Rationalizing Mincom Model
M 2010
May
2. Click New.
3. Type
yp the name of the p
project,
j , for example
p PROJECT_MINEX and then click OK.
Creating a New Borehole Database
Borehole Database Variables
KEY
Short term Planning
Main modules
4
Minex Data Load Process
1 3 2
Check
Ch k output
t t reportt
Do values look sensible
Minex Data Load Process
Proceed OK
Minex Data Load Process
Langkah-Langkah Persiapan
1. Import mincom model
2. Copy borehole db dan edit seam sequence
3. Buat grid topo progress
• Import dxf to gm3
• Buat boundary topo (jika belum ada)
• Ti
Triangulasi
l i ttopo
• Convert triangulasi topo to grid
• Gabungkan grid topo progress dengan topo periode sebelumnya
4
4. Cek hasil import model dengan cross section
5. Buat seam thickness grid menggunakan menu Seam Model
Operation – Arithmetic
Langkah-Langkah Persiapan
5. Membuang nilai null dari grid seam thickness dengan SQL – cek
dengan report. Seam Model – Seam Model Operation - SQL
6
6. Rename Quality Grid menggunakan SQL
SQL.
Seam Model – Seam Model Operation - SQL
7. Rename parting grid
8. Copy UNCUT.GRD folder menjadi UNCUT_EDIT.GRD
9. Mengurangi seam thickness dengan ketebalan parting
menggunakan
gg SQL.
Q
Seam Model – Seam Model Operation – SQL
10. Membuat kembali seam roof dengan menggunakan arithmetic
S
Seam Model
M d lOOperation
ti – Arithmetic
A ith ti
11. Membuat model Merged
• Pit Design – Create Merged Model, definisikan TOPO, WEATH dan urutan
merged buat ST and IB
merged,
none of the merged grids have empty spaces (that is, null values) in
them that would cause errors when Minex performs mathematical
operations on the grids.
A
An alternative
lt ti technique
t h i — one that
th t you could
ld use ffor gently-dipping
tl di i
seams — is to merge grids up to a TOPCOAL grid.
1 3 2
Proceed OK
Minex Data Load Process