACKET. ATTACHMENTS(INT/EXT) A 36/ A 36
3 UTILITY CONNECTION N3 3" 150# SORF 1 ** *** - PIPE SUPPORTS, CLIPS, LADDERS, PLATFORMS AND SPIRAL STAIRWAYS. PLATFORM/STAIRWAY A 36/ A 36
4 OVERFLOW N4 6" 10" 150# SORF 1 ** *** WITH DIP PIPE - BLIND FLANGE, GASKET, BOLTING AND DAVITS FOR MANWAYS. GASKET (API NOZZLES) CNAF
5 NITROGEN BLANKETING N5 4" 150# SORF 1 ** $ HOLD - 1 - RADAR GAUGE ASSEMBLY. GASKET (ASME NOZZLES) SPIRAL WOUND GRAPHITE FILLED SS 316 WINDING WITH
6 TEMPERATURE SENSOR N6 2" 300# SORF 1 ** *** LOCATE BELOW LLLL 4. APPURTENANCES ARE PRELIMINARY AND SHALL BE CONFIRMED BY TANK MANUFACTURER. SS 316 INNER RING & CS OUTER RING
7 OILY WATER OUTLET N7 10" 6" 150# SORF 1 ** *** NOTE-18 WITH DIP PPE 5. MOUNTING BOLTS SHALL BE DESIGNED BY TANK MANUFACTURER BASED ON AA-036322-001 AND
8 DELETED
TEMPERATURE SENSOR N8 2" 300# SORF 1 SUPPLIED BY OTHERS.
9 DELETED 6. ALL REMOVABLE INTERNALS SHALL PASS THROUGH MANWAY INTERNAL DIAMETER.
10 GAUGE HATCH N12 8" 150# SORF 1 ** $ NOTE 7-8 7. CONNECTION TYPE, SIZE AND QTY TO BE CONFIRMED BY TANK MANUFACTURER.
11 OWS DRAIN / VACUUM OUT(SLUDGE OUT) N16 6" 150# SORF 1 ** *** 8. GAUGE HATCH SHALL BE PROVIDED WITH NON -SPARKING COVER. REQUISITION NO: TBD

12 DELETED 9. ALL LADDERS AND WALKWAYS SHALL BE ACCORDING TO SAES-B-54 & SAES-M-001 VENDOR: TBD

13 EMERGENCY HATCH N18 150# SORF 1 ** *** NOTE-7&10 10. EMERGENCY HATCH SHALL BE DESIGNED AS PER API-2000 FIRE CASE FLOW REQUIREMENT AND
14 PVRV +ONE SPARE PVRV N19 150# SORF 1 +1 ** *** NOTE-7 FOR INSIGNIFICANT BACK PRESSURE (AS PER API 650 DESIGN PRESSURE) REVISION VALIDATION
15 RAW WATER N20 A/B/C 3/4" 150# SORF 3 ** $ NOTE-19 11. TANK SHALL BE SUPPLIED WITH A SUITABLE VERTICAL LADDER AND FULL TOP PLATFORM & RAILINGS THIS REVISION NO. B IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
16 LP STEAM CONDENSATE OUT N21 2" 150# SORF 1 ** $ NOTE 7 AROUND PERIPHERY TO ACESS MANHOLE AND GAUGE HATCH. REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATION NO:
17 LP STEAM IN N22 2" 150# SORF 1 ** $ NOTE 7 12. LONGITUDINAL WELDS OF NOZZLES AND MANWAY NECK FABRICATED FROM PLATE SHALL BE
18 LEVEL TRANSMITTER K1 4" 150# SORF 1 ** $ WITH STILL WELL FULLY RADIOGRAPHED. DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
19 INTERFACE LEVEL TRANSMITTER K3 4" 150# SORF 1 ** $ WITH STILL WELL 13. ALL FASTENERS SHALL BE COATED WITH FLUOROPOLYMER AS PER 7.1 G OF SAES-H-001 (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
20 PRESSURE TRANSMITTER K4 2" 150# SORF 1 ** $ 14. INSPECTION AND TESTING REQUIREMENT AS PER FORM-175-324900 & API-650 ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATION/DATE BY/DATE
21 MANWAY (ROOF) MH 1 24'' API 650 1 ** $ WITH COVER & HINGE 15. IF SP. GRAVITY OF HYDROTEST WATER IS MORE THAN 1.0, SAME SHALL BE SPECIFIED IN GA DRAWING
22 DELETED AS DESIGN CONDITION BY TANK MANUFACTURER (COMPLYING TO CL.8.4.4.OF SAES-D-100) REV. NO. DATE ENG’G REVISION DESCRIPTION
23 MANWAY (SHELL) MH-3 24" API 650 1 ** *** WITH COVER & DAVIT TEST HEIGHT MAY BE LOWERED TO LIMIT THE INDUCED STRESSES WITHIN APPLICABLE API CODE
24 DELETED ALLOWABLE STRESSES B 05/07/2015 RKM
CHANGES INCORPORATED AS PER
REVISED ETP SCHEME AND ISSUED FOR APPROVAL
25 16 PAINTING AND COATING SHALL BE AS PER CORROSIVE INDUSTRIAL ATMOSPHERIC EXPOSURE. JOB ORDER / EWO THIS DRAWING IS NOT TO BE USED FOR
NO.: BI-10-01055-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED
17 TANK MANUFACTURER SHALL DETERMINE THE ALLOWABLE INTERNAL PRESSURE LIMIT IN
Sludge Properties & Steam Data for Heating coil Design ACCORDANCE WITH CLAUSE 5.8.5.3 OF API 650 AND SPECIFY THE SET PRESSURE OF SAUDI ARABIAN OIL COMPANY
FOR THE MINIMUM ELEVATIONS REQUIRED REFER TO THE P&ID NOS: J55-A-VA-755599-010 & 019. EMERGENCY HATCH. MECHANICAL DATA SHEET FOR SLUDGE DECANT TANK DRAWING TYPE DAT
18 N7 NOZZLE SHALL BE LOCATED AT 6.5 METER FROM THE BOTTOM TANGENT LINE. HOLD4 NORTH TANK FARM AND LOADING ARM FACILITIES
o
(*) TO BE FILLED BY TANK MANUFACTURER 19 SPRAY NOZZLES( 3 Nos) TO BE LOCATED @120 APART AND AT AN ANGLE IN SUCH A WAY THAT JAZAN REFINERY & MARINE TERMINAL
** NOZZLE PROJECTIONS SHALL BE AS PER API 650, THE SHELL NOZZLE PROJECTION SHALL BE WATER JET IS DIRECTED TOWARDS THE SLUDGE OUTLET LINE( N16). JAZAN SAUDI ARABIA
MEASURED FROM THE TANK CENTER LINE UP TO THE FACE OF THE FLANGE. 20 TANK SHALL BE PROVIDED WITH STEAM HEATING COIL IN THE CONICAL PORTION TO MAINTAIN PLANT NO. INDEX DRAWING NUMBER SHT. NO REV NO.
*** SHELL NOZZLE ELEVATIONS ARE UNDER HOLD. TANK TEMPERATURE AT 60'C
J55 D VE-756373 5 OF 5 B
B0
$ NOZZLE ELEVATIONS & ORIENTATIONS SHALL BE AS PER DRAWING No.:
21
REFERENCE P&ID No.: J55-A-VA-755599-010,019 B SLUDGE DECANT TANK
(J55-D-0501 /0505)