STANDARD OPERATING PROCEDURE (SOP)
For
Doc.No. UCPL/ME/SOP/006
Safe Working at height on Rev.No: 00
scaffoldings & Steel Structures Page :
Approved By: HOD -MECHANICAL Issued By:
Date: 19.08.2018 Date:
Revision History
Page(s)/Section(s)
Date of Revision Revision Explanation
Revised
Page 1 of 6
UNITED CEMENTS PVT. LIMITED
STANDARD OPERATING PROCEDURE (SOP)
For
Doc.No. UCPL/ME/SOP/006
Safe Working at height on Rev.No: 00
scaffoldings & Steel Structures Page :
Approved By: HOD -MECHANICAL Issued By:
Date: 19.08.2018 Date:
TABLE OF CONTENTS
1. Purpose
2. Scope
3. Abbreviations
4. Responsibility
5. Procedure
a) Operation of Crusher
b) Maintenance of Crusher
Page 2 of 6
UNITED CEMENTS PVT. LIMITED
STANDARD OPERATING PROCEDURE (SOP)
For
Doc.No. UCPL/ME/SOP/006
Safe Working at height on Rev.No: 00
scaffoldings & Steel Structures Page :
Approved By: HOD -MECHANICAL Issued By:
Date: 19.08.2018 Date:
1. PURPOSE: -
To establish a system for handling, storage & disposal of used
oil & grease generated in the plant.
2. SCOPE: -
Applicable to used oil & grease generated in whole plant.
3. ABRIVIATIONS: -
4. RESPONSIBILITY: -
5. PROCEDURE: -
The used oil & grease generated in the plant is kept on the secondary
containment like steel tray / drum at specified place of respective area.
The place is properly identified as “USED OIL & GREASE”.
The drums are kept vertical and cap/ lid cover on used oil drum & cover
of grease drum are properly closed.
Used grease/oil is unloaded at identified area in scrap yard in presence
of authorized Store’s person.
Disposal of grease & oil from scrap yard is the responsibility of stores.
Avoid spillage of Oil / Grease on ground during the shifting work to
avoid earth contamination.
Page 3 of 6
UNITED CEMENTS PVT. LIMITED
STANDARD OPERATING PROCEDURE (SOP)
For
Doc.No. UCPL/ME/SOP/006
Safe Working at height on Rev.No: 00
scaffoldings & Steel Structures Page :
Approved By: HOD -MECHANICAL Issued By:
Date: 19.08.2018 Date:
All the operatives should use the PPE’S i.e. ear muffs, safety helmet
etc as per the requirement of working area.
All the operatives should be aware of using the tools & tackles.
7. APPLICABILITY: -
PURPOSE
Page 4 of 6
UNITED CEMENTS PVT. LIMITED
STANDARD OPERATING PROCEDURE (SOP)
For
Doc.No. UCPL/ME/SOP/006
Safe Working at height on Rev.No: 00
scaffoldings & Steel Structures Page :
Approved By: HOD -MECHANICAL Issued By:
Date: 19.08.2018 Date:
2. SCOPE
Applicable to kiln/raw mill / blending silo / raw mill / coal mill /Cement Mills/Packing Plant &
Crusher
3. RESPONSIBILITY
4. PROCEDURE
To carry out the jobs at height following safe work instructions must be followed.
4.1. Competent persons are deployed for the job and Safety Talk is given to all
work man before start of the job.
A>Safety belt
C>Hand gloves.
4.4. It is ensured that Guards/railings surrounding the work area are proper.
4.6. Work permit for work at height is issued before carrying out the job at height.
Page 5 of 6
UNITED CEMENTS PVT. LIMITED
STANDARD OPERATING PROCEDURE (SOP)
For
Doc.No. UCPL/ME/SOP/006
Safe Working at height on Rev.No: 00
scaffoldings & Steel Structures Page :
Approved By: HOD -MECHANICAL Issued By:
Date: 19.08.2018 Date:
4.7. It must be ensured that challis are properly bonded on pipes with suitable wire / clamps
and before start of work the same should be checked for its stability.
4.8. Before start of the job the concerned supervisor will check and ensure the above points
including the status of the platform made with MS Grating, whether it is intact and may be
used for safe working.
4.9. The work force engaged in the nearby area should be instructed, to check the scaffolding
condition before start of work.
4.11. All the scaffolding pipes should be free from dust and having wet surface.
5. RECORDS: