Polychem Ltd.
Corporate Office : M-3, Kanchan House, Mezzanine Floor, Karampura, New Delhi-110015
Telefax # : +91-11-45756853, 25453011 Website : E-Mail : info@malikpolychem.in
Quality Check
Report With
Test Certificates
Harvinder Singh
General Manager
( Project & Equipments)
PRODUCTION (Q.C.DEPARTMENT)
S.N.SHRIVASTAV IMRAN KHAN
5. FLANGE DETAIL
8
8. WARRENTY CERTIFICATE.
11
REMARKS
(PRODUCTION) (Q.C.DEPARTMENT)
S.N.SHRIVASTAV IMRAN KHAN
12
PRODUCTION (Q.C.DEPARTMENT)
S.N.SHRIVASTAV IMRAN KHAN
RUNNING TRIAL CARRIED OUT WITH FULL OF OR 80% WATER LEVEL,AND FOUND AS UNDER.
THIS IS TO CERTIFY THAT THIS ITEM HAS BEEN MANUFACTUREDAND SATISFACTORILY TESTED AT OUR
WORKS AS DETAILED BELOW UNDER INSPECTION OF M/S INDOGULF CROP SCIENCE LTD.
FLANGE T.C
ALL DIMENSIONS IN M.M.
(PRODUCTION) (Q.C.DEPARTMENT)
S.N.SHRIVASTAV IMRAN KHAN
(PRODUCTION) (Q.C.DEPARTMENT)
S.N.SHRIVASTAV IMRAN KHAN
(PRODUCTION) (Q.C.DEPARTMENT)
S.N.SHRIVASTAV IMRAN KHAN
WARRANTY CERTIFICATE
ITEM DESCRIPTION
Item REACTOR M.O.C S.S-316 Capacity 6.5 KL
Party Tag No Job Code R-0294
We hereby certify that the items supplied by us as per above reference and description is warranted for a
period of twelve (12) months from the date of dispatch of material against defective materials and bad
workmanship and if it shows any sign of defects we shall replace / rectify it free of cost against such items, -
provided,
The goods under dispute are returned carriage paid to our works within reasonable time, but not beyond
twelve months.
This Guarantee does not hold of repairs or replacements are made difficult by arbitrary attempts at your
end. Any modification carried out by you within the guarantee period will relieve us of the guarantee
obligation.
Harvinder Singh
General Manager
( Project & Equipments)