Cameron Mudline

Suspension System
Centric 15 Mudline Wellhead System

Key features make the The Cameron Centric 15 Mudline Suspension


System is a proven, dependable system for
patented Cameron Centric 15
drilling, temporary abandonment and produc-
and Centric 15 EX Mudline tion tieback operations.
Suspension Systems the most System Features
economical, dependable mudline ¥ Deep stack-down configuration eliminates
trash/debris traps and improves the reliability
equipment on the market today. and efficiency of tieback operations.
Every Centric 15 and Centric ¥ Separate thread and seal areas for running
and tieback minimize the risk of damage to
15 EX system comes with the fol- critical areas.
lowing features - each designed ¥ High-pressure and high casing hanger load
capacities increase system versatility.
to improve performance and
¥ Patented washout technique for large diame-
enhance reliability: ter casing strings eliminates pipe rotation.
¥ Washout is possible with conductor set in
• Stack-Down Configuration
tension.
• Patented Wash Sleeve Design ¥ Unique split-ring design prevents damage to
cage during compression in wellhead, accom-
• Separate Running/Tieback
modates debris and provides two point
Threads centralization.
¥ All threads prealign to facilitate installation
• Prealigning Threads
and tieback.
Throughout ¥ Split ring hanger reciprocation is achieved

• Stab-In and Threaded Tieback without recovery for resetting.


Options Installation Features
• Metal Sealing ¥ All running tools feature right-hand release
for ease of abandonment.
• High Pressure System ¥ All hangers incorporate dual centralization to
Available as Standard ensure concentricity.
¥ Washout ports located in the running tools.
¥ Low torque metal seals with resilient backup
In addition, the Centric 15 ensure seal integrity.
¥ External test ports for hanger/running tool
system offers the following
interface provide means for testing prior to
options: installation.
¥ Torque tool profiles in all running tools.
• Dual Centralization
• Tieback Testing Capability
Temporary Abandonment Features
¥ A single temporary abandonment cap covers
• Positive Hanger Lock-Down both production bore and annulus, locking the
hangers in place.
• Annular Sealing TA Caps
¥ Cap can be run and retrieved inside surface
casing.
¥ Single-trip cap design saves a trip during
Compare, feature for feature,
installation and retrieval.
you will see that Cameron’s ¥ Stab-in temporary abandonment caps

Centric 15 and Centric 15 EX standard.


¥ Handling profile extended for clear access.
Mudline Suspension Systems are
Tieback Features
your best choices for drilling, ¥ Robust threads ensure damage-free
temporary abandonment and connection.
¥ Right-hand make-up for tieback tools ensures
production tieback operations at ease of installation.
the mudline. ¥ Torque profiles available in tieback tools.
¥ Low torque metal-to-metal seals with resilient SD016628
back-up ensure sealing integrity.
¥ Ability to tieback to the 13 3/8Ó casing prior to
removing cap ensures safety, saves rig time.

2
Washout Procedure

The Cameron Centric 15 With more flexible casing


Mudline System incorpo- strings that are less prone to
rates a patented washout high manipulating torque,
technique which eliminates washout ports on the surface
the need to rotate the casing. and production string run-
In this system, a washsleeve ning tools are opened by
in the running tool can be rotating the casing. The
opened and closed using a ports are designed to ensure
torque tool run as part of the cleaning action.
cement stinger. Since the
sleeve is not affected by riser
bending loads, it can be
operated at all times using
low torque rates. Also, the
washports can be opened
with the cement string in
place, minutes after comple-
tion of cementing.

SD016675

Split Ring Mudline Hanger Engagement Sequence

Hanger Split Landing Ring Split Landing Ring Sets Hanger


Running Through Engages Receiving and Setting Lands on
Casing Hanger Profile Ring Engages Load Ring

SD016624

1. Hanger is inserted through 2. Split ring arrives at hanger 3. Split ring lands in hanger 4. Hanger seats on split ring; setting
wellhead into casing. Split ring profile where it easily expands prior to hanger suspension ring is forced into fully expanded
is retracted. Setting ring and prior to landing. on load ring. position. Hanger is suspended
fluted hanger section prevent parallel to the receiving profile.
presetting.
3
Mudline Liner Hanger Temporary Abandonment Cap

A mudline hanger is used to The Centric 15 temporary


suspend casing strings which abandonment cap protects the
will not be tied back to the casing hangers and tieback
surface during tieback opera- profiles from the environment
tions. This option allows during the abandoned period.
operators the flexibility of It is installed in the production
installing additional strings string mudline hanger sealing
of casing as needed without that bore and the next casing
the need for additional risers annulus. The cap is engaged in
to surface and the handling the 9 5/8Ó hanger with a stab-
time associated with surface type threaded ring and locks
wellhead equipment. itself in the 13 3/8Ó hanger with
a device activated by the down-
ward motion of the cap. During
recovery, trapped pressure can
be vented and its source identi-
fied. Other caps and trash
covers are available for larger
hangers.

SD016622

Tieback Methods

Threaded Tapered Stab-in

SD016629

SD016618

The Centric 15 System uses threaded or stab-in type tieback connections


on the smaller sizes and tapered threads on larger sizes where maximum
bending and tensile forces are exerted. Tieback threads and seal areas
are not used during drilling and abandonment.

4
Centric 15 EX Mudline Wellhead System

The Cameron Centric 15 EX Mudline Suspension


System is an economical, stack-down system. Its
configuration is based on the Centric 15, but a
shorter profile makes it ideal for exploration
applications.
System Features
¥ Stack-down configuration eliminates
trash/debris traps and improves the reliability
and efficiency of tieback operations.
¥ Separate thread and seal areas minimize
possibility of damage to critical areas.
¥ High-pressure and high casing hanger load
capacities increase system versatility.
¥ Optional patented washout technique for large
diameter casing strings eliminates pipe
rotation.
¥ Unique split-ring design prevents damage to cage
during compression in wellhead, accommodating
debris and provides two point centralization.
¥ All threads throughout the system prealign to
ensure precise installation and tieback.
¥ Split ring hanger reciprocation is achieved without
recovery or resetting.
Installation Features
¥ All running tools feature right-hand release for
ease of installation.
¥ Hangers can incorporate dual centralization to
ensure concentricity.
¥ Washout ports are located in the running tools.
¥ Low torque metal seals with resilient backup
ensure seal integrity.
¥ External test ports for hanger/running tool
interface provide means for testing prior to
installation.
Temporary Abandonment Features
¥ A temporary abandonment cap covers the
production bore and incorporates a simple
check valve.
¥ Threaded cap design standard. Optional stab-in
design available.
¥ Pressure retaining or vented cap designs
available.
¥ Handling profile extended for clear access.

Tieback Features
¥ Robust threads ensure damage-free connection.
¥ Right-hand make-up for surface and
production tieback tools ensures ease of
installation.
¥ Torque profiles available in tieback tools.
¥ Low torque metal-to-metal seals with resilient
back-up ensure sealing integrity.

SD016627

5
Washout Procedure

The Cameron Centric With more flexible casing


15 EX Mudline System incor- strings that are less prone to
porates the option of a high manipulating torque,
patented washout technique washout ports on the surface
which eliminates the need to and production string run-
rotate the casing. In this ning tools are opened by
system, a washsleeve in the rotating the casing. The
running tool can be opened ports are designed to ensure
and closed using a torque cleaning action.
tool run as part of the cement
stinger. Since the sleeve is
not affected by riser bending
loads, it can be operated at
all times using low torque
rates. Also, the washports
can be opened with the
cement string in place
minutes after completion
of cementing.

SD016625

Split Ring Mudline Hanger Engagement Sequence

Hanger Split Landing Ring Split Landing Ring Sets Hanger


Running Through Engages Receiving and Setting Lands on
Casing Hanger Profile Ring Engages Load Ring

SD016624EX

1. Hanger is inserted through 2. Split ring arrives at hanger 3. Split ring lands in hanger 4. Hanger seats on split ring; setting
wellhead into casing. Split ring profile where it easily expands prior to hanger suspension ring is forced into fully expanded
is retracted. Setting ring and prior to landing. on load ring. position. Hanger is suspended
fluted hanger section prevent parallel to the receiving profile.
presetting.
6
Mudline Liner Hanger Temporary Abandonment Cap

A mudline hanger is used to The temporary abandonment cap


suspend casing strings which protects the casing hangers and
will not be tied back to the tieback profiles from the environ-
surface during tieback opera- ment during the abandonment
tions. This option allows period. It is installed in the pro-
operators the flexibility of duction string mudline hanger
installing additional strings and seals that bore. The cap is
of casing as needed without engaged in the 9 5/8Ó hanger run-
the need for additional risers ning thread profile with either
to surface and the handling threaded or stab-in action. Other
time associated with surface caps and trash covers are avail-
wellhead equipment. able for larger hangers.

SD016622

Tieback Methods

Threaded Tapered Stab-in

SD016626

SD016619

The Centric 15 EX System uses threaded or stab-in type tieback


connections on the smaller sizes and tapered threads on larger
sizes where maximum bending and tensile forces are exerted.
Tieback threads and seal areas are not used during drilling and
abandonment.

7
MX Subsea Tree

T he MX subsea tree has been


developed as a simple production
system that can be economically
installed on a mudline well from
a jack-up rig. This system uses
diver assistance to minimize cost
and complexities and is very suit-
able for shallow water production
projects.
Features
¥ Flexible system can be installed
over Cameron and other mud-
line products.
¥ Offers minimum cost and low
maintenance.
¥ Tree designs are available for
single or multiple string comple-
tions.
¥ Reliable and field-proven fail
safe gate valves are available in
either a stacked or composite
valve block configuration.
¥ Tree design offers the option of
completing inside 9 5 Ú8" or 7"
casing.
¥ Primary metal-to-metal seals
are used at all environmental
interfaces.
¥ Tree features a self-orienting
tubing hanger with positive
lockdown and anti-rotation
capabilities.
¥ SCSSV lines are independently
controlled.
¥ Tree can be readily maintained
with diver assistance.
SD016673

8
Centric 15 and 15 EX Capacity Charts

Centric 15 Capacity Chart


30” x 20” x 13 3/8” x 9 5/8” x 7” Casing Program

System Variables 30” Hanger 20” Hanger 13 3/8” Hanger 9 5/8” Hanger 7” Hanger
Hanger Type n/a Load Shoulder Load Shoulder Split Ring Split Ring
Service Standard Standard H2S or Standard H2S or Standard H2S or Standard
Min I.D. (in.) 26.25 17.58 12.31 8.803 6.115 (5)/5.905(6)
Max O.D. (in.) 30.30 27.25 18.51 12.23 8.375
Recommended Bit (in.) 26 17 1/2 12 1/4 8 3/4 6 1/8 (5)/5 7/8 (6)
Pressure Rating (psi) n/a 4,020 H2S 9,470 H2S 11,840 (2) H2S 10,610 (5)
Std 10,660 H2S 10,160 H2S 13,340 (6)
Std 13,320 (2) Std 11,940 (5)
Std 11,430 Std 15.010 (6)
Rated Hanging H2S 2,461,000 (1) H2S 1,504,000 H2S 623,000
Capacity (lb) n/a 3,282,000 Std 2,769,000 Std 1,692,000 Std 701,000
Flow-By Running (in.2) n/a 81.90 21.70 9.90/6.61 (3) 4.70/2.6 (4)
Flow-By Landed (in.2) n/a 48.10 14.40 10.3 4.30
Particle size (in.) n/a 1.75 0.88 0.38 0.38
Axial Capacity (lb) H2S 2,165,000 .(1) H2S 1,534,000 H2S 531,000 (5)
(running) n/a 2,422,000 Std 2,436,000 Std 1,726,000 H2S 689,000 (6)
Std 597,000 (5)
Std 776,000 (6)
Thread Type 3 TPI Mod. 3TPI Mod. 3 TPI Mod. 3 TPI Mod.
(left or right hand) n/a Square Thread, Left Square Thread, Left Square Thread, Left Square Thread, Left
Number of Turns
to Full Engagement n/a 7 13 13 13
Number of Turns to 7
Expose Washout Ports n/a (Washout Sleeve) 8 8 7

(1) Hanger body only for H2S service (4) Flow-By areas are for running through 32lb/53lb - 9 5⁄ 8" casing
(2) High pressure system locates washout ports in hangers to enable true metal seal (5) For use with 20lb/29lb - 7" casing
(3) Flow-By areas for running through 48lb/72lb - 13 3⁄ 8" casing (6) For use with 32lb/38lb - 7" casing

Centric 15 EX Capacity Chart


30” x 16” x 10 3/4” x 7 5/8” Casing Program

System Variables 30” Hanger 16” Hanger 10 3/4” Hanger 7 5/8” Hanger
Hanger Type n/a Load Shoulder Split Ring Split Ring
Service Standard Standard H2S or Standard H2S or Standard
Min I.D. (in.) 20.12 14.99 10.04 6.80
Max O.D. (in.) 30.30 21.13 14.50 9.50
Recommended Bit (in.) 20 14 3/4 9 7/8 6 3/4
Pressure Rating (psi) n/a 6900 H2S 11,300 H2S 10,000
Std 12,800 Std 11,252
Rated Hanging H2S 1,520,000 (3) H2S 926,710
Capacity (lb) n/a 2,897,000 Std 1,710,000 Std 1,042,550
Flow-By Running (in.2) n/a 265 11.90/10.50 (1) 6.1/4.8 (2)
Flow-By Landed (in.2) n/a 24 15.40 5.50 (2)
Particle size (in.) n/a 1.25 0.50 0.38
Axial Capacity (lb) H2S 2,146,000 (3) H2S 926,710
(running) n/a 2,910,000 Std 2,415,000 Std 1,042,550
Thread Type 4 TPI Tapered 3 TPI Mod. 3 TPI. Mod.
(left or right hand) n/a Thread, Left Square Thread, Left Square Thread, Left
Number of Turns
to Full Engagement n/a 2-1/2 13 13
Number of Turns to
Expose Washout Ports n/a n/a 8 8

(1) Flow-By areas are for running through 65 lb/84lb 16" - casing
(2) Flow-By areas are for running through 32.75lb/60lb - 10 3⁄ 4" casing
(3) Hanger body only for H2S service

Other programs available upon request.

9
Western Hemisphere
Cameron
PO Box 1212
Houston Texas 77251-1212
Tel 713 939 2211
Fax 713 939 2620
http://www.camerondiv.com

Eastern Hemisphere
Cooper Cameron (U.K.) Ltd.
5 Mondial Way
Harlington
Hayes UB3 5AR
Tel 44 181 9901800
Fax 44 181 9901888
http://www.camerondiv.com

Asia Pacific/Middle East


Cooper Cameron (Singapore) Pte. Ltd.
No. 2 Gul Circle, Jurong Industrial Est
Locked Bag Service No. 3
Jurong Town Post Office
Singapore 2262
Republic Of Singapore
Tel 65 8613355
Fax 65 8616197
http://www.camerondiv.com

© Cooper Cameron Corporation, Cameron Division, Printed in USA, 12/97, TG/7.5M, WR6415/TC1256

Вам также может понравиться