Template Instructions
1 For Reference PFMEA press option 1.
For Process / Product application press option 2. to expand the full PFMEA
2 columns.
Qua
Version Control
GPO
Date Who GPO Notes R McIntyre
Export Control
Jurisdiction Classification Date
(Rating)
UK Not Listed 22-Jan-18
This document and the information embodied herein is the property of and proprietary to
Rolls-Royce Corporation, and shall not, without prior written permission of Rolls-Royce
Corporation, be used or disclosed in whole or in part to third parties. This legend shall be
included on any reproduction of this document in whole or in part.
Rated by
P Morrell
Requirements (Product
Potential Failure Mode Potential Cause(s) of Failure Control (Prevention) Control (Detection)
Characteristics)
Robust process control detailing the number of Post process visual inspection and laboratory
Inconsistent process / wrong calculations
passes required. inspection
Coating too Dense Detailed checks in data card Post process hardness test and laboratory
6.3.0.4 Coating porosity Spray distance too short
inspection
Powder feed rate checks Post process hardness test and laboratory
Feed rate too low
inspection
For robot controlled process use confirmation code Post process hardness test and laboratory
Incorrect parameters used to allow process to proceed. inspection
Coating too Porous Feed rate too high Powder feed rate checks Post process hardness test and laboratory
inspection
Incorrect parameters used For robot controlled process use confirmation code Post process hardness test and laboratory
to allow process to proceed. inspection
Spray distance too long Detailed checks in data card Post process hardness test and laboratory
inspection
Requirements (Product
Potential Failure Mode Potential Cause(s) of Failure Control (Prevention) Control (Detection)
Characteristics)
Coating too Hard Incorrect parameters used For robot controlled process use confirmation code Post process hardness test and laboratory
6.3.0.5 Coating hardness to allow process to proceed. inspection
Excessive oxide content Data card / process control Post process hardness test and laboratory
inspection
Feed rate too low Powder feed rate checks Post process hardness test and laboratory
inspection
Maintenance of assets / consider effect of changes Post process hardness test and laboratory
Atmospheric conditions in conditions inspection
Batch acceptance testing of powder Post process hardness test and laboratory
Powder drift
inspection
Coating too Sof Incorrect paarmeters used For robot controlled process use confirmation code Post process hardness test and laboratory
to allow process to proceed. inspection
Data card / process control Post process hardness test and laboratory
Excessive Unmelted particles
inspection
Excessive porosity Data card / process control Post process hardness test and laboratory
inspection
Batch acceptance testing of powder Post process hardness test and laboratory
Powder drift
inspection
Maintenance of assets / consider effect of changes Post process hardness test and laboratory
Atmospheric conditions in conditions inspection
Requirements (Product
Potential Failure Mode Potential Cause(s) of Failure Control (Prevention) Control (Detection)
Characteristics)
Geometrical considerations Appropriate process instructions Post process inspectionand laboratory inspection
Consumable checks
Contamination Robust Powder handling procedure Post process inspectionand laboratory inspection
Appropriate masking
Overspray Appropriate data card instructions Post process inspectionand laboratory inspection
Appropriate cleaning / fettling
Appropriate data card instructions
Correct Measurement / coating calculation
Coating locally too thin / thick Appropriate process control Post process inspectionand laboratory inspection
Powder feed checks
Appropriate packaging
Component handling Appropriate instructions Post process inspectionand laboratory inspection
Appropriate training
Damage during masking removal Appropriate masking technique. Post process inspectionand laboratory inspection
Staining. Appropriate processes and control Post process inspectionand laboratory inspection
Requirements (Product
Potential Failure Mode Potential Cause(s) of Failure Control (Prevention) Control (Detection)
Characteristics)
Coating cracked - when not by design See 6.3.0.5 Coating Hardness Post process inspection and laboratory
6.3.0.7 Coating Cracking Coating too hard
inspection
Coating oxide content too high Incorrect parameters used For robot controlled process use confirmation code
6.3.0.8 Coating Oxide to allow process to proceed. Post process laboratory inspection
Powder drift Batch acceptance testing of powder Post process laboratory inspection
Coating oxide content too low Incorrect parameters used For robot controlled process use confirmation code
to allow process to proceed. Post process laboratory inspection
Powder drift Batch acceptance testing of powder Post process laboratory inspection
Poor injection conditions Asset care Post process laboratory inspection
Requirements (Product
Potential Failure Mode Potential Cause(s) of Failure Control (Prevention) Control (Detection)
Characteristics)
Incorrect Coatings deposited Robust Powder handling procedure Post process laboratory inspection and possibly
6.3.0.9 Correct Coating Mis labelled powder Clear labelling final visual inspection
Robust Powder handling procedure Post process laboratory inspection and possibly
Wrong hopper used Clear labelling final visual inspection
Appropriate data card checks Post process laboratory inspection and possibly
Data card wrong
final visual inspection
For robot controlled process use confirmation code Post process laboratory inspection and possibly
Wrong programme selected to allow process to proceed. final visual inspection
Robust Powder handling procedure Post process laboratory inspection and possibly
Hopper topped up with wrong powder Clear labelling final visual inspection
Robust approval Post process laboratory inspection and possibly
Interstage drawing wrong
final visual inspection
Requirements (Product
Potential Failure Mode Potential Cause(s) of Failure Control (Prevention) Control (Detection)
Characteristics)
6.3.0.10 Coating Un-melted Particles (un- UMP too high Incorrect parameters used For robot controlled process use confirmation code Post process laboratory inspection and possibly
reacted and non flattened) to allow process to proceed. final visual inspection
Batch acceptance testing of powder Post process laboratory inspection and possibly
Powder drift
final visual inspection
under heating of the powder by poor injection Appropriate asset care Post process laboratory inspection and possibly
conditions Automate cooling sources final visual inspection
UMP too low Incorrect parameters used For robot controlled process use confirmation code Post process laboratory inspection and possibly
to allow process to proceed. final visual inspection
Batch acceptance testing of powder Post process laboratory inspection and possibly
Powder drift
final visual inspection
Over heating of the powder by poor injection Appropriate asset care Post process laboratory inspection and possibly
conditions Automate cooling sources final visual inspection
Requirements (Product
Potential Failure Mode Potential Cause(s) of Failure Control (Prevention) Control (Detection)
Characteristics)
Too much Process parameters incorrect. Data card / process control Post process laboratory inspection and possibly
6.3.0.11 Other phases Poor consumable control final visual inspection
Too little Process parameters incorrect. Data card / process control Post process laboratory inspection and possibly
Poor consumable control final visual inspection
Poor distribution Process parameters incorrect. Data card / process control Post process laboratory inspection and possibly
Poor consumable control final visual inspection
Contamination Process parameters incorrect. Data card / process control Post process laboratory inspection and possibly
Poor consumable control final visual inspection
Cause Description
Carrier gas leak, blocked injector, incorrect
Spray stream location changed
injector
Masking tape lifting / metal masking moving
Ineffective masking
during spraying / no masking / wrong masking
Poor initial cleaning regime
Contamination Failure to follow cleaning process
Failure to protect cleaned surface
Exhaust airflow, cooling conditions, outside
Atmospheric conditions
temperature etc.