MEMORIAL VOUCHER
PT. RANTE MUTIARA INSANI NO. VOUCHER M-ABC0001
:
MEMORIAL VOUCHER DATE 01.02.12
:

NO. DESCRIPTION ACCOUNT DEBET KREDIT

1 AR. PT ABC 10.500.000


AR. PT ABC / PPh 23 500.000
Over Bourden 3.000.000
Coal Hauling 5.000.000
Coal Getting 2.000.000
PPN Out 1.000.000
001/INV/RMI-ABC/I/2012 Periode : January-12

TOTAL 11.000.000 11.000.000

PROPOSED BY CHECKED BY APPROVED BY INPUT BY

PT. RANTE MUTIARA INSANI NO. VOUCHER M-ABC0002


:
MEMORIAL VOUCHER DATE 01.02.12
:

NO. DESCRIPTION ACCOUNT DEBET KREDIT

1 AR. PT ABC 15.750.000


AR. PT ABC / PPh 23 750.000
Rental Unit Komatsu D85 15.000.000
PPN Out 1.500.000
002/INV/RMI-ABC/I/2012 Periode : January-12

TOTAL 16.500.000 16.500.000

PROPOSED BY CHECKED BY APPROVED BY INPUT BY

PT. RANTE MUTIARA INSANI NO. VOUCHER M-ABC0003


:
MEMORIAL VOUCHER DATE 01.02.12
:

NO. DESCRIPTION ACCOUNT DEBET KREDIT

1 AR. PT ABC 21.000.000


AR. PT ABC / PPh 23 1.000.000
Pembuatan Bundwall, Parking Bay 20.000.000
PPN Out 2.000.000
003/INV/RMI-ABC/I/2012 Periode : January-12

TOTAL 22.000.000 22.000.000

PROPOSED BY CHECKED BY APPROVED BY INPUT BY

44
BANK VOUCHER

PT. RANTE MUTIARA INSANI NO. VOUCHER : B01-0001


BANK VOUCHER DATE : 15.03.12

-
NO. DESCRIPTION ACCOUNT DEBET KREDIT

1 Bank Sendiri Tanjung 49.500.000


AR. PT ABC
001/INV/RMI-ABC/I/2012 11.000.000
002/INV/RMI-ABC/I/2012 16.500.000
003/INV/RMI-ABC/I/2012 22.000.000
TOTAL 49.500.000 49.500.000

45
Lampiran 2
Format Laporan Laba Rugi PT. RMI

PT. RANTE MUTIARA INSANI


LABA RUGI
Periode 31 Desember 20X1
Nilai Nilai
% %
(Bulan Berjalan) (Kumulatif)
Pendapatan
Jasa Pertambangan xxxx xxxx
Pendapatan Proyek xxxx xxxx
Pendapatan Rental xxxx xxxx
Total Pendapatan xxxx xxxx

Biaya Operasional Proyek


Biaya Operasional Proyek
Beban Operasional Langsung xxxx xxxx
Total Biaya Operasional Proyek xxxx xxxx
Laba / Rugi OperasionalProyek
Total Biaya Operasional xxxx xxxx

Biaya Operasional Umum


Beban Usaha
Biaya Operasional Umum xxxx xxxx
Total Biaya Operasional Umum xxxx xxxx
Laba / Rugi Operasional xxxx xxxx

Pendapatan dan Beban Lain – lain


Pendapatan dan Beban Lain - lain
Pendapatan Bunga xxxx xxxx
Pendapatan Lain – lain xxxx xxxx
Laba Selisih Kurs xxxx xxxx
Rugi Selisih Kurs (xxxx) (xxxx)
Beban Bunga (xxxx) (xxxx)
Biaya Lain – lain (xxxx) (xxxx)
Total Pendapatan dan Beban Lain - lain xxxx xxxx

Laba Rugi Sebelum Pajak xxxx xxxx

Biaya Pajak
Biaya Pajak
Biaya Pajak (PPH 29) xxxx xxxx
Total Biaya Pajak xxxx xxxx

Laba Rugi Bersih xxxx xxxx


46
Lampiran 3
PT RANTE MUTIARA INSANI
General Contractor & Supplier
rmi
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
Contoh Matrik Harga Produksi
TABEL 1 : OB RATES FOR MONTHLY PRODUCTION (US $)
HORIZONTAL DISTANCE (M)
500 1.000 1.500 2.000 2.500 3.000 3.500
0 1,00 1,10 1,20 1,30 1,40 1,50 1,60
10 1,02 1,12 1,22 1,32 1,42 1,52 1,62
VERTICAL DISTANCE (M)

20 1,04 1,14 1,24 1,34 1,44 1,54 1,64


30 1,06 1,16 1,26 1,36 1,46 1,56 1,66
40 1,08 1,18 1,28 1,38 1,48 1,58 1,68
50 1,20 1,30 1,40 1,50 1,60 1,70
60 1,22 1,32 1,42 1,52 1,62 1,72
70 1,34 1,44 1,54 1,64 1,74
80 1,36 1,46 1,56 1,66 1,76
90 1,38 1,48 1,58 1,68 1,78
100 1,40 1,50 1,60 1,70 1,80

47
Lampiran 4
PT RANTE MUTIARA INSANI
General Contractor & Supplier
rmi
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
Paringin, 9 Februari 2012
Nomor : 001/INV/RMI-ABC/II/12 CONTOH
Lampirann : 1. Invoice
2. Kwitansi
3. Faktur Pajak
Perihal : Permintaan Pembayaran
Overburden, Coal Mining dan Coal Hauling to Kelanis

Kepada Yth,
PT. ABC Indonesia
Jalan Patimura, Blok 5, Kav 1-2
Salatiga, Indonesia.

Dengan hormat,
Bersama dengan ini kami sampaikan bahwa pekerjaan untuk bulan Januari 2012
telah selesai kami kerjakan.
Maka dengan ini kami mengajukan permintaan pembayaran sebesar :

Terbilang : Dua puluh dua milyar sembilan ratus lima puluh lima juta dua ratus
delapan puluh empat ribu dua ratus tujuh puluh lima rupiah

Mohon supaya ditransfer ke rekening kami A/C No. 031.009.653.0038 pada Bank
Sendiri Cabang Tanjung A/N PT. Rante Mutiara Insani.
Demikian dari kami, atas perhatian dan persetujuan dari Bapak kami ucapkan
terima kasih.

Hormat kami,
PT. Rante Mutiara Insani
Guno Gumilang

Operation Manager
48
Lampiran 5
PT RANTE MUTIARA INSANI
General Contractor & Supplier
rmi
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747

Invoice : 001/INV/RMI-ABC/II/12
CONTOH
PRODUCTION PAYMENT SUMMARY
Period : Januari 2012
No Description Amount IDR
A PARINGIN PIT
1 Overburden
((300,000 BCM x $ 1,00 ) + ( 200,000 BCM x $ 1,50)) x Rp.
9.500 2.850.300.000

2 Coal Mining
1000 TON x $ 1,25 x Rp. 9.500 11.875.000

3 Coal Hauling
((1000 TON x $0 ,50 ) + ( $ 0,40 x 1000 TON x 5.000 KM)) x
Rp. 9.500 19.000.000.500

SUBTOTAL 21.862.175.500
PPN 5% 1.093.108.775
TOTAL 22.955.284.275

Tanjung, 9 Februari 2012


PT. ABC INDONESIA PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Approved By, Approved By, Approved By,

SURYONO MUSLIH GUNO GUMILANG


General Operation Manager Deputy GM. Strategic Planing Operation Manager

49
Lampiran 6
PT RANTE MUTIARA INSANI
General Contractor & Supplier
rmi
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747

KWITANSI

Sudah terima dari : PT. ABC INDONESIA CONTOH

Banyaknya uang : Dua puluh dua milyar sembilan ratus lima puluh lima juta
dua ratus delapan puluh empat ribu dua ratus tujuh puluh
lima rupiah

Untuk pembayaran : Pekerjaan Overburden, Coal Mining, dan Coal Hauling


bulan Februari 2012.

Rp. Tanjung, 9 Februari 2012


22.955.284.275
PT. Rante Mutiara Insani

Guno Gumilang
Operation Manager

50
Lampiran 7
PT RANTE MUTIARA INSANI
General Contractor & Supplier
rmi
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747

Invoice : 001/INV/RMI-ABC/II/12
CONTOH
MINING SUMMARY SHEET
Period : Januari 2012
Quantity
No Description
This Month Year to Date
A. PARINGIN PIT
1 Overburden Removal (BCM) 30,000 150,000
Paringin Mine
Transport Distance (m) 200,000 500,000
Vertical Distance (m) 1,500
45,00
2 Coal Mining(Ton) 1,000 45,000
Transport Distance (m) 3,000
Vertical Distance (m) 55,00

3 Coal Hauling(Ton) 1,000 3,000


Paringin Mine 1,000
Transport Distance (km) 5,000

PT. ABC INDONESIA PT. RANTE MUTIARA INSANI


Checked By, Checked By,

MUSLIH GUNO GUMILANG


Deputy GM. Strategic Planing Operation Manager
Date : Date :

51
Lampiran 8
REKAPITULASI BIAYA PEKERJAAN
MINE INFRASTRUCTURE DEPARTMENT

Uraian Pekerjaan : Capex


Cost Code : 178.20.15 CONTOH
Periode : 26 Januari s/d 25 Februari 2012
Nama Kontraktor : PT. Rante Mutiara Insani

Harga Satuan Jumlah Biaya


No. Uraian Pekerjaan Volume Satuan Keterangan
(Rp) (Rp)

1 Haul Road Wara to North Tutupan


Compactor C150 150 jam 100.000 15.000.000
Excavator CAT 330 50 jam 50.000 2.500.000
Sub Total I 17.500.000

2 Haul Road HW Construction


Compactor C150 55 jam 100.000 5.500.000
Dump Truck CWB 340 35 jam 25.000 875.000
Sub Total II 6.375.000

3 Public Road Highwall Relocation


Compactor C150 25 jam 100.000 2.500.000
Backhoe JCB/MF 02 45 jam 35.000 1.575.000
Sub Total III 4.075.000
SUB TOTAL 27.950.000
PPn 5% 1.397.500
TOTAL 29.347.500

Supplied by, Approved by,


PT. Rante Mutiara Insani PT. ABC Indonesia

Guno Gumilang Hendra


Operation Manager Mine Civilwork Superintendent

52
Lampiran 9

Monthly Equipment Time Sheet


CONTOH
Periode : 01 – 31 Januari 2012
PT. Rante Mutiara Insani
Job Site : PT. ABC Indonesia Equipment No : XE 100 S
Unit Produksi : Kobelco SK 330 Serial No :-
Contract No : 001/ABC/K/MAT/I/2012

Salatiga, 1 Februari 2012


Dibuat Oleh, Disetujui Oleh, Disetujui Oleh,
PT. Rante Mutiara Insani PT. ABC Indonesia PT. ABC Indonesia

Guno Gumilang Putra Atma


Operation Manager Coal Transport Section Head Enginering Manager

53
Lampiran 10
PT RANTE MUTIARA INSANI
General Contractor & Supplier
rmi
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747

CONTOH
BERITA ACARA PRODUKSI
No: 001/BAP/RMI-ABC/I/12
Period : Januari 2012
Contact No : 001/ABC/K/MAT/I/2012
Total Price/WH Ammount
No Description WH (USD) (USD)

1 Excavator Kobelco EX 100 s 50,00 20,00 1,000


Sub Total 1,000
PPN 10% 100
Grand Total 1,100

Salatiga, 1 Februari 2012


PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Approved By, Prepared By,

SAPTO GUNO GUMILANG


Production Manager Operation Manager

54
Lampiran 11

CONTOH

55
Lampiran 12

BERITA ACARA JOINT SURVEY


PT. ABC INDONESIA
DENGAN
PT. RANTE MUTIARA INSANI
PROGRESS : JANUARI 2012

CONTOH
Pada hari ini, Senin tanggal 1 bulan Februari tahun 2012. Telah dilaksanakan
penandatanganan berita acara joint survey over burden removal dengan penjelasan
sebagai berikut :

- Berdasarkan : Perjanjian jasa penambangan batubara tanggal


1 januari 2008 antara PT. ABC Indonesia
dengan PT. Rante Mutiara Insani
- Progress pekerjaan : Januari 2012
- Pelaksanaan joint survey : 31 Januari 2012
- Volume OB removal : 100,000.00 bcm
- Jarak angkut OB : 1000 m
- Volume coal getting : 10,000 ton
- Jarak angkut batubara : 8.000 km

Terlampir peta progress dan data pendukung lainnya.

Demikian berita acara ini dibuat dengan sesungguhnya untuk dapat dipergunakan
sebagaimana perlunya.

PT. Rante Mutiara Insani PT. ABC Indonesia

Muchlis Abduloh Susilo Husodo


Deputy Operation Manager Prod. Eng. Section Head

Mengetahui,

Sandoro Adi Prakoso


Operation Manager

56
Lampiran 13
PT RANTE MUTIARA INSANI
General Contractor & Supplier
rmi
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747

Invoice : 001/INV/RMI/ABC/MINING/I/2012
SARAN
PRODUCTION PAYMENT SUMMARY
Period : Januari 2012
No Job Description Volume Unit Rate Total
Sudirman PIT (Rp) (Rp)
1 Over Burden 100 Ton 100.000 10.000.000

2 Coal Mining 500 Ton 150.000 75.000.000

3 Coal Hauling 100 Ton 50.000 5.000.000

Transportation 5000 Ton/Km 10.000 50.000.000


(100 Ton x 50Km )

SUBTOTAL 140.000.000
PPN 5% 7.000.000
GRAND TOTAL 147.000.000

Tanjung, 9 Februari 2012


PT. ABC INDONESIA PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Approved By, Approved By, Approved By,

SURYONO MUSLIH GUNO GUMILANG


General Operation Manager Deputy GM. Strategic Planing Operation Manager
57
Lampiran 14
PT RANTE MUTIARA INSANI
General Contractor & Supplier
rmi
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747

Invoice : 001/INV/RMI/ABC/CONST/I/2012
SARAN
Working Summary Sheet
Period : Januari 2012
No Job Description Volume Unit Rate Total
Sudirman PIT (Rp) (Rp)
1 Perbaikan jalan 20 Km 100.000 2.000.000
menuju lokasi
tambang Sudirman
PIT
2 Pembuatan Kolam 5000 M3 50.000 250.000.000
Penampungan air

SUBTOTAL 252.000.000
PPN 5% 12.600.000
GRAND TOTAL 264.600.000

Tanjung, 9 Februari 2012


PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Supplied By, Approved By,

SURYONO GUNO GUMILANG


Mine Civilwork Superintenden Operation Manager

58
Lampiran 15
PT RANTE MUTIARA INSANI
General Contractor & Supplier
rmi
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747

SARAN
PRODUCTION SUMMARY
No: 001/BAP/RMI/ABC/RENT/I/2012

Working Period : Januari 2012


Contract Number :-
Invoice Number : 001/INV/RMI/ABC/RENT/I/2012
Total Price/WH Total
No Unit Used WH (Rp) (Rp)

1 Excavator Kobelco EX 100 s 50,00 100.000 5.000.000


Sub Total 5.000.000
PPN 10% 500.000
Grand Total 5.500.000

Salatiga, 1 Februari 2012


PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Approved By, Prepared By,

SAPTO GUNO GUMILANG


Production Manager Operation Manager

59
Lampiran 16

60
Lampiran 17

DAFTAR RIWAYAT HIDUP

Nama Lengkap : Mahatma Hendranata Saputra


Jenis Kelamin : Laki-laki
Tempat/Tanggal Lahir : Boyolali, 19 Januari 1990
Agama : Kristen
Alamat Domisili : Jalan Perintis Kemerdekaan, Bangunharjo,
RT 07 RW II, Bangunharjo, Pulisen,
Boyolali
Status : Belum Kawin
Telp. : 085643747539
Email : mahatma_hs@yahoo.com
Nama Orang Tua
Nama Ayah : Hendratmoko
Nama Ibu : Sri Rahayuningsih

INFORMASI PENDIDIKAN

Pendidikan Nama Institusi Kota Tahun Lulus Jurusan

SD SD Pulisen Boyolali 2002


SMP SMP Negeri 1 Boyolali 2005
SMA SMA Negeri 1 Boyolali 2008 IPS
S1 Universitas Kristen Salatiga 2012 Akuntansi
Satya Wacana

PENGALAMAN PRIBADI

Pengalaman Keterangan Tahun


Sertifikasi 1. Brevet Pajak A & B Fakultas 2012
Ekonomika dan Bisnis UKSW.

61
Pengalaman Organisasi 1. Divisi Eksternal Himpunan 2009
Mahasiswa Program Studi Kelompok
Studi Akuntansi – Senat Mahasiswa
Fakultas Ekonomika dan Bisnis
2. Divisi Internal Himpunan Mahasiswa 2010
Program Studi Kelompok Studi
Akuntansi – Senat Mahasiswa
Fakultas Ekonomika dan Bisnis.

Pengalaman Kerja 1. Asisten Dosen Aplikasi Spreadsheet 2011


Fakultas Ekonomika dan Bisnis
UKSW
2. Asisten Dosen Aplikasi Spreadsheet 2012
dan Pengantar Akuntansi Fakultas
Ekonomika dan Bisnis UKSW
Kepanitiaan 1. Panitia Accounting Fair “Globalisasi 2009
Akuntansi dan Penguatan Usaha
Kecil Menengah di Indonesia”
2. Panitia Seminar Nasional “Kode Etik 2009
Profesi Akuntan Publik”
3. Sekretaris National Seminar on 2010
Accounting “Peran Akuntansi Dalam
Pemberantasan Korupsi”
4. Ketua National Seminar on 2011
Accounting “ Penyusunan Laporan
Keuangan Berbasis SAK 2010”
5. Ketua National Seminar on 2011
Accounting “ Penyusunan Laporan
Keuangan Berbasis SAK ETAP”
6. Panitia Makrab Ekonomi, “Economic 2011
Goes To The World”.

62
Seminar dan Pelatihan 1. Golden 2008 ( Program Pengenalan 2008
Fakultas )
2. Talk Show Fakultas Ekonomika dan 2008
Bisnis
3. Latihan Kepemimpinan Pra Dasar 2008
Mahasiswa
4. Seminar Kerohanian “Keluargaku, 2009
Penting nggak sih?”
5. Accounting Weekend Fellowship 2009
2008 ( Pengenalan Program Studi dan
Keakraban Mahasiswa Program
Studi)
6. Kegiatan Pelestarian Budaya Melalui 2010
“NOANCEP”
7. Kuliah Umum “Asuransi Sebagai 2010
Pilihan Investasi”
8. Kegiatan Basic Leadership Training 2010
“Prepare Future Leaders In Creative
and Innovative”
9. Seminar Nasional Kewirausahaan 2011
“Great Man Have a Great Mind”
10. Sosialisasi Undang – Undang No. 21 2012
Tahun 2011 Tentang Otoritas Jasa
Keuangan
Keterampilan 1. Konser Kursus Ke – 13 Fakultas Seni 2010
Penunjang Pertunjukan UKSW
2. Konser Kursus Fakultas Seni 2012
Pertunjukan UKSW “Brighten Your
Day With Music”

63

Вам также может понравиться