Title: Building Of Storage Room

Type: Building Plan

Number Of Beneficiaries Approximately 2500+ Students & Teachers

Location Of Beneficiaries Agusan National High School

Project Duration School Year 2017-2018

Area Of Project Agusan National High School – Senior High Building

Budget Requirements - STORAGE BUILDING

Budget Requested –
B. In Agusan National High School – Senior High Building there are many faulty chairs, table, storage box
and even used up projects just placed on the side of the rooms. These objects occupy spaces are
nuisance to students. For example, there is a role play practice supposed to perform over 15 minutes
and the room has a maximum capacity of 50 students, but instead the room can only accommodate up
to 35 students, the remaining 15 students have no choice but to practice outside of the room and
imagine even worse if they practiced outside of the room and many students pass by, this will be a
hindrance for their role play or they might not able to perform their role play as well.

These objects can’t be just thrown away, they may be used in the future. Faulty chairs, table and storage
box can be repaired, but for now it’s a waste of time to repair it while already having a large of number
of it than it should be. Since there are some complications that some chairs, end up being destroyed
after the school year, vacation will be the right time to repair those chairs to fill up insufficient chairs.
Used up projects can’t be just thrown away too, it can be an authentic example for the next students to
give them an idea what to do and maybe even to improve it.

C. To provide a proper storage for unwanted items for future use and to utilize space for its intended
purpose. It also aims to establish school’s cleanliness.

D. Expected outcome will be a storage room to pile up the things that may be used in the future. More
likely to move freely or unhampered use of the area. In addition, it would be a soothing effect for both
students and teachers.
E.

# Risk Description Probability Severity Actions to Minimize


Risk
1. Construction Risk
1.1 Availability Inadequate materials. Materials Moderate Major Examine the availability
of Resources may be already defective or of materials that will be
unavailable. needed.

1.2 Accidents Accidents that may happen Moderate Minor/Major Be careful and wear up
while making the proposed safety gears.
plan. (Such as getting hit in the
thumb while hammering nails,
falling debris, and so on)
F.

Key Team Members Role Key Responsibilities


TBD Project Engineer Develop project plan; manage
budget & schedule; issue status
reports; organize team
TBD Foreman Does the work while project
engineer is away; manage
workers; collaborate with
clients; suppliers and other
stakeholders to ensure all
aspects of the projects
proceeded as planned; read
blueprints and constructions,
maintain equipment and manage
paperwork.
TBD Electrician Install wiring, control, and
lighting systems
TBD Tinsmith(s) Install roof cover
TBD Carpenter(s) Follow blueprints and building
plans to meet the needs of
clients; install structures and
fixtures, such as windows and
molding; measure, cut, or shape
wood, plastic, and other
materials
TBD Mason(s) Mixes mortar; lays bricks and
stones
TBD Welder(s) Fabricate and assemble metal
structures and equipment
TBD Steel Worker(s) Install iron or steel girders,
columns, and other construction
materials to form buildings,
bridges, and other structures
TBD Laborer(s) Perform tasks involving physical
labor at construction sites; may
operate hand and power tools of
all types: air hammers, earth
tampers, cement mixers, small
mechanical hoists, surveying and
measuring equipment, and a
variety of other equipment and
instruments
Task Responsible Estimated time to be finished
Design Project Engineer
Render status Report Project Engineer
Recruit skilled workers Project Engineer / Foreman
Get Building permits Project Engineer
Project Implementation
Layout of the storage room Project Engineer Within 1-2 days
Excavation for structures Laborers Within 2 days
Perform steel works Steel Worker Within 2 days
Pouring of concrete for footings Laborers, Carpenters & Foreman Within 3-4 days
& columns
Zocalo walling Masons, Laborers & Foreman Within 2 days
Backfill Laborers Within 4 days
Concrete flooring Masons & Laborers Within 1-2 days
Pile concrete hollow blocks for Masons Within 10 days
walling
Roof framing Welders Within 4 days
Install roof cover Tinsmith Within 2 days
Install ceiling Carpenter Within 3 days
Finishing of walls Masons Within 10 days
Install door panels & windows Carpenter Within 5 days
Install electrical wirings & Electrician Within 2 days
lighting systems
Storage Room Within a 35-40 days
Materials & Machineries Cost
Pails
Hammer
Shovel
Welding Machines
Cement
Hollow blocks
Steel bars
Tire wire
Electrical wirings & fixtures
Lumber
Plywood
Nails
Angular bars
C_purlins
Welding rod
GI Sheets
Tex screw
Ratters
Ratter Hardware
Glass Jalousies
Door Panel
Door Knob
Hinges

Estimated Project Cost ₱235,750.00