Вы находитесь на странице: 1из 3

Sr.

Engineer’s comments Contractor’s reply to Engineer’s Engineer’s response


No submitted vide letter no. comments submitted vide letter
CRE/KTDP/BU/017/148 no. 607/Gen/KTMD/QS-513
dated: dated:
Data Sheet
1. The range of opening time is
mentioned as 90-150 sec
whereas in your technical
specificewfeation the same is
mentioned as 60-90 sec.
Clarification is required in this
regard.
2. It is stated that plunger
pumps will be used in the
hydraulic power pack. Please
note that this type of pump is
not acceptablewffw either use
rotary or screw type of
pumps.
3. The details of air valve, and
bypass valves including
hydraulic needle valve and
manual valve afwfwre
missing. Provide the same
along with f and supporting
documents of their
manufacturers.

4. The manufacturer for


hydraulic power unit (HPU) is
missing. Please confirm if it
will be manwfewfufactured by
China Valves Technology
(Changsha) Co. Ltd.

5. The manufacturer for


6. Specify the mass of counter
weight.

7. Specify the material of oil


piping.ergr
Calculations
8. The stress analysis of the
inlet valve through finite
element analysis is missing in
the calculations. Provide the
same. Also providrere
structural calculations of
upstream and downstream
extension pipes of the inlet
valve.

9. The ITP does not truly


represent the stipulations of
Clause 7-33, Vol-28 of the
Contract Documents. Please
note that shop assembly and
tests shall be made and
witnessed according to the
stipulations of thggrgere
above mentioned clause. You
are advised to revise the ITP
accordingly and resubmit.
Also note that no paint will be
applied on valve &
servomotor parts which are
required to be pressure
tested (hydraulic test) in shop
as specified egrin the above
Clause 7-33.
Drawings
10. It is observed that no
drawings of hydraulic power
unit (HPU) are provided 1n
the submittakjhjhk,l which
needs to be furnished by you.
11. The material of piston rod is
mentioned as 45#. Please
note that as per the Contract,
only forged steel with chrome
plating will be used. Please
confirm.
12. The upstream extension
section does not show the
pressure taps. As per the
requirement of Clause 7 -
28(c), Voi-2B of the Contract
Documents you are required
to provide four pressure taps
of stainless steel equally
spaced around the upstream
extension on diameters at 45
degree for net head
measurements and for
connections to a pressure
gauge to be mounted on the
control cabinet. All required
piezometer piping, manifolds,
and fittings shall be furnished.

13.