1.1 Design 50
1.1.1 Imoca 60 Design Acquired 50
1.1.2 Design Adjusted 0
1.1.3 Final Design Completed 0
Manufacturing 320
1.2 Materials Decided 0
1.2.1 Materials Procured 300
1.2.2 Frames Completed 20
1.2.3 Hull and Deck laminated 0
1.2.4 Cosmetics (Sanded & Painted) 0
1.5 Testing
1.5.1 Electronics tested 0
1.5.2 Rig tested 0
1.5.3 Pool trial 0
1.5.4 Sea Trial 0
Total Costs 870