Aerial view of Susquehanna-Western, Inc., Uranium Mill near Falls City, Texas. Ore stock
piles are upper center. The tailings line is seen at the upper right portion of the photo.
Note the flat root and open wall design of the mill building.
I Need Consulting Engineering Help

The completion of this 300-ton per day mill marked the first commercial plant in Texas
to treat uranium ores. The plant is owned by Susquehanna-Western, Inc., a totally-owned
subsidiary of Susquehanna Corporation, Chicago, Illinois. In addition to this mill,
Susquehanna- Western, Inc., owns and operates a 550-ton per day uranium mill and a
250-ton per day sulphuric acid plant at Riverton, Wyoming. The 400-ton per day uranium
mill of Mines Development, Inc., at Edgemont, South Dakota is also owned by the
Susquehanna Corporation.

Susquehanna-Western, Inc., and Mines Development, Inc., are under the capable
direction of Mr. Allen D. Gray, President of both firms. The companies are also engaged in
exploration and production of minerals other than uranium.

Initial discussions with the Atomic Energy Commission for a yellow cake purchase
contract in Texas commenced on November 23, 1959. The contract resolved provides for
the purchase of a maximum of 1.6 million pounds of U3O8 for the period ending
December 31, 1966 at a price of approximately $9.90 per pound prior to March 31, 1962,
and $8.00 per pound thereafter. The total value of the contract is $13,000,000.

The majority of uranium processing plants constructed in recent years were allowed an
accelerated amortization schedule up to 1962. However, this mill was built at a time that
did not permit the full realization of the previous favorable amortization schedule. The
company therefore established a policy to achieve maximum metallurgical efficiency and
profit but not one dime could be spent unless necessary to attain this goal.

Checkout our Mining Process & Lab Equipment Selection CLICK HERE TO ENTER
I Need Ore Laboratory Testing
Location

This mill is located in Karnes County, approximately 50 miles southeast of San Antonio,
I Need Consulting Engineering Help

Texas, or about 10 miles southwest of Falls City.

Most employees were hired locally from the nearby towns of Falls City, Poth, Karnes City,
and Kennedy. The site was selected due to its proximity to the mining area and the
availability of power, water, natural gas and living facilities. The mill operates twenty-
four hours per day, five days per week and employs approximately sixty persons.

Design and Construction

Design and construction of this nearly $2 million facility was accomplished in eight
months by Susquehanna Engineering Company, a division of Susquehanna-Western, Inc.
Process and metallurgical design were by H. L. Hazen, Inc., Metallurgical Consultants to
Susquehanna. O. W. Walvoord, Inc., of, cooperated as construction consultant and design
manager. More than one hundred construction people were employed during the peak
period.

Mr. G. H. Bryant, Manager of the Metallurgical Division for Susquehanna-Western, Inc.,


coordinated all phases of the project. Mr. George Wallbank was Project Engineer for
Susquehanna Engineering.

The mill operating staff consists of Ron Bethurum, Mill Superintendent; Gene Cooley,
Control Engineer; Waynard Jensen, Production Foreman; Carl Bennett, Maintenance
Foreman; and L. A. McGill, Office Manager.

Mining

Checkout our Mining Process & Lab Equipment Selection CLICK HERE TO ENTER
The source of ore for this plant is from the company operated Luckett open pit mine
some two miles away and a 100,000-ton stockpile of ore owned by the AEC. Independent
shippers will ship ore to the plant in the future.

Prior to the start of mining the first ore body, it was necessary for Susquehanna-Western,
Inc., to drill 15,000 feet of exploratory holes to delineate the mining area. After this was
completed, the DRD Construction Company of San Antonio removed over 300,000 tons of
earth to reach the ore. Actual mining commenced on November 10, 1960, and is now
progressing at an average rate of 14,000 tons per month. The deposit covers 17 acres
and varies from 4 to 12 feet in thickness. The ores contain an average of 20% moisture
and are loosely cemented sandstones with a relatively high content of bentonitic-type
clays. Control drilling of the ore body continues as a guide to mining. Each sample is
carefully prepared and placed in a scaler which, in a space of minutes, totals the gamma

I Need Ore Laboratory Testing


radiation and particle emissions to give the uranium content of the sample.

A full time exploration crew is engaged in the area investigating other possible ore
deposits for mining at a later date.
I Need Consulting Engineering Help

The ore is hauled to the plant site in trucks, weighed and deposited in 300-ton stockpiles
around the ore receiving hopper. Moisture samples are taken from each lot of ore to
determine the dry weights.
The ores have an average U3O8 content of 0.22%.

Crushing and Sampling

Since the ores contain as much as 20% moisture and are characterized by varying
amounts of bentonitic- type minerals that deter thickening rates, drying and calcining at
600° to 800° F. is necessary prior to processing.

The ores are fed directly from the stockpiles by means of a rubber tired loader to the ore
receiving hopper. The hopper is fed around the clock by one front end loader operator
per shift. The hopper is discharged using a revolving roll-type grizzly feeder. The
oversize is crushed to 1½” in a traveling grate-type swing hammer mill because of the
sticky nature of the feed. When the crusher is out of service for any reason, the feeder
can be reversed and ore from a crushed ore pile delivered to the plant.

The inclined 18″ x 223′ belt conveyor that receives the crushed ore and delivers it to the
surge bin is equipped with a plow at a point about half way up the conveyor. This plow
can be positioned so that the crushed ore can be scraped off the belt into a chute that
delivers directly to a truck below. The truck piles the ore on a crushed ore stockpile to
furnish the mill requirements when the crusher is out of service.

The 25-ton surge bin in the main plant flow is equipped with a level control device that
automatically stops the initial crude ore feeder. At this point the front end loader
Checkout our Mining Process & Lab Equipment Selection CLICK HERE TO ENTER
operator has about an hour’s free time for other work or until a signal notifies him to
start crushing again.

No large fine ore storage bins are used because of the sticky nature of the ores. Ore is
drawn from the 25-ton surge bin by a 36″ wide belt conveyor that travels under the full
length of the bin. This bin and feeder are specially designed to handle this difficult ore.

As the ore falls from the feeder belt, it is cut by a Automatic Sampler equipped with a
Type “C” Dry Cutter. The inside bottom of the cutter has a 60° slope and is lined with
Teflon to prevent any ore fines from sticking to the cutter. Teflon is a plastic made from
fluorine and has practically no coefficient of friction. A cut is made every 10 minutes and
amounts to about one pound of sample per ton of ore. This sample represents the mill
feed and is dried, crushed to ¼”, split through a Jones Riffle, mixed, crushed to 10 mesh,

I Need Ore Laboratory Testing


and ground preparatory to analysis for U3O8.

Calcining and Grinding


I Need Consulting Engineering Help

The ore from the 25-ton surge bin falls through a chute into the 6′ x 50′ Standard Steel
Countercurrent Kiln. This chute is lined with Teflon at critical points.

The refractory lined kiln is normally operated at 800° F. The burner is rated at a
maximum of 18,000 cubic feet of natural gas per hour. This will deliver 18,000,000 BTU’s
per hour which is sufficient to calcine 300 tons per day of the bentonitic-type ores
containing 21% moisture. A standby gasoline engine is provided for kiln rotation in the
event of power failure. This precaution is necessary to prevent severe warpage of the
shell.

The hot dust-laden gases from the kiln pass through cyclones to remove most of the dust
and then through a wet strubbing tower. The dry dust from the cyclones are fed to the
same vibrating feeder that delivers the hot calcine from the kiln to the quench unit. The
slurry from the scrubbing tower is pumped to the same quench unit. Provision is also
made to bypass the kiln for certain ores that do not require calcining.

The quench unit consists of a 36″ x 19′-10″ Spiral Classifier tilted so that all the pulp is
discharged from the sand end of the classifier. This classifier, which has a full-flared
tank, is of modified design for handling pulp at near boiling temperature.

The discharge from the quench unit feeds directly to a 3′ x 8′ Steel Head Rod Mill
operating at 32 RPM, and equipped with a 30-HP high starting torque motor. This is a
small rod mill for a 300-ton per day plant but was selected due to the softness of the ore
and the need of reducing the ore to only grain size. The feed scoop was specially
designed for this installation as the standard feed scoop for a rod mill of this size would
not handle the high feed rate required. The trunnion bearings of the rod mill are water
cooled due to the high temperature of the pulp. A 24″ x 12″ Trommel Screen is attached
Checkout our Mining Process & Lab Equipment Selection CLICK HERE TO ENTER
to the large diameter discharge trunnion and fitted with a ¼” screen cloth to remove any
oversize or tramp material ahead of the leach system.

Leaching

The pulp from the rod mill (approximately —20 mesh) is pumped at 45% solids to four
13′ x 13′ Heavy Duty Turbine Agitators. Sulphuric acid is added in the first agitator to
produce a pH of 1.0 for dissolution of the uranium. The average leaching temperature is
140° F. which is due entirely to residual heat of the hot pulp from the calcining and
grinding circuit. The use of an oxidant is not required for extraction. Extraction is in
excess of 95% of the contained U3O8.

The agitators are equipped with 42″ diameter Turbine – Type Propellers driven by 15-HP

I Need Ore Laboratory Testing


motors. The shafts and propellers are rubber covered. All leach tanks are 4″ nominal
thickness wood stave tanks with polyethylene covered bands for protection from the acid
pulp.
I Need Consulting Engineering Help

Calcining of the ores at 800°F. prior to processing is required to dehydrate the bentonitic
clays and thus improve the settling characteristics of the ore.

Classification and Thickening

The leach pulp is pumped to a series of five 10″ cyclones and five 40′ x 10′ acid proof
Checkout our
thickeners. Mining
The Processfrom
sand fraction & Labthe
Equipment Selection are counter-currently
cyclone underflows CLICK HERE TO washed
ENTER
in each successive cyclone stage. The cyclone overflows are countercurrently washed in
the thickeners. Fresh water and raffinate (spent leach solution) from the solvent
extraction system are added to the last cyclone. This combined classification and
thickening washing circuit is illustrated on the flowsheet.

The sand underflow from the No. 5 cyclone and the thickened slime underflow from the
No. 5 Thickener are combined in an 8′ x 8′ Turbine Agitator and then pumped to the
tailings pond about 1000 feet away using a 3″ x 3″ SRL Sand Pump. The agitator is
equipped with a 24″ diameter rubber covered Turbine-Type Propeller driven by a 7½-HP
motor.

I Need Ore Laboratory Testing


I Need Consulting Engineering Help

The 3′ x 8′ Rod Mill handles 300 tons per day of Susquehanna calcined uranium ore. A
special scoop feeder was developed to handle this exceptionally high tonnage for such a
small rod mill. Feed to this unit is from a 36″ Spiral Classifier which serves as a quench
tank for the hot calcine.

Checkout our Mining Process & Lab Equipment Selection CLICK HERE TO ENTER
I Need Ore Laboratory Testing
I Need Consulting Engineering Help

Acid leaching of the —20 mesh ore takes place in four 13′ x 13′ Heavy Duty Turbine
Agitators equipped
with 42″ diameter propellers and 15 HP motors.

The acid proof Thickeners have rubber covered wetted parts with the exception of the
rake blades and feed well which are Type 316 stainless steel. The wood stave tanks are
4″ nominal thickness.

Each of the five thickeners is equipped with a 4″ Duplex Adjustable Stroke Diaphragm
Pump for removal of the thickener underflow at about 40% solids. These pumps have
rubber covered bowls and valve seats; all other wetted parts are constructed of Type 316
stainless steel.

The underflow from each thickener is repulped in separate 4′ x 5′ Heavy Duty Open Type
Agitators using 15″ diameter rubber covered Turbine-Type Propellers driven by 2-HP
motors. This repulping step breaks up all slime flocs and prevents entrainment of
Checkout our Mining Process & Lab Equipment Selection CLICK HERE TO ENTER
solution for the purpose of achieving a high washing efficiency.
Separan is added to each thickener for flocculation of the slime. Other flocculants are
also being evaluated.

Solvent Extraction Recovery System

The solvent extraction process, as applied to uranium treatment, is a liquid-liquid


method of ion exchange in which the uranium content of the acidic aqueous solution is
selectively transferred to an immiscible organic chemical solvent. The uranium depleted
aqueous solution is termed raffinate and is phase separated

I Need Ore Laboratory Testing


I Need Consulting Engineering Help

The Heavy Duty Turbine Agitators are of acid-proof construction. Shafts and propellers
are rubber covered. Wood tanks have polyethylene covered bands.

from the uranium-bearing organic due to the immiscibility of the two liquids. Following
this extraction and phase separation step, which usually consists of four or five stages,
the uranium-bearing organic solution is stripped of its uranium content using a soda ash
or acidified sodium chloride solution. This step is essentially the reverse of the extraction
circuit. The organic is then reused and the enriched uranium strip solution is precipitated
to produce the final high purity uranium yellow cake.

The overflow from the No. 1 Thickener, pregnant leach solution containing 0.6 grams
U3O8 per liter, flows by gravity to a 25′ x 10′ holding tank which is the feed for the
solvent extraction system. Feed to the solvent extraction circuit is pumped through a
Checkout our Mining
control flowmeter Process
at the & Lab
rate of 150 Equipment
GPM. Selection CLICK HERE TO ENTER
The solvent extraction system is of the latest design. It consists of two wood
compartmented extraction tanks, one 31 ‘-6″ diameter x 9′ deep with three mixer-settler
units and the other 25′-6″ diameter x 9′ deep with two mixer-settler units which provide
a total of five stages. This internal type extractor eliminates the need of expensive acid
proof piping required for individual units. Pumps or airlifts are not required. Each mixing
compartment is a special Vertical Pumping Turbine which advances 150 GPM of aqueous,
22 GPM of organic and also recirculates 150 GPM of the organic. It also provides contact
between the aqueous and organic phases in the mixer compartment. Type 316 stainless
steel is used for all wetted parts of the mixer.

The pregnant leach solution enters the No. 1 mixer and progresses through the five
stages of extraction countercurrent to the flow of organic extraction which is added to
the No. 5 mixer through a flowmeter. The raffinate flows to a rectangular-shaped

I Need Ore Laboratory Testing


scavenging tank where a small amount of organic is recovered and returned to the
circuit. A portion of the raffinate is pumped to the No. 5 cyclone in the classification
thickening section and used to supplement the addition of fresh repulping water at this
point. The raffinate, or any part of it, can be added to the plant tailing and sent to waste
I Need Consulting Engineering Help

if desired.

The organic solution used consists of 5% Alamine 336, 2.5% Isodecanol, and 92.5%
kerosene. These proportions are on a volume basis.

The pregnant organic from the No. 1 mixer of the extraction circuit contains
approximately 6 grams of U3O8 per liter and is stripped in two stages. The stripping
mixers consist of two 2′-9″ diameter x 5′ deep Vertical Turbine Mixers with Type 316
stainless steel vertical turbines driven by 1.5-HP motors. The settlers are 8’ diameter
conical bottom tanks. The first stripping agitator is P.V.C. lined, both settlers and the
second agitator is made of steel.

The stripping solution is 10% soda ash and is fed countercurrent to the pregnant organic
through a flowmeter at the rate of 2.5 GPM. Acidified sodium chloride solution is
commonly used as a stripping solution, but the more expensive soda ash solution was
chosen in this case because the ore contains small quantities of molybdenum. Soda ash
will strip both uranium and molybdenum from the organic, and, therefore, will not allow
the molybdenum to build up in the amine organic after constant recirculation in the
system. Acidified sodium chloride will recover the uranium but not the molybdenum from
solution. Excessive molybdenum will interfere in the solvent extraction if not removed.
The stripped organic is returned to the organic make-up tanks and fortified periodically
as determined by
analysis.

The preparation and handling of the organic solution and the carbonate stripping
solution is illustrated
on the flowsheet.
Checkout our Mining Process & Lab Equipment Selection CLICK HERE TO ENTER
The pregnant carbonate solution flows through a rectangular-shaped organic scavenging
tank before it
goes to precipitation to remove small quantities of

I Need Ore Laboratory Testing


I Need Consulting Engineering Help

The five-stage solvent extraction system eliminates all need for acid-proof pumps and
piping. The mixing and settling and counter-current flows of both the aqueous and
organic phases take place in the Solvent Extraction System.

organic. The organic is periodically collected from the tank and reused in the organic
system.

Precipitation and Drying

The pregnant soda ash solution after stripping contains about 40 grams of U3O8 per liter
and is fed to an 8′ x 10′ holding tank where it is heated to 130° F. The holding tank is
discharged by means of a pump and alternately feeds into two 7′ x 7′ Paddle-Type Batch
Precipitation Agitators equipped with 3-HP motors. The paddles and shaft are rubber
covered.

Checkout our Mining Process & Lab Equipment Selection CLICK HERE TO ENTER
When ore containing little molybdenum is treated the carbonate pregnant solution is
precipitated by first acidifying to a pH of 3.0 with sulphuric acid to destroy all carbonate
compounds and to drive off the CO2. The temperature is 130° F. The uranium is then
precipitated

I Need Ore Laboratory Testing


I Need Consulting Engineering Help

Thickener o’ flow from the 40′ x 10′ acid-proof Thickener (center) flows to the solvent
extraction holding tank at lower left. Thickener underflow advances counter-currently
through five stages of repulping and washing.

as a yellow sodium diuranate by adding caustic soda and raising the pH to 7.0. When ore
containing too much molybdenum is milled, sodium diuranate is precipitated by adding 3
grams per liter excess caustic soda to the carbonate solution. This last precipitate is
difficult to filter and wash but meets AEC molybdenum specifications.

The slurry containing the precipitated uranium is pumped to a plate and frame filter
press for filtration and washing for the removal of soluble impurities. Special provision is
made to catch rain water off the mill roof and to use potable water for the purpose of
washing the filtered yellow cake. The well water used for milling is so impure that it will
kill cattle if allowed to drink it. The well water cannot be used for washing the filter
Checkout our Mining
cake. Special Process
care must & Lab Equipment
be exercised at this Selection CLICK HERE TO ENTER
I Need Ore Laboratory Testing
I Need Consulting Engineering Help

Acid-proof Thickeners have rubber-covered wetted parts. Rake blades and feed well are
of Type 316 Stainless. Final thickener o’flow is sent to solvent extraction circuit. Final
thickener underflow is sent to tailings pond.

Checkout our Mining Process & Lab Equipment Selection CLICK HERE TO ENTER
Modern laboratory equipment and techniques provide efficient mill control.

point to insure that the yellow cake will meet AEC specifications.

After the yellow cake is washed, it is discharged from the filter, repulped in a 6′ x 6′
Turbine- Type Agitator equipped with a 24″ diameter propeller, and pumped at 50%
solids to the center of a 9′ diameter revolving table dryer. Gas-fired infrared heaters are
placed about 12″ above the rotating table for evaporation of four pounds of water per
square foot per hour. The dryer will evaporate about 90 pounds of water per hour and
produce about 2,100 pounds of dry yellow cake per 24 hours. The rotating table is made
of flat steel plate with a ¼” raised edge and is supplied with stationary rabbles for
moving the yellow cake from the center feed point to the peripheral discharge edge. It is
also provided with rollers which break up lumps of yellow cake to permit effective drying

I Need Ore Laboratory Testing


and to minimize lumps in the discharge. The unit is completely enclosed in a hood under
suction. Windows are placed so that the operation can be observed at any time.

The dried yellow cake falls through a rotating breaker that works all the lumps through a
I Need Consulting Engineering Help

¼” screen and then to the product hopper for packing in 55-gallon steel drums for
weighing and shipment.

Special attention was given to the dust collection facilities in the drying and packaging
part of the plant. The dust is collected in a wet-type dust collector and this product is
returned to the 25′ x 10′ solvent extraction holding tank where the yellow cake is readily
dissolved and reprocessed in the extraction circuit.

Fire Protection and Water Supply

Water is pumped from an 840 foot deep well along side the mill to a 250,000 gallon tank
at the rate of 300-GPM. The overflow from this tank supplies the mill water tank. The
250,000 gallon tank is therefore kept full at all times and is available for fire protection.
Whenever a fire water valve is opened, a 150-HP diesel engine that drives a 1500-GPM
fire pump automatically starts up. This fire water system is fully automatic. A small
jockey pump and electric motor maintains pressure in the fire system, and the automatic
fire pump starts up whenever the pressure falls below a preset pressure.

Checkout our Mining Process & Lab Equipment Selection CLICK HERE TO ENTER
Tailings are pumped by a 3″ x 3″ SRL Pump to a large earthen dam about 1000 feet from
the mill.

Electric Power and Natural Gas

The Central Power and Light Company erected a power line and installed a substation
near the mill at no cost to Susquehanna-Western, Inc.

Natural gas was available approximately 4.3 miles from the mill. Susquehanna-Western

I Need Ore Laboratory Testing


installed a 2″ pipe line to furnish the mill requirements from the 200 pound pressure
main gas line of the United Gas Pipeline Company.

Laboratory
I Need Consulting Engineering Help

In addition to the sample preparation laboratory, the company operates a plant control
laboratory for analyzing solutions by the fluorimetric method. Ore and mill pulps are
prepared at the mill but sent to another laboratory for volumetric analysis.

Office

The main office is a separate air conditioned building located near the mill. All clerical
phases of the mill are performed in this office. The foreman and shift boss offices are
located in the mill so that the entire operation can be seen from the office windows.

Conclusion

Flowmeters, pyrometers, and other technical instruments have been provided so the
plant can be operated with maximum metallurgical efficiency. Attention has been paid to
the comfort and well-being of all employees and the plant has been arranged for easy
maintenance and operation. All major equipment is serviced by overhead cranes. The
grinding, leaching, solvent extraction, and precipitation sections are covered with a roof
but much of the mill is open on the sides. The thickeners are located in the open.

Checkout our Mining Process & Lab Equipment Selection CLICK HERE TO ENTER
By David Michaud | November 22nd, 2016 | Categories: Concentrator Manuals/Procedures | Comments Off

 Previous Next 



Do you need Need
METALLURGICAL ENGINEERING
TESTING of Services or

I Need Ore Laboratory Testing


your ORE? Plant
View the Services we TROUBLESHOOTING?
Provide We can IMPROVE ALL
I Need Consulting Engineering Help

PLANTS / Mineral
Processing
Engineering &
LABORATORY Ore
Testing

Related Posts

SIGN-UP or
SIGN-IN Now!

Checkout our Mining Process & Lab Equipment Selection CLICK HERE TO ENTER
Join 6000
Metallurgists

I Need Ore Laboratory Testing


I Need Consulting Engineering Help

SEARCH
911METALLURGIST

Custom Search

Checkout our Mining Process & Lab Equipment Selection CLICK HERE TO ENTER
Copyright 2012-2017 911Metallurgist | All Rights Reserved

I Need Ore Laboratory Testing


About us | Privacy | Contact Us

18
SHARES
 Linkedin  Google  Facebook  Twitter  Vk  Print
I Need Consulting Engineering Help

Checkout our Mining Process & Lab Equipment Selection CLICK HERE TO ENTER

Вам также может понравиться