Вы находитесь на странице: 1из 5

No DT Date Site Name

1 18-Mar WAHANAASRIMW
2 18-Mar JLSIAGAMW
3 18-Mar TOTALPTMINAMW
4 7-Mar TNHGROGOTMW
5 7-Mar KPGTAPISMW
6 7-Mar TNHPRIUKMW
7 18-Mar ASRAMAHAJIMW
8 19-Mar ASYAHRANIMW
9 19-Mar GUNUNGSATUMW
10 23-Mar STOBONTANGMW
11 24-Mar BONTANG6MW
12 24-Mar PKTLHOKTUANMW
13 24-Mar JPERTAHANANMW
14 25-Mar KM3.5MW
15 25-Mar PEMOTONGANSAPIMW
16 25-Mar KPBARUMW
17 27-Mar SUTOMO2MW
18 3-Apr BHAYANGKARAMW
19 27-Mar JLSENTOSAMW
20 27-Mar SEMPAJA2MW
21 27Mar and 29Mar PERJUANGANMW
22 27Mar and 29Mar PDAMSMRDMW

23 27Mar and 29Mar UTGSURAPATIMW

24 27Mar and 29Mar POLITEKNIK2MW

25 27-Mar BRIMOBMW
26 PELABUHANBONTANGMW
27 KLANDASANMW
29 GNMALANGMW
30 JLPANJAITANMW
31 KPGBARU2MW
32 NAVIGASIMW
33 2-Apr BELATUKMW
34 29-Mar BENGKURINGMW
35 JLAYANI1MW
36 30-Mar MUARAJAWAULUMW
37 31-Mar BMSEMPAJA2MW
38 KARANGPACI2MW
39 TLKLERONGMW
40 MANGKUPALASMW
41 29-Mar ISLAMCICTRMW
42 CBTPERTAHANANMW
43 BKTPELANGIMW
44 SANGATA5MW
45 SANGATA3MW
46 TERMINALBARUMW
47 SANGATAMW
48 SANGATA7MW
49 JLANGGREK1MW
50 29-Mar ERLISA2MW/pndnwangimw
Remarks DT Engineer DT plan
Done Robisandi
Done Robisandi BHAYANGKARAMW
Done Robisandi JLAYANI1MW
Done Rendi JLPANJAITANMW
Done Rendi BONTANG6MW
Done Rendi
Done Robisandi
Done Jefri
Done Jefri
Done Robisandi
Done Robisandi
Done Robisandi
Done Jefri
Done Jefri
Done Robisandi
Done Robisandi
Done Jefri
Done Jefri
Done Robisandi
Done Robisandi
Done Robisandi
Done Robisandi
1 sector down. 2nd visit: alarm cell faulty, base station
Robihamdan
transmission alarm, base station operation degraded
Coverage problem, 2nd visit: base station
Robihamdan
transmission alarm, failure in wcdma wbts o&m
Done Robihamdan
Not done
Not done
Not done
Done
Not done
Not done
Done Robisandi
Done Robisandi
Transmission Problem
Done Robisandi
Done Robisandi
Not done
Not done
Not done
Done Jefri
Not done
Not done
Not done
Not done
Not done
Not done
Not done
Not done
Robihamdan/jeffr
sector 1 not serving/ sector 3 not serving
y
jefry
robsan
robsan