Вы находитесь на странице: 1из 11

CURRICULUM VITAE

NAME SHIRSENDU DAS


Nationality INDIAN
Contact Details +91 7905918685 ;dasshirsendu1@gmail.com;
+918826055772

QUALIFICATIONS

CAREER SUMMARY
An accomplished Electrical Engineer in Project Execution, Project Management with wide range
operational experience in different phases of execution with operational warranties in the field of
Oil&Gas on-shore and off-shore Projects. As a Senior Electrical Engineer worked closely for
handling managerial responsibilities for material finalising and Execution of work.With a total of
12+ years work experience in the field of electrical engineering in the construction and Maintenance
of Oil and Gas projects industrial buildings, involving in the implementation, inspection,
monitoring and supervision work.Being furnished with good knowledge and experience in
Constructing and Commissioning and Maintenance of indoor and outdoor substations involving LV,
MV and HV system with installation of Controlling systems of electrical equipments and electrical
Machine including Testing and Commissioning completed varios projects in India and Gulf
countries.

1. Resposible for Errection of electrical equipments, supervision of errection work at site.

2. Responsible for the Preparation, Planning,Precommissioning, Commissioning Schedule,


Detailed Commissioning Procedure and Commissioning of the Project.

3. Coordinating with drafts man for preparation of shop floor drawings,and material
mangement.

4. Prepare the Method statement of Maintenance work.

5. Conversant in preparation and review of SLDs, Electrical Load list, Block diagrams,
Equipment Data sheets, Cable sizing Calculations.

6. Conversant with electrical deliverables electrical equipment layout, eaarthing and lightning
protection, lighting, cable tray layout.

7. Preparation of work method statements with Detailed testing and Commissioning Procedures
for Electrical equipments like Power and Distribution transformers, Switchgears, MCCBs,
Motor feeders, OLRs, Induction motors, pumps, Cables, Trasformer Oils, CTs, PTs
Generators, Ductor test, Charging and Discharging test of Battery banks, Load test of
generators, Power sockets, lighting Circuit test, Hi-pots of Busbars and Cables, Lux level
checks.
8. Assisted to prepare database afetr precommissioning test and also to submit technical report
on Data base after final commissioning of the project.

Page 1 of 11
9. Manage and Coordinate site activities as per the contractual scope.

10. Inspection of materials, cable, panels,equipments and instruments and to hold regular site
meetings with client to update progress.

11. Plan,Monitor and supervises the maintenance activities of plants.

12. Plan, Monitor and Assist in Vendor activities as required.

13. Hold regular site meetings regarding saftey measure regarding electrical Hazards.

14. Carry out site engineering and supervision of all electrical works carried out by contractors.
Including providing direction to contractors for site installation, resolution of site engineering
issues as well as ensuring that all works are carried out all necessary QA/QC checks.

15. Verification on site the completed and inspected works against the progress report submitted by
contractor.

16. Oversees the daily construction activities at work site, including scheduling of work force and
progress of the project.

17. Monitoring and verification of contractor activities if they are complying with contract and
adhering to project specifications and standards.

18. Witness FAT

19. Supervise the resources at the site. Supervise the sub contractors at site.

20. Making the High voltage cable schedule.

21. Supervises the MV and High Voltage plant cable laying 6.9kV,11kV,33kV cable termination, cable
joints.

22. Perform the Cable megger, and Hi-pot test.

23. Finding the cable faults with fault locator.

24. Performing the Installation of cable trays, Equipments, distribution boards, Instrument devices,
junction boxes in the field.

25. Tested the Instruments control loops.

26. Integrated complex control system, Communication system and flow measurement system,
Temperature, pressure measurement system.

27. Participated in commissioning and startup of steam boiler, compressors, centrifuge, cooling tower,
water treatment system.
28. Sending the daily progress report.
29. Approve the redline markup drawing.
30. Can Read Electrical schematics, SLDs, Control schemes protection schemes, prepare
protection settings.
31. Prepared measurements and billing to subcontractors.
Commissioning:
1. Implement & test the subsystems as per project commissioning test sheets.
2. Applying for work permits, PTW, LOA, Tag in, Tag out.
3. Perform checks for the Electrical activities.
4. Actively involves in shutdown activities.
5. Planning the Vendor activies for Testing.

Page 2 of 11
6. Witness the test filling the test sheets/ check sheets.
7. Prepare request for inspection RFI.
Hands on experience in

1. 20 MVA 33kV, 2MVA 6.6kV Transformer test.


2. ACB, VCB, and SF6 6.6 Kv , 415 V Circuit Breaker Insulation Test, Contact Resistance test.
3. MCCBs short circuit trip test, fault current trip test.
4. Motor winding Insulation Resistance test, Verification of protection relay set points, motor
5. Rotation check, start and stop push button check, motor feeder check, settings of
6. Motor overload relay check, Motor winding resistance test, Motor temperature rise test,
7. Vibration test, Motor Energisation test No load run test, full load run test.
8. Load test of Battery Banks 40 Ah to 700 Ah and Generators.
9. Ductor test of busbar joints in panels.
10. Hi-Pot test of Cables, and Busbars upto 33kV
11. Power Sockets, Lighting circuits Test.
12. Hands on experience in Transformer Oil Filtration at site, Trip Current settings of MCCBs
13. Overload relays. Control circuit test of MV and LV panels.
14. Plan and Monitor Vendor Activities, Assisting the vendor in carrying the test
15. filling the test report submitting to the client .
16. Witnessing the testing and calibration of meters.
17. Knowledge of Protection Systems – differential protection, eart fault protection, REFs for Transformers ,
generators. and Relays
18. Instrument and Control system Installation, testing and Commissioning.
19. HART communication.
20. DCS cabling and wiring making terminations.
21. Prepare the Test sheet and submit to Client.
22. Familiarity with equipment datasheets, specifications, can read all types of Electrical
23. drawings, schematics.
24. Prepare the electrical equipment test sheets and analyse the test data as per the standards.
25. Knowledge of International codes.
22 .Review and follow up to EPC the base construction schedule and ensure the target schedule shall be
accomplished on time.

Worked Done at Sites


o Construction and Installation of PowerTransformer, Distribution Transformer, HV
panels 6.6kV, 33kV, LT panels 415 V, DGs 6.6kV , 6.6kV Plant Motors, HVAC
motors,Normal and Emergency Lighting, battery bank, Switchgears ,415
Distribution boards, Earth electrodes, Busducts, RTCC panel, Transformer
monitoring system, SCADA panels,UPS. Installation of cathodic protection cables
,Rectifiers. Plant Cable laying for Motor loads , Transformers, DG sets, battery
banks, air fin coolers, Lighting circuits, cable routing , Glanding termination, Cable
tagings, Interconnections.Industrial lighting circuit cabling termination,Emergency
lighting. Preparation of redmarkup drawings.
o HV/MV/ Power cable,Control cable laying on cable trays, structures and
undergrounds. Supervision of making Cable joints for HV,MV and LV cables
,Glanding and Termination. Having experience in laying
6.9kV/11kV/33kV/66kV/132kV 2000kM of laying at varoius stages of
Transmission, Sub-Transmission and Distribution level. Used Horizontal drilling
machies too. HV/MV/LV cable laying under ground, structures on cable trays for
Refineries,plants, substations etc. and making connections with Power
transformers / Capacitor Banks/ 1 MVA Motors HV generators etc.
o Conducts Megger tests on Substation Cables/ plant cables for HV/ MV & LV

Page 3 of 11
switchgear, transformers, reactors, capacitor banks, UPS Motors so forth together
with safety requirements and compliance. Hands on experience on megger testing
and Hi pot test on cables. Tracing underground cable fault using fault locator.
Taking the megger values and HI pot test results for preparation of test sheets/
ICAPs as per the project standards.
o Earth pit and earth electrode installation. Hands on experience in measuring earth
resistivity and Earth pit resistance value. Taking the values and prepare earth pit
resistance and grid resistance value.
o Hands-on experience of electrical power distribution schemes and practices in MV
and HV industrial process plant.
o Erection, Pre-Commissioning and Commissioning of Power Transformer,
Distribution Transformer, Capacitor Banks, CVT, H.T and L.T Switchgears and
Motors.
 Errection, Precommissionin and Commissioning of MCC, PCC, LDB, ELDB, DC panels,
UPS panels and Distribution boards . Preparation of check sheets and filling the punch points.
 Manage a large work force including Engineers, electricians, technicians and Vendors
 Assisting the vendors in testing activities.
 Assisting the Principal designers in calculations and in design deliverables
 Assisting and managing the draughtsmen for drawing preparation.
 Erection, Cabling, Pre-commissioning and Commissioning of DG set. Assisting the vendors for
special tests. Wittnesing the test, Filling the test sheets and analyse the results.
 Hands on experience of motor test, overload relay test, overload relay settings.
 Hands on Experience in Load test of DGs and battery Banks.
 Hands on experience of Over Load Relay test for Motors. CBCT test, CT and PT test. Primary and
Secondary Injection test.
 Errection and Commissioning of HVAC Package units
 Pre-Commissioning and Commissioning of RTU panel. SCADA signal verification for substation
equipments.
 Familiarity with Relays and testing.
 Pre-Commissioning and Commissioning of HSSD panel, fire alarm panel, Gas panel. Integration of
Fire alarm system with HVAC units.
 Installation, Commissioning of SCS/RTU/ SCADA for Power system monitoring, substation
monitoring and Plant monitoring. Well versed in display build, Database build, Configuration of
alarms, Event logs.
 Hands on Experience in Pre-Commissioning and Commissioning of HVAC units equipments
Heaters, TT, PT, AHU so forth… cabling and termination of HVAC control panel. HVAC Control
Panel Philosophy check and HMI configuration.
 Errection of telephone exchange panels wiring and Commissioning of IP addressed Plant
telephone system.
 Knowledge of Electrical codes and standards, hazardous area classification and equipment
selection.
 Preparation of Red line mark up drawing.
 Carried on electrical maintenance work of Industrial Plants, Panels, transformer, motors, pumps,
HVAC system, Cables, removal of existing breaker and MMCB and its replacements. Busbar
replacements. Start-stop button switches replacements. Fixing of energy meters, power factor
meters etc.
 Making list of materials required for a maintenance work of a subsystem.

Site Management Skills:-


 To work directly with PM and with selected contractor to develop a project-specific execution
plan
 To address technical questions and to relay them to the team at SITE
 To ensure that field-safety procedures are implemented at SITE with respect to personnel

Page 4 of 11
 To develop corrective action plans (as required) to ensure successful achievement of project
cost, schedule, quality, and safety objectives
 To set-up temporary Office at SITE
 To establish and to maintain communication infrastructure (voice and data)
 To establish and to maintain the latest engineering deliverables at SITE including project
drawings, vendor data etc
 To establish and to maintain a SITE progress and inspection tracking system
 To monitor and to report progress at SITE during intervals, as agreed, with a PM
 To report project metrics like S-curve, discipline-wise progress etc
 To forecast/ identify problems (e.g. cost overruns, schedule delays, technical, contractual
etc)
 To support required project closeout procedures/ activities as related to SITE
 To advise need for discipline specialists at SITE and to co-ordinate facilities at SITE to
support the activities of these engineers so as to ensure effective use of their time while at
SITE
 To engage with third party inspection agencies as contracted by with respect to services at
SITE including assessing its performance
 To co-ordinate with PM including engagement with customer team for visits to SITE
 To create INSTALLATION Package by co-ordinating with team and with team of module
fabrication/ manufacture shop etc.
 To provide one-on-one training to new resident engineers and equipment specialists that
visit SITE

EMPLOYMENT EXPERIENCE

August2018 – till now Feedback Infra private limited ( Power and ICT expert)
Prepare and check Equipment specification, data
sheet,material requisition,drawings,design calculations, Design
basis report for power. Supervision of work execution by EPC.

March-2017- June2018 Anwesha Engineering

SENIOR ELECTRICAL ENGINEER

PROJECT:- Strategic Petroleum Reserve Vishakhapatnam /Padur


Client:- ISPRL INDIA
 Perform Supervisiory functions and exercises authority at the level established by the
management.
 Plan and Monitor the maintenance work.
 Prepare the equipment and Instruments require for the maintenance work.
 Arranging the Shutdown activities. Maintenance work for Cables, Motors, Panels and switchgears.
 Monitor the Project/Maintenance schedule regarding the electrical, instrument system.
 Vendor followups.
 Coordinate engineering details for the projects/work calculating material and equipment
requirements, preparing drawings and forwarding internal Memos to concerned departments and
contractors and follow through to construction stage.
 Manage and Coordinate site activities as per the contractual scope.
 provide technical expertise, estimating, planning, engineering, procurement, construction &

Page 5 of 11
execution, pre-commissioning through all phases of projects/maintenance work.

July 2016– January2017 Consolidated Gulf Company, Qatar - Projects Execution


Management

Senior Electrical Engineer

Brown fields
 Attended manual and e-CPW training.
 Managing Onshore QP Maintenance projects at RASLAFFAN

 Direct managing and coordination of ElectricalEngineers,Technicians.Electricians,Vendors.

 Vendor followups for HVAC equipments, ducts, Panels, fire alarms sensors.
 Assisting draftsman for the shop drawings.
 Reporting to Stakeholders Qatar Pertroleum QP
 Managing project execution in line with Company VAP.
 Day to day managing performance of the maintenance work by supervising, directing and
coordinating.
 EPIC for TOXIC GAS project by Qatar Petroleum it involves installation of Toxic Gas
Detectors electrical panels,Fire and Gas Panels, Toxic gas Sensors, HVAC
equipments, at various location in the field and buildings, installation of Fire and
Gas Panel, integration of Gas detectors with HVAC Dampers.
 Removal of Existing HVAC system and errection of new HVAC units , cable work
ducts,instruments.
 Integration of HVAC with fire and gas panel and DCS panel.
 Review the Technical Document Register (TDR) & evaluate scope of work, number of
required drawings and establish design and drafting requirements.
 Guding a team of draughtsmen for Drawing preparation.
 Preparation of Data sheet for electrical equipment and instrument.
 Preparing Method Statement of the work at site submitted for approval to the Client.
 Carrying the removal of the existing units and replacement with new installation work of
electrical equipments. Cabling, glanding and Termination work.
 Attend progress meetings.
 Review and checking of engineering layouts for Cable routing, earthing and lighting.
 Co-ordination with other disciplines for engineering inputs and changes.
 Manage the Testing and Commissioning of Electrical equipments and Instruments,
Sensors.
 Prepared red line mark up drawing.
 Coordinating vendor for Testing activities.
 Filling up the test sheets and commissioning sheets/ICAPS
 Taking Power Shut down, shutdowns of Fire Alarms Gas Alarms in own Name.

1. Motor Control Centers Ugrading and Maintenance work EPIC project of ASHGAL
QATAR :

 Engineering, and controlling the Vendors


 Prepared the method statement for the execution of the work and submit to client for
getting approval on it.
 Carried the Installation work of Desiel Generator sets, Precommissioning and Commissionin
 Taking Shut down, Replacement of existing Circuit Breakers and Busbars and Enhanced the
Capacity by replacement
 Cable laying glanding termination work. Shut down activities.
 Assisting the vendor for testing activities.
 Filling the test sheets, commissioning sheets, pucnh list.
 Linking with SCADA system and system verifications.

Page 6 of 11
August 2015 –June2016 CCTC Abudhabi

Team Leader Commissioning Engineer Electrical

 100MBD ZWSC Modification project CCTC ABUDHABI.


 WELL HEAD TOWER -1 lulu Full FIELD DEVELOPMENT PROJECT CCTC ABUDHABI
 JOPETWIL300 JACKUP BARGE MODIFICATION PROJECT CCTC ABUDHABI (MARINE)
CLIENT: ADMA-OPCO, NPCC

Responsibilities:

 Coordination with the Electrical department


 Reporting to the Project Manager, Manages and supervises the Construction, Mechanical
Completion, Commissioning.
 Manage 60+ numbers of Electricins, Technicians.
 Managing the Vendors for the Testing activities where required.
 Installation, Precommissioning, and Commissioning of Transformers(6.6kVHV and LT),6.6kV
panel,415V Panels and Distribution boards, DG sets, lighting distribution boards, MCC
panels, HVAC system structured cable trays, LT motors, cabling, interconnections, Glanding
and Termination work for transformers, switchgears,distribution boards,motors. Panel
interconnections
 Errection and Commissioning of NOVEC system , HSSD panel and systems . Sprinkler
system, Fire & Gas detection System, DCS panel installation and cabling. Public Address &
General Alarm system, IP addressed telephones, Access points, NAVTEX system, HF/MF
radio system. Quality checks for the project work.
 Errection of LDBs, PCC, Lights, HVAC motors, Power sockets, Battery banks, 6.6kV panels,
NOVEC systems, Fire alarm systems, DGs.
 Co-ordination with other disciplines for engineering inputs and changes.
 Plan and coordinate the manpower and equipment required for errection and commissioning
activities.
 Planning and Supervising the Installation work. Planning and witnessing the testing activities
carried on by the Vendors. Filling the test sheets, commissioning sheets, resolving the punch
points.
 Test the Lux level of plant building.
 Self Electrical testing of plant motors , power sockets, lighting circuits, cables, earth test,
ductor test, Distribution board tests as per the given procedures and test sheets.
 Testing of Cables , Testing of CBs, Setting of relays own hand.
 Witness testing and commissioning of all protection equipment and instruments such as
Relay, CT, VT etc.
 Witness all necessary tests and commissioning for all new/replaced/mal-operation of the
followings: protection relays, CT, VT, power transformer, capacitor bank, auto-recloser,
battery chargers, switchgears ...etc.
 Check and approve As-Built electrical drawings when required.
 Provide technical consultation & support to Client operation & maintenance departments and
other departments when required
 Liaise with other consultants/contractors for interface meetings, troubleshooting, & agree
technical reports.
 Investigate tripping incidents and comment on reports provided by Contractor.
 Check relay-setting calculation for existing and new devices.
 Revue protection scheme when required by Client.
 Comment on Fault analysis & trouble shooting made by contractor
 Filling the testing results and checking its correctness.
 Filling the Pre-commissioning and Commissioning , ICAPs/SAT procedures/check sheets.
 Get the ICAPs endorsed by the Client/ Inspector /Consultant.
 Hands on testing done for motors, transformers,cables, ductor test for the busbar

Page 7 of 11
joints. OLR relay setting, MCCB breaker setting for short circuit and Over current
setting. VCB and SF6 testing done. Also assisting the vendors for testing activities.
 DG sets testing and commissioning.
 HVAC commissioning . Air balancing, Maintaing the temperature and Pressure level checks in
rooms . Integrating the HVAC with Fire and Gas Panel and DCS system.
 Philosophy checking of the HVAC system, PLC programming for the control philosophy of
HVAC system with the vendor at site. Showing the correctness to the client on site.
 Installation of SCADA system linking SCADA system Configuration of Alarm/SOE/Event logs
of Substation equipments-- Transformers, CBs, Loads..etc.
 Attended the FAT.
 Review the commissioning related documents.

May 2013 – July 2015 IOT Infrastructure and Energy Services Limited

Senior Electrical Engineer Errection and Commissioning

 Greenfields project
 INDIAN STRATEGIC PETROLEUM RESERVES LIMITED
 Supervises the project work.
 The primary responsibility to support the Company on the interfaces with Authority
requirements within the project scope in a time line to meet major milestones defined by
project stakeholders;
 Liaise with the Local Authorities and Government organitions for various issues.
 Identify approval procedure, design instructions and project procedures; Coordination within
the Company Project team; to compile required deliverables during all phases of the project;
Provides input to the schedule, and to the project budget;
 Review vendor drawings and design calculations, ensure vendor specifications are in full
compliance with contract requirements.
 Errection of electrical equipments inside Substations and in field site. Installation of 20MVA
power transformers, 2MVA distribution transformers, 1 MVA HT motors, 415V LT motors for
different locations at site like Fire water system, Drinking water system, Crude Booster
Pumps, Crude Transfer pumps and so forth.
 Installation of capacitor banks, Busduct for connection of Transformers to panels.
 Carried Construction & Installation work of 33kV Panel, 6.6kV Panel,415V panels and DC
panels.
 Installation of 70kVA UPS, UPS panel, Battery banks for UPS and Battery banks for
Protection system.
 HVAC panel and HVAC AHU system.
 Carried Installation work of Cabling inside the substation, underground cabling and
structured cabling in field side of the entire plant.
 Carried Constrution and Installation work of Plant earthing system, substation earthing
system and Installation of earth electrodes and formation of eatrh grids for relaying and
protection. Also involve equipment earthing and Building Earthing.
 Carried the Installation work of Plant lighting, substation lightings, cable cellar lighting work.
 Installation of lighting distribution boards, inside the sustation and inside the buildings and in
the plant.
 Installation of lights on the platforms and on stacks.
 Installation of the Plant DG sets. Establising the cable connection between the DGs and the
supply panel. Connection of Battery banks to DGs. Establising the control cabling between
the supply line and DGs. Formation of separate earth pits for the DGs
 Plant cabling HT cabling, LT cabling and Control cabling.
 Supervising the Glanding and Termination work of Transformers, HT and LT motors, Pumps,
Heaters, Compressors, Panels.
 Guiding the team for making the pipe earth electrodes for substation and plant grid. Taking
the earth resistance values periodically and taking suitable measure to bring the resistivity

Page 8 of 11
value down.
 Guiding the electricians to take the megger values, winding resistance values of motors,
setting the overload relay of each motors and pumps. Doing the No load run test of motors.
Preparing the test for the motors and filling the result.
 Guiding the electricians to Test the lighting circuit and measured the LUX level and current
levels of the circuit.
 Attend progress meetings.
 Review and checking of engineering layouts for Cable routing, earthing and lighting.
 Co-ordination with other disciplines for engineering inputs and changes.
 Provide clarification, guidance and technical support to construction and commissioning
personnel.
 Prepare testing and commissioning methods as per standards and project specification, local
regulation and manufacturer recommendation.
 Under ground HV/MV/LV cabling work700kms
 Verify and Witness Testing and Commissioning of all electrical equipments such as Power
and Distribution Transformers, Vacuum circuit breaker, Air circuit breaker, GIS breaker,
HV/MV and LV switchgears, UPS panels, battery banks, battery chargers, , Electrical control
Systems, Protection and Control systems. SCADA signal cabling to RTU panel, SCADA signal
verifications for Transformers , Circiut breaker, panels…etc
 Analyse and Interpret test report to determine any acceptable and un- acceptable results.
 Provide technical assistance and resolution when electrical/technical problems encountered
during any phase of project execution.
 Collaborate with the clients for resolution of any technical problems during any phase of the
project.
 Quality checks of the Electrical construction work. Attending all the puch points related to
electrical quality. Pre-commissioning ICAPs. And Commissioning ICAPs
 Calibration of instruments and loop checking. Tubing checks.
 Conduct regular site inspection, report the findings and recommendation.
 Adhere to safety rules and regulations of the company to avoid accidents
 Carried on the Maintenance work of the Oil Terminals

February 2008 – May 2011 Rohini Industrial Electricals Limited

Senior Engineer Electrical

Bharat Oman Refineries Limited


 Project Management of the entire project during construction phase of the 132kV/ 33kV
substation for the Refinery, Managing the entire work force for the construction work of
Crude Distillation Units, Vaccum Distillation Units, Sulphur units, Diesel unit.
 Coordination of the execution work.
 Assigning work to, foremens, electricians.
 More than 150 men worked at shifts on site.
 Setting up the PTW (Permit to Work) system to carry on the construction and Commissioning
work safely.
 Coordinate swiftly execution of PTW system and reporting to the Company safety related
issues and interfaces SIMOPS complications between Commissioning and Construction
activities on site.
 Management from day to day the Look-Out and Isolation process for multidiscipline on
interfaces between Commissioning, Construction, and Functional Equipment Testing.
 Co-ordinate with engineering, support with consultant for detailed engineering, Project
Execution Plans (PEP), Order Execution Instructions (OEI) for sub contractors.
 Review SLDs, Equipment layouts.
 Attend client meeting.
 Preparation of Bill of materials for the site work.

Page 9 of 11
 Co-ordinate with planning department.
 Construction and errection of 2 numbers of 132/33kV transformer bays.
 Errection of substation equipments power Transformers20 MVA, 8 nos. of Distribution
transformers 2 MVA, 33kV, 6.9 kVSwitchgears, GIS breakers, HT and LT Motors, Lightings in
Plants and on platforms.
 Glanding and termination of Transformers, Motors, 70kVA UPS, Battery banks, 6.6 kV DGs.
 Cabling, Pre-commissioning, Commissioning and Maintenance of various Control panels,
power system equipments for crude Distillation unit, Vacuum distillation unit, Hydro cracker
Unit, Naphtha unit etc.
 Supervision of 600 kilometers of HT/LT cabling work.
 Cross checking of any mismatch in manufacturing and supplying of electrical
equipments/panel components with drawings. Preparation of lists resolution of the issues
with the client engineers and Vendors.
 Commissioning of Substation and its equipments.
 Pre-commissioning and commissioning of 33kV panels/6.6kV panels/.433kVpanels.
 Cable glanding and Termination workof HT and LT motors.
 Substation earthing, plant earthing, earth pits, lightning arrestors.
 Erection, Cabling, Pre-commissioning and Commissioning of Power transformers 20 MVA,
distribution Transformer 2000kVA, lighting transformer.
 Signal verification of SCADA SYSTEM, RTU,IED.
 Quality checks of the Electrical construction work

May 2006 – January 2008 Rohini Indutrial Electricals

Project Execution Management,Electrical Engineer.

 Reliance Refinery Jamnagar


 Responsible for Projects Execution for aspects such as discipline engineering input,
Construction, commissioning, start-up and upto final operational warranty.
 Single point responsibilities for the daily management of the assigned projects from start up
to Project Close-out;
 Responsible for Definition of Project execution strategies and development contracting out
strategies;
 Managing Company interfaces to the project with operations. Managing external interfaces
with respect to the project such as local authorities;
 Prepare project documents in accordance EPC Contract, project execution plan, instructions
to the Subcontractors.
 Perform the construction work at site in line with agreements and formalized via Work Safety
plan, Timely submission of permit requests and completing the work in line with the permits.
 Managing the preparation of EPC project deliverables; Ensure that facilities are designed
and specified such that they will be manufactured, tested and constructed in such a
manner that assures their safety, design integrity, reliability and operability with due respect
for life cycle cost considerations and in line with the TA framework;
 Monitor the overall performance of the EPC Contractor as per agreed reporting, against
agreed indicators.
 Taking approval of DCN’s (Design Change Notice) on an Order within the EPC Contract;
 Accountabilities fields to complete the project within the HSE targets of EPC, to execute
Projects in accordance with the defined strategies, to complete the project within the agreed
planning and budget, Execute the Project in line with the EPC Contract.
 Carried the maintenance work of the Plant.

July 2001- March 2006 Talupula Engineering

Project Management field construction, Commissioning

Page 10 of 11
Site Engineer,

Madhya Pradesh power Generation Company 2* 250 MW steam power Plant


 Line up the deliverables and submittals
 Lineup the contractors for day to day activities.
 Liaise with the authorities.
 Managing from day to day Start-Up activities of site execution and commissioning activities
of power plant projects
 Errection of site equipments and cabling work. Managing the vendors rfor erection and
testing activities.

 Glanding and Termination work of equipments.
 Making Interconnections of panels and control panels
 Fixing of various types of instruments.
 Checking the signals and its correctness.
 Assisting in Commissioning activitiess.

Computer Literate: Excellent in MS-WORD, MS-Project and Primavera


Good Knowledge of oral and written English.
Good Managment skills.
M.Tech (Electrical Power System Engineering)
B.tech Electrical -2001

Page 11 of 11

Вам также может понравиться