SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT

1 External Graffi Repair of damaged areas

2 Internal Graffi Repair of damaged areas

3 Internal flooring (Floor Tiles) Shall be cleaned properly

4 Toilet and kitchen area tile work Shall be cleaned properly

5 Marble for Kitchen slab and door steps/threshold Edges shall be round properly and polished
Proper cleaning required and gasket shall be fixed on inner
6 windows and ventilator installation
face for waterproofing
7 Door frames Cleaning & polish final coat required

8 Door Shutters Cleaning & polish final coat required


1: Repair of Shutters and alignment
9 Kitchen Cabnets
2: Proper plaster required in floor mounted cabnets
10 Wooden carving sections 15" x 15" on external façade Polish final coat required

11 Paint work Repair in Washrooms & Final coat in Store Room

12 Toilet signage plates Shall be fixed properly

13 External steps and Plinth protection Clenaing required

14 Rockery on front side of the restaurant Crush to be filled

15 Electrical Wiring, Telephone cable and TV cable wiring Minor repairs & tests required

16 Electrical switch board and lights installation Minor connection settings required
Galss is brocken need to be fixed, All connection need to be
17 Electrical DB checked & Tags must be palced on each breaker plus testing
required
1: Proper cleaning of all fixtures
2: Basin mixtures shall be replaced as chrome is damaged
18 Internal Plumbing work in toilets and Kitchen
3: White cement shall be filled around basin stands and
comodes

19 External plumbing works

20 Rain water pipes To be fixed properly

21 Vent pipes Shall be fixed properly & Cowels shall be fixed

22 Gas pipe line Testing required


Roof Khurra shall be completed as per drawing & Joint of
23 Roof treatment rainwater pipe with parapet wall shall be filled with cement
sand mortar properly
24 Bottom khurra below rain water pipe Shall be constructed as per drawing
Inner plaster shall be done properly and Covers shall be
25 Construction of man holes and gully traps
fixed properly
26 External hard lanscaping and plinth protection Crackes in palster and concrete shall be repaired properly

27 Fiber shed over toilet ventilator Silicone shall be filled in gaps

28 MS Grill Ventilator in Store & Kitchen To be Fabricated & fixed

29 Shed over Ventilators Concrete Shed to be constructed

30 Gyser To be purchesd and installed

31 Valve on toilet supply line Seprate gate valve shall be installed in toilet Hot & Cold lines