Вы находитесь на странице: 1из 1

Visual Art Linear Perspective Unit □ Friday – Finish measured block

letters. Also, see directions for


1st, 2nd, 5th, 7th P e r i o d s Friday, 1-11-19.
J a n u a r y 7 – F e b r u a r y 15, 2019
Week 4, 1-28 to 2-1-19: Two-point
Week 1, 1-7 to 1-11-19: Line Work in Interconnecting Textured Boxes
One-Point Perspective
□ Monday – Make sure to finish 5 two-
□ Monday – buildings by the road point boxes above and below the
horizon line, including shading.
□ Tuesday – house by the road
□ Tuesday – Draw interconnecting and
□ Wednesday – 5 one-point boxes above overlapping textured boxes.
and below the horizon line
□ Wednesday – Continue drawing
□ Thursday – shade two sides of each interconnecting and overlapping
of the boxes drawn yesterday; one side textured boxes.
(same side for every box) in light
shading and another one (but the same □ Thursday – Continue drawing
side in every box) in medium shading. interconnecting and overlapping
textured boxes.
□ Friday – prepare assignments for
grading; all lines must be made with □ Friday – Finish textured boxes.
the ruler; all lines must touch either Also, see directions for Fri, 1-11-19.
the vanishing point or be registered
Week 5, 2-4 to 2-8-19: One-point
on the sides of the paper; assignments
Perspective Imaginative Drawings
must be neat and clean
□ Monday – earth opening up drawing
Week 2, 1-14 to 1-18-19: Line Work in
Two-Point Perspective □ Tuesday – Continue earth opening up.
□ Monday – 5 two-point boxes above and □ Wednesday – bird’s eye city scape
below the horizon line; shade sides
light and medium □ Thursday – Continue city scape.

□ Tuesday – two-point fishing cottage □ Friday – Finish this week’s


assignments and see directions for
□ Wednesday/Early Release – Finish Friday, 1-11-19.
two-point fishing cottage.
Week 6, 2-11 to 2-15-19: Adding Color
□ Thursday – two-point city scape to Perspective Drawings
□ Friday – Finish two-point city □ Monday – Draw bridge with landscape
scape. Also, see directions for onto 6x9-inch watercolor paper.
Friday, 1-11-19.
□ Tuesday – Add ink wash to bridge
Week 3, 1-22 to 1-25-19: Shading and with landscape drawing.
Block Lettering
□ Wednesday – Add layer one of
□ Monday – MLK Holiday watercolor to bridge with landscape
underpainting.
□ Tuesday – Complete spheres and
geometric forms shading handouts. □ Thursday – Add layer two of
watercolor to bridge with landscape
□ Wednesday – Complete spheres and
underpainting.
geometric forms shading handouts.
□ Friday – Finish this week’s
□ Thursday – measured block letters,
assignments and see directions for
“AHS” and student names in one-point
Friday, 1-11-19.
perspective

Вам также может понравиться