Engineer’s comments Contractor’s reply to Engineer’s Engineer’s response
No submitted vide letter no. comments submitted vide letter CRE/KTDP/BU/017/148 no. 607/Gen/KTMD/QS-513 dated: dated: Data Sheet 1. The range of opening time is mentioned as 90-150 sec whereas in your technical specificewfeation the same is mentioned as 60-90 sec. Clarification is required in this regard. 2. It is stated that plunger pumps will be used in the hydraulic power pack. Please note that this type of pump is not acceptablewffw either use rotary or screw type of pumps. 3. The details of air valve, and bypass valves including hydraulic needle valve and manual valve afwfwre missing. Provide the same along with f and supporting documents of their manufacturers.
4. The manufacturer for
hydraulic power unit (HPU) is missing. Please confirm if it will be manwfewfufactured by China Valves Technology (Changsha) Co. Ltd.
5. The manufacturer for
6. Specify the mass of counter weight.
7. Specify the material of oil
piping.ergr Calculations 8. The stress analysis of the inlet valve through finite element analysis is missing in the calculations. Provide the same. Also providrere structural calculations of upstream and downstream extension pipes of the inlet valve.
9. The ITP does not truly
represent the stipulations of Clause 7-33, Vol-28 of the Contract Documents. Please note that shop assembly and tests shall be made and witnessed according to the stipulations of thggrgere above mentioned clause. You are advised to revise the ITP accordingly and resubmit. Also note that no paint will be applied on valve & servomotor parts which are required to be pressure tested (hydraulic test) in shop as specified egrin the above Clause 7-33. Drawings 10. It is observed that no drawings of hydraulic power unit (HPU) are provided 1n the submittakjhjhk,l which needs to be furnished by you. 11. The material of piston rod is mentioned as 45#. Please note that as per the Contract, only forged steel with chrome plating will be used. Please confirm. 12. The upstream extension section does not show the pressure taps. As per the requirement of Clause 7 - 28(c), Voi-2B of the Contract Documents you are required to provide four pressure taps of stainless steel equally spaced around the upstream extension on diameters at 45 degree for net head measurements and for connections to a pressure gauge to be mounted on the control cabinet. All required piezometer piping, manifolds, and fittings shall be furnished.